Answer: Modern Methodologies Do Not Focus On Linear Processes But They Provide An Alternative Look at Project
Answer: Modern Methodologies Do Not Focus On Linear Processes But They Provide An Alternative Look at Project
The following stages are included the traditional project management methodology:
Initiation
planning and design
execution
control and integration
closure(installation and maintenance)
Modern methodologies do not focus on linear processes but they provide an alternative look at project
management. Some of the method are best for it and software development while others can be implemented in
production, process improvement,product engineering, and so on.
Modern project management approaches use different models of the management process. The basic modern
approaches are:
Agile methodology
CPM methodology
PMBOK methodology and
PRINCE2 methodology
2. In CPM Network diagram, identifying Link and Unlink tasks is crucial. In this
regard, write detail about Tasks-Link types (Finish- Start (FS), Finish- Finish(FF),
Start- Start (SS), and Start- Finish (SF))
3. Suppose you are a project consultant and want to determine the way in which
the parts of the project are organized and determine the time duration of the given
projects. In this regard, answer the following questions on the basis of the
information given in the table below.
Answer
A.
B.
ABEFGHI =45
ACEFGHI =43
ACDGHI =41
ACDHI =27
C.
ES=5 ES=11 ES=12
EF= 11 EF=12 EF=16
ES=0 LS= 5 LS=11 LS=12
EF=5 LF= 11 LF=12 LF=16 ES=16
LS=0 EF=30
B(6 E(1
LF=5 F(4)
) ) LS=16
LF=30
A(5
)*(( G(1
4)4
444
C(4 D(3 H(12 I(3
) )) )’ )
ES=5 ES=9 ES=30 ES=42
EF=9 EF=11 EF=42 EF=45
LS=7 LS=13 LS=30 LS=42
LF=11 LF=16 LF=42 LF=45
ES is Earliest Start,
EF is Earliest Finish
LS is Latest Start and
LF is Latest Finish times