Al Jazeera Asphalt Plant
Al Jazeera Asphalt Plant
1 GENERAL ...................................................................................................... 2
nt
1.1.13 Job Conditions 8
1.1.14 Approved Manufacturers 8
la
1.1.15 Approved Installation Subcontractors 8
tP
1.1.16 Spare Parts and Tools 8
1.1.17 Software al 8
1.2 PRODUCTS ................................................................................................... 9
ph
1.2.1 Materials 9
1.2.2 Structural Steel Fabrications 9
As
1.2.3 Mountings 9
1.2.4 Instrument Identification 10
1.2.5 Electronic Equipment 10
a
1.2.13 Manifolds 11
1.2.14 Painting and Protective Coatings 11
1.2.15 Electrical 11
1.2.16 Process Connections 12
1.3 INSTALLATION ........................................................................................... 12
1.3.1 Inspection 12
1.3.2 Preparation of Installation Areas 12
1.3.3 Installation and Supervision 12
1.3.4 Instrument Calibration 13
1.3.5 System Validation 13
1.3.6 Commissioning 14
1.3.7 Final Acceptance 14
1.3.8 Commissioning Assistance 14
1.3.9 Instruction and Training of The Owner's Personnel 14
1.3.10 Specialised Training Programme for Owner‟s Personnel 14
QCS 2014 Section 10: Instrumentation Control Page 2
Part 01: General
1 GENERAL
1.1 GENERAL REQUIREMENTS
1 This Part covers the general requirements for design, supply, installation and commissioning
of all instrumentation, control and automation (ICA) systems complete in every detail as
specified in the other Parts of Section 10.
2 The complete ICA system, shall be furnished by a single ICA Subcontractor to ensure system
uniformity, subsystem compatibility and co-ordination of all system interfaces. Deviations
shall be as specified in the Project Specification or approved by the Engineer.
1.1.2 Scope
1 Provide all tools, equipment, materials, and supplies and perform all labour required to
complete the supply and installation, including all instrumentation signal and power conduit
nt
and wiring not specifically shown on the electrical drawings, validation, start-up and
commissioning of a complete and operable ICA system as indicated in the Project
la
Specification.
tP
2 Provide all the necessary equipment components and interconnections and the services of
the manufacturers, engineering representatives for the engineering, implementation,
al
commissioning, operation, and instruction, to ensure that the Owner receives a completely
integrated and operational ICA system as herein specified.
ph
This Section
Part 2, General Telemetry/SCADA
Part 3, Primary Elements
a
Section 8, Sewerage
Section 9, Mechanical and Electrical Equipment
Ja
1 The standards referred to for Manufacturers quality procedures and documentation are:
ASTM A123, A386......Galvanizing
ASTM A36, A500, A501, A570, A618, Structural steel shapes
1 Contractor's attention is directed to the fact that the ICA system as specified in these ICA
Parts of Section 10 is an integrated system, and therefore shall be provided by a single
competent, qualified instrumentation Subcontractor (hereinafter referred to in these ICA
Sections as the ICA subcontractor) who shall have total responsibility for the ICA work of this
Section. Entire system installation including calibration, validation, commissioning,
operational testing, and training shall be performed by qualified personnel, possessing all the
necessary equipment and who have had experience performing similar installations. The
system shall be integrated using the most modern and proven design and shall, as far as
practical, be of one manufacturer. Overall system performance shall be guaranteed by the
ICA Subcontractor.
2 The Contractor shall appoint a qualified ICA Subcontractor who shall perform the work under
this ICA Section, the Contractor shall be fully responsible at all times for the conduct and
performance of the appointed ICA Subcontractor. Although many references made herein
are to work requirements and responsibilities of the ICA Subcontractor such references shall
nt
only mean that responsibility shall pass through the ICA Subcontractor but in the final
analysis shall rest with the Contractor.
la
3 The ICA Subcontractor shall be responsible for the correct installation of all hardware and
tP
systems specified in this ICA Section. Certain primary elements, final control elements, etc.,
although provided as part of this Section, shall be installed in the process lines under other
Sections of these Specifications; however, this installation shall be under the direct
al
supervision of the ICA Subcontractor.
ph
4 The ICA Subcontractor shall be responsible to see that all components of the instrumentation
system, including primary measuring, indicating, transmitting, receiving, recording, totalising,
As
controlling, and alarming devices and all appurtenances, are completely compatible and shall
function as outlined and he shall furnish and install such additional equipment, accessories,
etc. as are necessary to meet
a
er
1 The Contractor shall arrange a meeting between the ICA Subcontractor and the Engineer
within sixty (60) days after award of the Contract for a detailed discussion and verification of
the ICA Subcontractor's system engineering methods and equipment and to generally
Ja
provide a framework for communication and co-ordination. This meeting shall be attended
by ICA Subcontractor, Contractor and the Engineer.
Al
1.1.6 Submittals
1 Submittals and approvals schedule shall generally be as specified under Section 9, Part 1,
Clause 1.1.4. All items proposed for this section shall be listed. Items shall be identified by
tag number, description, function, manufacturer, model number, descriptive literature and
statement as to whether items is “as specified or equivalent”. Logic diagrams and flow charts
illustrating the process control philosophy, shall be provided.
2 Shop Drawings. Before proceeding with any manufacturing, submit shop drawings for
approval in complete bound sets indexed by specification number. Describe the items being
submitted. Manufacturer's specification or data sheets shall be clearly marked to delineate
the options or styles to be furnished. Submit only complete systems, not pieces of equipment
from various systems.
(a) show dimensions, physical configurations, loop diagrams and cable termination
schedules
QCS 2014 Section 10: Instrumentation Control Page 4
Part 01: General
(b) submit fabrication drawings, nameplate legends, and control panel internal wiring and
piping schematic drawings clearly showing all equipment and tag numbers on all
panels
(c) submit panel graphic drawings where applicable. Include material specifications lists
where applicable. Include a draft of the theory of operation for all relay or PLC logic
circuits and analogue control loops
(d) Process and Instrumentation Diagrams. Prepare and submit instrumentation loop
diagrams for all work included in the ICA Sections in accordance with BS 1646.
3 Within 90 days from the start of the Contract, submit an "Equipment Specification Data" form
for each item of equipment which shall summarise the specification features as called for in
these Specifications and include such other necessary data as would provide a complete and
adequate specification for reordering an exact duplicate of the original item from the
manufacturer at some future date. The assigned tag numbers and manufacturer's part
numbers shall be included but will not be considered as a substitute for any of the required
statement of specifications. More than one tag numbered item may be included on a sheet.
nt
4 Operation and Maintenance Manuals and Instructions. Furnish instruction manuals and part
lists for instrumentation equipment provided under the ICA sections. Obtain distribution
la
method instructions from the Engineer.
tP
(a) schedule. Deliver two (2) copies of manuals 60 days before commencing the Site
Acceptance Tests. After installation is complete, update the manuals to reflect any
al
changes which occurred during installation and deliver the remaining three copies of
manuals to the Engineer immediately after the Site Acceptance Test. The manuals
ph
shall be in English.
(b) manuals shall be contract specific, and be fully indexed and sectioned, for allocation
As
and distribution to the specialist staff involved on the particular plant and equipment
(c) where several sub-contractors and manufacturers have supplied equipment the
Contractor shall, if required by the Engineer provide a complete integrated manual
a
(d) manuals shall be provided in durable hard cover backed A4 sized loose-leaf four ring
ze
binders. Lever arch binders are not acceptable. The full project title shall appear on
the cover and spine
Ja
(e) the manuals shall enable the client to safely operate and maintain all parts of the works
(f) Original copies of leaflets and instructions provided by the specialist manufacturers
shall be provided. Superfluous information shall be clearly deleted and relevant
Al
nt
(j) control loop and/or subsystem operational descriptions shall identify the function of
each instrument and its relation to the other instruments in the loop
la
(k) binding. Bind each manual in a cover which indicates the system name,
manufacturer's name, local address and telephone number, and year of purchase.
tP
Punch and bind manuals in standard three ring binders and include system name and
ICA Subcontractor's name on binding.
al
5 Further to the above Clause 1.1.5.4, the Contractor shall ensure that the structure of the
ph
operation and maintenance manual meets the conditions specified in Section 1 Clause
7.12.2 or otherwise agreed with the Engineer.
As
6 Record Drawings:
(a) The Contractor shall submit complete schematics, wiring diagrams and installation
a
drawings to include all installed field and panel conduit and piping/tubing runs and
er
routing, tray systems, supports, mounting details, point to point diagrams with a cable,
wire, tube and termination numbers. One copy of applicable schematics and diagrams
ze
shall provide the Owner prints of each on thick paper and one ISO size A1
negative of each. All drawings shall be prepared on a CAD system
and printed on ISO standard sized paper A3 unless specifically requested
Al
7 ICA Subcontractor's System Validation Report. The ICA Subcontractor, shall submit a report
for each control system, panel and associated field instruments certifying that the equipment:
This report shall indicate calculated system tolerances, data verifying that the system meets
these tolerances, and any provisional settings made to devices. Data sheets shall be similar
to those used for Calibration.
8 Factory Acceptance Test (FAT) and Site Acceptance Test (SAT). Submit for approval at
least 30 days prior to the test demonstration, a written plan for demonstrating that each
system of equipment provided under the ICA Sections meets the specified operational
requirements. The plan shall include procedures to be used in final operation testing of entire
systems including a description for each system of test methods and materials, testing
instruments and recorders, a list of the equipment involved with the functional parameters to
be recorded on each item, and shop drawings of required temporary by-passes and like
facilities.
9 Final Acceptance Report. Submit three copies of certified test results and records.
nt
la
1 Qualification and Manufacturers. The ICA Subcontractor shall be an approved systems
integrator, a panel fabricator, and installer of field instruments. The ICA Subcontractor shall
tP
have a minimum of 5 years documented experience in providing ICA equipment on a single
system responsibility basis, of which at least 3 years shall be for municipal water and
wastewater pumping stations and sewage treatment works. The personnel employed for
al
system engineering, supervision, start-up, operational testing and training shall be regular
employees of the ICA Subcontractor. The ICA Subcontractor shall be fully responsible for the
ph
the ICA Section including deputation of qualified personnel for instructing operating personnel
and preparing technical documentation. A certificate of compliance with the ICA
er
3 Standard of Quality. Furnish equipment of the types and sizes specified which has been
demonstrated to operate successfully. Wherever, in the Project Specification and in these
Ja
specifications, materials or equipment have been specified by using the name of products or
manufacturers, the term "or equal and approved" is always understood to follow immediately.
Material and equipment, so specified, has been selected as being most suitable and is
Al
regarded as a standard and is not intended to eliminate others of equal quality and
performance. Workmanship for the installation of instruments, wiring, piping, painting and
labelling shall be equal to the best industrial standards for instrumentation and control work.
4 All equipment shall be suitable for installation and continuous services in the climatic
conditions prevailing in Qatar.
5 All electrical equipment and materials, including their installation, shall conform to the
standards specified for each equipment, unless specified otherwise in this Section.
6 All equipment of a similar type shall be supplied from a single manufacturer to ensure
common spares, operation and maintenance procedures.
1 The ICA manufacturers shall demonstrate a successful track record of having complete
similar ICA installation works. The ICA Subcontractor shall provide a reference list from the
instrumentation manufacturers for having installed and commissioned instruments operating
under process and ambient conditions similar to the specified works.
QCS 2014 Section 10: Instrumentation Control Page 7
Part 01: General
1 Factory Inspection. The Engineer or his representative may inspect fabricated equipment at
the factory. Notify the Engineer at least 30 days prior to shipment, so that factory inspection
can be arranged. Factory inspection shall be made only after manufacturer has performed
satisfactory checks, adjustments, tests and operations. Tests shall be made using simulated
inputs and output loads. Approval of equipment at the factory only allows the manufacturer to
ship the equipment to the site, and does not constitute final acceptance by the Engineer.
2 The Engineer reserves the right to inspect the ICA equipment at the factory. The Engineer
will indicate on return of the approved submittal, each item requiring factory inspection.
1 Factory test carried out for primary elements shall include pressure and calibration tests.
Certificates shall be provided for pressure test, calibration test and conformity to
specifications. Material certificates shall be furnished if it is so specified.
nt
2 Factory Acceptance Test (FAT) shall be carried out for the control and automation equipment
la
such as control panels. FAT procedure shall be submitted to the Engineer for approval. FAT
based on the approved test procedure shall be witnessed by the Engineer or his authorized
tP
representative at expense of the Contractor.
3 If after examining or testing any equipment the Engineer, or his representative, shall decide
al
that such equipment or any part thereof is defective or, not in accordance with the
ph
specification, he may reject the said equipment or part thereof. He shall notify the Contractor
in writing within 7 calendar days of the rejection, stating the grounds on which the rejection is
based.
As
1 Box, crate, or otherwise enclose and protect instruments and equipment during shipment,
er
handling, and storage. Keep all equipment dry and covered from exposure to weather,
moisture, corrosive liquids, and gases or any element which could degrade the equipment.
ze
Protect painted surfaces against impact, abrasion, discoloration, and other damage. Repair
any damage or replace defective equipment, as directed and approved by the Engineer.
Ja
1.1.12 Guarantee
Al
1 The Contractor shall provide a guarantee during the maintenance period for all the equipment
in accordance with the General Conditions of the Contract.
2 Equipment warranty shall cover defects in materials or workmanship for 400 days from date
of satisfactory completion of Site performance test and issue of Practical Completion
Certificate.
4 Items which fail during the warranty period, excluding expendable items, shall be replaced
without cost to the Owner.
QCS 2014 Section 10: Instrumentation Control Page 8
Part 01: General
1 Drawings are diagrammatic and show the intended arrangement for system operation,
piping, and appurtenances. Conform to Drawings as closely as possible and exercise care to
secure neat arrangement of piping, valves, conduit, and like items, and to overcome
structural interferences. Verify dimensions and conditions at the place of work, and install
materials and equipment in the available spaces.
1 The ICA equipment shall be provided by approved, prequalified system manufacturers and
suppliers designated in the Project Specification.
nt
1.1.16 Spare Parts and Tools
la
1 Furnish the following items as specified herein. Provide the Engineer, with an itemised list in
tP
a letter of transmittal accompanying each shipment.
al
2 Special Tools and Accessories. Furnish special tools, instruments, and accessories for
maintaining instruments and equipment requiring periodic repair and adjustment as specified
ph
elsewhere in this Section. Also, furnish special lifting and handling devices for equipment
requiring such devices.
As
4 Spare parts shall be sufficient for 2 years of normal service from completion of the
er
maintenance period, and shall include, as a minimum, the following basic items:
ze
(a) five (5) percent but not less than one (1) minimum of each type of plug-in unit, etched
or printed circuit board assembly
Ja
(b) ten (10) percent but not less than one (1) of each type relay and timer used
(c) ten (10) percent but not less than one (1) of each type switch used
Al
(d) twenty (20) percent but not less than ten (10) of each type light bulb and fuse used
(e) 2 years supply of expendable items, diskettes, toner cartridges etc.
1.1.17 Software
1 The ICA Subcontractor shall be responsible for obtaining all software user licences for
development and runtime systems as necessary. Application software written specifically for
the Owner under this contract shall remain the property of the Owner and shall not be
disclosed, copied or distributed at any time to a third party without the Owners explicit written
consent.
QCS 2014 Section 10: Instrumentation Control Page 9
Part 01: General
1.2 PRODUCTS
1.2.1 Materials
1 The ICA Subcontractor shall provide instruments, equipment and materials suitable for
service conditions and meeting the appropriate British Standards. The intent of this
Specification is to secure instruments and equipment of a uniform quality and manufacture
throughout the plant; i.e., all instruments in the site, i.e., all instruments supplied by the ICA
Subcontractor, of the same type shall be by the same manufacturer. This allows the stocking
of the minimum number of spare parts.
1 The ICA Subcontractor shall design all fabrications for dynamic and vibratory loading. Use
structural steel shapes conforming to ASTM A36, A500, A501, A570, A618, or equal and
approved, as applicable. Conform welding to AWS D2.0 Code. Galvanize specific items in
accordance with ASTM A123 or A386 as applicable; use galvanized bolts and fasteners with
nt
galvanized assemblies. Use minimum 6 mm thickness for steel entirely or partially
submerged during equipment operation. Submit design calculations showing adequate
la
structural integrity for the intended purpose.
tP
1.2.3 Mountings al
1 The ICA Subcontractor shall mount and install equipment as indicated in the Project
Specification. Where not shown, mount site instruments according to best standard practice
ph
on pipe mounts, pedestal mounts, or other similar means in accordance with suppliers
recommendation. Where mounted in control panels, mount according to requirements of
As
2 Equipment specified for Site mounting shall be suitable for direct pipe mounting, pedestal
mounting, or surface mounting and non in-line indicators and equipment with calibration
a
adjustments or requiring periodic inspection shall be mounted not lower than 900 mm nor
er
higher than 1500 mm above walkways, platforms, catwalks, etc. so as to provide easy
access. All such equipment shall be weather and splash proof, and electrical equipment
ze
hazardous area, the equipment shall be explosion proof or rated intrinsically safe, whether so
specified herein or not.
Al
3 The equipment shall be guaranteed suitable for operation under the climatic conditions
specified in under Clause 1.2.6 of this Part and shall be designed:-
(a) such that routine and occasional maintenance throughout its life shall be a practical
minimum compatible with the preservation of maximum reliability
(b) to withstand the electrical, mechanical, thermal and atmospheric stresses to which it
may be subjected under operational conditions, without deterioration or failure
(c) constructed to the highest available standards of manufacture, reliability, accuracy and
repeatability
(d) the degree of protection for equipment enclosures shall be in accordance with
BS EN 60529
4 Provide protection from direct sun light for all ICA equipment installed outdoors.
QCS 2014 Section 10: Instrumentation Control Page 10
Part 01: General
1 All instrumentation and equipment items or systems specified in the Project Specification
shall be identified by system and tag numbers. This same number shall appear in the tag
number designations on the Drawings and on the schedules of the Project Specification.
Nameplates for panels and panel mounted equipment shall be as specified in the Project
Specification. Field equipment shall be tagged with assigned instrumentation tag number
and function. Tags shall be black lamacoid with engraved white characters of 5 mm
minimum height. Tags shall be attached to equipment with a commercial tag holder using a
stainless steel band with a worm screw clamping device or by a holder fabricated with
standard hose clamps and meeting the same description. In some cases where this would
2
be impractical, use 0.5 mm stainless steel wires. For field panels or large equipment cases
use stainless steel screws, however, such permanent attachment shall not be on an
ordinarily replaceable part. In all cases the tag shall be plainly visible to a standing observer.
In addition to tags, field mounted control stations, recorders or indicators shall have a
nameplate indicating their function and the variable controlled or displayed. Nameplate shall
be attached by one of the above methods.
nt
1.2.5 Electronic Equipment
la
1 If the equipment is electronic in nature, provide solid state equipment to the extent
tP
practicable. Select components of construction for their suitability and reliability. Employ
adequate component derating to preclude failures because of transients and momentary
overloads reasonably expected in normal operation. Provide units for operation without
al
forced cooling, unless such cooling is an integral part of the device. Provide protection on all
ph
relevant circuits and equipment against the effects of lightning and other induced voltages.
1 All equipment shall be rated for normal operating performance with varying operating
conditions over the following minimum ranges.
a
er
2 Power:
ze
3 Field Instruments:
Al
(a) all the ICA equipment supplied shall be suitable for operation in the tropical climate
prevalent in Qatar. All ICA equipment shall be designed and constructed to operate
satisfactorily and without any deleterious effect for prolonged and continuous periods
at the following maximum ambient temperature conditions:
o
(i) indoors in normally air-conditioned environment - 50 C
o
(ii) indoors in a ventilated environment - 55 C
o
(iii) outdoors under direct sunlight - 85 C
1 The ICA Subcontractor shall provide electrical instruments, transmitter power supplies and
control devices for operation on 110 V a.c., 50 Hz. Transmitter power supplies shall be
provided for individual transmitters. Where designated in the Project Specification, process
critical instruments shall receive power from a UPS, as specified in Section 21.
QCS 2014 Section 10: Instrumentation Control Page 11
Part 01: General
1 The ICA Subcontractor shall ensure that input-output signals of all instruments and control
devices (whether supplied by the ICA Subcontractor or not) are compatible. Unless
otherwise specified in the Project Specification, signals between field and panels shall be volt
free contacts or 4 to 20 mAdc, unless specifically approved otherwise. Granting such
approval does not relieve the ICA Subcontractor from the compatibility requirement above.
Provide signal isolators and converters as necessary to obtain the required system
performance. Mount the devices behind control panels or in the Site at the point of
application.
1 The ICA Subcontractor shall provide instruments and equipment to interface with auxiliary
contacts provided under other Contracts, for alarms, status of equipment, interlocking, and
other functions as indicated and as specified in Project Specification.
nt
1.2.10 Air Supply Valves
la
1 The ICA Subcontractor shall provide 316S12 valves for instrument air supply shutoff,
regulating, switching, metering, valve manifolds, etc. Provide a separate isolation valve for
tP
each instrument or actuator feed line.
operation. All instrument pneumatic air fittings, shall be double compression type.
er
1 The ICA Subcontractor shall provide a filter-regulator and discharge pressure gauge with a
Ja
dripwell assembly for each point of use where regulated instrument air is required. Separate
regulators shall be used for each control loop.
Al
1.2.13 Manifolds
1 The ICA Subcontractor shall furnish an integral three-valve manifold for each differential
pressure transmitter on a flow application.
1 The ICA Subcontractor shall provide factory paint for all instruments and equipment except
where in pipelines. Provide paint as required for structural supports, brackets, etc. Painting
and protective coatings shall generally comply with the requirements specified in Part 8 of
Section 8.
1.2.15 Electrical
1 The ICA Subcontractor shall provide all the power supply wiring, instrumentation wiring,
interconnecting wiring and equipment grounding as indicated, specified and required.
QCS 2014 Section 10: Instrumentation Control Page 12
Part 01: General
2 Wiring installations shall include cables, conductors, terminals connectors, wire markers,
conduits, conduit fittings, supports, hardware and all other required materials not specifically
included in the work of other Sections.
3 Provide the materials and complete all the required installations for equipment grounding as
specified in Section 21 of these Specifications indicated on the Electrical Drawings or
necessary to complete the Work.
4 Incidental items, not specifically included in the Contract Documents, that can legitimately
and reasonably be inferred to belong to the instrumentation work shall be provided by the ICA
Subcontractor.
5 Field Wiring. Ring out signal wiring prior to termination. Provide wire number tags marked in
indelible waterproof form of slip-on type or equal for each termination. Provide preinsulated
crimp-on connectors for wire terminations and splices. Use ratchet type crimping tool which
does not release until proper crimp pressure has been applied.
nt
1.2.16 Process Connections
la
1 Piping, tubing, and capillary tubing shall be of stainless steel. If this material is unsuitable for
ambient or process conditions, piping and tubing shall be of a material approved by the
tP
Engineer. Slope lines according to service to promote self draining or venting back to the
process. Terminate connection to process lines or vessels in a service rated block valve,
that will permit closing off the sense line or removal of the element without requiring shut
al
down of the process. Include drip legs and blow-down valves for terminations of sense lines
ph
at the instruments when mounted such that condensation can accumulate. Process vessels,
line penetrations, connecting fittings, and block valves shall be furnished and installed under
other Sections of these Specifications but coordinated by the ICA Parts. Instrument process
As
taps shall be a minimum 18 mm BSP except flowmeter taps which shall be 12 mm BSP.
1.3 INSTALLATION
a
er
1.3.1 Inspection
ze
1 Inspect each instrument and piece of equipment for damage, defects, completeness, and
correct operation before installing. Inspect previously installed related work and verify that it
Ja
1 Ensure that installation areas are clean and that concrete or masonry operations are
completed prior to installing instruments and equipment. Maintain the areas in a clean
condition during installation operations.
1 Provide the services of suitably trained and experienced personnel in the installation of the
equipment to:
(a) complete the installation in accordance with the manufacturers instruction manual
(b) inspect, check, adjust as necessary, and prepare the equipment for system validation
(c) calibrate the instruments, in accordance with the specifications herein, until all trouble
or defects are corrected and the installation and operation are acceptable.
QCS 2014 Section 10: Instrumentation Control Page 13
Part 01: General
1 The Contractor shall provide the services of trained and experienced instrumentation
technicians, tools and equipment to site calibrate each instrument to its specified accuracy in
accordance with the manufacturer's specifications and instructions for calibration.
2 Each instrument shall be calibrated at 10 percent, 50 percent and 90 percent of span using
test instruments to simulate inputs and read outputs that are rated to an accuracy of at least
5 times greater than the specified accuracy of the instrument being calibrated.
3 Test instruments shall hold a valid calibration certificate from a NAMAS accredited calibration
centre or alternative, subject to the approval of the Engineer
4 Provide a list and basic specifications for instruments used. Certify to the Engineer that each
instrument has been calibrated to its published specified accuracy. The calibration certificate
shall include all applicable data as listed below plus any defects noted, correction action
required, and correction made. Data shall be recorded on separate proformas attached to
nt
the certificate and shall include not less than the following items:
la
(a) facility identification (name, location, etc.)
(b) loop identification (name or function)
(c) equipment tag and serial numbers
tP
al
(d) scale ranges and units
(e) test mode or type of test
ph
1 Provide the services of trained and field experienced instrumentation engineer(s) to validate
each system to verify that each system is operational and performing its intended function
within system tolerance. System tolerance is defined as the root-mean-square sum of the
Al
2 Validate each system by simulating inputs at the first element in loop (i.e. sensor) of 10
percent, 50 percent and 90 percent of span, or on/off and verifying loop output devices (i.e.
recorder, indicator, alarm, etc. except controllers). During system validation, make
provisional settings on levels, alarms, etc. Verify controllers by observing that the final
control element moves in the proper direction to correct the process variable as compared to
the set point. Verify that all logic sequences operate in accordance with the specifications.
3 Cause malfunctions to sound alarms or switch to standby to check system operation. Check
all systems thoroughly for correct operation. Test equipment shall comply with Clause 1.3.4.
4 Immediately correct all defects and malfunctions‟ disclosed by tests. Use new parts and
materials as required and retest.
1.3.6 Commissioning
1 Upon completion of instrument calibration and system validation, test all systems under
process conditions. The intent of this test is to demonstrate and verify the operational
interrelationship of the instrumentation systems. This testing shall include, but not be limited
to, all specified operational modes, taking process variables to their limits (simulated or
process) to verify all alarms, failure interlocks, and operational interlocks between systems
and/or mechanical equipment.
1 Final acceptance report. Immediately correct defects and malfunctions with approved
methods and materials in each case and repeat the testing. Upon completion of final
operational testing, submit certified report, with substantiating data sheets, indicating that
total ICA System meets all the functional requirements specified herein. The Engineer will
countersign this report and it shall constitute final acceptance of the ICA System.
nt
2 Final Operational Testing shall be witnessed and approved by the Engineer. Notify the
Engineer in writing a minimum of 48 h prior to the proposed date for commencing the test.
la
Upon completion of this test the Contractor shall begin or have begun system start-up. The
Owner reserves the right to set the schedule.
1 After the ICA equipment has been calibrated, installed, tested and placed in satisfactory
er
operation the Contractor shall provide the services of qualified staff approved by the
Engineer, or if specified in the Project Specification, of the manufacturer‟s representatives, to
ze
instruct and train the Owner‟s personnel in the use and maintenance of the ICA equipment.
An instruction and training programme shall be conducted for up to six personnel designated
by the Owner. The Contractor shall give the Owner at least one month‟s written notice of the
Ja
proposed instruction and training programme. Instruction and training covering basic system
operation theory, routine maintenance and repair, and “hands on” operation of the ICA
Al
equipment shall be included. Each trainee shall be provided with a training manual covering
operation and maintenance of the ICA equipment. The duration of the programme shall be
based on the complexity of equipment involved, and the Engineer‟s approval of instruction
adequacy obtained before terminating the programme. Instruction and training periods shall
be acceptable to the Engineer.
1 Where designated in the Project Specification the Contractor shall provide a specialised
training programme and manual for the Owner‟s key personnel in the equipment, electrical
systems and instrumentation systems, to be conducted by the supplier/manufacturer and
held at locations outside Qatar. The training programme and manual shall be submitted to
the Owner for approval and shall be designed to:
(a) provide in depth information and familiarisation of the equipment installed in the
Project
(b) receive specialised training in the design, proper operation, maintenance and
replacement of the equipment and components
QCS 2014 Section 10: Instrumentation Control Page 15
Part 01: General
2 The Contractor shall provide whatever assistance is requested by the Owner to develop
meaningful itineraries for the training programme. The Contractor shall provide hotel
accommodation, travelling expenses by air, land transport and per diem allowance as per the
Ministry of Education guidelines.
END OF PART