Integrated Flow Assurance Analysis From "Reservoir To Export"
Integrated Flow Assurance Analysis From "Reservoir To Export"
“Reservoir to Export”
TOPSIDE PROCESS
System Deliverability
Dynamic Flow Simulations
Liquid Slugging
h
Paraffin,l Hydrates, Corrosion
Thermal Systems Design
Operating Procedures
Topside Impact Evaluation
Chemical Injection System
TRANSPORT
SYSTEM
SUBSEA PROCESSING SUBSEA PRODUCTION
SYSTEM SYSTEM
RESERVOIR
Scenario Planning
Installation &
Constructability
Integrated
Project Execution Integrated
Total Development
Project Execution
Solution
Operability Hardware
Building Blocks
Flow Assurance
Systems Approach to
Cost Effective Field
Developments
University of Houston – Spring 2013
SUBS 6310 - Flow Assurance
4 Phaneendra Kondapi, Ph.D.
2
Typical Flow Assurance Issues
Technical Challenges
· Deeper water depths
· Longer offsets/ tie-backs
· Bathymetry
· Arctic environment
· Low-energy reservoirs
· Heavy oil
· Subsea commingling
· Marginal and smaller fields
· Subsea processing
Flow assurance is key to
ensure project success!
4
Field Architecture Design Considerations
Wellbore Geometry & Reservoir
Drainage Philosophy
· Vertical vs. Deviated
· Single vs. Multiple Zones
· Natural Drive vs. Enhanced Recovery
· Smart Well Completions
70 80 90 100 110
FlowlineTemperature,d
· Single satellite vs. subsea manifolds
degF
· Single flowline vs dual flowlines
Pipe-in-Pipe
Externally Coated Line
10
20
25
15
0
TimeAfterShutDown,hours
University of Houston – Spring 2013
SUBS 6310 - Flow Assurance
11 Phaneendra Kondapi, Ph.D.
6
17 kbpd (free-flow)
19 kbpd (Pump dP = 602 psi)
21 kbpd (Pump dP = 1767 psi)
23 kbpd (Not enough flowing P)
Pump
location
System modeling helps
identify design limits &
J-T Heating flow assurance issues.
across
perforations