Footing Schedule
Footing Schedule
CF2
F4 CF2 F4 CF2
850
1400
F1 CF1
F3 F3 F3 F3 F3
F2 F2 F2
A
850
1400
CF1
F3 F3 F3 F3 F3
F1
F2 F2 F2
FOOTING SCHEDULE
GROUND LEVEL GROUND LEVEL
Depth Of Footing 1500mm
900
900
700
5-#16 #20@125 c/c 5-#16 #20@125 c/c
150
150
DWG NO: SHT NO :
P.C.C. (M15) P.C.C. (M15)
SECTION - A-A SECTION - B-B
REVISIONS
COLUMN SCHEDULE
REV. DATE DESCRIPTION
DOUBLE STORY ELEVATED SINGLE OFFRS (06) ACCN
WITH ATTACHED TOILET
FOOTING LAYOUT