0% found this document useful (0 votes)
186 views

UN 5000 User's Manual: 3BHS114940/E80

This document is the user's manual for the UN 5000 system. It contains 3 sentences or less: The document provides instructions and information for operating and configuring the UN 5000 excitation system, including safety precautions, descriptions of interfaces like the service panel and configuration tool, and explanations of the system components, structure, and regulation types. Reproduction or sharing of the document without permission is prohibited.

Uploaded by

Amit Biswas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
186 views

UN 5000 User's Manual: 3BHS114940/E80

This document is the user's manual for the UN 5000 system. It contains 3 sentences or less: The document provides instructions and information for operating and configuring the UN 5000 excitation system, including safety precautions, descriptions of interfaces like the service panel and configuration tool, and explanations of the system components, structure, and regulation types. Reproduction or sharing of the document without permission is prohibited.

Uploaded by

Amit Biswas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

We reserve all rights in this document and in the information contained therein.

Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industrie AG

UN 5000 User’s manual

Contents

No. of sh.
Prep.

Appr. 7
Resp. dept.
Document number Lang. Rev. ind. Sheet

ABB Industrie AG 3BHS114940/E80 en i


REVISION

Rev. Page (P) Description Date


ind. Chapt.(C) Dept./Init.

Document number Lang. Rev. ind. Sheet

ABB Industrie AG 3BHS114940/E80 en ii


1 Introduction......................................................................................................................................................1-3

1.1 The aim and purpose of this manual .............................................................................................................1-5


1.2 Using this manual ..........................................................................................................................................1-5
1.3 Important advice ............................................................................................................................................1-6
1.4 Manufacturer’s address .................................................................................................................................1-7

2 Safety precautions...........................................................................................................................................2-3

2.1 Safety regulations ..........................................................................................................................................2-3


2.2 Requirements for operating personnel ..........................................................................................................2-4

3 Man-machine communication 3-4

3.1 General ..........................................................................................................................................................3-4


3.2 Service Panel UNS 0874 ...............................................................................................................................3-6
3.2.1 Introduction 3-6
3.2.2 Description of the device 3-7
3.2.3 User manual 3-15
3.2.4 Programming application function blocks 3-26

3.3 CMT tool ..................................................................................................................................................... 3-33


3.3.1 Introduction 3-33
3.3.2 Installation 3-33
3.3.3 Installation of the software 3-35
3.3.4 Starting from CMT 3-38
3.3.5 Menus overview 3-39
3.3.6 Connect menu 3-40
3.3.7 Parsig menu 3-41
3.3.8 DLog menu 3-49
3.3.9 Diagrams menu 3-54
3.3.10 Trending menu 3-56
3.3.11 DrvFuncs menu 3-59
3.3.12 Faults menu 3-66
3.3.13 Exit menu 3-67
3.3.14 Help menu 3-67
3.3.15 Overview of error messages 3-67

4 Configuration and Settings ............................................................................................................................4-5

4.1 Why you should read this section..................................................................................................................4-5


4.2 Overview ........................................................................................................................................................4-5
4.3 Available devices in the UN 5000 system .....................................................................................................4-7
4.4 UNITROL type code ......................................................................................................................................4-8
4.5 Structure of the excitation system .............................................................................................................. 4-11
4.5.1 Power supply to the excitation system – shunt supply with AC field breaker 4-11
4.5.2 Power supply to the excitation system – supply from auxiliary line with AC field breaker 4-12
4.5.3 Power supply to the excitation system – supply from PMG with AC field breaker 4-13
4.5.4 Power supply to the excitation system – shunt supply with series compounding and AC field breaker 4-14
4.5.5 Power supply to the excitation system – shunt supply with brake and AC field breaker 4-15
4.5.6 Power supply to the excitation system – supply from auxiliary line with brake and AC field breaker 4-16
4.5.7 Power supply to the excitation system – shunt supply with DC field breaker 4-17
4.5.8 Power supply to the excitation system – supply from auxiliary line with DC field breaker 4-18
4.5.9 Power supply to the excitation system – supply from PMG with DC field breaker 4-19
4.5.10 Regulation – Type: S5.. 4-20
4.5.11 Regulation – Type: D5.. 4-21
4.5.12 Regulation – Type: A5.. 4-22
4.5.13 Regulation – Type: A5xB.. 4-23
4.5.14 Converter – Type: E 4-24

Document number Lang. Rev. ind. Sheet

ABB Industrie AG 3BHS114940/E80 en iii


4.5.15 Converter – Type: T 4-25
4.5.16 Converter – Type: S 4-26
4.5.17 Converter – Type: S 4-27
4.5.18 Discharge 4-28
4.5.19 Discharge 4-29
4.5.20 Discharge 4-30
4.5.21 Discharge 4-31
4.5.22 Discharge 4-32
4.5.23 Discharge 4-34
4.5.24 Discharge 4-36
4.5.25 Discharge 4-38
4.5.26 Actual value measurement for generator voltage / generator current – Single-Channel System 4-40
4.5.27 Actual value measurement for generator voltage / generator current – Double-Channel System 4-41
4.5.28 Actual value measurement for generator voltage / generator current – Auto-Channel System 4-42

4.6 Hardware Device Arrangement and settings.............................................................................................. 4-43


4.7 Device Designation (Screen print with detailed information)...................................................................... 4-44
4.7.1 Ordering information 4-44

4.8 ARCnet node addresses............................................................................................................................. 4-45


4.8.1 Setting using a Hex switch 4-46
4.8.2 Setting using a DIL switch 4-46

4.9 Control Board UNS 2880a-P (COB) .......................................................................................................... 4-47


4.9.1 Features 4-47
4.9.2 Device settings 4-48
4.9.3 COB: ARCnet node addresses 4-48
4.9.4 Position of setting elements 4-49

4.10 Signal measuring unit UNS 2881a-P (MUB).......................................................................................... 4-50


4.10.1 Features 4-50
4.10.2 Device settings 4-51
4.10.3 Position of the setting elements 4-52

4.11 Converter Interface UNS 0880a-P (CIN)................................................................................................ 4-53


4.11.1 Features 4-53
4.11.2 Device settings 4-54
4.11.3 Position of the setting elements 4-55

4.12 Gate Driver Interface UNS 0881a-P, V1/V2 (GDI)................................................................................. 4-56


4.12.1 Features 4-56
4.12.2 Device settings 4-56

4.13 Power Signal Interface UNS 0882a-P (PSI) .......................................................................................... 4-57


4.13.1 Features 4-57
4.13.2 Schematic circuit diagram 4-58
4.13.3 Device settings 4-58
4.13.4 View of total PSI 4-59
4.13.5 Current measurement : Detail view 4-60
4.13.6 Exciter current measurement (on AC side of the converter) 4-60
4.13.7 Zero-current detection (on AC side of the converter) 4-60
4.13.8 Exciter current measurement (AC side) with one current transformer for two PSI 4-61
4.13.9 DC field current actual value 4-61

4.14 Fast I/O unit UNS 0883a-P (FIO) ........................................................................................................... 4-62


4.14.1 Features 4-62
Device settings 4-62
Position of the setting elements 4-66

4.15 Local Control Panel AF C094 AE, 02 (LCP) ........................................................................................... 4-67


4.15.1 Features 4-67
4.15.2 Device settings 4-67

4.16 Extended Gate Controller UNS 2882a-P (EGC) .................................................................................... 4-69


4.16.1 Features 4-69
4.16.2 Device settings 4-70
4.16.3 Position of the setting elements 4-73

4.17 Fieldbus Coupler UP C090 AE (FBC) .................................................................................................... 4-74


4.17.1 Features 4-74
4.17.2 Device settings 4-74
4.17.3 Position of the control elements 4-75

4.18 Local Bus Interface UNC 4674 b-E (LBI) ............................................................................................... 4-76
4.18.1 Features 4-76

Document number Lang. Rev. ind. Sheet

ABB Industrie AG 3BHS114940/E80 en iv


4.18.2 Signals to trip busbars 4-77
4.18.3 Protection of internal power supply F1 4-77
4.18.4 Protection of external add-on devices F2 4-77
4.18.5 Position of setting elements 4-77

4.19 Analogue I/O interface to fieldbus UA C096 (AIO)................................................................................. 4-78


4.19.1 Features 4-78
4.19.2 Device settings 4-78
4.19.3 Position of the setting elements 4-80

4.20 Firing unit (1400 V) to Crowbar UNS 0007a-P....................................................................................... 4-81


4.20.1 Features 4-81
4.20.2 Device settings 4-81
4.20.3 Position of the setting elements 4-83

4.21 Firing unit (3800 V) to Crowbar UNS 0017a-P........................................................................................ 4-84


4.21.1 Features 4-84
4.21.2 Device settings 4-84
4.21.3 Position of the setting elements 4-86

4.22 Optical Bus Interface UP C325 AE (OBI)................................................................................................ 4-87


4.22.1 Features 4-87
4.22.2 Selection of operating mode 4-87
4.22.3 Setting the max. transmission distance 4-87

4.23 Current sensor UNS 0884 (CUS)............................................................................................................ 4-87


4.24 Converter Display Panel UNS 0885 (CDP)............................................................................................. 4-87
4.25 Rotor ground fault detection UNS 3020, V1/V2 ...................................................................................... 4-88
4.25.1 Features 4-88
4.25.2 Device settings 4-89
4.25.3 Position of the setting elements 4-90

5 Erection Instructions.......................................................................................................................................5-3

5.1 General ..........................................................................................................................................................5-3


5.1.1 Safety instructions 5-3
5.1.2 Receipt of the delivery 5-4
5.1.3 Storage 5-5
5.1.4 Unpacking 5-6
5.1.5 Transport of equipment / cabinets 5-8

5.2 Installation planning .................................................................................................................................... 5-11


5.2.1 Installation planning for mounting frame 5-11
5.2.2 Installation planning for equipment / cabinets 5-12

5.3 Installation................................................................................................................................................... 5-13


5.3.1 Electrical connections 5-13
5.3.2 Installation of the mounting frame 5-15
5.3.3 Installation of cabinets / equipment 5-19

6 Commissioning 6-3

6.1 General ..........................................................................................................................................................6-3


6.2 Safety conditions ...........................................................................................................................................6-3
6.2.1 Consequences of non-compliance 6-5
6.2.2 Requirements for the personnel carrying out the work 6-5

6.3 Instructions in the event of emergencies .......................................................................................................6-6


6.3.1 Behaviour in case of fire: 6-6
6.3.2 First aid measures for electrical installations: 6-6

6.4 Prerequisites for commissioning....................................................................................................................6-7


6.5 Commissioning procedure .............................................................................................................................6-7
6.6 Commissioning activity ..................................................................................................................................6-8
6.6.1 Preliminary tests 6-8
6.6.2 No-load tests 6-9
6.6.3 Tests under load 6-10

Document number Lang. Rev. ind. Sheet

ABB Industrie AG 3BHS114940/E80 en v


6.6.4 Concluding work: 6-11

6.7 Commissioning report................................................................................................................................. 6-12

7 Operation..........................................................................................................................................................7-3

7.1 Introduction ....................................................................................................................................................7-3


7.2 Automatic voltage- and reactive power regulation of the synchronous machine ..........................................7-3
7.2.1 The synchronous machine on the network 7-3
7.2.2 The stationary behaviour of the synchronous machine 7-4
7.2.3 The dynamic behaviour of the synchronous machine 7-13
7.2.4 The transient behaviour of generator and network 7-16

7.3 Control and display elements ..................................................................................................................... 7-19


7.3.1 General 7-19
7.3.2 Remote control (control room) 7-20
7.3.3 Analogue displays 7-31
7.3.4 Status and alarm messages 7-31

7.4 Local control ............................................................................................................................................... 7-33


7.4.1 Analogue value display 7-33
7.4.2 Fault display 7-34
7.4.3 Controlling the display 7-35
7.4.4 Printer key 7-35
7.4.5 Command keys 7-36
7.4.6 Service Panel 7-36

7.5 Operation of the system.............................................................................................................................. 7-37


7.5.1 Checks before switching on 7-37
7.5.2 Switch-on sequence 7-38
7.5.3 Checks during operation 7-40
7.5.4 Shut-down sequence 7-40
7.5.5 Emergency-OFF 7-40

8 Maintenance and Trouble Shooting Instructions.........................................................................................8-3

8.1 General ..........................................................................................................................................................8-3


8.1.1 Safety regulations 8-3
8.1.2 Consequences of negligence 8-4
8.1.3 Requirements for the personnel carrying out work 8-4
8.1.4 Instructions for emergency situations 8-4

8.2 Maintenance ..................................................................................................................................................8-5


8.2.1 Introduction 8-5
8.2.2 Operating conditions during maintenance work 8-6
8.2.3 Maintenance schedule 8-6
8.2.4 Three-monthly maintenance work (operating condition f) 8-7
8.2.5 Annual maintenance work (during planned shutdown of the plant) 8-10

8.3 Trouble Shooting ........................................................................................................................................ 8-13


8.3.1 Principles of trouble shooting 8-13
8.3.2 Working methods 8-14
8.3.3 Instructions on how to replace printed circuit boards 8-15
8.3.4 Semiconductors 8-16
8.3.5 Hardware faults 8-17
8.3.6 Event, Alarm and Fault messages 8-20

9 Storage and Decommissioning 9-3

9.1 Preservation and Storage ..............................................................................................................................9-3


9.1.1 Safety Instructions 9-3
9.1.2 Why You Should Read this Chapter 9-3
9.1.3 Storage Conditions 9-3
9.1.4 Preservation 9-3
9.1.5 Periodical Inspections 9-4

9.2 Decommissioning ..........................................................................................................................................9-4


9.2.1 Safety Instructions 9-4
9.2.2 Why You Should Read this Chapter 9-4

Document number Lang. Rev. ind. Sheet

ABB Industrie AG 3BHS114940/E80 en vi


9.2.3 Excitation System Standstill 9-4
9.2.4 Excitation System Intermediate Storage 9-5
9.2.5 Dismantling the Excitation System and Separation of Materials 9-5
9.2.6 Disposal and Recycling 9-5

10 Drawings 10-3

10.1 General:................................................................................................................................................... 10-3


10.1.1 Why You Should Read this Chapter 10-3

10.2 How to read the Hardware Drawing ........................................................................................................ 10-3


10.2.1 Cover sheet 10-4
10.2.2 Sheet index 10-4
10.2.3 Drawing 10-5
10.2.4 List of terminals 10-8

10.3 How to read the Software Drawing ......................................................................................................... 10-8

11 Technical descriptions................................................................................................................................. 11-3

11.1 General.................................................................................................................................................... 11-3


11.1.1 Why You Should Read this Chapter? 11-3

11.2 Table of Content...................................................................................................................................... 11-3


11.2.1 Functional Description 11-3
11.2.2 Power Components and Low Voltage Components (Optional) 11-4
11.2.3 Components of the Control Electronics (Optional) 11-5
11.2.4 Service Documents 11-6

Document number Lang. Rev. ind. Sheet

ABB Industrie AG 3BHS114940/E80 en vii

You might also like