0% found this document useful (0 votes)
80 views

RFA-013 (Formwork Method Statement) PDF

This document is a request for approval form submitted by CNQC-MTRA JO to LMO/TTW regarding a formwork method statement for the Logos MetroLink Logistic Hub project. It includes attachments of technical documents and drawings. The architect/consultant will review and provide a status code of A, B, C, or D to indicate if the submission can proceed as is, with comments, needs revision, or does not proceed. The reviewer will note any comments on a continuation sheet and suggest an overall status. The formwork method statement is attached in Appendix 1.0.

Uploaded by

Made Gilee
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
80 views

RFA-013 (Formwork Method Statement) PDF

This document is a request for approval form submitted by CNQC-MTRA JO to LMO/TTW regarding a formwork method statement for the Logos MetroLink Logistic Hub project. It includes attachments of technical documents and drawings. The architect/consultant will review and provide a status code of A, B, C, or D to indicate if the submission can proceed as is, with comments, needs revision, or does not proceed. The reviewer will note any comments on a continuation sheet and suggest an overall status. The formwork method statement is attached in Appendix 1.0.

Uploaded by

Made Gilee
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

REQUEST FOR APPROVAL FORM WH3-RFA-013 Rev: 0

Project Title : LOGOS METROLINK LOGISTIC HUB (MC) WH3

Contractor : CNQC-MTRA JO

Attention To : LMO / TTW

Submission Description : Formwork Method Statement

Submission date : 15 August 2020 Response Date: 21 August 2020

Issued for Approval


Remarks:

Attachments:

Catalogue of Manufacturer / Technical Data Equipment Schedule

Certificate / Approval Letter Equipment Installation Drawing

Sample Others

Architect / Consultant’s Official Review Status:

A - No adverse comment, proceed according to this submission.

B - Proceed in accordance with the comment. No resubmission required.

C - Proceed in accordance with the comment. Revise and re-submit.

D - Do not proceed: incorporate comments and re-submit.

* Comments are to be noted on the continuation sheet.

ER:

Reviewed / Company: Date:


Signed by:

Consultant:

Reviewed / Company: Date:


Signed by:

Page 1 of 3
Submission Date: 15th August 2020 Reference No. WH3-RFA-013 Rev 0

Document Reference:

Submission Description: Formwork Method Statment

Reviewer’s Name and Contractor’s Reply


No Comments Rev.
Company (and name)

Reviewer’s suggested status code:

LMO Archi Consultant M&E Consultant C&S Consultant Other (state) Client/Owner

This section is to record the reviewing party’s suggested status code only: the official status code for the submitted item is
recorded on the first sheet of this document.

Page 2 of 3
Appendix 1.0 Formwork Method Statement

Page 3 of 3