Project:: DBL Nadiad - Modasa Tollways Limited
Project:: DBL Nadiad - Modasa Tollways Limited
Pages: 1 + 13 = 14
Design Note No. 11027-Q-PS-BS-01 (R0)
SR NO SUBJECT
1 General
2 Load Data
2.1 Dead load
2.2 Live load
2.3 Staad input file
3 Foundation design
FOUR LANING OF NAGPUR -WAIGANGA BRIDGE SECTION OF NH-6 FROM KM 498+000 TO KM 544+200
DESIGN OF BUS SHELTER
1.0 General
Self weight
Self weight of the structure is generated by the software itself
Dead Load
Weight of GI Sheet = 3.6 kg/m²
Live Load
For Non accessible roof and zero degree slope = 750 N/m²
Wind load
Location = Nadiad
Basic Wind Speed (Vz )(IRC-6-2010) = 39m/s
Terrain Category = 1 ( CL 5.3.2.1)
Class of structure = A (CL 5.3.2.2 )
K1(From Table-1) = 1
K2(From Table-2) = 0.91
K3 = 1
2
Design Wind Pressure: Pz = 0.6 x Vz
= 756 N/m²
= 0.76 KN/m²
FOUR LANING OF NAGPUR -WAIGANGA BRIDGE SECTION OF NH-6 FROM KM 498+000 TO KM 544+200
DESIGN OF BUS SHELTER
Load Combination
FOUR LANING OF NAGPUR -WAIGANGA BRIDGE SECTION OF NH-6 FROM KM 498+000 TO KM 544+200
DESIGN OF BUS SHELTER
FOUR LANING OF NAGPUR -WAIGANGA BRIDGE SECTION OF NH-6 FROM KM 498+000 TO KM 544+200
DESIGN OF BUS SHELTER
51 2.41 3.025 2.35; 52 0.4175 0 2.35; 59 0.3037 2.1006 2.35;
60 0.5827 2.2973 2.35; 62 1.0377 2.5535 2.35; 64 1.4926 2.8098 2.35;
65 0 0 4.7; 66 0 0.6 4.7; 68 0 1.1002 4.7; 70 0 1.6004 4.7; 72 0 2.1002 4.7;
73 0.4892 2.7143 4.7; 75 0.331 2.6548 4.7; 76 0.1943 2.5554 4.7;
77 0.0889 2.4232 4.7; 78 0.0226 2.2677 4.7; 79 0.9771 2.8237 4.7;
80 1.221 2.8784 4.7; 81 1.465 2.9331 4.7; 82 1.8747 3.025 4.7;
83 2.41 3.025 4.7; 84 0.4175 0 4.7; 91 0.3037 2.1006 4.7; 92 0.5827 2.2973 4.7;
94 1.0377 2.5535 4.7; 96 1.4926 2.8098 4.7; 98 0.330798 1.6004 2.35;
99 0.384995 0.6 2.35; 101 0.357897 1.1002 2.35; 103 0.275849 2.6147 2.35;
104 0.384995 0.6 0; 106 0.357897 1.1002 0; 108 0.330799 1.6004 0;
110 0.275849 2.6147 0; 111 0.384995 0.6 4.7; 113 0.357897 1.1002 4.7;
115 0.330798 1.6004 4.7; 117 0.275849 2.6147 4.7; 121 0.8551 2.79635 0;
122 0.8551 2.79635 2.35; 123 0.8551 2.79635 4.7; 124 1.58209 2.95936 0;
125 1.58209 2.95936 2.35; 126 1.58209 2.95936 4.7; 127 2.14235 3.025 0;
128 2.14235 3.025 2.35; 129 2.14235 3.025 4.7;
MEMBER INCIDENCES
1 1 2; 2 2 4; 8 8 14; 9 14 13; 10 13 12; 11 12 110; 12 11 9; 13 9 121;
15 15 16; 16 16 124; 18 18 127; 27 27 28; 28 28 30; 30 30 32; 32 32 18;
33 2 104; 35 4 106; 37 6 108; 39 8 27; 40 9 28; 42 15 30; 44 17 32; 45 33 34;
46 34 36; 52 40 46; 53 46 45; 54 45 44; 55 44 103; 56 43 41; 57 41 122;
59 47 48; 60 48 125; 62 50 128; 71 59 60; 72 60 62; 74 62 64; 76 64 50;
77 34 99; 79 36 101; 81 38 98; 83 40 59; 84 41 60; 86 47 62; 88 49 64;
89 65 66; 90 66 68; 96 72 78; 97 78 77; 98 77 76; 99 76 117; 100 75 73;
101 73 123; 103 79 80; 104 80 126; 106 82 129; 115 91 92; 116 92 94; 118 94 96;
120 96 82; 121 66 111; 123 68 113; 125 70 115; 127 72 91; 128 73 92; 130 79 94;
132 81 96; 133 2 34; 134 34 66; 135 4 36; 136 36 68; 137 6 38; 138 38 70;
139 8 40; 140 40 72; 149 18 50; 150 50 82; 151 19 51; 152 51 83; 153 52 99;
154 59 98; 162 59 45; 163 103 43; 164 59 103; 165 20 104; 166 104 106;
168 106 108; 172 110 11; 173 27 110; 174 27 13; 175 84 111; 176 111 113;
182 117 75; 183 91 117; 184 91 77; 202 121 15; 203 122 47; 204 123 79;
205 121 122; 206 124 18; 207 125 50; 208 126 82; 209 122 123; 210 16 48;
211 48 80; 212 124 125; 213 125 126; 214 99 36; 215 111 68; 216 104 4; 217 4 6;
218 6 8; 219 108 27; 220 36 38; 221 38 40; 222 98 101; 223 101 99; 224 68 70;
225 70 72; 226 113 115; 227 115 91; 230 110 103; 231 103 117; 232 127 19;
233 128 51; 234 129 83;
UNIT METER MTON
DEFINE MATERIAL START
ISOTROPIC STEEL
E 2.03889e+007
POISSON 0.3
DENSITY 7.83337
ALPHA 6.5e-006
DAMP 0.03
END DEFINE MATERIAL
UNIT MMS NEWTON
MEMBER PROPERTY INDIAN
1 2 8 TO 13 15 16 18 27 28 30 32 33 35 37 39 40 42 44 77 79 81 83 84 86 88 -
89 TO 90 96 TO 101 103 104 106 115 116 118 120 121 123 125 127 128 130 132 -
162 165 166 168 172 TO 176 182 TO 184 202 204 206 208 214 TO 219 224 TO 227 -
232 234 TABLE ST PIP424M
45 46 52 TO 57 59 60 62 71 72 74 76 153 154 163 164 203 207 220 TO 223 -
233 TABLE ST PIP603M
133 TO 140 149 TO 152 205 209 TO 213 230 231 TABLE ST PIP483M
CONSTANTS
MATERIAL STEEL ALL
SUPPORTS
Design Note No. 11027-Q-PS-BS-01 (R0)
FOUR LANING OF NAGPUR -WAIGANGA BRIDGE SECTION OF NH-6 FROM KM 498+000 TO KM 544+200
DESIGN OF BUS SHELTER
1 20 33 52 65 84 FIXED
Design Note No. 11027-Q-PS-BS-01 (R0)
FOUR LANING OF NAGPUR -WAIGANGA BRIDGE SECTION OF NH-6 FROM KM 498+000 TO KM 544+200
DESIGN OF BUS SHELTER
UNIT METER MTON
LOAD 1 LOADTYPE Dead TITLE DEAD LOAD
MEMBER LOAD
133 TO 140 230 231 UNI GY -0.00185
UNIT MMS NEWTON
149 TO 152 205 209 TO 213 UNI GY -0.0134
SELFWEIGHT Y -1 LIST 1 2 8 TO 13 15 16 18 27 28 30 32 33 35 37 39 40 42 44 -
45 TO 46 52 TO 57 59 60 62 71 72 74 76 77 79 81 83 84 86 88 TO 90 96 TO 101 -
103 104 106 115 116 118 120 121 123 125 127 128 130 132 TO 140 149 TO 154 -
162 TO 166 168 172 TO 176 182 TO 184 202 TO 213 217 TO 227 230 TO 234
UNIT METER MTON
LOAD 2 LOADTYPE Wind TITLE WIND LOAD 1
MEMBER LOAD
133 TO 140 UNI GX 0.0385453
UNIT MMS NEWTON
149 TO 152 205 209 TO 213 UNI GY -0.28
230 231 UNI GY -0.378
UNIT METER MTON
LOAD 3 LOADTYPE Wind TITLE WIND LOAD 2
MEMBER LOAD
133 TO 140 UNI GX -0.0385453
UNIT MMS NEWTON
149 TO 152 205 209 TO 213 UNI GY 0.28
230 231 UNI GY 0.378
UNIT METER MTON
LOAD 4 LOADTYPE Live TITLE LIVE LOAD
MEMBER LOAD
UNIT MMS NEWTON
149 150 205 209 TO 213 UNI GY -0.278
151 152 230 231 UNI GY -0.375
UNIT METER MTON
LOAD COMB 5 DL + WL1
1 1.0 2 1.0
LOAD COMB 6 DL + WL2
1 1.0 3 1.0
LOAD COMB 7 DL + WL1 + LL
1 1.0 2 1.0 4 1.0
LOAD COMB 8 DL + WL2 + LL
1 1.0 3 1.0 4 1.0
LOAD COMB 9 DL + LL
1 1.0 4 1.0
PERFORM ANALYSIS
UNIT MMS NEWTON
LOAD LIST 5 TO 9
PARAMETER 1
CODE INDIAN
CHECK CODE MEMB 1 2 8 TO 13 15 16 18 27 28 30 32 33 35 37 39 40 42 44 TO 46 -
52 TO 57 59 60 62 71 72 74 76 77 79 81 83 84 86 88 TO 90 96 TO 101 103 104 -
106 115 116 118 120 121 123 125 127 128 130 132 TO 140 149 TO 154 -
162 TO 166 168 172 TO 176 182 TO 184 202 TO 213 217 TO 227 230 TO 234
PRINT ALL
FINISH
Design Note No. 11027-Q-PS-BS-01 (R0)
FOUR LANING OF NAGPUR -WAIGANGA BRIDGE SECTION OF NH-6 FROM KM 498+000 TO KM 544+200
DESIGN OF BUS SHELTER
Generator room building foundation F1 footing Sizing
Footing size
A = 2.10 m Fb = 2100 mm
B = 1.00 m Fd = 1000 mm
Thickness of Base Slab = 0.30 m At face D = 300 mm
Pesestal Size D
B = 0.70 m Pb = 700 mm
D = 0.30 m Pd = 300 mm
Area of Footing = 2.10 m2 Effe. Cover to reinf = 40 mm
Footing Wt. = 15.75 kN Concrete Grade = M20
Soil Wt. = 45.36 kN Steel = 500 N/mm2
Net SBC = 100 kN/m2
Gross SBC = 127 kN/m2
Spacing of bt two post = 0.42 m
FOUR LANING OF NAGPUR -WAIGANGA BRIDGE SECTION OF NH-6 FROM KM 498+000 TO KM 544+200
DESIGN OF BUS SHELTER
M/Z = 32.53 kN/m2
Pmax = P/A + M/Z = 67.337 kN/m2
Pmin = P/A - M/Z = 2.278 kN/m2
Max pressure < SBC hence, Footing Size is OK!
There is no tension hence, Footing Size is OK!
FOR STRUCTURAL DESIGN: P/A = 5.708 kN/m2 (Excluding Selft wt & Soil Wt.)
M/Z = 32.530 kN/m2
P Max = P/A + M/Z = 38.237 kN/m2
in X-direction in Y-direction
Offset A & B = 700 mm = 350 mm
Pmax (without soil weight & selfwt.) = 38.24 kN/m2 = 38.24 kN/m2
Factored Moment @ yy & Moment @ xx = 14.052 kN-m = 7.377 kN-m
de required = 71.354 mm = 35.677 mm
de provided = 256 mm = 248 mm
Cross section area at face = 0.300 m2 = 0.630 m2
Reinforcement required = 129.700 mm2 = 65.858 mm2
Minimum 0.12% reinf. = 360.00 mm2 = 756.00 mm2
Reinf. Bar Dia = 8 mm = 8 mm
Nos. of bars required = 8 nos = 16 nos
Spacing of bars = 131.429 mm = 134.667 mm
Provided reinf. % = 0.134 % = 0.128 %
FOUR LANING OF NAGPUR -WAIGANGA BRIDGE SECTION OF NH-6 FROM KM 498+000 TO KM 544+200
DESIGN OF BUS SHELTER
Design of Pedestal
Pu /fck bD = 0.00428
Mu/fckbD^2 = 0.02846
p/fck = 0.02
Provide minimum steel = 0.3 %
Reinforcement required = 630 mm2
Reinforcement Provided = 6 nos
Dia = 12
= 678.58 mm2 Safe O.K.
Design Note No. 11027-Q-PS-BS-01 (R0)
FOUR LANING OF NAGPUR -WAIGANGA BRIDGE SECTION OF NH-6 FROM KM 498+000 TO KM 544+200
DESIGN OF BUS SHELTER
Generator room building foundation F1 footing Sizing
Footing size
A = 1.50 m Fb = 1500 mm
B = 1.00 m Fd = 1000 mm
Thickness of Base Slab = 0.30 m At face D = 300 mm
Pesestal Size D
B = 0.70 m Pb = 700 mm
D = 0.30 m Pd = 300 mm
Area of Footing = 1.50 m2 Effe. Cover to reinf = 40 mm
Footing Wt. = 11.25 kN Concrete Grade = M20
Soil Wt. = 32.4 kN Steel = 500 N/mm2
Net SBC = 100 kN/m2
Gross SBC = 127 kN/m2
Spacing of bt two post = 0.42 m
FOUR LANING OF NAGPUR -WAIGANGA BRIDGE SECTION OF NH-6 FROM KM 498+000 TO KM 544+200
DESIGN OF BUS SHELTER
M/Z = 24.22 kN/m2
Pmax = P/A + M/Z = 56.229 kN/m2
Pmin = P/A - M/Z = 7.779 kN/m2
Max pressure < SBC hence, Footing Size is OK!
There is no tension hence, Footing Size is OK!
FOR STRUCTURAL DESIGN: P/A = 2.904 kN/m2 (Excluding Selft wt & Soil Wt.)
M/Z = 24.225 kN/m2
P Max = P/A + M/Z = 27.129 kN/m2
in X-direction in Y-direction
Offset A & B = 400 mm = 350 mm
Pmax (without soil weight & selfwt.) = 27.13 kN/m2 = 27.13 kN/m2
Factored Moment @ yy & Moment @ xx = 3.255 kN-m = 3.739 kN-m
de required = 34.344 mm = 30.051 mm
de provided = 256 mm = 248 mm
Cross section area at face = 0.300 m2 = 0.450 m2
Reinforcement required = 29.069 mm2 = 33.224 mm2
Minimum 0.12% reinf. = 360.00 mm2 = 540.00 mm2
Reinf. Bar Dia = 8 mm = 8 mm
Nos. of bars required = 8 nos = 11 nos
Spacing of bars = 131.429 mm = 142.000 mm
Provided reinf. % = 0.134 % = 0.123 %
FOUR LANING OF NAGPUR -WAIGANGA BRIDGE SECTION OF NH-6 FROM KM 498+000 TO KM 544+200
DESIGN OF BUS SHELTER
Design of Pedestal
Pu /fck bD = 0.00156
Mu/fckbD^2 = 0.01081
p/fck = 0.02
Provide minimum steel = 0.3 %
Reinforcement required = 630 mm2
Reinforcement Provided = 6 nos
Dia = 12
= 678.58 mm2 Safe O.K.
Design Note No. 11027-Q-PS-BS-01 (R0)
FOUR LANING OF NAGPUR -WAIGANGA BRIDGE SECTION OF NH-6 FROM KM 498+000 TO KM 544+200
DESIGN OF BUS SHELTER
P = 46.413 kN b
M = 0.648 kN-m
Fx = 3.244 kN
Conc grade of pedestal = M 20 Z
Permissible bearing stress(0.25fck) = 1.12 b' b'
a'
Base Plate Dimensions X A X
Plate Size A = 200 mm
B B = 200 mm a'
Center of Bolt a' = 75 mm
b' = 75 mm B
Plate thickness t = 10 mm Z
w = 1.646 N/mm2
t minimim required (IS 800) = 2.674 OK
P
Bolts No of bolts = 4 nos
Diameter = 16 mm Mz t
Calculations F
Tensile force = -34.43 kN
Tension in one Bolt = -8.61 kN
Bond stress = 0.80 N/mm2 x T
Length of the bolt required = 214.14 mm
Length of the bolt Provided = 215.00 mm Sbc XA
Area of the bolt = 602.88 mm2 C
Stress in plate = -57.10 OK