100% found this document useful (1 vote)
2K views162 pages

Stormwater Management Manual - COJ PDF

This document provides a stormwater management manual for the City of Johannesburg. It outlines principles of stormwater management including preservation of water resources, catchment planning, and addressing flood risks. It also interprets the city's by-laws regarding stormwater management and site development permits. Guidelines are given for stormwater management reports and site planning/design, including conducting site analyses of topography, geology, climate, hydrology, ecosystems and other factors to inform conceptual stormwater system layouts.

Uploaded by

D-Boy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
2K views162 pages

Stormwater Management Manual - COJ PDF

This document provides a stormwater management manual for the City of Johannesburg. It outlines principles of stormwater management including preservation of water resources, catchment planning, and addressing flood risks. It also interprets the city's by-laws regarding stormwater management and site development permits. Guidelines are given for stormwater management reports and site planning/design, including conducting site analyses of topography, geology, climate, hydrology, ecosystems and other factors to inform conceptual stormwater system layouts.

Uploaded by

D-Boy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 162

STORMWATER MANAGEMENT MANUAL

REVISION CV4 AF CJB 2017/08/12

REPORT TO

CITY OF JOHANNESBURG

BY

NEWTOWN LANDSCAPE ARCHITECTS


CBA SPECIALIST ENGINEERS
FOURTH ELEMENT
UNIVERSITY OF WITWATERSRAND
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING

1
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

Executive summary

i
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

Contents
List of Tables .................................................................................................................................. ix
List of Figures .................................................................................................................................. x
Definitions, terminology and acronyms .......................................................................................... xi
INTRODUCTION ..................................................................................................................................1
The City of Johannesburg By-laws ...................................................................................................1
The Manual .....................................................................................................................................2
Structure of the Manual ..................................................................................................................3
PART 1: PRINCIPLES ............................................................................................................................4
Purpose of stormwater management ..............................................................................................4
Preservation and enhancement ......................................................................................................4
Protection and enhancement of water quality ............................................................................4
Protection of ecological resources ...........................................................................................5
Protection of open space networks .........................................................................................7
Catchment Master Planning ............................................................................................................7
Catchment recovery ........................................................................................................................8
Runoff harvesting............................................................................................................................8
Flood and hazard risk ......................................................................................................................9
Flood management .................................................................................................................9
Adaptation to climate and weather change ........................................................................... 12
Densification and brownfields development.......................................................................... 13
Informal settlements and informal densification ................................................................... 13
Stormwater Network and Asset Register ....................................................................................... 14
PART 2: INTERPRETATION AND APPLICATION OF BY-LAWS ............................................................... 16
CHAPTER 1: INTERPRETATION, PURPOSE AND APPLICATION AND RESPONSIBILITY FOR COMPLYING
WITH BY-LAWS: PART 1 BY-LAWS ...................................................................................................... 17
Definitions .................................................................................................................................... 17
Purpose of By-laws ................................................................................................................ 23
Application of By-laws and manual ........................................................................................ 24
Responsibility for complying with By-laws ............................................................................. 25
CHAPTER 1: INTERPRETATION, PURPOSE AND APPLICATION AND RESPONSIBILITY FOR COMPLYING
WITH BY-LAWS : PART 2 THE MANUAL.............................................................................................. 26
CHAPTER 2: SITE DEVELOPMENT ACTIVITY PERMITS PART 1 BY-LAWS............................................... 27
Permits required ................................................................................................................... 27
Exceptions to permit requirements ....................................................................................... 27

ii
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
Applications for permits ........................................................................................................ 28
Expiry of permits ................................................................................................................... 28
Professional engineer required.............................................................................................. 29
Site development activity plan .............................................................................................. 29
Stormwater drainage plan ..................................................................................................... 29
Off-site stormwater drainage analyses .................................................................................. 30
Geotechnical reports ............................................................................................................. 30
Soils investigations reports .................................................................................................... 31
Permit modifications ............................................................................................................. 31
CHAPTER 2 : SITE DEVELOPMENT ACTIVITY PERMITS PART 2: THE MANUAL...................................... 32
STORMWATER MANAGEMENT REPORT ........................................................................................ 32
Deemed to Satisfy ..................................................................................................................... 32
Minimum Content ..................................................................................................................... 32
Credentials of Author ................................................................................................................ 34
SITE PLANNING AND DESIGN GUIDELINES ..................................................................................... 34
Planning Stage .......................................................................................................................... 34
Site Analysis .............................................................................................................................. 35
Topography ........................................................................................................................... 35
Geology, Soils and Groundwater ........................................................................................... 35
Climate.................................................................................................................................. 36
Hydrology.............................................................................................................................. 36
Natural Ecosystems, Flora and Fauna .................................................................................... 36
Ecological Characteristics of Freshwater Ecosystems ............................................................. 37
Cultural and Historical Landscapes and Archaeological Sites .................................................. 37
Development Requirements .................................................................................................. 37
Ownership Opportunities and Constraints ............................................................................. 38
Spatial Opportunities and Constraints ................................................................................... 38
Surrounding Developments ................................................................................................... 39
Maintenance Capacity ........................................................................................................... 39
Conceptual Layout .................................................................................................................... 39
Conceptual Stormwater Planning .......................................................................................... 39
Design of the Stormwater Management System .................................................................... 40
System Design Objectives ...................................................................................................... 40
CHAPTER 3: EROSION AND SEDIMENT CONTROL PART 1: BY-LAWS ................................................... 41
Minor developments ................................................................................................................. 41

iii
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
Control for minor developments ........................................................................................... 41
Requirements for minor developments ..................................................................................... 41
Major developments ................................................................................................................. 42
Provisions applicable to major developments ........................................................................ 42
Stormwater control measures for major developments ......................................................... 42
Control of off-site erosion ..................................................................................................... 43
Stabilisation of temporary conveyance channels and outlets ................................................. 44
Stormwater drain inlet protection ......................................................................................... 44
Trenches for municipal services ............................................................................................. 44
Constructed access routes ..................................................................................................... 45
Removal of temporary facilities ............................................................................................. 45
Dewatering of development sites .......................................................................................... 46
Control of pollution other than sediment .............................................................................. 46
Maintenance of erosion and sediment control facilities......................................................... 46
Erosion control design storm event ....................................................................................... 46
Installation of rain meter ....................................................................................................... 47
CHAPTER 3: EROSION AND SEDIMENT CONTROL PART 2: THE MANUAL ............................................ 48
SEDIMENT CONTROL: MANAGEMENT OBJECTIVES ........................................................................ 48
Sources of Sediment .............................................................................................................. 48
Setting Limits for Acceptable Sediment Discharge ................................................................. 49
Setting Limits for Acceptable Site Discharge for Sediment Control ......................................... 50
Erosion & Sediment Control .................................................................................................. 50
Best Management Practices: Erosion and Sediment Planning .................................................... 50
BEST MANAGEMENT PRACTICES: EROSION CONTROL ............................................................... 51
Assessing stability of temporary erosion protection works .................................................... 53
BEST MANAGEMENT PRACTICES: SEDIMENT CAPTURE AND DISPOSAL ...................................... 53
Designing Sediment Settlement Facilities. ............................................................................. 54
Designing Filtration Facilities. ................................................................................................ 55
Dewatering flooded areas on site (trenches, pits, etc.). ......................................................... 55
Control of vehicle borne mud from the site ........................................................................... 55
Disposal of Sediment ............................................................................................................. 56
BEST MANAGEMENT PRACTICES: OUTFALL ENERGY MANAGEMENT ......................................... 56
Monitoring and Maintenance of BMPs .................................................................................. 57
CHAPTER 4: GRADING PART 1 BY-LAWS ............................................................................................ 58
Grading plans ........................................................................................................................ 58

iv
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
Drainage................................................................................................................................ 58
Change in topography of development site ........................................................................... 59
Maintenance ......................................................................................................................... 59
CHAPTER 4: GRADING PART 2 THE MANUAL .................................................................................... 60
CHAPTER 5: STORMWATER MANAGEMENT PART 1 BY-LAWS ........................................................... 61
PART 1: ......................................................................................................................................... 61
Major developments ................................................................................................................. 61
Application ............................................................................................................................ 61
Development activities .......................................................................................................... 61
Approved hydrological methods for design ........................................................................... 61
Stormwater quantity control ................................................................................................. 62
Combination of quality and quantity control facilities............................................................ 67
Quality control requirements ................................................................................................ 67
Part 2: ........................................................................................................................................... 68
Major and minor developments ................................................................................................ 68
Application ............................................................................................................................ 68
Stormwater drainage facilities ............................................................................................... 68
Servitudes ............................................................................................................................. 70
Wetlands............................................................................................................................... 70
Regional stormwater facilities ............................................................................................... 71
Planning of catchment areas ................................................................................................. 72
CHAPTER 5: STORMWATER MANAGEMENT PART 2 THE MANUAL .................................................... 73
Definition of Predevelopment Condition ....................................................................................... 73
Pre-Development Target Values ................................................................................................ 73
Target Volume of Runoff ....................................................................................................... 73
Target Frequency of Runoff ................................................................................................... 74
Target Frequency of Runoff Design Storm Approach.............................................................. 75
Target Frequency of Runoff Continuous Model ..................................................................... 77
Summary and recommended targets for frequency of runoff ................................................ 79
Target Peak Discharge ............................................................................................................... 79
Peak Unit Rate of Runoff ....................................................................................................... 81
Summary and recommended targets for peak discharge ....................................................... 81
Target Water Quality................................................................................................................. 81
Target Duration of Runoff ......................................................................................................... 83
CHAPTER 6: OPERATION AND MAINTENANCE : PART 1 BY-LAWS ...................................................... 85

v
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
Application ............................................................................................................................ 85
Duty to maintain stormwater facilities................................................................................... 85
Acceptance by Agency of duty to maintain new stormwater facilities .................................... 85
Agency acceptance of duty to maintain existing stormwater drainage facilities ..................... 86
Inspections of privately maintained stormwater facilities .............................................................. 86
Inspection schedule............................................................................................................... 87
CHAPTER 6: OPERATION AND MAINTENANCE : PART 2 THE MANUAL ............................................... 88
CHAPTER 7: CRITICAL DRAINAGE AREAS : PART 1 BY-LAWS ............................................................... 89
Additional requirements........................................................................................................ 89
CHAPTER 7: CRITICAL DRAINAGE AREAS : PART 2 THE MANUAL ........................................................ 91
CHAPTER 8: STORMWATER POLLUTION : PART 1 BY-LAWS................................................................ 92
Prohibition of pollution ......................................................................................................... 92
Maintenance of pollution control device ............................................................................... 92
Exemptions ........................................................................................................................... 92
Test procedures .................................................................................................................... 92
Stormwater quality : not addressed....................................................................................... 92
CHAPTER 8: STORMWATER POLLUTION : PART 2 THE MANUAL ........................................................ 94
Filtration and Treatment ............................................................................................................... 94
CHAPTER 9: MISCELLANEOUS : PART 1 BY-LAWS ............................................................................... 96
Experimental best management practices ............................................................................. 96
Deviations and exemptions from By-laws .............................................................................. 96
Deviations and exemptions from manual .............................................................................. 97
Progress of work ................................................................................................................... 97
Compliance notices ............................................................................................................... 97
Stop work orders ................................................................................................................... 98
Serving of notices .................................................................................................................. 98
Inspections ............................................................................................................................ 99
Appeals ................................................................................................................................. 99
Offences and penalties .......................................................................................................... 99
Short title ............................................................................................................................ 100
CHAPTER 9: MISCELLANEOUS : PART 2 THE MANUAL ...................................................................... 101
MANAGEMENT OBJECTIVES: EXPERIMENTAL BMPs..................................................................... 101
Outline for an Experimental BMP Proposal .............................................................................. 101
Which GSI and Green Infrastructure are not Experimental?..................................................... 101
PART 3: APPENDICES...........................................................................................................................1

vi
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
Appendix A: Geographical information............................................................................................1
A.1 GEOLOGY AND SOILS .............................................................................................................1
Hydrological Characteristics of Soils.........................................................................................2
Problem Soils ..........................................................................................................................5
Equivalence of Horton and Green and Ampt Parameters .........................................................5
A.2 CATCHMENT AREAS ..............................................................................................................8
A.2.1 South flowing catchments ............................................................................................ 10
A.2.2 North flowing catchments ............................................................................................ 10
A.2.3 External catchments ..................................................................................................... 10
A.3 CLIMATIC CONDITIONS ........................................................................................................... 11
Rainfall and Evaporation ........................................................................................................... 11
Appendix B: Rivers and riparian corridors............................................................................................1
B.1 PRINCIPLES................................................................................................................................1
B.2 RIVER CROSSINGS......................................................................................................................1
B.2.1 Aquatic Organism Passage ..................................................................................................1
B.3 FLOODLINES AND FLOODPLAINS ...............................................................................................1
B.3.1 Land Use ............................................................................................................................1
Appendix C: Green stormwater infrastructure.....................................................................................1
C.1 INTRODUCTION AND DEFINITIONS ............................................................................................1
C.2 LANDSCAPE PERFORMANCE ......................................................................................................2
C.3 ECOSYSTEM ASSETS AND SERVICES ...........................................................................................2
C.4 POTENTIAL BENEFITS OF GREEN INFRASTRUCTURE ...................................................................3
Social benefits .............................................................................................................................3
Climatic modification ..................................................................................................................3
Water management ....................................................................................................................3
· Reduced and Delayed Stormwater Runoff Volumes .........................................................4
· Enhanced Groundwater Recharge....................................................................................4
· Stormwater Pollutant Reductions ....................................................................................4
· Reduced Sewer Overflow Events......................................................................................4
Air Quality ...................................................................................................................................4
Food production .........................................................................................................................5
C.5 CONCLUSION ............................................................................................................................5
Appendix D: Calculation methods and modelling (include ‘supporting calculations’) ...........................1
D.1 MODEL SELECTION AND USE .....................................................................................................1

vii
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
D.2 RAINFALL ..................................................................................................................................1
D.3 MODEL PARAMETERS ...............................................................................................................1
D.4 DESIGN GUIDELINES FOR GSI ....................................................................................................1
D.5 RAINFALL AND RUNOFF ............................................................................................................1
Rainfall Depth Required to Initiate Runoff Sandy Loam Soil .........................................................1
Peak Discharges for Storm Duration ............................................................................................2
Comparison of Rainfall IDF Curves ...............................................................................................3
Variation of Unit Runoff with Catchment Area.............................................................................4
Continuous Modelling .................................................................................................................5
· Model..................................................................................................................................5
· Rainfall data ........................................................................................................................6
· Runoff .................................................................................................................................6
Appendix E: Review of Design Rainfall for Johannesburg .....................................................................1
E.1 INTRODUCTION .........................................................................................................................1
E.2 ASSUMPTION OF STATIONARITY................................................................................................1
E.3 DESIGN EVENT ANALYSIS VS CONTINUOUS SIMULATION ...........................................................2
E.4 GENERAL CLIMATE OF JOHANNESBURG ....................................................................................2
E.5 TOPOGRAPHY OF THE CITY OFJOHANNESBURG .........................................................................2
E.6 WEATHER SYSTEMS AFFECTING JOHANNESBURG ......................................................................3
Frontal cyclones (or mid-latitude cyclones) .................................................................................3
Tropical Cyclones and Ridging Indian Ocean Highs.......................................................................3
Thunderstorm systems (and tornados) ........................................................................................5
E.7 STORM RAINFALL FREQUENCY ..................................................................................................6
E.8 DISTRIBUTION OF STORM FREQUENCY ACROSS THE METROPOLITAN AREA ..............................8
E.9 LIKELIHOOD OF ANTECEDENT RAINFALL. ...................................................................................8
E.10 STORM SPEED AND TRAJECTORY .............................................................................................8
E.11 STORM RAINFALL INTENSITY ...................................................................................................9
E.12 DESIGN STORM EVENT DATA FOR JOHANNESBURG ............................................................... 10
E.13 RAINFALL DATA FOR CONTINUOUS SIMULATION................................................................... 11
E.14 CLIMATE CHANGE – KEY ISSUES Jen to check and comment .................................................. 12
Climate Change – Recent Trends ............................................................................................... 12
Appendix F: Review of sediment control BMPs ...................................................................................1
F.1 Background ...............................................................................................................................1
Setting Limits for Acceptable Sediment Discharge .......................................................................1

viii
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
REFERENCES .......................................................................................................................................1

List of Tables

Table 2.3.1: Summary of water quality guidelines for South African rivers and streams..................... 48
Table 2.3.2: Interim trap efficiency of on-site sediment treatment facilities. ..................................... 49
Table 2.3.3: Erosion Control BMPs. ................................................................................................... 52
Table 2.5.1: Mean Annual Runoff from Quaternary Catchments ....................................................... 74
Table 2.5.2 Rainfall Depth required to initiate Runoff (Dry Sandy Loam Soil) ..................................... 76
Table 2.5.3 Rainfall Depth required to initiate Runoff (Dry Clayey Loam Soil) .................................... 76
Table 2.5.4 Rainday Frequency Zoological Gardens ........................................................................... 77
Table 2.5.5 Probability of a Rainday Following a Previous Rainday .................................................... 77
Table 2.5.7: Wastewater Discharge Limits (from National Water Act, 1998) ...................................... 82
Table A.1: Typical Values for the Parameters in Horton’s Equation ......................................................3
Table A.2: Rate of Decay of Infiltration for Different values of k ..........................................................3
Table A4: Computed Runoff Characteristics (Horton) ..........................................................................6
Table A5: Computed Runoff Characteristics (Green & Ampt) ...............................................................7
Table D5.1: Rainfall and Discharge at Initiation of Runoff (Initially Dry Sandy Loam) ............................1
Table D3: Computed Natural Peak Discharge 2yr RI.............................................................................3
Table D4: Computed Natural Peak Discharge 5yr RI.............................................................................3
Table D5: Comparison of Rainfall Depths Calculated Using Different Equations ...................................4
Table D.7: Variation in Peak Discharge with Catchment Area ..............................................................5
Table E1: Statistics of summer rainfall (mm) over Gauteng, 1977/78 to 2008/09 (after Dyson, 2009). .2
Table E2: Summary of Tornado Activity Recorded in Gauteng (from Goliger, et al, 1997) ....................5
Table E3: Statistics of monthly and daily rainfall over Gauteng (after Dyson, 2009) .............................6
Table E4: Maximum recorded 24-h rainfall at a single station in Gauteng, 1977/78 to 2008/09 (Dyson,
2009). .................................................................................................................................................7
Table F.1: Summary of water quality guidelines for South African rivers and streams. .........................1
Table G.2: Interim trap efficiency of on-site sediment treatment facilities. ..........................................4

ix
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

List of Figures

Figure 2.5.1: Rainfall and computed runoff for the entire period October 1994 to December 2011 ... 78
Figure 2.5.2: Relationship between peak discharge and event max rainfall intensity ......................... 78
Figure 2.5.3 Computed Natural Peak Discharge 1.01yr RI (Dry Sandy Loam) ...................................... 80
Figure 2.5.4 Computed Natural Peak Discharge 2yr RI (Dry Sandy Loam) ........................................... 80
Figure 2.5.5 Computed Natural Peak Discharge 5yr RI (Dry Sandy Loam) ........................................... 80
Figure 2.5.6 Flow duration curves calculated for a 1.0 ha catchment for imperviousness ratios from
0% to 70% ......................................................................................................................................... 83
Figure D1: Runoff vs Precipitation Depth for Storm Duration (Initially Dry Sandy Loam) ......................2
Figure D2: Graph of Rain Depth for RI & Td .........................................................................................4
Figure D3: Graph of Rain Depth for RI & Td .........................................................................................5
Figure D4: Rainfall and computed runoff for the entire period October 1994 to December 2011 ........7
Figure D5: Relationship between peak discharge and event max rainfall intensity Enlarge text ...........7
Figure D7: Hydrograph and Hyetograph for Event 32 on 9 January 2010, Total Rain 59.6 mm .............9
Figure E1: The Witwatersrand ridge and the profiles of the Braamfontein Spruit and Klipspruit
draining north and south of the ridge respectively. Provide new diagram. ..........................................3
Figure E2: The Witwatersrand Scattered and isolated storm cells which are independent of each
other. (Source?) ..................................................................................................................................4
Figure E3: Comparison of storm profiles of rainfall events > 10mm at OR Tambo (1994-2010) and the
Storm Type 3 profile for the greater Johannesburg area (Piketh, et al, 2013). ................................... 10
Figure F1: Examples of turbidity (City of Calgary, Canada, www.calgary.ca).........................................2
Figure F2(a): Braamfontein Spruit during normal flow with low turbidity (February 2015)...................3
Figure F2(b): Braamfontein Spruit after a storm event showing high turbidity (January 2015). ............4

x
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

Definitions, terminology and acronyms

BMP Best Management Practice is a term used in the United States of America and Canada to
describe a type of water pollution control measure. Historically the term has referred to
auxiliary pollution controls in the fields of industrial wastewater control and municipal
sewage control, while in stormwater management (both urban and rural) and wetland
management, BMPs may refer to a principal control or treatment technique as well.

ESCP Erosion and Sediment Control Plan, to be compiled as part of the Stormwater Drainage Plan,
that address the risk of sediment yield from a development site, the potential impacts on the
receiving environment, the intended measures to address the risk and a demonstration of
the expected performance. The intended measures will be a combination of planning to
minimise exposed areas as well as BMPs to contain the sediment yield from those exposed
areas.
GI Green Infrastructure refers to “the interconnected set of natural and man-made ecological
systems, green spaces and other landscape features that together form an infrastructure
network providing services and strategic functions in the same way as traditional ‘hard’
infrastructure” (GCRO, 2013). It is not specific to urban stormwater infrastructure though
stormwater networks are a common focus of Green Infrastructure design. Importantly,
Green Infrastructure aims to provide multiple services of which stormwater functions could
be one (others may be public amenity (parks) and biodiversity, for example). This usually
involves multiple municipal departmental stakeholders and (currently) institutional and
administrative problems. Nevertheless, Green Infrastructure is increasingly being seen as
critical to sustainable cities and as a climate adaptation initiative; therefore, stormwater
planning and design will inherently be central to it. A distinction is to be made between this
term and GSI, though in practice many drainage solutions may be both.
GSI Green Stormwater Infrastructure maximises the use of infiltration, evapotranspiration,
storage and reuse to control and treat stormwater runoff. GSI practices are generally small in
scale and distributed in a decentralized manner throughout the landscape. GSI is intended to
manage stormwater runoff as close to the source as possible in an effort to maintain pre-
development hydrology.
LID Low Impact Development is an approach to land development (or re-development) that
works with nature to manage stormwater as close to its source as possible. LID employs
principles such as preserving and recreating natural landscape features, and minimizing
effective imperviousness to create functional and appealing site drainage that treat
stormwater as a resource rather than a waste product. There are many practices that have
been used to adhere to these principles such as bioretention facilities, rain gardens,
vegetated rooftops, rain barrels, and permeable pavements. By implementing LID principles
and practices, water can be managed in a way that reduces the impact of built areas and
promotes the natural movement of water within an ecosystem or watershed. Applied on a
broad scale, this approach can maintain or restore a watershed's hydrologic and ecological
functions. (EPA, date)
LIDS Low Impact Drainage Systems, synonymous with GSI.

xi
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
SDP Stormwater Drainage Plan is a drawing or drawings of the site showing the spatial
relationship, capacities, flow directions, and all other characteristics of the stormwater
management system for the site and its receiving system. It forms part of the Stormwater
Management Report (SWMR).
SQID Stormwater Quality Improvement Device is an intervention with the primary function of
improving the quality of the stormwater runoff. This can include structures such as gross
pollutant traps or proprietary devices for separating sediment, floating debris and non-
emulsified oil from the stormwater flow. The can also include interventions with multiple
functions, such as wetlands or sediment traps
SUDS Sustainable Urban Drainage Systems recognise the value of rainwater, seeking to capture,
use, delay, or absorb it, rather than reject it as a nuisance or problem. Sustainable drainage
delivers multiple benefits. As well as delivering high quality drainage whilst supporting areas
to cope better with severe rainfall, SUDS can also improve the quality of life in developments
and urban spaces by making them more vibrant, visually attractive, sustainable and resilient
to change by improving urban air quality, regulating building temperatures, reducing noise
and delivering recreation and education opportunities.
SWMR Stormwater Management Report, needs to contain minimum content as outlined in Chapter
2 of the Manual. The SWMR shall include the Stormwater Drainage Plan (SDP) and the
Erosion and Sediment Control Plan (ESCP)
WSUD Water Sensitive Urban Design integrates water cycle management into urban planning and
design to manage the impacts of stormwater from development. It is applied at all scales,
from the individual property to the regional catchment. It aims to protect and improve
waterway health by replicating the natural water cycle as closely as possible.

xii
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

INTRODUCTION
Urban stormwater management is no longer about efficient drainage and flood management. It is
about the protection of a resource. Storm drains are no longer wastewater networks but a means of
conveying water resources to control points for treatment and reuse to enhance the urban
environment. In addition to protecting water resources, a sustainable drainage system can improve
the quality of life in urban spaces by making them more vibrant, visually attractive, sustainable and
more resilient to change, by improving urban air quality, regulating building temperatures, reducing
noise and delivering recreation and education opportunities.
Fill out intro with the ‘problem statement’, and the broad aims of the by-laws and manual.

This Manual provides guidance to:


· Catchment planners

· Project team designing stormwater management systems

· Authorities designing surface water management systems


· Authorities reviewing site development plans

The City of Johannesburg By-laws

· Densification, pollution, degradation of natural water resources

The City of Johannesburg is the fastest growing metropolitan municipality in South Africa. The
population has grown at an average 3.2% pa since 2001 and in 2011 stood at just over 4.4 million
(Stats SA, 2011). The proportion of the population living in informal settlements has decreased over
that time from 23% to 19% (HDA, 2013), but both formal land development and informal areas
continue to expand. Plans for urban densification and likely growth of informal settlements require
proactive management and planning to ensure recovery and protection of the City’s water resources.
Make the link between development and stormwater explicit here – impervious surfaces (volume
and peak discharge), heat build-up, pollution.
· Current thinking on stormwater

[“Holistic approach” = water as resource rather than ‘waste’; catchment recovery, catchment
planning, risk (flood and hazard) management…]

Stormwater management problems present themselves in the form of severe pollution, erosion and
river bank damage, and increasing reports of flooding every summer, with property damage, traffic
disruption and loss of life. All the streams in the metropolitan area are in a poor state (State of Rivers
Report, 2011); yet there remains a high demand for more development. The management of urban
runoff, along with protection of the environment and provision for public amenity needs urgent
attention.
Sustainable stormwater management is central to the initiative of Green Infrastructure investment
(GCRO, 2016). High quality drainage systems that are integrated into the overall design of a
development will automatically provide many other services and become features themselves,
attracting tourism and investment, driving local economic growth. Where such systems are designed

1
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
to make efficient use of the space available, they can often cost less to implement than underground
piped systems (Woods-Ballard, et al., 2015).
Zero impact targets (explain what this means) are often best achieved through the support from
facilities planned at a catchment scale. Catchment stormwater planning is critical to achieving an
effective balance between water resource management, environmental sustainability and optimal
land use. Urban planners and engineers planning at catchment scale must be aware of the contents
of this Manual to make provision for the inclusion of surface water management principles and
facilities described here to enable the target of zero negative impact to be achieved.
These guidelines are applicable to all projects and changes of land use that will affect runoff or
infiltration, irrespective of property size. Different standards and evaluation criteria are applied to
projects of different scales. They also apply to site redevelopments, where retrofitting of Green
Infrastructure facilities can be introduced.

· Climate change

Is this appropriate here – duplicates 1.6.1? Is this a real driver of the new by-laws?

The Manual

“manual” means the stormwater design manual contemplated in section 3(3)(a), adopted by the
Council, as amended or substituted from time to time

This Design Manual seeks to achieve two main aims:


1. To modernise the management of urban runoff as a resource and to ensure that it is given
early consideration in both urban planning and the development of site plans, and
2. To set out methodologies and data relevant to the management of storm runoff under
Highveld weather conditions specific to Johannesburg.
The guidelines given in this document are the minimum applicable standard. Property owners,
developers and design teams are encouraged to apply more stringent criteria and to strive for zero
negative impact.
· Briefly discuss main changes to by-laws – role of professionals and landowners

· Reference manual for green infrastructure and interpretation of by-laws

Many of the principles discussed in this Manual are drawn from current thinking on best
international practice. These include SUDS (Sustainable Urban Drainage Systems) adopted in the UK,
LID (Low Impact Development) principles adopted in the US, and WSUDS (Water Sensitive Urban
Design) adopted in Australia. They all seek to minimise the impact of urban development on local
water resources, and have been adopted in other developing countries such as Brazil and China,
which have experienced similar rapid growth of their metropolitan areas to South Africa.
SUDS are designed to maximize the opportunities and benefits obtained from surface water
management, specifically by improving the way we manage water quantity, water quality, amenity,
and biodiversity. In this section, some broad planning principles derived from The SUDS Manual

2
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
(Woods-Ballard, et al., 2015) will be discussed. More specific principles as they apply to water
quantity and water quality will be elaborated upon.
The SUDS approach involves slowing down and reducing the quantity of surface water runoff from a
developed area to manage downstream flood risk, and to reduce the risk of that runoff causing
pollution. This is achieved by harvesting, infiltrating, slowing, storing, conveying, and treating runoff
on site and, where possible, on the surface rather than underground.
By adopting this approach, SUDS can enhance the green space within developments and link wider
green networks, supporting the provision of habitats and places for wildlife to live and flourish. The
benefits to the community of using this approach are also numerous, including improvements in
health, wellbeing, and quality of life for individuals and communities. (Woods-Ballard, et al., 2015).
To maximise these benefits, surface water management should be considered from the beginning of
the development planning process, influencing site layout and design, and the characteristics of
urban spaces. So it is important that, where appropriate, an interdisciplinary team (including
planners, landscape architects, architects, and drainage and environmental engineers) should work
together from the outset.
There are many different ways that these systems can be applied to deliver effective surface water
management and the apparent lack of space should never be a reason for not using SUDS. Designing
drainage systems so that the space performs multiple functions is particularly important in dense
urban areas where space is at a premium (Woods-Ballard, et al., 2015).
In order to maximise benefits, managing surface water runoff should, as far as possible:

· Use surface water runoff as a resource


· Manage rainwater close to where it falls (at source)
· Manage runoff on the surface (above ground)

· Allow rainwater to soak into the ground (infiltration)


· Slow and store runoff to mimic natural runoff rates and volumes
· Reduce contamination of runoff through pollution prevention and by controlling the runoff
at source
· Treat runoff to reduce the risk of urban contaminants causing environmental pollution.
Depending on the characteristics of the site and local requirements, these may be used in
combination and to varying degrees (Woods-Ballard, et al., 2015).

Structure of the Manual

Part 1 – Principles

Part 2 – Annotated by-laws. Chapters numbered to match the chapters in the By-Laws

Part 3 – Appendices

3
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

PART 1: PRINCIPLES
The cumulative impact of ever-increasing areas of development and hard pavement in metropolitan
areas suggests that a “one size fits all” standard for stormwater management does not assure
optimum design and management. This is especially the case where site specific decisions are made
without an understanding of the constraints and requirements of the wider catchment, and the
engineer or planner is limited to a set of potentially unsuitable standards that may be applied to
obtain sign-off of a site development plan.

A set of principles has therefore been prepared which is intended to provide a backdrop against
which decisions on stormwater planning and design may be applied. Planners and designers need to
refer to these principles to ensure that their stormwater plans meet the requirements of good
stormwater management. Furthermore, these principles are intended to provide support to
consultants, developers and municipal officers considering plans for the development and
management of the City, from spatial development frameworks through to site development plans.

How to apply the principles:

i. If in doubt, adopt the precautionary principle.

ii. If there is no catchment surface water management plan to guide site development
stormwater requirements, adopt the precautionary approach.

iii. Manage stormwater volume and not just peak discharge.

iv. Stormwater designs must address all the principles in this manual.

v. Make space for stormwater management.

Purpose of stormwater management

Surface water should be managed for maximum benefit, now and in the future. By understanding
context and the Departments responsible for the planning and design of urban areas working
together, surface water management can be integrated into the design of our urban areas, to protect
our environment and to create high quality places for future generations (Woods-Ballard, et al.,
2015).

Preservation and enhancement

Protection and enhancement of water quality


It is estimated that runoff from Johannesburg’s paved surfaces, less what would have run off in its
pre-development greenfield state, is close to 45% of the annual purchase of potable water (as at
2011, including non-revenue water), and as much as 70% of the billed water. Water for the City of
Johannesburg is imported from as far afield as KwaZulu-Natal and Lesotho through inter-basin
transfer schemes and international agreements. In addition, along with Ekurhuleni, the City of
Johannesburg pollutes the local streams to such an extent that Rand Water and the Department of
Water & Sanitation are required to use some of this imported water to flush the Vaal River to protect

4
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
downstream users. Similar impacts are experienced in the Crocodile River and Hartebeespoort Dam.
In drought years these impacts are severe and at a regional scale. This is clearly an unsustainable
situation and the City of Johannesburg will, at some point, need to play a significant role in the
management and preservation of water resources.

Principle:
Stormwater is a water resource. The effects of urbanisation resulting in flash flooding, sediment, and
pollution loads, surcharging sewer systems, watercourse erosion, etc., substantially increase the cost
of capture, storage, and treatment of the water. Urban planning and all development should support
the protection and preservation of this resource. Furthermore, new development should not
compromise the potential for rehabilitation and enhancement of pre-existing urban areas.

The protection and enhancement of water quality is one of the core principles of sustainable urban
drainage. Runoff from urban surfaces in Johannesburg is polluted with sediments, hydrocarbons,
phosphates, potentially pathogenic organisms, and a range of organic and inorganic compounds.
Litter is a constant presence and threatens the design capacity of stormwater systems. Furthermore,
rainfall-runoff in Johannesburg can be acidic, with pH levels as low as 4 (Mphepya, et al., 2004),
particularly for first flush events after a dry period.

Principle:
A Stormwater Management Plan, whether at catchment scale or for a specific site, must describe the
pollution risks and how these may affect the quality of the runoff and stream flow. It must also
describe the potential impacts on the receiving systems and identify Best Practice measures to
mitigate the risks as far as reasonably possible. Where the potential for mitigation is limited or
reasonably beyond the means of the site to achieve, this should be clearly stated and motivated.

Protection of ecological resources


Protection and enhancement of ecological systems is a central theme of source control, green
infrastructure, and sustainable drainage. Ecological systems form part of the Urban Natural Capital
that plays an integral role in contributing to the environmental and economic health of cities. In
addition they provide cost effective benefits to stormwater quality and flood management.
Policy-makers now recognise the important contribution that designing for biodiversity can make to
ecosystem services and improved community ‘living’ space. The benefits of creating new habitats
and rehabilitating or enhancing existing habitats through sustainable drainage system design go far
beyond the contribution that planting makes to the functionality and performance of the drainage
system. Landscape features that support diverse habitats and associated ecosystems provide a
healthy and stimulating environment that can add significant value to urban living. Biodiversity value
can be delivered by even very small, isolated schemes, but the greatest value is achieved where the

5
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
drainage systems are planned as part of wider green landscapes, as they can then help to provide
important habitat and wildlife connectivity.
A fundamental aspect of ecological health is heterogeneity. Structural heterogeneity is a crucial
component of this. In terms of wetlands, this includes micro-topography, wetland shape, vegetation
community, macro and micro-invertebrate communities. For lotic systems such as streams, structure
is important for both riparian and instream aspects of the stream. Using the South African Scoring
System Version 5 (SASS5) as a guideline (Dickens & Graham, 2002), instream habitat is partitioned
into overhanging vegetation (including submerged plants), sand, stones and bedrock. All are
important although stones in-current usually provide the most species rich biotope on the Highveld.
A mix of these habitat types is healthy, and imparts a degree of ecological resilience to the stream.
Riparian habitat also benefits from structural heterogeneity, and a good mix of species both creates
this and enhances faunal species richness simultaneously. These factors play a role in the design of
channel morphology and materials used in channel construction.
Not all parts of urban drainage networks can be maintained or converted to green infrastructure, and
hard surface grey infrastructure will continue to perform important stormwater management
functions in Johannesburg. There should, however, be consistent effort to maximise the ecological
potential of drainage systems in new development (and land re-development), coupled with a
programme of retrofitting green infrastructure in existing networks. Watercourses, natural drainage
lines, wetlands, attenuation and retention dams, and sediment traps are ideally suited for ecological
engineering design.
The following criteria should be used to guide design proposals around biodiversity and ecosystem
services:
· support and protect natural local habitat and species

· contribute to the delivery of local biodiversity objectives


· contribute to habitat connectivity
· create diverse, self-sustaining, and resilient ecosystems
Detailed design criterial can be derived from various sources, for example The SuDs Manual (Woods-
Ballard, et al., 2015).

Principle:
Green infrastructure, with defined targets for habitat creation, should be addressed as part of the
drainage alternatives considered for all new development sites, and presented as part of the SDP
submission.
As part of catchment master planning, existing networks should be assessed for sections of the
network that may be converted to green infrastructure. A programme of retrofitting green
infrastructure should be drawn up and implemented. Such programmes in established metropolitan
areas such as the City of Johannesburg could extend to 50 years or more.

6
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
Protection of open space networks
Good urban design aims to deliver attractive, pleasant, useful and above all ‘liveable’ urban
environments that support and enhance local communities. Water is a valuable natural resource,
and the management of rainfall and runoff can form a key part of an urban vision. Designs using
surface water management systems to help structure the urban landscape can enrich its aesthetic
and recreational value, promoting health and well-being. Water managed on the surface, rather
than underground, can help reduce summer temperatures, provide habitat for flora and fauna, act as
a resource for local environmental education programmes and working groups and directly influence
the sense of community and prosperity of an area. SUDS can provide opportunities for water to be
visible and audible as it travels through the landscape – places where water flows, stills, trickles or
splashes are often where it is experienced and valued most. Amenity and biodiversity are often
considered together, but they are each important in their own right, and the overlaps and linkages
should be recognised by designers (Woods-Ballard, et al., 2015).
The benefits of integrated networks of public open space to community health and wellbeing are
well documented (cf. Fletcher, et al., 2015; Lawson, et al., 2015; Mguni, et al., 2016). Watercourses,
drainage lines and urban streams provide important corridors of open space suitable for public
access, and therefore an important contribution to Urban Natural Capital. A good example in
Johannesburg is the river corridor of the Braamfontein Spruit and its tributary streams that link
numerous public parks providing an almost continuous 25km open space corridor, which is used for
recreational purposes from Braamfontein to Sunninghill. Even though it is not in pristine condition
and issues of security along the route are a concern, it is used daily by communities along its length.
Not all parts of an open space network will be public, and private open space areas still contribute to
the wider health and wellbeing of the municipal area, particularly where watercourses and drainage
lines offer corridors of open space continuity across public and private areas. Where private open
space breaks the continuity of the public open space corridor, alternative public pathways should be
provided.
The following criteria should be used to guide design proposals around amenity and open space
(Woods-Ballard, et al., 2015):
· maximise multi-functionality;
· enhance visual character;
· deliver safe surface water management systems;
· support development resilience/adaptability to future change;
· maximize legibility;
· support community environmental learning.

Catchment Master Planning

Stormwater management is optimised through the identification of objectives and performance


targets on a catchment basis. These are presented as Catchment Master Plans that should reflect
both baseline conditions and long-term land development plans, and will then set out stormwater
targets to achieve this. These may include “catchment recovery” or “runoff harvesting” targets as
outlined in the sections below. The Catchment Master Plans should include stormwater control

7
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
targets for new development, retrofitting source control and SUDS facilities in established
catchments, and the development of Green Infrastructure. Site design requirements, including
attenuation or retention and water quality requirements, are best set in the context of Catchment
Master Plan requirements.

Catchment Master Plans shall be established, reviewed, and updated for all major drainage networks
in the City of Johannesburg. They will acknowledge downstream risks and requirements, and set
stormwater targets for the catchment as a whole. Stormwater management criteria for site
development will be defined in the Catchment Master Plan and these criteria may vary across the
catchment.
Site development plans should refer to the relevant Catchment Master Plan, and demonstrate how
the site drainage will support the aims of the master plan.
In the absence of a Catchment Master Plan, on-site drainage management should default to
frequency of runoff and volume control with parameters equivalent to greenfield site conditions for
a range of storm return periods and durations.

Catchment recovery

An integral part of Catchment Master Planning is the theme of catchment recovery (or catchment
repair). This considers the long-term recovery of the hydrological response of the urban catchment
to pre-development conditions. It is the foundation for the application of WSUDS in Australia (Argue,
2004), or the “sponge city” concept being implemented on a grandiose scale in China, that guides
both the development of greenfield sites and the re-development of sites within established urban
areas. This concept encourages the Catchment Master Plan to consider the potential for retrofitting
WSUDS in established areas and even setting standards for greenfield development that
compensates for older development upstream.
Principle:
All stormwater design shall consider the return of the urban catchment to greenfield conditions.
All Catchment Master Plans should plan toward catchment recovery.

Runoff harvesting

Runoff harvesting is a viable means of stormwater management, and offers the added value of
providing a water source. At a site scale, the efficacy of the harvesting systems can be affected by
storage capacity and use. Harvesting runoff at a catchment scale, utilising facilities in the public space
(e.g. floodplains) with potentially larger storage volumes has the potential to optimise the water
balance and therefore the efficacy of the system.
Principle:
Runoff harvesting is a form of SUDS that is encouraged in the City of Johannesburg. At catchment

8
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
scale, this should be represented in the Catchment Master Plan. On-site drainage design in the
upstream areas should demonstrate support for this, but must not compromise the flood risk of
properties or potential damage to natural water courses downstream.

Runoff harvesting at catchment scale (and therefore represented in the Catchment Master Plan)
could require the promotion of storm runoff to maximise the yield from upstream catchments. On a
site scale this would encourage impermeability and attenuation rather than permeability and
retention in support of the principle of on-site volume control. However, at a catchment scale, the
principle of volume control is preserved by the runoff harvesting facility. This approach would,
however, require extreme care to ensure protection of the drainage system upstream of the regional
harvesting facilities.

Principle:
Rainwater should be treated as a resource and its harvesting should be the default design intention.

Flood and hazard risk

Flood management
Flood Volume

Flood hazard and the changing risk with incremental upstream development and climate change is
one of the founding themes of stormwater management. The principle of flood peak flow
attenuation via detention systems is embedded in current practice in Johannesburg. Some
authorities believe that the combined performance of these systems on a catchment scale or metro
scale is uncertain and could even be detrimental to the flood risk of properties further downstream,
but this concern has not been demonstrated in practice (Boyd 1993). Internationally, volume control
has superseded attenuation as Best Practice, requiring the implementation of retention and
infiltration systems.
Infiltration systems appropriate for Johannesburg will need further research. Given the steep terrain
and the quartz and granite geology over much of the metropolitan area, deep groundwater recharge
will be limited. Infiltration may therefore be restricted to the relatively flatter slopes along natural
drainage lines where soil depths are greater.
Runoff harvesting may instead offer greater potential for volume control, particularly if used in
conjunction with retention systems.

Principle:
Precautionary Principle: On-site retention (instead of attenuation) is the default condition in the
absence of a catchment management plan.
Whether at catchment scale or site scale, development should seek to limit storm runoff to no

9
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
greater than a greenfield state condition under all storm conditions up to the 1:100 year event.
Measures to manage volume fall into two categories; retention for reuse, and infiltration and
evapotranspiration. All developments must address either one or a combination of these measures.
However, attenuation measures may be considered where there is a Catchment Master Plan
providing for retention and reuse in other parts of the catchment.

Flood Conveyance and Disaster Management

Planning, providing for, and maintaining flood conveyance paths and corridors is an important part of
stormwater management at both catchment scale and site scale. It is an integral part of flood hazard
management and a key service provided by the stormwater network.
Flood conveyance is designed as part of the stormwater drainage network for effective disaster
management. This essentially provides flood capacity exceeding the design capacity of the primary
asset (for example, the culvert or storm drain along a road). Hence flood conveyance may include
streets and roads that will convey the 100 year flood when the 5 year design capacity of the culvert is
exceeded. These systems need to be specifically planned and designed for, with capacity and
performance clearly stated. Flood conveyance systems need to be included in the municipal
infrastructure asset register.
Whilst the 100 year flood is enshrined in law in Section 144 of the Water Act (Act 36 of 1998) it
cannot be regarded as the limit of risk. There is a significant probability that the 100 year event will
be exceeded during the lifetime of a development, and the system should be designed to minimise
the consequences of flood events with recurrence intervals exceeding 100 years.

Principle:
The design capacity of the different components of the stormwater network will be defined
according to Catchment Master Plan requirements and within the guidelines set out in this Design
Manual. However all sites will analyse the 100 year flood event, clearly setting out the intended
conveyance of the storm runoff through the site by means of flood lines, and indicating the safe
height of threshold levels for buildings above the flood line.
The consequences of flood events with recurrence intervals exceeding 100 years should be assessed
and minimised

Floodplain Management

Floodplains are a specific component of the flood conveyance network of a city. They typically form
part of major drainage networks and include a natural channel and riparian open space that is
inundated in extreme events. Section 144 of the National Water Act (Act 36 of 1998) requires the 100
year flood line to be represented on planning and site design drawings, implying that this is the

10
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
defined extreme event to be used. The CSIR (2000) “Red Book” instead suggests the Regional
Maximum Flood (RMF) should determine the extent of the floodplain.
In many developing cities, the stream morphology will have been altered by the storm runoff
responses from the upstream catchment under development. In Johannesburg the river corridors are
mostly degraded environments where flash flooding is readily recognised in the steeper north-
flowing streams by the steep, unstable, eroded river banks and the river bed eroded to bedrock.
Similar features appear in the upper sections of the south-flowing streams but then present as wide,
heavily sedimented, and often unstable, wetland areas as the gradients flatten out. Many sections of
these floodplains are security risk areas and have become dumping grounds for building rubble and
general waste.
Yet even in severely degraded conditions, these floodplains still provide flood management, open
space, recreation, and habitat services, albeit to an extent well below their potential. They perform
an important hazard management function as they convey the largest portion of the storm runoff
and still offer some attenuation of flash floods. They can, however, also be a source of hazard risk
when they overflow bridges or inundate property as their capacity is exceeded by uncontrolled
runoff from catchment development or debris build-up, or both.
The benefits of streams and rivers, and their floodplains, to urban communities and their
environments are well documented. A central principle of this Design Manual is therefore to
preserve and rehabilitate the municipality’s watercourses and floodplains, and to convert them from
hazard zones and dumping grounds to assets that contribute to community wellbeing and improve
land values along their corridors. This involves bringing the floodplains into the community
environment and developing them as functioning parts of the stormwater system whilst supporting
other services such as open space and recreational areas and opportunities for ecological
enhancement.
The primary function of floodplains and their watercourses should remain the safe conveyance of
flood flows, yet they have the capacity for multiple functions well beyond this, particularly in the
urban environment. To achieve this they need to be developed and utilised. Therefore, the intention
is not to prohibit development adjacent to, or into, the floodplain. Instead development is
encouraged to incorporate the floodplain, and its watercourse, as part of urban rehabilitation and
development. This approach is best supported by catchment plans that set out the flood
management performance of the watercourses to ensure that flood hazard is controlled.

Principle:
The primary function of floodplains is to convey extreme flood events safely. The municipality shall
determine the magnitude and recurrence interval of the design event, which may vary according to
location, catchment size, land use and sensitivity to flood hazard.
In addition, in accordance with a Catchment Master Plan, floodplains may also provide features that
perform other functions such as flood peak attenuation, retention and runoff harvesting, water
quality treatment, parkland and recreation, and ecological services.
It is also possible to include development feature as extensions to the floodplain to perform flood
management functions; for example using streets as part of the flood conveyance, utilising car parks
and sports fields for flood storage and attenuation. The inclusion and design of such features will

11
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
need to show that flood risk to adjacent areas upstream and downstream is not increased, that the
targets set by Catchment Master Plans are not compromised, and that the facilities are manageable
and sustainable.
Floodplains should be developed as assets providing multiple services to the municipality and its
communities. They should be integrated with the rest of the municipal network of Green
Infrastructure and captured on the municipal asset register with a full description of their respective
functions, services to the community, ecological status, flood capacity status and flood lines.
Individual assets within the floodplain, such as attenuation dams, wetlands, bridges, etc. should also
be captured in the asset register, with similar detail. The asset register should present the long-term
objectives of each floodplain, reflecting the potential for both flood conveyance and provision of
multiple other services to the communities along their length.
Development in the floodplain should always seek to enhance the value of the asset by improving
the functionality of one or more of the services, or adding to the services. Compromise of any of the
services should be avoided unless there is offset provided to the net benefit of the community.

Adaptation to climate and weather change


As the urban footprint of the City of Johannesburg expands and changes over time, there are
potential changes in weather and climate that need to be considered in stormwater management.
Climate change predictions for the Highveld currently show a trend of decreasing number of rainfall
events in combination with larger storm events. Fatti & Vogel (2011) analysed storm data at
OR Tambo with results suggesting this trend is already in effect. Climate model simulations at
municipal scale are still poor, but recent research for the Ekurhuleni area offers an indication of the
potential change in intensities in the near future.
Weather patterns over the developed metropolitan area may also change the nature of storm
events. Research in Beijing, China linked heightened storm intensities to the heat island effect of the
expansive city. Indeed it is not clear whether the trend identified by Fatti & Vogel (2011) may be
linked to the rate of expansion of the metropolitan areas of Johannesburg and Ekurhuleni.
Further research on these topics relevant to Johannesburg and the Highveld area is required, but
there are at least some data at the municipal scale that can be applied to storm design analysis to
test for sensitivity of systems to changing storm conditions.

Principle:
The Stormwater Management Report should indicate how changing climatic conditions have been
taken into account in the stormwater management plan. For example this could include:

· Application of a climate change design curve for Highveld conditions (Dunsmore, et al, date)
· Application of a percentage increase to design rainfall depth (e.g. 20% as done in UK),
· A combination of these two.

12
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
Densification and brownfields development
Retrofitting stormwater systems with sustainable drainage facilities provides an important
opportunity for catchment recovery when previously developed sites are re-developed. All re-
development sites will be assessed in relation to pre-development runoff conditions. Planning for
open space in urban densification plans remains as important as it does in all other urban
development plans. SUDS, WSUDS, LID and Green Infrastructure are a requirement in densification
programmes.

Principle:
The principles of catchment recovery shall apply.
Site re-development shall be considered against Greenfield site runoff conditions. Make space for
surface water management facilities.
The drainage solutions need to be integrated as part of the overall Catchment Master Plan where
available.

Informal settlements and informal densification


Give intro to this section on why informal settlements and informal densification need special
attention. Look at re-wording this whole section…

Like many of the factors that impact on stormwater systems, the influence informal settlements and
even some of the more recently established low-cost-housing schemes, is more in the hands of the
planners and the city administration than the stormwater managers. However, international
experience shows that stormwater managers, often in a close association with wastewater
managers, should be active participants in any “urbanisation” plan for formal areas.
While informal areas are typically diverse, research shows they tend to share common
characteristics; illegality in land tenure, precariousness of dwelling conditions, lack of urban
infrastructure and segregation from the formal town centres or city hubs (Fitchett, 2017). Addressing
these issues requires an effective combination of social understanding and community support,
institutional structures and capacity, and technical support (engineering, planning, architectural). The
principles and design guidelines in this Manual will support the stormwater managers in their role in
participating in an urbanisation plan for informal settlement areas, but in advance of such plans,
there are several conditions that the stormwater manager can assume in dealing with stormwater
from these areas.
a. Informal settlements and low-cost-housing areas need to be included in Catchment Management
Plans. The baseline hydrological and hydraulic parameters need to be carefully considered, with
site inspection, consultation and monitoring central to establishing these parameters.
b. The formalisation of informal settlements should always be assumed as part of the future
scenario land use in the Catchment Master Plan. This is because relocation of inhabitants is
usually undesirable.
c. The stormwater management of informal settlement areas should be catchment based rather
than according to municipal boundaries (e.g. wards).
13
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
d. Due to typically high population densities in urban slums, it is reasonable to assume an
urbanisation plan to be equivalent to any other urban densification plan
e. Examples of successful urbanisation plans show that public open space is central to a viable and
healthy urban landscape. Therefore, SUDS, WSUDS, LID and Green Infrastructure are as applicable
to the upgrading of informal settlements as any other part of the municipal environment.
f. Provision of effective stormwater and sewer infrastructure is shown to be central to the success
of any urbanisation plan. However, the separation of these systems in informal settlements is not
always assured. With the very strong trend of developing backyard shacks in established low-cost-
housing schemes in Gauteng, it is common, for example, for stormwater downpipes to be
connected directly to the sewer lines by the new owners. This leads to surcharging sewers that
then pollute the surface water drainage network. In places such as Brazil, where similar storm
conditions encourage separate stormwater and sewer networks, combined sewer systems in slum
urbanisation programmes are actively considered. This approach needs careful consideration in
Johannesburg, but may require a review of treatment facilities for these specific applications.
While the above provides for long-term catchment planning scenarios, the stormwater manager
should still be active and proactive for current situations where informal settlements and low-cost-
housing areas are established and potentially expanding. Initiatives should include the
encouragement of compliance with by-laws ( a requirement in the case of low-cost-housing), regular
monitoring programmes (water quality in receiving streams, spread and configuration of settlement),
and hazard management (e.g. flooding).

Principle:
Catchment Master Plans should represent informal settlements and low-cost-housing areas in detail,
allowing an assessment of stormwater internal conditions and influences on downstream areas. The
master plans should be used to mitigate stormwater problems, highlight the plight of residents in
these communities, and help to point the way for the ultimate formalisation and upgrade of these
areas. Monitoring programmes will help to refine the Catchment Master Plans over time, and should
prove valuable in disaster management.

Stormwater Network and Asset Register

A stormwater system will comprise a network of facilities designed to perform a function in the
management of stormwater. This will include all grey and green infrastructure, floodplains, and flood
conveyances (including street conveyance), attenuation facilities (whether concrete ponds or
wetlands), treatment facilities (trash racks or vegetated sediment traps), and runoff harvesting
systems.
For the effective planning and maintenance of the stormwater network, all components of the
functional system must be captured on the municipal asset register. Whereas this was historically
undertaken for grey infrastructure components only, it should now include all green infrastructure,
infiltration, runoff harvesting and vegetated systems where these have been presented as active
components of a site or a catchment stormwater management system.

14
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
The intended function (service) of each component must be clearly described and include capacity
and performance criteria. Some assets may provide multiple services, which should be stated. In the
case of green infrastructure components, these services may include open space, recreation and/or
habitat services.
Assets under private ownership should also be recorded where they have formed part of the
approved Site Development Plan, as they contribute to the overall performance of the municipal
system and become part of the baseline on which future catchment plans are developed.

Principle:
All components of the functional stormwater network will be captured on the municipal asset
register with records such as description, function, location, size, capacity, permits, monitoring and
maintenance requirements, ownership, and responsibilities.
Facilities on private property shall be included, particularly where these facilities are compliant with
catchment stormwater strategies, or where they are important for overall catchment water resource
or stormwater performance

15
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

PART 2: INTERPRETATION AND APPLICATION OF BY-LAWS

16
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

CHAPTER 1: INTERPRETATION, PURPOSE AND APPLICATION AND


RESPONSIBILITY FOR COMPLYING WITH BY-LAWS: PART 1 BY-
LAWS
Definitions

1. In these By-laws, unless the context otherwise indicates –


“adjacent property” means a property which has one or more common boundaries with another
property regardless of whether such properties have separate owners, were acquired in ownership at
different times, are situated in different catchment areas or municipal areas or are separated from
each other by a private road or private right-of-way;
“Agency” means the Johannesburg Roads Agency (Pty) Ltd., established by the Council as a service
provider fulfilling a responsibility under these By-laws which responsibility has been assigned to it in
terms of section 81(2) of the Local Government : Municipal Systems Act, 2000 (Act No 32 of 2000),and
in relation to a situation where there is no Agency or other service provider contemplated in that
section, means the Council;
“attenuation facility” means any drainage facility designed to store stormwater for gradual release
of that stormwater by infiltration into the soil or into an existing drainage system;
“authorised official” means any official of the Council or the Agency who has been authorised by the
Council or the Agency, as the case may be, to administer, implement and enforce the provisions of
these By-laws, acting within the scope of such authorisation;
“best management practice” means any physical, structural or managerial practice that, when used
singly or in combination with any other such practice, prevents or reduces pollution of stormwater,
erosion or sedimentation which may be caused by stormwater, and which has been approved by the
Council;
“bio-filtration facility” means a stormwater filtration system based on an appropriate best
management practice which treats stormwater by filtration through vegetation, and includes any
grassed or vegetated marshy area and any land through which stormwater is filtered by means of
vegetation;
”buffer” means an area or strip of land on a development site or property which is to be or is utilised
for the management of stormwater or conservation of the riparian habitat as defined in section 1 of
the National Water Act, 1998 (Act No 36 of 1998);
“catchment area” means an area of land in its natural state, from which stormwater runoff
originates;
“catchment area plan” means a plan and all implementing rules and procedures relating to such
plan, including land use management for managing surface water and stormwater quality, any
facility for managing the quantity of such water and any drainage feature within a catchment area;
“certificate of occupancy” means a certificate issued in terms of section 14 of the National Building
and Building Standards Act, 1977 (Act No 103 of 1977);
“clearing” means the removal of vegetation from the surface of any property or a portion of a
property;

17
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
“closed depression” means any low-lying area of land, either natural or man-made, which receives
stormwater;
“completion certificate” means the written acknowledgement by the Agency of the satisfactory
completion of all work on a construction site approved by the Council, including any work shown on
the approved building plans or approved plans of a township concerning the provision of municipal
infrastructure, and any revision of such plans and field change approved by the Council;
“comprehensive drainage plan” means a plan for a catchment area adopted by the Agency
containing a detailed analysis which deals with-
(a) the capacity of any stormwater drainage system and the need to embellish that capacity due to
various combinations of development, land use and available structural and non-structural
stormwater management possibilities;
(b) the form, location and extent of stormwater quantity and
quality control measures which would satisfy the requirements of the National Water Act, 1998, and
any other applicable law;
(c) stormwater quality standards; and (d) the funding requirements for the implementation of such
plan.
“construction” means –
(a) in relation to a township, the construction or provision by the developer of a township of any
municipal infrastructure or service; and
(b) in relation to a property, other than a township, the erection of any immovable structure on a
property, excluding the erection of a boundary wall, and “construct” has a corresponding meaning;
“Council” means –
(a) the Metropolitan Municipal of the City of Johannesburg established by Provincial Notice No 6766
of 2000 dated 1 October 2000, as amended, exercising its legislative and executive authority through
its municipal Council; or (b) its successor in title; or
(c) a structure or person exercising a delegated power or carrying out an instruction, where any
power in these By-laws has been delegated or sub-delegated, or an instruction given, as
contemplated in section 59 of the Local Government : Municipal
Systems Act, 2000 (Act No 32 of 2000), as the case may be;
“critical drainage area” means an area contemplated in Chapter 7;
“design storm event” means a theoretical storm event which generates stormwater, of a given
frequency interval and duration, used in the analysis and design of a stormwater facility;
“detention facility” means a stormwater facility designed to store stormwater, gradually releasing it
at a pre-determined controlled rate, and includes any appurtenance associated with its designed
function, maintenance or security;
“developed property” means the condition of a property following completion of a development, or if
a property is developed in phases, any phase of development on that property;

18
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
“developer” means any person undertaking or proposing to undertake a development and includes a
developer of a township;
“development” means any construction or proposed construction as contemplated in paragraph (a)
and (b) of the definition of “construction” and “develop” has a corresponding meaning;
“development site” means the whole or a portion of any property or township which it is proposed to
develop or is in the process of being developed;
“diversion” means the routing of stormwater in a direction other than its natural discharge direction
and “divert” has a corresponding meaning;
“floodplain” means an area of land adjacent to a watercourse, or water body, with a catchment area
exceeding 30 ha that will be inundated by floodwater on average once in a 100 years as determined
by a professional engineer, on the basis that the minimum width of a floodplain is 32m on each side
of the centre line of the water course or water body;
“geotechnical engineer” means a practising professional engineer who has at least four years of
professional experience in geotechnical and landslide evaluation;
“geotechnical report” means a written report prepared by a geotechnical engineer based on a study
of the effects of stormwater drainage and drainage facilities on soil characteristics, geology and
groundwater;
“grading” means any excavation, filling or embankment building with earth materials on any
property;
“grubbing” means the removal from any property, or portion of a property, of subsurface vegetative
matter including sods, stumps, roots, buried logs, or other debris, and the incidental removal of
topsoil to a depth not exceeding 300 mm;
“hydrograph” means a graph indicating stormwater runoff rate, inflow rate and discharge rate of
stormwater, past a specific point over a time period;
“hydrograph method” means a method of estimating a hydrograph, using a mathematical
simulation;
“impervious surface” means –
(a) a hard surface area on a property which prevents or retards the entry of stormwater into the soil;
and
(b) a hard surface area on a property which causes stormwater to run off its surface in a greater
quantity or at an increased rate of flow, compared to the pre-development condition of that property,
and includes any roof, walkway, patio, driveway, parking lot, storage area, concrete or asphalt
paving, gravel road with compacted subgrade, compacted earth material, naturally compacted earth
surface such as a path or swept garden, an oiled or macadamised surface and any other surface
which may similarly impede the natural infiltration of stormwater, and any open uncovered
attenuation or detention facility;
“land disturbing activity” means any activity on a property that results in a change in the existing soil
cover, vegetative or nonvegetative, or both, or the existing soil topography and includes demolition,
construction, paving, clearing, grading and grubbing;

19
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
“maintenance” means any activity which is necessary to keep a stormwater facility in good working
order so as to function as designed and includes –
(a) complete reconstruction of a stormwater facility if reconstruction is needed in order to return the
facility to good working order; and
(b) the correction of any problem on the property concerned which may directly impair the
functioning of a stormwater facility;
“maintenance manual” means a manual adopted by the Agency in terms of section 51;
“major development” means any development which results in –
(a) the creation or cumulative addition of 500 m² or greater of impervious surface; or
(b) land disturbing activity of 4000 m² and greater; or
(c) grading involving the movement of 5,000 m³ or more of earth material;
“manual” means the stormwater design manual contemplated in section 3(3)(a), adopted by the
Council, as amended or substituted from time to time;
“minor development” means any development which results in –
(a) the creation or addition of less than 500 m² of new impervious surface area; or
(b) land disturbing activity of less than 4 000 m²; or
(c) grading involving the movement of less than 5 000 m³ of earth material;
“oil/water separator” means a structure or device used to remove suspended, floating or dispersed
oil and greasy solids from stormwater;
“operation and maintenance manual” means a written manual contemplated in section 49(f),
containing a description of operation and maintenance procedures for a specific stormwater facility,
for use by operation and maintenance personnel of the Agency;
“owner” means in relation to –
(a) immovable property, subject to paragraph (b), the person registered as the owner or holder
thereof and includes the trustee in an insolvent estate, or judicial manager of a company or a close
corporation which is an owner, and the executor of any owner who has died or the representative
recognised by law of any owner who is a minor or of unsound mind or is otherwise under disability,
provided such trustee, liquidator, executor or legal representative is acting within the authority
conferred on him or her by law;
(b) immovable property -
(i) which is in the name of both spouses in a marriage in community of property, either one or both of
the spouses;
(ii) which is registered in the name of only one spouse and which forms part of the joint estate of both
spouses in a marriage in community of property, either one or both of the spouses;
(iii) which is registered under section 17 of the Deeds Registries Act, 1937 (Act No 47 of 1937), in the
name of both spouses in a marriage in community of property to which the provisions of Chapter III of
the Matrimonial Property Act, 1984 (Act No 88 of 1984), are not applicable, the husband;

20
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
(iv) which is registered in the name of only one spouse and which form part of the joint estate of both
spouses in a marriage in community of property to which the provisions of Chapter III of the
Matrimonial Property Act, 1984, are not applicable, the husband; and
(c) a township, the township owner, and includes an owner of land or a unit under a sectional title
deed or a deed of transfer as contemplated in the Sectional Titles Act, 1986 (Act No 95 of 1986);
“permit” means a site development activity permit contemplated in sections 7 and 8(4);
“pollution” means contamination, or other alteration of the physical, chemical, or biological
properties, of surface water or stormwater and includes any change in temperature, taste, colour,
turbidity or odour of the water and the discharge of any liquid, gaseous, solid, radioactive or other
substance into any watercourse or stormwater system, and “pollute” and “pollutant” have
corresponding meanings;
“post-development condition” means the condition of any property after the conclusion of
development thereon and “post development” has a corresponding meaning;
“pre-development condition” means the condition of any property or portion of a property as it
existed in its unaltered natural state prior to any development on that property and “pre-
development” has a corresponding meaning;
“professional engineer” means any person who is registered with the Engineering Council of South
Africa as a professional engineer or a professional engineering technologist, who is qualified in the
engineering field concerned and who is considered competent by the Agency and who has been
approved by it;
Interpretation “professional engineer”
The professional engineer responsible for the preparation and submission of stormwater
management plans to the Agency shall be required to prove competence in the field concerned. The
definition of “professional engineer” in the By-laws requires that the person shall be considered
competent by the Agency and shall have been approved by it. Moreover, the professional engineer is
required to have the appropriate PI insurance cover. The application for approval submitted by the
Engineer to the Agency shall include his or her CV highlighting previous work in stormwater
management projects, a short (maximum 500 word) outline of the work done and the education
received in the field, and a recommendation by at least one peer not employed by the same
organisation. The peer submitting the recommendation shall have proven competence in the field of
stormwater management. Note that this is consistent with the approach of “specialist lists” currently
under consideration by the SA Institution of Civil Engineering (Watermeyer & Smith 2016).
Stormwater planning and design is now a specialist line of engineering. It is, however, crucial to the
successful implementation of an effective stormwater management system, that the professional
engineer assemble consultants with the required multi-disciplinary expertise from the outset of the
project and that they be briefed to operate as a team. In order to meet the objectives in designing an
effective stormwater management system, the developer is urged to adopt a multi-disciplinary
approach to the project from inception through to completion and acceptance by the City of
Johannesburg. This will enable the developer to maximise opportunities. The core members of the
group would provide expertise in civil engineering, town planning and environmental consulting.
Closely allied disciplines of freshwater ecology and landscape architecture should be added, if

21
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
required, on the advice of the other professionals (SAWE, 2002).

“property” means any land registered as a separate entity of land in the Deeds Office and includes
any township and any land or unit contemplated in the Sectional Titles Act, 1986;
“public road” means a road, street or thoroughfare or any other right of way to which the public or a
section of the public has a right of access or which is commonly used by the public or a section of the
public and includes any portion of a public road between the road edge and the boundary of the land
reserved for such road including a sidewalk;
“retention facility” means a stormwater facility designed to store stormwater runoff for an indefinite
period with the volume of stored water being reduced by evaporation, infiltration or pumped out for
the irrigation of land, and which may be combined with a detention facility;
“site development activity” means any land disturbing activity associated with the preparation of a
property or portion of a property, for development;
“site development activity plan” means a plan contemplated in section 10, depicting all site
development activities which it is proposed to implement on a development site;
“stabilise” means the application of a best management practice, sufficient to protect soil from the
erosive force of raindrop impact and flowing stormwater and includes the establishment of
vegetation, mulching, plastic covering, the application of a compacted gravel base and the protection
of any channel or ditch conveying stormwater or outlet for stormwater so as to prevent any
sedimentation resulting from stormwater from leaving a development site and “stabilisation” has a
corresponding meaning;
“stormwater” means the surface stormwater runoff that results from any natural form of
precipitation of water or moisture in any form;
“stormwater drainage facility” means any facility installed or constructed for the purpose of the
conveyance or retention of stormwater;
“stormwater drainage feature” means any natural or man-made structure, facility, conveyance or
topographic feature which has the potential to concentrate, convey, detain, retain, infiltrate or affect
the flow rate of stormwater;
“stormwater drainage system” means every stormwater drainage facility and stormwater drainage
feature forming part of a system that combines to lead stormwater from a higher lying area;
“stormwater facility” means a component of a man-made drainage feature for dealing with
stormwater, designed or constructed to perform a particular function or multiple functions, and
includes any pipe, marshy area, ditch, culvert, street gutter, detention facility, attenuation facility,
wetpond, constructed wetland, infiltration device, catch basin, oil/water separator and sediment
basin, but excludes any building gutter, downspout and stormwater drain serving one single family
residence, or such residence and one or two additional residential units permitted by an applicable
town planning scheme or other applicable law, on the same property;
“stormwater quality control” means the control of the introduction of any pollutant into stormwater
and the process of separating any pollutant from stormwater, and includes any source control,

22
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
biofiltration facility, wetpond, wetland, litter trap, oil/water separator, constructed wetland and any
facility to control erosion or sedimentation;
“stormwater quantity control” means the control of the rate and volume of stormwater released
from a development site, and includes any attenuation, detention and retention facility;
“stormwater system” means any natural or man-made system which functions independently or
together with another such system to collect, convey, store, purify, infiltrate and discharge
stormwater, including any stormwater facility and water course;
“township” means a township approved in terms of the Town-planning and Townships Ordinance,
1986 (Ordinance No 15 of 1986) or any other law;
“watercourse” means –
(a) a river or spring;
(b) a natural channel in which water flows regularly or intermittently;
(c) a wetland, lake or dam into which, or from which, water flows; and
(d) any collection of water which the Minister concerned may, in terms of the National Water Act,
1998 by notice in the Government Gazette, declare to be a watercourse, and a reference to a
watercourse includes, where relevant, its bed and banks;
“water quality sensitive area” means any area that is sensitive to a change in water quality and
includes any lake, ground water management area, aquifer as defined in the National Water Act,
1998, and a closed depression;
“ wetland” means land which is transitional between terrestrial and aquatic systems where the water
table is usually at or near the surface or the land is periodically covered with shallow water, and
which land in normal circumstances supports or would support vegetation typically adapted to life in
saturated soil, and any area where the soil shows evidence of water-logging, and includes the flood
plain of any watercourse and any area which is defined as a wetland by any law, irrespective of
whether such conditions exist naturally or are manmade;
“wetpond” means a natural or man-made basin for the receipt of stormwater with the intention of
maintaining a permanent quantity of stormwater.

Purpose of By-laws
2. The purpose of these By-laws is to manage, control and regulate the quantity, quality, flow and
velocity of stormwater runoff from any property which it is proposed to develop or is in the process of
being developed or is fully developed, in order to prevent or mitigate –
(a) erosion and degradation of watercourses;
(b) sedimentation in ponds and watercourses;
(c) degradation of water quality and fish habitat; and
(d) excess stormwater runoff onto a public road which may pose a danger to life or property or both.

23
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
Application of By-laws and manual
3. (1) Subject to the provisions of subsection 2, these By-laws do not apply in respect of any activity,
structure, matter or thing on a property which has been authorised by the approval of building plans
in terms of the National Building Regulations and Building Standards Act, 1977, or authorised under
the National Water Act, 1998;
(2) The provisions of subsection (1) are not applicable in respect of any structure, matter or thing
appearing on an approved building plan, if that structure, matter or thing did not require approval
under the National Building Regulations and Building Standards Act, 1977, and any regulations made
thereunder.
(3)(a) In order to ensure that the latest and best technology is utilised in the area of jurisdiction of the
Council, these By-laws must be read with the manual, the provisions of which must be complied with.
The By-laws, read in conjunction with the Manual require the use of the latest and best technology.
It is clear from the definitions in Clause 3(3)(a) of the By-laws that the intention of the By-laws is to
ensure the use of the best available methodology to mitigate the impacts of urban development on
stormwater runoff.
Specifically, the interventions to mitigate these impacts must address:
· Peak discharge,
· Volume of runoff,
· Frequency of runoff,
· Duration of runoff,
· Quality of runoff,
and these mitigation measures must be considered for all stages of the project including:
· Planning to ensure that sufficient space is made available for the required stormwater
management measures;
· Design to achieve the desired result;
· Construction to ensure that no contaminated stormwater discharges from the site
(including sediment) or enters the drainage or riparian system;
· Operation, maintenance and education to ensure that the constructed stormwater
management measures continue to function as designed for the life of the project;
· Decommissioning to ensure that the drainage system is restored to its natural
functionality at the end of the project life.
In addition to the use of the latest and best technology, new developments should adhere to best
practice by understanding the context of the development in terms of the application of Green
Infrastructure principles (see Appendix C). This approach is equally applicable to stormwater
management upgrading and rehabilitation projects. By taking greater cognisance of natural
hydrological patterns and processes, it is possible to develop stormwater management systems in a
manner that reduces potentially negative impacts and mimics the pre-development regime.

(b) If an irreconcilable conflict arises between any provision of these By-laws and any provision of the
manual, the provision of the By-laws prevails.

24
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

Responsibility for complying with By-laws


4. (1) A developer who proposes to undertake or undertakes any work or action contemplated in
these By-laws, is responsible for compliance, and for ensuring compliance, with any provision of these
By-laws relating to such work or action.
(2) A contractor or agent appointed by a developer to carry out any work or action contemplated in
these By-laws, is jointly and severally responsible with that developer for compliance, and for
ensuring compliance, with any provision of these By-laws relating to such work or action.
(3) An owner of property which has been developed, is responsible for compliance, and for ensuring
compliance, with any provision of these By-laws which is applicable in respect of that property after
conclusion of that development.

Section 4 of the By-laws places the responsibility for compliance jointly on the developer, the
agent or contractor appointed by the developer (which includes the responsible professional
engineer and his/her team of consultants) and the owner of the property. The owner is therefore
required to provide any subsequent owner with an operation and maintenance manual to ensure
that the stormwater management system continues to function in accordance with the By-laws
and the design intention for the entire life of the project.

25
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

CHAPTER 1: INTERPRETATION, PURPOSE AND APPLICATION AND


RESPONSIBILITY FOR COMPLYING WITH BY-LAWS : PART 2 THE
MANUAL

26
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

CHAPTER 2: SITE DEVELOPMENT ACTIVITY PERMITS PART 1 BY-


LAWS
Permits required
5. A permit is required for any of the following site development activities :
(a) Any site development activity in respect of a major development;
(b) any site development activity that will require connection to the Council’s stormwater drainage
system;
(c) any grading activity that will result in the movement of 100m³ or more of earth;
(d) any grading activity that will result in a temporary or permanent slope with a steepness exceeding
3m horizontal to 1m vertical and with a total slope height, measured vertically from bottom to top of
the slope, exceeding 1,5 m;
(e) any grading activity that will include the construction of an embankment or berm which will result
in the impoundment of water to a depth exceeding 450 mm or with a maximum volume exceeding 50
m³ of water;
(f) any grading activity that will result in the diversion of any existing stormwater drainage feature
from its natural point of entry to or exit from a development site;
(g) any clearing or grading on a slope steeper than 3 m horizontal to 1m vertical; and
(h) any clearing within a floodplain.

Exceptions to permit requirements


6.(1) The provisions of section 5 do not apply -
(a) in respect of any property used for commercial agriculture unless it is wholly or partially situated
in a floodplain;
(b) to any of the following grading activities :
(i) The excavation for any Council services or tunnel authorised under any law;
(ii) any excavation for a basement or footing for a building, retaining wall or other structure
authorised by an excavation permit issued under the National Building Regulations made under the
National Building Regulations, and Building Standards Act, 1977, or any other law : Provided that the
provisions of this paragraph do not apply in respect of –
(aa) the placement of any fill material removed from such excavation; or
(bb) any excavation beyond the limits of a basement or footing for a building;
(iii) agricultural crop management outside any critical drainage area but limited to the preparation of
soil by turning, discing, or other means approved by the Agency ;
(iv) excavation for graves, provided the excavated material is placed on the uphill side of the grave on
any slope exceeding 100 m horizontal and 3 m vertical;
(v) landscape installation if fill is confined to less than 250 mm of topsoil and land disturbing activity is
limited to less than 500 m²; and

27
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
(vi) any exploratory excavation for soil investigation or for determining the location of any service
relating to infrastructure for the public benefit.

Applications for permits


7.(1) No person may commence any site development activity specified in section 5, on any property
unless a site development activity permit has been issued for that activity by the Agency.
(2) Application for the issue of a permit must be made by the developer concerned on a form
prescribed by the Agency.
(3) An application in terms of subsection (2) must be accompanied by –
(a) if the developer is not the owner of the property concerned, an authorisation in writing by the
owner to the developer to lodge the application;
(b) a site development activity plan prepared in terms of section 10;
(c) a stormwater drainage plan prepared in terms of section 11;
(d) the documents required by sections 11, 12, 13, 14, 31 and 37(3) to the extent that those sections
are applicable to the application concerned; and
(e) the fee prescribed by the Council.
(4) The Agency must within a reasonable time, consider an application in terms of subsection (2) and
may refuse or grant it and the applicant must forthwith in writing be notified of the decision and be
furnished with reasons for a refusal of an application.
(5) Upon the granting of a permit in terms of subsection (4), a permit must be issued by the Agency
subject to site development standards specified in the manual and applicable at the time of the issue
of a permit.
The overriding site development requirement applicable to a permit being granted for site
development, is that the site development plan must illustrate how the stormwater management
system ensures that the characteristics of stormwater runoff from the site during and after
development will not differ from those of the runoff from the site in its natural condition prior to the
commencement of any site development activity (Section 32(2)).

(6) Approval for the issue of a permit in terms of this section also signifies approval by the Agency of
all plans and other documentation submitted in terms of subsection (3).
(7) A developer must at all times display and maintain an easily legible permit notice in a form
prescribed by the Agency at a conspicuous place on the development site concerned, until completion
of the site development activities contemplated in the permit concerned.

Expiry of permits
8. (1) An expiry date, not exceeding three years, or in the case of a permit for grading not exceeding
six months, from the date of issue of a permit, must be specified in every permit.
(2) A permit expires upon the issue of a certificate contemplated in section 82(1)(b)(ii)(cc) of the
Town-planning and Townships Ordinance, 1986, or a certificate of occupancy, as the case may be, in

28
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
respect of the development concerned or upon the expiry date specified in terms of subsection (1),
whichever is the earlier.
(3) If a permit expires prior to the completion of construction on the development site concerned, all
site development activities contemplated in that permit, must, subject to the provisions of subsection
(6), cease immediately until such permit is renewed.
(4) Application for the renewal of a permit may be made by a developer on a form prescribed by the
Agency, at any time from a date 30 days prior to the expiry of the permit and must be accompanied
by a new stormwater drainage plan as contemplated in section 11 and such other documentation and
information as may be required in writing by an authorised official.
(5) The Agency must within 30 days of receipt of an application in terms of subsection (3) consider the
application and may either refuse or grant it and the applicant must forthwith in writing be notified of
the decision and be furnished with reasons for a refusal of an application.
(6) If construction on a development site concerned has commenced but is not completed when a
permit expires, the developer must, within seven days after such expiry submit a plan for approval by
the Agency, temporarily to stabilise the site from stormwater damage or sediment runoff until the
permit is renewed and must within seven days of the approval of the plan by the Agency, implement
that plan.

Professional engineer required


9. Any document contemplated in section 7(3)(b), (c) and (d) must be prepared by a professional
engineer, if any of the following conditions exists :
(a) The proposed development on the property concerned constitutes a major development;
(b) if the site development activity incorporates any stormwater facility or other improvement
relating to stormwater in a public road for which facility or improvement the Agency will assume
responsibility for maintenance;
(c) if a site development activity is to take place within a floodplain or within 100 m from the centre
line of any water course;
(d) if a site develop[ment] activity is to take place on a property shown by a 15 000 scale geological
map to be underlain by, or within 500m of, dolomitic geology; or
(e) in respect of any other site development activity, if the Agency considers it to be in the public
interest to require that the documents concerned be prepared by a professional engineer.

Site development activity plan


10. A developer must in respect of any development site in respect of which a permit is required in
terms of section 7, prepare a site development activity plan.

Stormwater drainage plan


11.(1) A developer must in respect of any development site for which a permit is required in terms of
section 7, prepare a stormwater drainage plan.

29
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
(2)` A plan contemplated in subsection (1), must relate to the collection, transportation, treatment
and discharge of stormwater from the development site concerned and must include a profile view of
the property concerned and construction details and notes relevant to such plan.
(3) (a) A plan contemplated in subsection (1) must contain an analysis of the impact of stormwater up
to 500 m or a greater distance required by a notice in writing by an authorised official served on the
developer concerned, downstream from the property on which the development site concerned is
situated, which may result from the proposed development on that site and must contain features to
mitigate such impact.
(b) For the purposes of paragraph (a), any existing and potential impact of stormwater, including –
(i) increased sedimentation and streambank erosion and discharge;
(ii) flooding;
(iii) overcharging of any existing closed stormwater conveyance facility;
(iv) discharge to a closed depression;
(v) discharge to an existing off-site stormwater runoff control facility;
(vi) infiltration to groundwater or any area of land with the ability to contribute to, or recharge,
ground water;
(vii) deterioration of stormwater quality; and
(viii) any spill and discharge of a pollutant into stormwater, must be evaluated and mitigated.

The SWMR must contain a discussion on the evaluation and mitigation of existing and potential
stormwater impacts as listed, namely: stream sedimentation, erosion, and discharge; flooding;
overcharging of existing stormwater conduit; discharge to a closed depression; discharge to an off-
site stormwater control facility; infiltration to groundwater; deterioration of stormwater quality,
pollutant discharge.

Off-site stormwater drainage analyses


12.(1) For the purposes of an application for a permit in terms of section 7 a written off-site
stormwater drainage analysis must be prepared by a professional engineer, based on a study of the
existing and predicted impact of stormwater runoff from the development site concerned on to any
property and on a field investigation at the development site concerned, relating to any drainage
area from which stormwater is received from any adjacent property and any other area contributing
to stormwater being discharged on to any such property.
(2) The extent of the analysis contemplated in subsection (1), is limited to information that can be
supplied by the Agency or can be obtained from ground level by opening manhole covers giving
access to any stormwater drainage system, which can be opened manually, other than such covers
that can only be opened by using mechanical lifting equipment.

Geotechnical reports
13.(1) The Agency may require a geotechnical report prepared by an geotechnical engineer, to
accompany an application for a permit in terms of section 7 in respect of a development if –

30
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
(a) grading or the provision of any attenuation facility, detention facility or other stormwater facility
is proposed within 50 m of a slope steeper than 3 m horizontal to 1 m vertical; or
(b) the development site is underlain by, or within 500 m of dolomitic geology shown on a 1:50 000
scale geological map; or
(c) an authorised official considers that the proposed development on the property concerned poses a
potential stormwater hazard due to its proximity to a slope in the topography on that property either
natural or man-made.
(2) The report required in terms of subsection (1) must include the effects of groundwater interception
and infiltration, seepage, potential slip planes, changes in soil bearing strength and any other factor
required by an authorised official.

Soils investigations reports


14. For the purposes of an application for a permit in terms of section 7, if section 9 applies in respect
of that application, a soils investigation report must be prepared by a geotechnical engineer or an
employee employed and supervised by such engineer, if -
(a) the soils underlying the proposed development have not been mapped;
(b) existing soils maps of soils contemplated in paragraph (a), are inconsistent; or
(c) an authorised official considers that existing soils maps are not of sufficient resolution to allow
proper engineering analysis.

Permit modifications
15.(1) A developer may on a form prescribed by the Agency, apply for a modification of a permit
contemplated in sections 7 or 8(5), issued to him or her.
(2) An application in terms of subsection (1) must be accompanied by the fee prescribed by the
Council.
(3) For the purpose of considering an application in terms of subsection (1), an authorised official may
require the applicant to furnish any document and information.
(4) The Agency must consider an application in terms of subsection (1) and may refuse or grant it and
the applicant must forthwith in writing be notified of the decision and be furnished with reasons for a
refusal of an application.

31
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

CHAPTER 2 : SITE DEVELOPMENT ACTIVITY PERMITS PART 2:


THE MANUAL
STORMWATER MANAGEMENT REPORT

Deemed to Satisfy
Implementation of Green Stormwater Infrastructure (GSI) is required even where application for a
permit is not required in terms of Clause 5 of the By-laws. A combination of the following will be
deemed to satisfy the requirements:
1. A rainwater harvesting system or rain barrels with a capacity of at least 1 m3 of storage per
100 m2 of impervious area.
2. At least 50% of the impervious area on the site should discharge to pervious area. The pervious
area accepting run-on shall be at least 2m wide and generally vegetated during the summer, e.g.
a flower or vegetable garden.
3. The first few millimetres of runoff should be attenuated in a depression such as a rain garden
with a capacity of at least 0.5 m3 per 100 m2 of impervious area draining to it.
4. Where possible paving should be flagstones interspersed with vegetation or gravel rather than
impermeable concrete, asphalt, or closely interlocked bricks.

Minimum Content
As a minimum’ a stormwater management report shall include:
1. Site location and description
a. Site description, including area, bounding properties, drainage systems
b. Topography,
c. Geology and soils
d. Existing land use and proposed future land use
e. Existing vegetation and proposed future vegetation
f. Watercourses and wetlands
g. A locality plan
2. Pre-Development Runoff
The pre-development condition is defined as the state of the site prior to the discovery of gold on the
Witwatersrand.
a. Peak discharges and storm runoff volume for all applicable storm recurrence intervals
and durations
b. Frequency of surface runoff
c. Quality of runoff
d. Water balance, i.e. proportions of surface runoff, evapotranspiration, deep infiltration,
and delayed runoff via shallow groundwater paths
3. Stormwater Management Interventions (GSI) Evaluated and Selected with reasons for selection
a. Opportunities for harvesting of rainfall or runoff
b. Peak discharge control methods
c. Volume control methods
32
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
d. Frequency of runoff control methods
e. Water quality management methods
f. Multiple benefits, including those not related to stormwater such as recreational,
aesthetic, wildlife habitat, carbon sequestration etc.
g. Diagrams or working drawings of all proposed GSI
h. Evaluation of risk including:
i.Uncertainties in results of calculations
ii.Uncertainties parameters
iii.Potential impacts of climate change
4. Neighbouring Properties and Receiving Systems
a. Expected flow onto the site
b. Description and capacity of the receiving system
c. Remedial measures if the receiving system does not have adequate capacity
5. Hydrograph and Water Balance Analyses
a. Calculation methods
b. Parameters selected, with reasons
c. Results of calculations, peak discharges, volume of runoff, frequency of runoff
d. Water balance, i.e. proportions of surface runoff, evapotranspiration, deep infiltration,
and delayed runoff via shallow groundwater or highly throttled outlets.
e. Uncertainty of results
6. Measures to Address Runoff Water Quality
a. Construction phase
i.Erosion & Sediment Control Plan (ESCP),
ii.Pollution control plan (hydrocarbons, cement, camp sewage, etc.)
b. Operational Phase
i.Gross solids (litter)
ii.Sediment
iii.Nutrients
iv.Toxins, metals, organics
v.Pathogens and sewage spills
As a general rule, quality of water stored or discharged should meet the standards for its particular
use as set out in the appropriate volume of The South African Water Quality Guidelines, Second
Edition 1996 (see https://www.dwa.gov.za/iwqs/wq_guide/index.asp).
7. Safety of Selected Interventions
a. Rate of rise and fall of water, and velocity hazard
b. Embankment stability (possible rapid drawdown conditions)
c. Protection, maintenance and public awareness of extreme flood zones
d. Escape routes and prevention of entrapment, including orifices and weirs
e. Public access and hazard risk
f. Security and access, hiding places for criminals, etc.
33
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
g. Suitability of stored water for human contact
8. Maintenance, Monitoring and Expected Lifespan of the GSI
a. Management of sediment and debris
b. Cleaning regime
c. Weed, reed and alien vegetation eradication
d. Monitoring regime and acceptability criteria
e. Suggested remedial measures if failure occurs
9. Operation and Maintenance Manual
a. For current and future owners

Credentials of Author
The author of the stormwater management report shall be a Professional Engineer as defined in
Section 2.1 of this Manual

SITE PLANNING AND DESIGN GUIDELINES

The overriding standard is that the stormwater management system must take cognisance of natural
hydrological patterns and processes and be designed to reduce potentially negative impacts and
mimic nature (i.e. the pre-development – before the discovery of gold) and the natural conditions of
the site. The Manual currently does not have a ‘standard form’ or ‘checklist’ of site development
standards, but will be described in the future. During this interim period the applicant must compile
a Stormwater Management Report (see notes to Section 11.(3)(b) for the structure of the report)
using the guidelines (SAWE, 2002) elaborated on below which promote the following stormwater
management objectives:
· Minimise threat of flooding;
· Protect receiving water bodies;
· Promote multi-functional use of stormwater management systems;
· Develop sustainable stormwater systems.

Planning Stage
The following information should be collated for each site, during the planning stage and used to
feed into the more detailed site assessment:
· Catchment area in which site is located;
· Catchment or river management plans; the overall management objectives and recommend key
management actions with respect to runoff quantity, quality and other associated
environmental and social issues, where such plans exist for the catchment in question, must be
met in the design stage;
· Existing reports relating to the sensitivity of known wetlands, rivers or other natural ecosystems
on or associated with the study area.
A site analysis plan should be prepared in which the physical features of the site as well as ownership
and spatial constraints, including adjacent and downstream areas, are assembled and evaluated.

34
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

Site Analysis
The physical characteristics of the site reflect the existing course of runoff and stormwater. Working
with the natural environment and processes has been found to be safer, more sustainable and easier
to maintain in the long term than more traditional engineering approaches aimed at controlling
these processes. On sites that have been substantially disturbed, consideration should be made of
what the natural drainage and runoff conditions would have been, as well as the existing situation.
This will enable potential problems and opportunities to be identified.
The following are some of the main features that should be considered and collated in the form of a
site analysis plan that should be used to inform the design process.

Topography
The following topographical factors should be considered:
· Gradients dictate the direction of flow, and runoff/drainage routes can be plotted over land,
identifying areas of ponding and concentration of loads.
· In some areas that are very flat, earthworks may be required to provide sufficient grade for
drainage.
· Topography influences the potential for erosion to occur.
· Topography informs the feasibility of different locations for stormwater routes, outlets and
treatment areas. The main stormwater routes should be located along natural drainage routes.
· In ecological terms, different habitats, some of higher conservation value than others, are
frequently associated with changes in topography.
· From an environmental and stormwater management perspective, as the slope increases, erf
sizes should also increase to prevent excessive run-off and potential erosion. Road and planning
layouts should also reflect the topography of an area, to enable integrated stormwater design
and management.
· The commercial (and aesthetic) value of different sections of a development area is also
frequently derived from different topographical characteristics.

Geology, Soils and Groundwater


A good understanding of the geology, soil and groundwater conditions is an important factor in
assessing the infiltration potential of the site. The following factors should be considered:
· Soil types affect surface permeability and hence rate of runoff.
· The mapping of geology and soils will indicate areas of potential groundwater recharge.
· Geology and soils influence the potential for erosion to occur.
· Soil types should be identified, along with the characteristics of the different soils, such as levels
of infiltration, permeability and their water-bearing capacity.
· The presence of contaminated soils, which may pose a threat to surface and groundwater
quality, should be identified and plotted.
· Areas of high groundwater levels can limit the possibilities and/or desirability of groundwater
recharge and filtration methods. It should be noted that large-scale removal of certain
vegetation types, such as Bluegums (Eucalyptus spp.), that consume large volumes of water,
might significantly raise groundwater levels.
· Need to determine seasonal and longer term trends in groundwater level fluctuation. In the
absence of sufficient documented groundwater information, the seasonal and long-term ground
35
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
water fluctuations should be projected, based on the hydrological, geological and climatic
information available.
· Soil types indicate the likely occurrence of particular plant communities, some of which may
play a role in the stormwater management plan.
· Assessing soils can also indicate the presence of existing and even historic wetlands.
· Seasonal variation of groundwater levels should be taken into account.
· The geology and soils of a site will inform the feasibility of different locations for stormwater
treatment areas and the potential for groundwater recharge.
· Different habitats (some with high conservation value) are associated with specific geological
features and soils.

Climate
The following climatic factors should be considered:
· Storm rainfall parameters are major design factors and must be carefully determined.
· The general climatic characteristics of an area will also impact on the site and stormwater
systems implemented, i.e. whether the site is generally waterlogged or dry, and if evaporation
levels are high or low.
· Microclimate conditions can inform the spatial layout of water treatment and attenuation,
particularly those associated with specific planting and multifunctional uses.

Hydrology
For successful, sustainable and integrated stormwater management, it is essential that the existing
and/or natural hydrological response and functions of the site are understood. The following factors
should be considered:
· The natural drainage that was characteristic of the development area, to the extent that this is
possible, should be determined: both the irreversible as well as less permanent changes that
have taken place should be identified.
· The hydrology of the development area is a function of the site analysis data: tools for
quantifying storm runoff quantity and quality are dealt with in the literature (refs).

Natural Ecosystems, Flora and Fauna


The site should be assessed in terms of the natural ecosystems and habitat types that it supports.
The following factors should be considered:
· Conservation (or improvement) of bio-diversity and ecosystem function must be one of the
objectives of a management plan.
· Some habitats are afforded protection by existing legislation and guideline (e.g. wetlands;
buffers around rivers and wetlands).
· Where the site intercepts natural corridors of movement between ecologically important areas,
stormwater management should seek to retain or recreate such corridors.
· Endangered or threatened vegetation, animals and/or habitats should be identified and
associated opportunities and constraints for stormwater management assessed.
· Vegetation and animals that have roles or functions that can improve water quality,
amelioration and/or infiltration should be identified, and their natural status and integrity
determined.

36
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

· Healthy, diverse and/or relatively undisturbed natural systems should be identified and assessed
in terms of their habitat integrity and importance (environmentally, socially and culturally), and,
wherever possible, be accommodated within the future planning and development of the site.
· The presence of invasive alien animals (e.g. fish, birds) or plants should be discouraged from any
developments. Alien flora or fauna associated with habitats created or maintained for the
management of stormwater from a site should not be allowed to pass into any downstream or
associated water bodies.

Ecological Characteristics of Freshwater Ecosystems


The occurrence of rivers, streams or other watercourses on the site should be identified, and the
habitat integrity of each should be determined. The following ecological and ecosystem factors
should be considered:
· Floodplains and ecological buffers that relate to the site should be determined at an early stage
in order to establish the broad development planning, and specific stormwater implications that
they have for the site.
· The presence of wetlands within the development site should be red flagged, due to their global
and nationally threatened status. Protection is accorded by certain policies and legislation.
· The stormwater discharge and receiving capacity of rivers, channels and drainage courses
should be determined to establish the levels of integration of the natural and proposed
stormwater management systems.
· The use of these linear elements should form part of an integrated public open space and
stormwater system, and promote the multifunctional use of space.
· Floodplains and ecological buffers provide open space systems within which the more space-
consuming “soft technologies” of stormwater management can be accommodated, without
posing a conflict with development pressures on land.
· Development sites that do not have floodplains and ecological buffers within the area should
consider integrating a public open space system with an overland escape route for an extreme
storm event, to maximise the opportunity for habitat corridors.
· Where ecologically important wetlands or rivers are recipients of stormwater discharge, the
quality and quantity of stormwater discharges into such systems should be regulated to
minimise downstream impacts. Cognisance should be taken of cumulative impacts to water
bodies occurring, as a result of discharge from several sources (Refer to the DWAF Water Quality
Guidelines).

Cultural and Historical Landscapes and Archaeological Sites


Areas, routes, vegetation and landmarks that have a cultural and/or historical use or significance
should be identified. Development and stormwater planning should avoid disturbing these areas
where possible. Where possible they should generally be incorporated within the public open space
of a development. This contributes a further function to the public open space system, and should be
integrated into a network of public open space.

Development Requirements
The public open space and pedestrian access requirements of a development should be incorporated
into the stormwater management planning of the site. The integration of public open space and

37
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
access requirements with the spatial requirements of stormwater management not only reduces the
conflict of pressure on land, but also enables the amalgamation of maintenance requirements, and
optimises the use of resources. The following factors should be considered:
· Land use planning should be done in relation to the natural context and characteristics of the
site. The appropriate placement of land uses will enhance the multi-functionality of the
stormwater systems and their use as an amenity by residents in the area.
· The need for a safe environment must be taken into account (e.g. avoidance of potential hiding
places for criminal elements; do not create unnecessary hazards in the selection of stormwater
management options).
· The cost of stormwater implementation, management and maintenance, as well as flood risk,
can be greatly reduced by identifying, retaining and enhancing the natural areas along which
runoff and natural habitat retain ecological integrity. The advantages of this approach are not
limited to stormwater, but can increase the visual, amenity and ecological value of a
development.

Ownership Opportunities and Constraints


A clear distinction should be made between public and privately owned land. The following factors
should be considered:
· As a principle, stormwater should as far as possible be accommodated within public open areas
or spaces under common ownership.
· Servitudes should always be registered in the favour of the controlling authority to ensure
effective management and access at all times.
· Public open space used in the stormwater systems should be clearly demarcated to ensure that
the stormwater functions are apparent and to enable monitoring and policing.
· Early identification of land ownership in potential stormwater treatment or conveyance areas
outside of the development area will assist in identifying constraints, in some cases, as well as
opportunities to provide additional space for stormwater management, through inter alia land
swaps, use of public open space and local authority land.
· Servitudes and public rights of way can also be incorporated into the stormwater systems, for
example use of road reserves for conveyance and/or infiltration, but these elements should not
be critical to performance, as they may be relinquished for later development purposes (road
widening, etc.). The servitudes may not however be relinquished if they are embodied in the
title deeds, without legally altering or deleting the servitude, which would require the local
authority consent.

Spatial Opportunities and Constraints


The amount of appropriate public space that is available for stormwater management should be
identified at an early stage in project planning, since this will largely dictate the extent to which
different stormwater design elements are feasible in a development. Where site analyses show that
spatial constraints are likely to dictate stormwater design, attention should focus on identification of
spatial opportunities outside of the development area (e.g. areas of public open space, local
authority land; schools and other areas of open space), that might lend themselves, through
negotiation, to more ecologically desirable stormwater design options.

38
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

Surrounding Developments
Stormwater management design options should take cognisance of developments in the upstream
catchment that are likely to impact on the timing, quality or quantity of stormwater generated
upstream of the development area. Identification of these issues will highlight potential problem
areas in stormwater management. The following factors should be considered:
· It is important that site planning be done in context with the adjacent properties to ensure
effective stormwater systems and integrated stormwater corridors. Sufficient retention facilities
should therefore be planned and provided on site as part of an integrated open space system.
· Clarity on the stormwater management principles employed in upstream developments should
also be obtained so that anticipated stormwater runoff from these areas can be quantified.
· The rate of growth and anticipated land-use of surrounding developments and areas that
discharge onto the development site should also be taken into account to determine the future
pressures on the stormwater systems.
· The general capacity of the stormwater systems of surrounding developments that lie
downstream of the site and the current rate of growth and pressure on these systems should be
taken into account during site planning and design. Failure of systems downstream can cause
failure and flooding upstream. As a principle, the post development runoff should not exceed
the predevelopment runoff.

Maintenance Capacity
Before stormwater design options are considered in any detail, it is vital that the developer has a
clear indication of the practical maintenance capacity, in terms of time, personnel and finance, of the
final managing authority for the stormwater system. Aesthetically or ecologically complex designs
that owe their sustainability to regular maintenance inputs on a permanent basis will fail in the
medium to long term if there is no capacity for ongoing and adequate maintenance. Similarly, where
public expectations centre on aesthetically pleasing design, adequate allowance must be made for
basic maintenance activities, such as removal of litter or alien clearing. If this is neglected, the project
as a whole may be deemed a failure in the eyes of the public. This may have ramifications for the rest
of the project in question, as well as future projects requiring public support.

Conceptual Layout
A general concept plan should form part of the Stormwater Management Report for the site layout,
taking into account the legal and physical aspects of the site as developed through the site analysis
process. This plan should indicate the location of different land-uses. This will influence the
stormwater management conditions, and reflect some of the spatial requirements of the system.

Conceptual Stormwater Planning


The information gathered concerning the site and relevant legislation and policy documents as
derived from the site analysis and conceptual layout will then be used to draw up a Conceptual
Stormwater Plan. This plan will indicate the major flow routes, natural features that will form a part
of the stormwater system and areas that are to be set aside for elements of the stormwater system,
such as attenuation ponds. It will then be modified and refined in the design phase.

39
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

Design of the Stormwater Management System


Once the planning phase process has developed a conceptual stormwater plan for the site, the
design phase needs to develop site and context specific design of the stormwater management
system. This section provides design guidelines to inform appropriate stormwater design for a
development. The key variables to be evaluated and managed are water quantity (volume and peak
flow) and water quality. Calculation methods and parameters must be justified by references to the
literature and accepted practice.

System Design Objectives


Various stormwater management facilities and techniques must be presented and evaluated in terms
of engineering, ecological, health, safety, aesthetic, social, construction and maintenance design
objectives. These should form the basis for the selection of appropriate design options. The
developer needs to demonstrate, through submission of appropriate stormwater designs, the extent
to which the proposed development meets these system design objectives. Monitoring requirements
may be imposed on the development to measure long term performance and compliance.

40
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

CHAPTER 3: EROSION AND SEDIMENT CONTROL PART 1: BY-


LAWS
Minor developments
Interpretation Clauses 16 & 18
The focus of the By-laws is the construction phase of a site. Internationally this is seen to be
the period of highest risk of sediment generation. However, this Manual seeks to widen the
focus to the operational phases of a development as well.

Control for minor developments


16. In respect of any minor development, erosion and sedimentation must be controlled during
construction and any soil exposed or disturbed during construction must be permanently stabilised in
compliance with the provisions of section 17.

Requirements for minor developments


17.(1) Access to a development site for vehicles must, if reasonably possible, be limited to one route.
(2) Any access route contemplated in subsection (1) must be stabilised with crusher dust, quarry spall
or crushed rock to minimise the depositing of soil and other debris onto any public road.

Access roads and areas of exposed soil must be stabilised to manage both dust generation and
sediment load in the stormwater runoff. The period of highest risk is the wet season and
stabilisation should be immediate, but stabilisation is still required in the dry season. All
stabilised areas must be inspected daily, maintained, and repaired within 12 hours of damage
or failure. Stabilisation methods may vary and must be approved by the Agency after
consultation with the City of Johannesburg EISD.

(3) (a) Any exposed loose soil on a development site must be stabilised by utilising an appropriate
best management practice and be maintained in accordance with the manual.
(b) During any period from 1 October to 30 April, no soil contemplated in paragraph (a), may remain
unstabilised for more than two days and during any period from 1 May to 30 September, for more
than seven days.
(c) Sufficient material, equipment and labour must at all times be available on a development site to
stabilise any exposed soil within 12 hours, if continuous rainy weather or any other occurrence
necessitates it.
(4) Any adjacent property must be protected from sediment deposition by the use of a vegetated
buffer, sediment barrier or filter, dike or mulching, or by a combination of these measures or by
utilising any other appropriate best management practice.

Interpretation Clause 17 (4 & 5)


The site boundary is usually the last point of control for stormwater and sediment runoff and
measures should be in place to treat both. Methods may vary and must be approved by the

41
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
Agency after consultation with the City of Johannesburg EISD. These measures should be in
place before construction starts.

(5) Any adverse effect of increased stormwater runoff resulting from any land disturbing activity or
land development activity, on a development site must be controlled by the application of an
appropriate best management practice.
(6) Any measure taken in terms of this section must be inspected daily and maintained to ensure
continued effective performance of its intended function.

Major developments
Provisions applicable to major developments
18. If a proposed development on any property constitutes a major development, the requirements of
sections 19 to 30 inclusive, apply, in respect of the development site concerned.

Stormwater control measures for major developments


Interpretation Clause 19
Principles for minor sites (Clause 17) apply. Areas set aside from development as identified in
an EIA or other regulations must be clearly marked on site for protection during construction.

19.(1)(a) Any soil which is exposed or disturbed during construction and any material stockpile on a
development site must be stabilised utilising an appropriate best management practice and be
maintained in accordance with the manual.
(b) During any period from 1 October to 30 April, no soil or material stockpile contemplated in
paragraph (a) may remain unstabilsed for more than two days and during any period from 1 May to
30 September for more than seven days.
(c) Sufficient materials, equipment and labour must at all times be available on a development site to
stabilise any exposed soil or material stockpile within twelve hours, if continuous rainy weather or
other occurrence necessitates it.
(2)(a) Any clearing limit, setback, buffer and other area sensitive to stormwater, such as a steep
slope, wetland or riparian corridor, on a development site determined by an environmental impact
assessment in terms of the National Environmental Management Act, 1998 (Act No 107 of 1998), or
any regulation made thereunder, must be clearly marked on the development site by visible pegs or
other effective means and may at any time be inspected by an authorised official.
(b) For the purpose of this subsection –
(i) “clearing limit” means that portion of a development site cleared from vegetation or on which any
structure has been demolished to prepare the site for a proposed development; and
(ii) “setback” means any portion of a development site where the erection of a building is prohibited
by the determination of building lines in terms of an applicable town planning scheme or any other
law.

42
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
(3) Any property adjacent to a development site must be protected from sediment deposition by the
use of a vegetated buffer, sediment barrier, or filter, dike or mulching, or by a combination of these
measures or by utilising an appropriate best management practice.

As per Clause 17(4&5). On major sites it is imperative sediment control facilities are
established before grading or construction starts.

(4) Any measure contemplated in subsection (3), must be effected prior to the commencement of any
grading, and must be functional before any other land disturbing activity takes place, on a
development site.
(5) Every structure such as a dam, dike or diversion, whether temporary or permanent, must be
stabilised in terms of subsection (1).
All stormwater control structures must be stabilised before operation. Methods may vary and
must be approved by the Agency after consultation with the City of Johannesburg EISD.

(6)(a) Any cut and fill slope resulting from an excavation on a development site must be stabilised in
accordance with subsection (1), and must be constructed with a roughened soil surface instead of a
smooth surface, in a manner that will minimise erosion.
(b) A stormwater drainage facility to regulate stormwater flow must be constructed at the top of a
slope 3m horizontal to 1 m vertical or steeper, which has an area above it that contributes to
stormwater runoff.
(c) Concentrated stormwater must not be allowed to flow down the face of a cut and fill slope unless
contained within a channel or pipe, adequate to deal with the volume of water.
(d) If a cut and fill slope face crosses a water seepage plane, a drainage or other erosion protection
facility to deal adequately with the volume of stormwater, must be provided.
Control of erosion on slopes requires particular attention, whether temporary or permanent.
Hydraulic design will be critical where catchment areas will result in significant storm runoff
volumes. Measures for runoff interception, downslope conveyance and seepage planes should
be designed.

Control of off-site erosion


20. Any property and watercourse downstream from a development site must be protected from
erosion due to an increase in the volume, velocity, and peak flow rate of stormwater from that site by
the utilisation of an appropriate best management practice to minimise any adverse downstream
stormwater impact.
Stormwater discharge points and outfalls from a site must be designed to avoid erosion to
downstream watercourses and properties. The stormwater design must demonstrate that
systems below the site will be stable. The downstream distance analysed must be determined
and motivated by the stormwater engineer for the development.

43
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

Stabilisation of temporary conveyance channels and outlets


21.(1) Any temporary on-site stormwater conveyance channel on a development site must be
designed, constructed and stabilised to prevent erosion from an expected flow velocity from a 2-year
frequency design storm event of any duration, for the post development condition.
(2) Stabilisation in terms of subsection (1) must be adequate to prevent erosion of any outlet,
adjacent stream-bank, slope and downstream area and must be provided at the outlet of every
stormwater drainage system.

Temporary outlets and conveyance facilities need to be stabilised before being put into
operation. This would imply that this needs to be achieved before work starts in the catchment
area. It is also recommended that the 2-year design storm standard is reviewed according to
the catchment size and flood risk, and the duration that the temporary facilities are expected
to operate. The stormwater engineer must consider the risk of failure during the entire
duration of the various phases of the project and make a recommendation on this before the
temporary works are approved.

Stormwater drain inlet protection


22.(1) Any stormwater drain inlet made operable during construction on a development site must be
protected so that stormwater runoff does not enter a municipal stormwater drainage system without
first being filtered, or otherwise treated effectively to remove sediment.
(2) (a) Subject to a developer lodging an application on a form prescribed by the Agency, the
requirement of subsection (1) may be waived by an authorised official if any stormwater drainage
system downstream of the inlet referred to in subsection (1), discharges to an on-site sediment
control facility based on an appropriate best management practice, including but not limited to, a
sediment pond or trap;
(b) A drainage system contemplated in paragraph (a) must be adequately cleaned at the conclusion
of the development concerned so that it operates to its best potential.
Existing municipal drainage systems should not be compromised by discharges from
construction sites and should be protected by appropriate sediment control measures on site.
These in turn need to be adequately maintained. This clause should also apply to the
operational phase of the development, including the cleaning and maintenance of the
facilities.

Trenches for municipal services


23. (1) The construction of any trench for municipal services on a development site must be limited, if
practically possible, to no more than 100 m of open trench at any one time.
(2) If consistent with safety and space considerations, material excavated from a trench
contemplated in subsection (1), must, if practically possible, be placed on the uphill side of the trench.
(3) Any device for pumping water out of a trench contemplated in subsection (1), must discharge to
44
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
an effective sediment trap or pond, and the velocity of such water must be sufficiently lowered prior
to its leaving a development site so as to prevent erosion and sedimentation.
Trenches for installation of new services can intercept and concentrate stormwater runoff.
They can also become unstable if flooded. The clause gives guidelines for trench construction,
but these should be reviewed in conjunction with trench slope and potential catchment area.
The applicant should make a recommendation on the best construction method in each case.
Discharge from trench dewatering must include treatment for sediment load.

Constructed access routes


24. (1) If any vehicle access route to a development site intersects a paved road, either public or
private, steps must be taken to minimise the deposit of matter such as mud and other debris onto
such road by utilising an appropriate best management practice such as a stabilised entrance to the
site.
(2) If matter is deposited onto the surface of a road contemplated in subsection (1), the road must be
thoroughly cleaned, at least at the end of each working day.
(3) Matter deposited on a road contemplated in subsection (1), must be removed from such road by
shovelling or sweeping and be deposited in a disposal area on the development site capable of
accommodating the quantity concerned, or at a municipal solid waste disposal site.
(4) Washing of a road contemplated in subsection (1), may only be done after any matter deposited
thereon has been removed in the manner required in terms of subsection (3).
Tracking of mud, dust, and materials on to paved roads must be monitored and managed using
appropriate mitigation measures. The applicant or stormwater engineer should make
recommendations on this aspect for approval by the Agency after consultation with the City of
Johannesburg EISD.

Removal of temporary facilities


25. (1) Any temporary stormwater facility for erosion and sediment control relating to a development
site must be removed within 30 days after the date of issue of a completion certificate in respect of
the development concerned or after any such facility is no longer required, whichever is the earlier.
(2) Sediment trapped by a facility contemplated in subsection (1), must be removed from or stabilised
on the development site concerned.
(3) Any disturbed soil area resulting from the removal of any facility contemplated in subsection (1),
must be permanently stabilised.
(4) An authorised official may in writing, exempt a developer from any requirement of subsection (2)
in respect of a specified development site.
Site clearing after issue of a completion certificate should not leave any risk of erosion or
sedimentation arising from temporary stormwater facilities.

45
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
Dewatering of development sites
26. Any stormwater facility on a development site transporting stormwater from that site, must
discharge into an appropriate sediment trap or sediment pond designed to accept the discharge of
stormwater which must be preceded by a measure to reduce the velocity of stormwater to not more
than 3 m per second before it leaves that site.
Sediment control facilities are required on all outfalls and discharge points from a site. The
performance of these facilities must be stipulated in the design, including flow velocities and
settlement performance. An upper limit on flow velocity is indicated, but the appropriate
velocity needs to be confirmed by the stormwater engineer for each case.

Control of pollution other than sediment


27. (1) Any pollutant, other than sediment, that occurs on a development site due to construction and
related activities, must be disposed of in a manner that prevents pollution of any surface water or
underground stormwater system.
(2) Pollutants contemplated in subsection (1), include any lubricant, solvent, concrete by-product,
construction material, and organic debris from clearing and grubbing on a development site.
Where sediment treatment facilities are required to capture any other types of pollutant,
these need to be set out in the design of each facility.

Maintenance of erosion and sediment control facilities


28. (1) Any temporary or permanent stormwater facility for erosion and sediment control must be
maintained and repaired by the owner of the property concerned to ensure its continued effective
performance of its intended function.
(2) Any maintenance and repair in terms of subsection (1), must be conducted in accordance with the
manual.
(3) If any stormwater facility contemplated in subsection (1), is damaged during any flood, storm or
other adverse weather condition, it must forthwith be returned to its normal operating condition by
the owner of the property concerned.

One of the main causes of failure of stormwater and sediment treatment facilities is poor
maintenance. The monitoring and maintenance requirements of all aspects of the stormwater
system need to be set out by the stormwater engineer.

Erosion control design storm event


29 Any stormwater facility designed for the control of erosion and sediment, must be designed for a
2-year recurrence interval design storm event of any duration from 0.25 hours to seven days.
The By-laws indicate that all erosion and sediment control facilities are to be designed to a 2-
year design storm. This should be reviewed on a site by site basis and in the context of the

46
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
receiving environment. A recommendation on this should be made by the stormwater
engineer in each case.

Installation of rain meter


30. For the purpose of ensuring compliance with the relevant provisions of this Part, an authorised
official may, by notice in writing, require a developer to install and maintain a rain meter, of a kind
required by that official, on a development site and to furnish the Agency with a written statement
within two days after the conclusion of every week, specifying the quantity of rainfall that fell on that
site during the previous week.
General
If the applicant believes that it is not practically possible to meet the requirements of this
chapter a detailed explanation of why that is the case shall be included in the application
prepared in accordance with section 7. A relaxation of the requirements of this section may
only be given by the Agency after consultation with the City of Johannesburg EISD.

47
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

CHAPTER 3: EROSION AND SEDIMENT CONTROL PART 2: THE


MANUAL
SEDIMENT CONTROL: MANAGEMENT OBJECTIVES

The management objective is to control sediment loads in streams and rivers across the city to
preserve water resources and to establish and protect healthy aquatic systems. The objective
includes the ability to recover degraded streams as part of catchment management strategies.
Therefore new developments, and any site redevelopments, should comply with longer term
objectives.
Water quality guidelines for sediment loads in South African rivers are given in Table 2.3.1. In the
absence of river-specific standards, current Catchment Management Plan and river quality
objectives, these guidelines may be used to set management objectives. The 2010 City of
Johannesburg State of Rivers Report shows that typical turbidity of Johannesburg rivers ranges
between 10 NTU and 30 NTU in normal flow conditions, well within the guidelines in Table 2.3.1.
However, in flood conditions, sediment loads across Johannesburg are generally observed to be
unacceptably high (see Appendix G).
Table 2.3.1: Summary of water quality guidelines for South African rivers and streams.
Source Determinand Unit Limit Comment
SA Water Quality TSS mg/l 100 All aquatic ecosystems.
Guidelines (DWA,
50 Aquaculture, clear water fish
1996a)
species.
SA Water Quality Turbidity NTU 25 Aquaculture, clear water fish
Guidelines (DWA, species.
1996a)

Sources of Sediment
The primary sources of sediment in the streams and drainage systems of the City of Johannesburg
include:
i. Streambank erosion,
ii. Erosion of poorly design drainage networks,
iii. Erosion on construction sites and areas with exposed soils,
iv. Runoff from paved surfaces (containing dust, grit, tyre rubber, etc.),
v. Litter,
vi. Sewer discharge to stormwater systems.
This section of the Manual addresses the first four sources, which are directly linked to changes in
kinetic energy introduced to rainfall-runoff processes brought about by land development and which
are central to stormwater design procedures. In contrast, the last two are influenced by external
social and municipal factors that require additional planning, design and management measures of
which many are reliant on third party participation. These are not covered in this chapter. Of the first
four sources of sediment, the erosion on construction sites and runoff from paved areas are typically
48
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
the focus of sustainable drainage manuals, with greater attention to construction sites. Indeed, these
are also the focus of the By-laws. However, in rapidly developing city environments such as
Johannesburg, the erosion of receiving streams and damage to existing drainage networks is also
problematic, and may indeed produce the bulk of sediment volume in storm runoff. Therefore, it is
important that the sediment control measures addressed in this chapter are closely linked to the
stormflow peak and volume reduction measures addressed in other sections of this Manual. This is
especially the case for the protection of off-site streams and networks where energy control
measures at site outfalls only have very localised effect. The By-laws also make reference to this
aspect.

Setting Limits for Acceptable Sediment Discharge


Targets for discharge limits should be determined by the sensitivity of the receiving stream and any
strategic objectives for the stream. These will vary with location, even within a municipality. They will
also vary between normal and flood flow conditions, though the ideal conditions are not yet
identified for Johannesburg streams. The SA Water Quality guidelines recommend that to maintain
healthy aquatic ecology, sediment loads should not vary by more than 10%, though this may not be
realistic for natural streams in flood conditions. Sediment loads during and after storms across all of
Johannesburg are seen to be unacceptably high, and in the absence of identified targets, upper limits
for general conditions may be adopted as per Table 2.3.1, but these are likely to be overly strict and
difficult to achieve (see case study for the US-EPA in Appendix G). Further research specific to
Johannesburg streams is required. In the interim, the sediment trap targets in Table 2.3.2 are
proposed. It is based on trapping different grades of sediment by a combination of settlement and
filtration methods. Additional background is given in Appendix G.
Trap efficiency is for the design event. This requires testing the system for the same range of design
hydrographs required for testing retention and attenuation facilities. If the system design is based on
peak flow only, the same targets will need to be achieved even though this will be more
conservative.
Table 2.3.2: Interim trap efficiency of on-site sediment treatment facilities.
Treatment Trap Efficiency (per design storm event)
Particle
Category Primary(1)
size 1.01 yr. 5 yr. 10 yr. 20 yr.
Secondary(2)
Gravel, coarse
≥0.2mm Settlement(1) 100% 100% 100% 90%
to fine sand

≥0.075m Settlement(1),
Fine sand 100% 100% 90% 65%
m filtration(2)
Settlement(1),
≥0.04mm Coarse silt 100% 55% 35% 25%
filtration(2)
Medium to Filtration(1),
≤0.04mm 50% 10% ~ ~
fine silt & clay settlement(2)

49
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
Setting Limits for Acceptable Site Discharge for Sediment Control
Setting discharge limits for the site are addressed in Section 2.5. The By-laws require that site runoff
should not compromise neighbouring and downstream properties, and this includes the receiving
stormwater networks and streams. Damage to these systems can result in severe erosion that may
be the cause of the bulk of the stormwater sediment. The cost of repair can be high and experience
in Johannesburg shows that the problem may persist for many years, resulting in extensive loss of
river bank material and a substantial change in the state of the receiving streams.
For this reason, the process to determining the acceptable discharges from a site must include
consideration of the hydraulic capacity and structural stability of the receiving formal and natural
drainage systems. It should indicate the changes in stormflow in these systems due to the
development of the site and it should calculate the likelihood of damage to the receiving systems. An
inspection of the river bank material and erodibility, vegetation cover and flow velocities will be
needed in such an assessment.
The extent of the downstream network to be considered must be determined by the stormwater
engineer, and the calculations will demonstrate the effectiveness of this. Catchment management
plans, where available, must be considered in this assessment. The risk of erosion will be assessed for
all the design storms and durations as set out in Section 2.5.

Erosion & Sediment Control


Literature on erosion and sediment management practices is extensive and wide ranging, and in
some cases manuals run into multiple volumes. In this version of the CoJ Stormwater Design Manual
the Best Management Practices are collated into three categories which may be developed over
time. While the techniques are prescriptive, the methods are not and the developer and professional
engineer are left to develop the most suitable approach in each case. It will be the responsibility of
the professional engineer to demonstrate the performance of the practices to be employed on the
development site, and to indicate the monitoring and maintenance requirements.
The three categories of Best Management practices for the control of erosion and sediment on a
development site are:
· Planning,
· Erosion control,
· Sediment capture and disposal.

Best Management Practices: Erosion and Sediment Planning


Planning for erosion and sediment is central to successful sediment management on a development
site. This is applicable to both minor and major sites. The professional engineer must, as part of the
site drainage plan, prepare an Erosion and Sediment Control Plan (ESCP) that addresses the
following:

· A risk assessment of sediment yield during construction, including zones of high, medium and
low risk. Show separation of the drainage of clean and dirty runoff zones.
· Presentation of the post-construction erosion and sediment management facilities and the
integration of these facilities into the sediment management of the construction site.

50
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

· A description of the anticipated sediment type. This will include geotechnical analysis of the
soil types (particle size distribution, specific gravity, plasticity index), as well as imported
materials. The risk assessment should include contamination risk, with a chemical description
of the contaminant(s).
· This should also include an indication of the dates and durations when these areas will be
exposed. Where possible show optimum use of dry season construction. A scheduling of
exposed areas will be required on major sites and must demonstrate that exposed areas are
kept to a minimum at all times.
· Description of methods for storage of building materials and the handling of rubble, spoil,
etc.
· A description of the receiving environment and aspects sensitive to erosion, sediment
deposition or suspended sediment.
· A description of soil stabilisation BMPs to be applied for access roads, excavated areas and
stockpiles (Clauses 17, and 19 to 30).
· A description of sediment treatment BMPs in the form of settlement and filtration, and an
evaluation of the effectiveness of these measures, including a discussion on retention times
compared to expected settling times of the sediment. These will be an integral part of the
development site stormwater system.
· Use of vegetated systems for erosion and sediment control, and the early establishment of
these before the main site clearing and construction activities begin. These may include
vegetation buffers, vegetation lined channels, energy management, sediment filtration and
vegetated settlement ponds.
· On major sites, the anticipated performance of the BMPs must be demonstrated using the
same range of design storm tests undertaken for attenuation and retention facilities.
· Monitoring requirements must include suspended sediment sampling at off-site discharge
points during storm events, logging sediment capture volumes.
· The ESCP must also set out the maintenance and monitoring requirements for the erosion
and sediment control system, including frequency of renewal of soil stabilisers, methods for
cleaning BMP filter systems and requirements for emptying settlement facilities.
· Disposal of sediment must be clearly stated, including expected contamination and special
requirements for disposal. Testing and monitoring for contaminants in sediments should be
addressed.
The ESCP must be signed off as part of the stormwater drainage plan (SDP) prior to start of
construction. It will also form part of the ECO reporting where suspended sediment sampling,
sediment volume monitoring and any water quality testing is reported. Adaptations to any of the
erosion and sediment control facilities must be reported.

BEST MANAGEMENT PRACTICES: EROSION CONTROL


The following measures are considered best practice. The detail and application may vary according
to site conditions and season and the most appropriate design should be researched by the
professional engineer.

51
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
Table 2.3.3: Erosion Control BMPs.
Erosion Control BMP Description & examples Minor Major
Site Site
Minimise exposed areas and only Scheduling during site and construction
ü ü
excavate when necessary planning
Rainfall energy dissipation, · Grass & vegetation mulching,
suitable for stock piles, spoil · Shade cloth ü ~
heaps, small exposed areas, etc. · HDPE sheeting
Short-term revegetation · Hydromulching, hydroseeding
· Sodding ~ ü
· Fibre weave blankets
Long-term revegetation Early establishment of parts of the final
landscaping and green stormwater
ü ü
solutions, which can perform sediment
treatment functions during construction.
Cellular confinement systems · Manufactured geotextile systems
(most suited to slope ü ü
stabilisation)
Interception filters · Fibre weave or geotextile upright barrier
across the slope ü ü
· Manufactures products.
Interception drains (best suited · Similar to agricultural contour, installed
to large exposed slopes) across the slope
~ ü
· Interception drains set at flatter slopes
to reduce flow velocity
Riprap armouring (best suited to Rock, waste rubble or large gravel cladding
~ ü
drain liners) (depending on slope)
Fabricated liner systems There are a range of fabricated liners
available in SA that are suitable for erosion ü ü
control, particularly as drain liners.
Vegetated lined systems Use of grasses, sedges and similar
vegetation as natural liners for storm
drains. These are good for energy ~ ü
management and erosion control, but
need early establishment.
In-line energy control structures · Weir structures, sand bags, gabions,
(structures used in the drainage located along storm drains to reduce
network to manage velocity and hydraulic gradient and flow velocity.
depth of stormwater flow) · Drop structures, used for conveying
stormwater down steep slopes. ü ü
· Energy dissipaters & ”level spreaders”
(typically used at outfalls) discharge
concentrated stormflow over a wide
spillway

52
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
Assessing stability of temporary erosion protection works
Planning is as critical for ensuring the stability and performance of temporary works as it is for
permanent works. The following apply:

· Temporary erosion protection works need to be installed and stabilised before pressed into
operation on a construction site. Hence the employment of vegetated systems needs to be
adequately planned such that sufficient time is allowed for the establishment of vegetation.
Lined systems may be required if time is too short.
· Hydraulic structures and conveyance systems for major sites need to be sized and designed
for capacity and stability. Hydraulic capacity must assume worst case runoff conditions.
Hydraulic resistance parameters must be clearly defined and appropriate to the lining
intended.
· Hydraulic structures and conveyance systems for minor sites need to be checked for
hydraulic gradient (slope) and the consequences of overtopping in a large storm event.
· Flow velocities in conveyance channels should be kept as low as possible, and may not
exceed 3 m/s. Lower velocities may be needed for unlined or vegetated lined channels.
Design velocities must be suitable for the lining of the channel, the erodibility of the
subgrade, and the size and stability of receiving structures. Channel gradients may be
flattened to reduce flow velocities by the introduction of energy breaks (e.g. small weirs) in
the channel, or by increasing flow resistance (e.g. by large stone or cobble lining, or the
introduction of vegetation). The latter will reduce channel hydraulic capacity and the channel
size should be increased.

BEST MANAGEMENT PRACTICES: SEDIMENT CAPTURE AND DISPOSAL


The following measures are considered best practice. The detail and application may vary according
to site conditions and season and the most appropriate design should be researched by the
professional engineer.

Table 2.3.4: Sediment Capture BMPs.

Sediment Control BMP Description & examples Minor Major


Site Site
Maximise use of vegetation Grassed swales are particularly effective.
buffers around the construction Maintenance should be minimal and grass
site, and along the site cutting is ideally avoided. However these areas
boundaries. need protection from construction traffic,
ü ü
Construction site runoff may stockpiling and dumping, and should be fenced
discharge directly into these off. Stormwater collection facilities may be
buffer areas. required on the down slope side of these
buffer areas.

53
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
Sediment Control BMP Description & examples Minor Major
Site Site
Sediment trap and filter barriers · Swales (as above) where space allows,
(usually applied in locations · Fibre weave or geotextile upright barriers
where sheet flow will occur) installed across the slope, ü ü
· Hay bales across the slope (properly joined
and embedded)
Stormwater inlet filters · Gravel “sausages” made from geo-fabrics,
(for sediment trapping at kerb · Geo-fabric barriers ü ü
inlets, drop structures, etc.)
Sediment traps · Designed and constructed for the specific
(settlement basins) sediment type and design storm event.
These must be designed as an Storage volume is critical and dimensions
integral part of the stormwater are important.
network and must meet · Wide range of options including concrete
performance requirements for structures, excavated ponds, over-sized
design storm size and trap channel sections.
efficiency. · Lined, unlined and vegetated sediment traps ü ü
They are often located before can be considered, depending on water
off-site discharge, and upstream quality, erosion risk and maintenance
of key stormwater control requirements.
facilities (e.g. attenuation · Adaptation of attenuation ponds and
dams), but they should be retention ponds may be considered.
considered for use throughout · Performance requirements (storm size and
the stormwater network. trap efficiency) must be clearly defined.
Litter traps The effects of blockages on stormwater
systems due to litter can be rapid and severe.
Stormwater systems are therefore vulnerable
to failure due to litter. Management of litter
from on-site sources is best achieved through
effective litter collection rather than litter traps
ü ü
installed within the stormwater network.
However, if still required, litter trap facilities
may be included in on-site stormwater systems
and must be approved by the Agency or EISD.
Note that monitoring and maintenance will be
key considerations.

Designing Sediment Settlement Facilities.


The design of a settlement treatment facility will require knowledge of the nature of the sediment
(grading and specific gravity) and the retention time in the facility (a function of the flow rate and
size of storage). The samples selected for grading must demonstrate that they are representative of
the material likely to be eroded. Typically, this will look at all erodible material on site, including soils,
excavated areas, stock piles and spoil heaps. The flow rates will be determined from the storm runoff
calculations as set out in Chapter 5. The stormwater engineer must provide the calculations
demonstrating the performance of the selected settlement treatment facility.

54
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
Designing Filtration Facilities.
Design of filtration systems is dependent on each situation. Narrow filter barriers are typically
applied to areas where sheet flow occurs. Spacing of the strips will be dependent on slope and area.
They can be vulnerable to sediment build-up and damage in storm events and require inspection and
repair after each storm event.
More effective filter strips are vegetated strips of land that can receive overland flow from large
areas of the site, and even concentrated outfalls if provided with energy (velocity) dissipaters and
flow spreaders. The filter strip should be on an even, shallow gradient, with a dense vegetation cover
(e.g. bush grasses, sedges, etc.). The width of the strip should be a minimum of 4m, but ideally 6m or
more. Sediment management on the filter strip is important, to maintain an even gradient and to
avoid channels forming with risk of erosion.

Dewatering flooded areas on site (trenches, pits, etc.).


Rainwater collecting in pits and trenches on a site may contain high levels of suspended sediment.
Overflow from all flooded areas of the site must be captured in the stormwater management system
and associated sediment control facilities. Where dewatering takes place, the sediment discharge
limits shall be as per Table 3.2 for the 1.01 year design storm event, and any of the sediment
containment BMPs may be considered. Ideally, the water will be left in the pit or trench long enough
for settlement of the bulk of the sediment, so that filtration is all that is required.

Control of vehicle borne mud from the site


Sites in Johannesburg are likely to have high clay content in the soils and this will lead to tracking of
mud from the site onto public roads on the wheels of construction vehicles. Access points to and
from the site are generally targeted as the best locations to manage this, although on a major site
the main internal roads may be treated in the same way. This is the construction of a stabilised pad
that will assist in the removal of mud from vehicle tyres. The basic requirements are as follows:
Aggregate size: G5 (50-60mm), placed on a geotextile layer where required.
Depth of layer: 150mm (minimum).
Dimensions: Width = full width of the access point.
Length = 20m (minimum).
Drainage: The stabilised pad must be adequately drained to prevent submergence
during storm events, and to allow washing when required.
Washing: Provision for washing may be required in times when mud is not removed
by vehicle movement alone. Drainage of the pad should discharge to a
settlement pond with a pump facility for jetting the tyres and thus recycled
for tyre washing.
Monitoring of the system is critical and may be combined with any weighbridge and security
operations for the site. Response to mud tracking off-site should be immediate. Requirements of the
By-laws (Clause 24) include the cleaning of public roads by the end of the working day.

55
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
Disposal of Sediment
Both settlement facilities and filter strips will accumulate sediment. For the facilities to continue to
perform their function, sediment will need to be removed on a regular basis.
Disposal of sediment will depend on the nature of the sediment (as defined by the grading of the
material and any organic content) and any contamination of the sediment. Contamination will
include any detergents, hydrocarbons and cement commonly found on construction sites, or any
other pollutant. Polluted sediments must be collected and disposed of at a registered waste disposal
facility. All off-site disposal should be at a licensed waste disposal facility. Any alternative off-site
disposal must be authorised by a manger of the Agency after consultation with EISD.
The developer and contractor may also obtain exemption from off-site disposal if the sediments are
pollution free and can be recycled on site. This may include returning building material to stock piles,
or mixing into the topsoil and landscaping material if suitable. Exemption will need to be obtained
from the Agency after consultation with EISD before this approach can be adopted.

BEST MANAGEMENT PRACTICES: OUTFALL ENERGY MANAGEMENT


If the target of ensuring that post development discharge is similar to pre-development conditions,
both in peak flow and volume, the requirement for energy management (i.e. velocity management)
at the outfall from the site should be minimal. However, if post development discharge is
significantly greater than pre-development conditions, it is likely to destabilise the receiving drainage
network, rivers and streams.
The design of energy management outfall structures can vary significantly from site to site. The most
appropriate design in terms of detail and application should be researched by the professional
engineer. However, the following principles are considered best practice:
· It is NOT ideal to install energy management controls in the receiving stream or drainage
line. Instead, the outfall from the site should ensure that site discharge flow rates are already
at the preferred velocity BEFORE entering the receiving system.
· The maximum velocity of 3m/s is a guideline. Site specific conditions may require velocities
lower than this. The professional engineer must assess this for each outfall and recommend
appropriate maximum velocities.
· Energy reduction is achieved either by reducing the hydraulic gradient, or by increasing the
flow resistance in the conveyance system. A combination of the two may also be used.
· Reducing the hydraulic gradient may be achieved by introducing a drop structure (a weir,
attenuation dam, etc.), or by reducing the gradient of the conveyance channel.
· Increasing flow resistance can be achieved by introducing energy blocks into the lined
systems, though this is an old approach. Alternatives include stone pitched liners, careful
placement of large rocks or using vegetated channels. Caution: Increasing flow resistance
requires larger conveyance channels, especially in the case of vegetated channels. For
example, reeds are a very effective form of velocity management but can reduce the
hydraulic capacity of a channel by a factor of 10.
· Vegetated filter strips may also be used as a very effective velocity control measure. Storm
runoff is discharged over a length of a filter strip which then drains into the receiving
watercourse or drain. This will also provide a measure of sediment trapping and water

56
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
quality treatment. Caution: Managing flow distribution over the filter strip will be critical to
its success.

Monitoring and Maintenance of BMPs


Monitoring and maintenance of erosion and sediment control facilities is critical to the performance
and success of the system. The developer and contractor must ensure that a person (or persons) is
allocated to this task. Actual on-site monitoring and maintenance will be dependent on the site, the
drainage network and the requirements in the ECSP, and will need to adapt to storm conditions.
However, the following must be included:

· A rain gauge must be maintained on site, and rainfall recordings taken at least daily, typically
at 08:00 each day. More frequent readings may be taken during storm events.
· Daily inspection of all erosion and sediment control facilities in the wet season (October to
March), and every week in the dry season (April to September).
· Inspection of all erosion and sediment control facilities should also take place after large
storms.
· Sediment removal from settlement facilities needs to be done to maintain their
performance. Sediment disposed off-site needs to be taken to a licensed waste facility.
· Sediment maintenance of filter facilities is required to ensure their continued function. Filter
barriers require inspection and repair after each storm event. Filter strips and vegetation
buffers may need sediment build-up to be raked to maintain an even gradient.
· Water quality sampling (both TSS and Turbidity) must be undertaken at all site outfalls, and
at main settlement facilities within the site. Sampling during storm events is required;
approximately weekly at major sites and approximately monthly at minor sites.
· Reporting of maintenance and monitoring must be carried out in accordance with the ESCP.

57
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

CHAPTER 4: GRADING PART 1 BY-LAWS


Grading plans
31. (1)(a) A grading plan in respect of any proposed grading on a development site must, subject to
the provisions of section 9, be prepared.

A grading plan is required for any site activity that requires a permit in terms of section 5 of
the By-laws. The application for the Grading Plan shall be in accordance with section 7 of the
By-laws. The application for the Grading Plan shall be prepared by an approved professional
engineer if any of the conditions stipulated in section 9 of the By-laws exist.

(b) A plan contemplated in paragraph (a), must incorporate a plan of every retaining structure which
is greater than 1,5m in height which is to hold graded soil in place, if such structure has not been
included in building plans approved under the National Building Regulations and Building Standards
Act, 1977.
(2) A grading plan contemplated in subsection (1), must –
(a) indicate both temporary and permanent erosion and sedimentation stormwater control facilities
on the development site concerned for a period from the commencement of site development
activities, continuing without interruption to the completion of the development on that site;
(b) specify the construction sequence for the establishment of every such facility; and
(c) conform to every applicable requirement and standard for erosion and sedimentation control
specified in Chapter 3.

Drainage
32.(1) The requirements of Chapter 5 relating to stormwater management must be complied with
prior to the commencement of any grading on a development site.
(2) The characteristics of all stormwater from a development site with regard to quality, flow rate,
velocity and frequency must be the same as the stormwater runoff which would have flowed from the
development site in its natural condition prior to commencement of any site development activity.
The minimum acceptable pre-development values for stormwater with respect to quality, flow
rate, velocity, and frequency, are those that would have occurred if the property had been in
its natural condition i.e. prior to the discovery of gold on the Witwatersrand. If the
development site is in its natural state, these baseline data can be obtained by monitoring
runoff from the site for at least two hydrological years prior to the commencement of
construction. It is, however, unlikely that any site will be in its natural condition so baseline
data can be generated by hydrological modelling using parameters applicable to the site in its
natural condition. The Stormwater Management Report contemplated in section 7 shall give
details of the parameters used and the results of the modelling.

58
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
(3) Any stormwater runoff which would have flowed onto a development site naturally, must be
accepted onto that site, and must be discharged from that site to a natural watercourse or a
municipal stormwater drainage system.

Change in topography of development site


33. (1) The maximum surface gradient resulting from any grading activity on a development site may
not exceed 3 m horizontal to 1 m vertical : Provided that such gradient may be exceeded, subject to
the prior approval in writing by an authorised official if he or she is satisfied on the basis of
engineering calculations prepared by a professional engineer, that surface erosion on the
development site concerned can be controlled to an erosion rate equal to a stabilised gradient under
the same conditions as those existing on the development site in its predevelopment condition.
(2) (a) Any property, public road or other municipal infrastructure which is adjacent to a development
site must be protected from stormwater damage occurring during grading operations.
(b) If any damage contemplated in paragraph (a) occurs, an authorised official may, by written notice
served on the developer concerned, require him or her to take the steps specified in the notice to
restore such damage within a time so specified and to prevent a recurrence of such damage.
(c) Any damage contemplated in paragraph (a), must irrespective of whether a notice has been
served in terms of paragraph (b), forthwith be restored by the developer concerned at his or her own
cost.
(d) If there is a failure to comply with paragraph (b) or (c), the Council may take the steps necessary to
restore the damage and may recover the cost thereof from the developer concerned.

Maintenance
34. Any erosion and sediment control, and stormwater facility and drainage facility relating to
grading, must be maintained in good operating condition at all times, as required by section 28.

59
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

CHAPTER 4: GRADING PART 2 THE MANUAL

60
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

CHAPTER 5: STORMWATER MANAGEMENT PART 1 BY-LAWS


PART 1:

Major developments
Application
35. If a proposed development on any property constitutes a major development, the requirements of
this Part apply in respect of the development site concerned.

Development activities
36. (1) If one or more of the following conditions exist on a development site, the requirements of this
Part apply to the maximum extent practically possible in respect of that site, and in respect of any
adjacent property which is part of the development:
If the applicant believes that it is not practically possible to meet the requirements of this
section a detailed explanation of why that is the case shall be included in the application
prepared in accordance with section 7. A relaxation of the requirements of this section may
only be given by the Agency after consultation with the City of Johannesburg EISD.

(a) a development site greater than 4000 m² in area in size with 40 per cent or more impervious
surface, prior to commencement of the development;
This section shall apply to any development site greater than 4 000m2 in area irrespective of
the proportion of impervious cover either before or after completion of the development.

(b) a development site from which stormwater is discharged to a watercourse or water body which
has a water quality problem documented in the records of the Council or the Agency, and includes,
but is not limited to, a watercourse and water body –
(i) listed in a report required under the National Water Act, 1998, and designated as not being
beneficially used; or
(ii) listed under the National Water Act, 1998, as not expected to meet water quality standards or
water quality goals contemplated in that Act ; and
(c) a development site in respect of which the need for stormwater control measures additional to
those applicable to that site has been identified by an authorised official.

Approved hydrological methods for design


37.(1) For the purposes of any estimation of peak stormwater runoff rate used in the design of any
stormwater quantity control facility, a hydrograph method of analysis approved by the Agency must
be utilised.
A hydrograph method shall generate a continuous time series of discharge against time of
sufficient duration to show the trend of the falling limb of the hydrograph after the end of
rainfall. The application shall contain a description of the methodology used and a motivation

61
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
as to why the chosen method is appropriate for use on the site.

(2) Any storage facility that forms a part of a stormwater quality control facility, must be designed by
using a method approved by the Agency.
The design of a storage facility must use a recognised routing calculation method to compute
the outflow hydrograph from the inflow hydrograph and the stage/storage and
stage/discharge characteristics of the basin. If the purpose of the basin is to reduce peak
discharge only, then a simple reservoir (level pool) routing calculation will be sufficient. If the
basin is to be used for longer duration storage with the intention of reducing volume or
frequency of discharge, or of improving water quality, then the computation method used
shall take account of infiltration and evapotranspiration losses and the physical, chemical and
biological processes that take place in the water body.

(3) Any calculation method used for a design contemplated in subsection (1), must be described, the
value of any parameter and variable must be stated, and the reason for selecting a specific range of
values must be set out in a design report for a proposed stormwater management strategy for the
property concerned, prepared on behalf of a developer and such report must be submitted to the
Agency for approval.
Suggested values for some parameters are given in Appendix E. Runoff and infiltration
parameters are, however, highly dependent on site characteristics. The stormwater
management report shall describe and give reasons for the selection of all parameters used.

Stormwater quantity control


38.(1) Subject to the provisions of subsection (2), the following requirements for stormwater quantity
control apply :
(a)(i) All stormwater entering a development site in its predevelopment state from a depression or
conduit, must be received on that site at a naturally occurring or otherwise legally existing location;

In accordance with the Common Law, a downhill property must accept all natural stormwater
runoff from a higher lying property. If the runoff is concentrated either in time or space then
the neighbours must agree on an acceptable discharge point onto the lower lying property and
route that the runoff must follow across the lower property. The cost of any improvements
necessary to allow the flow to cross the lower property safely and conveniently shall be borne
by the higher lying property or properties in proportion to their contributing catchment areas

(ii) all stormwater leaving a development site must at all times during and after development, be
discharged at a naturally occurring or otherwise legally existing discharge location so as not to be
diverted onto or away from any adjacent downstream property : Provided that a diversion which will
correct an existing downstream stormwater problem, may, on written application by a developer on a
form prescribed by the Agency, be permitted in writing by an authorised official;

62
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
(iii) for the purpose of this paragraph “naturally occurring location” means the location of any
watercourse, channel, depression or marshy area existing as an established system, identifiable on a
topographic representation of the property in the records of the Council, either from a map,
photograph, site inspection, decision of a court of law or other means approved in writing by the
Agency;
(b) the post-development peak stormwater discharge rate from a development site for a 5- to 25-year
recurrence interval design storm event of any duration from 0.25 to 24 hours, or any other design
storm event stipulated by the Agency up to and including a 50-year design storm event, may not at
any time exceed the pre-development peak stormwater runoff rate from that site for the same design
storm event;

The maximum post-development stormwater discharge rates shall not exceed the pre-
development discharge rates for the entire range of recurrence intervals for events of any
duration. The pre and post development discharge rates shall be determined for a range of
recurrence intervals from 1.01 years to 100 years and for a range of durations that include
0.25h; 0.5h; 1.0h; 6.0h; 12.0h and 24.0h and curves plotted to demonstrate that the post-
development peak does not exceed the pre-development peak discharge rate for any of the
recurrence intervals or the durations calculated, and is unlikely to exceed the pre-development
peak for any intermediate duration.
Alternatively, continuous modelling can be used to determine frequency of runoff and flow
duration frequency curves. These results can then be used in the SWMR to show that
characteristics of the post-development runoff do not differ from the pre-development
characteristics.
This section shall be read in conjunction with section 32.(2), therefore:
· The characteristics of the runoff from the site after development must meet the target
values for peak discharge, volume of discharge, frequency of runoff and quality of
runoff as described later in this Section or in the applicable appendices.

· The methodology for demonstrating compliance with this clause must be described in
detail in the Stormwater Management Report submitted in accordance with section 7
of the By-laws.
Although this section requires analysis for events of recurrence interval up to 50 years the
Stormwater Management Report should consider at least the 100 year recurrence interval
event, and consider rarer events where appropriate. The requirement for the determination of
the 100 year floodline in terms of Section 144 of the Water Act (Act 36 of 1998) has been
interpreted by the courts as meaning that any event with a recurrence interval of less than 100
years should be anticipated by a reasonable engineer. Only if the recurrence interval exceeds
100 years can the event be regarded as “force majeure”.

(c) any closed depression which receives stormwater discharge from a development site must be
analysed using a hydrograph method for routing stormwater, and infiltration relating to such
depression must be addressed, if relevant;

63
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
For a closed depression without a defined overflow the expected 100 year maximum water
level should be evaluated using a water balance analysis. This analysis shall be:
Either over a period of 3 years using motivated values for evapotranspiration and
infiltration as outflows and measured rainfall records to estimate inflow. The maximum
time step shall be one month. The first year of the analysis shall be for a year with the
average annual rainfall for the site, the second year shall be for the 100 year RI annual
precipitation, and the 3rd year shall be an average year as used for year 1. If rainfall
records for the 100 year RI 1 year depth are not available the monthly values can be
estimated by using a Gumble plot to estimate the 100 year rainfall depth and by using
the monthly values of the best available data adjusted in proportion to the ratio of the
annual rainfall depths.
Or a long term analysis using a set of statistically generated synthetic monthly rainfall
values. At least 5 analyses with different random seeds shall be done and the minimum
duration for each analysis shall be 1 000 years. (Guidance for this method can be taken
from water resources practice)
The report required in terms of Clause 7 shall describe in detail the methodology used and the
parameters assumed.

(d) if a proposed development will result in a discharge of stormwater to a closed natural depression
that has a water surface area greater than 500 m² at overflow elevation, the following requirements
must be complied with for the purpose of an analysis contemplated in paragraph (c) :
(i) the stormwater runoff hydrograph from a 100-year design storm event, of any duration from 24
hours to seven days from the pre-development catchment area draining to a closed depression
contemplated in paragraph (c), must be routed into that depression using only infiltration as outflow
from the depression;
(ii) if a portion of such closed depression is located off the development site concerned, the impact of
stormwater on any adjacent property must be taken into account;
(iii) if overflow of such closed depression occurs, the closed depression must be analysed as a
detention or infiltration pond, to determine whether the depression can safely cope with the expected
quantity of stormwater;
(iv) no discharge from a closed depression may exceed the discharge rate from that depression
immediately prior to the development, resulting from a 2, 10, 25 and 100-year design storm event of
any duration from 0.25 hours to seven days and a control structure to regulate outflow from such
depression, an emergency overflow spillway and an access road must be provided and other design
criteria required in writing by the Agency must be complied with;
(v) if a closed depression will be maintained by the Agency, a servitude in respect thereof must,
subject to the provisions of section 43(1), be registered in favour of the Council to protect the
Council's rights; and
(vi) if a development will create a stormwater runoff from the property concerned to a closed
depression located off the development site, the volume of runoff discharged may not be increased

64
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
beyond the effect of a 2, 10, 25 and 100-year design storm event of any duration from 0,25 hours to
seven days;
(e) any stormwater quantity control facility to be provided, must be designed to meet, as a minimum
performance standard, the requirements of this section, unless –
(i) stormwater from a development site will discharge to a Council stormwater system approved by an
authorised official to receive stormwater from that site; or
(ii) stormwater from a development site discharges to a receiving body of water and it can be
demonstrated by the developer, to the satisfaction of an authorised official, that stormwater quantity
control is not warranted;
If the developer believes that the requirements for the control of stormwater runoff from the
site is not warranted, the Stormwater Management Report shall contain a detailed motivation
for the complete or partial relaxation of the stormwater management requirements. The
stormwater management requirements may be relaxed by an authorised official of the Agency
after consultation with appropriate officials of the City of Johannesburg EISD. A relaxation of
the stormwater management requirements will only be valid if specifically noted in the site
development activity permit issued in terms of section 7.

(f) if the conditions downstream from a development site are determined by an authorised official to
be exceptionally sensitive to potential stormwater discharges from that site compared to the situation
immediately prior to the development, that official may, by notice in writing, require a factor of safety
to be applied in respect of the total storage volume of any attenuation and detention facility and a
reduction of the stormwater released from the site concerned;
The decision of whether downstream conditions are sufficiently sensitive to require the
application of a factor of safety shall be at the discretion of the official of the Agency after
consultation with appropriate officials of the City of Johannesburg EISD.

(g) no attenuation facility or open stormwater quantity control facility may be located –
(i) in a public road;
(ii) on any land zoned as public open space under an applicable town planning scheme, without
written approval of the Council ;
(iii) in any floodplain below the 50-year floodline; or
The construction of an attenuation facility below the 100 year floodline that requires
excavation or infilling of more than 5 m3 of material is a listed activity in terms of regulations in
terms of the National Environmental Management Act (NEMA) and will therefore require
authorisation from the Gauteng Department of Agriculture and Rural Development (GDARD).
Moreover, this is regarded as an alteration of the bed or banks of the watercourse in
accordance with Section 21 of the Water Act and will therefore require a Water Use Licence
from the Department of Water and Sanitation (DWS).

65
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
(iv) in any wetland without approval of the Department of Water Affairs and Forestry;
(h) reasonable access to any stormwater facility to enable ease of maintenance, as determined by an
authorised official, must be provided;
(i) if conditions on a development site are appropriate for infiltration of stormwater and ground water
quality on that site is protected, streambank erosion control must be implemented, utilising
infiltration to the fullest extent practicable; and

Retention storage, combined with infiltration and evapotranspiration, are the preferred
methods for runoff volume reduction. Suitability of the site for infiltration is dependent on soil
type and depth, proximity to vulnerable structures, etc. If infiltration is inappropriate for the
site, the Stormwater Management Report shall explain why, and offer alternative methods for
the reduction of runoff volume and frequency.

(j) any quantity control facility contemplated in paragraph (g), must be selected, designed and
maintained according to the manual, and may not be built within a vegetated buffer, except for a
stormwater conveyance system approved in writing by an authorised official and subject to the
provisions of the National Environmental Management Act, 1998 (Act No 107 of 1998).
Quantity control facilities shall be designed to meet the target characteristics for stormwater
runoff given later in this Chapter.

Impervious underground tanks intended specifically for peak discharge attenuation are not
acceptable unless more than 80% of the volume of the tank is allocated to long term storage
for the purpose of harvesting rainwater.
The Stormwater Management Report shall describe in detail the reasons for the selection of
the various components of the management facility and give details of the design and
calculation methods used. This Report shall contain details of the maintenance requirements
for the facility, including arrangements for inspection of the facility from time to time by
officials of the Agency. The maintenance section of the Stormwater Management Report shall
contain the name and contact information of the person responsible for the maintenance of
the facility.
The developer and all subsequent owners of the property shall ensure that the maintenance
section of the Stormwater Management Report is passed on to each subsequent property
owner. The seller of the property shall be responsible for informing the Agency of the name
and contact information of the new person responsible for maintenance of the facility.

(2) The Agency may, if it considers that circumstances relating to stormwater management in respect
of any development so requires, by notice in writing, require the developer concerned to comply with
any additional requirement relating to control of the peak discharge or quantity of stormwater,
specified in the notice.
(3) No person may do anything which may interfere with the proper functioning and the ease of
maintenance of any structure or facility contemplated in this section.

66
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
Combination of quality and quantity control facilities
39. Any quality control stormwater facility may be incorporated into the design of a stormwater
quantity control facility if such combination will facilitate water quality control.

Quality control requirements


40.(1) Subject to the provisions of subsection (2), the following requirements for stormwater quality
control apply :
(a) A best management practice concerning stormwater quality control must be utilised in respect of
any stormwater facility relating to stormwater quality in respect of a development site, to the
maximum extent practically possible;
The target values for the quality of stormwater runoff are given later in this section. The
Stormwater Management Report shall give details how these targets will be achieved in
accordance with international best practice. If the developer believes that the target values
cannot be practically achieved, then the Stormwater Management Report shall explain in
detail why that is the case and contain proposals for alternative target values. Relaxation of
the target values may be allowed by an authorised official of the Agency after consultation
with an appropriate official of the City of Johannesburg EISD.

(b) a stormwater facility for any treatment relating to the quality of stormwater must be of a size
sufficient to hold and treat stormwater runoff from a 2-year recurrence interval design storm event of
any duration;
(c) no structure relating to stormwater quality control may be built within a vegetated buffer, other
than a conveyance system approved in writing by an authorised official;
(d)(i) treatment of stormwater discharge must be provided by utilising a wetpond or biofiltration or
both, based on a best management practice : Provided that another best management practice may
be utilised subject to the granting of a deviation or exemption from the provisions of the manual in
terms of section 61;
Retention basins (wet ponds) and biofiltration are the preferred methods of managing the
quality of stormwater runoff. Any alternative best management practice for improvement of
stormwater runoff quality shall be described in detail in the Stormwater Management Report.
The description shall contain details of the calculations used to show that the practice will
work and examples of its application internationally. Innovative water quality management
practices may be permitted at the discretion of an authorised official of the Agency following
consultation with an appropriate official of the City of Johannesburg EISD.

(ii) a wetpond is required for a development site on which an impervious surface greater than 2 ha for
use by motor vehicles, will be created by the development from which stormwater will discharge –
(aa) directly to a municipal or private regional stormwater facility or closed depression without
providing stormwater quantity control on the development site concerned ; or

67
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
(bb) directly or indirectly to a water course or wetland within 1 km downstream of the development
site concerned;
(e) all stormwater must, prior to its discharge to a stormwater facility based on an appropriate best
management practice and designed to utilise infiltration, pass through a stormwater treatment
facility designed to remove suspended solids; and
For the purposes of this section the definition of suspended solids shall include floating debris.
The Stormwater Management Report shall contain information on the expected particle size
distribution of the likely suspended solids and information on the duration of retention
required to ensure effective removal of 95% of the suspended material. The maintenance
section of the Stormwater Management Report shall contain details of how the accumulated
sediment will be removed from the treatment facility.

(f) all stormwater from a development site on which heavy construction equipment is used,
maintained or stored or on which any petroleum product is stored or transferred to such equipment
or any vehicle, and from any vehicle washing bay, must be treated by an oil/water separator of a size
effectively to prevent pollution of such stormwater.
(2) The Agency may, if it considers that circumstances relating to stormwater quality control in
respect of any development so require, or that the requirements of subsection (1) do not afford
adequate protection for any water quality sensitive area on site or within the catchment area where
the property concerned is situated, by notice in writing, require the developer concerned to comply
with any additional requirement, relevant to such control, specified in that notice.

Part 2:

Major and minor developments


Application
41. If a proposed development on any property constitutes a major or minor development, the
requirements of this part apply in respect of the development site concerned.

Stormwater drainage facilities


42.(1) An on-site stormwater drainage facility must be provided on every development site and must
be of sufficient capacity to convey –
(a) stormwater without flooding or otherwise damaging any existing or proposed structure;
(b) any post-development peak stormwater runoff from a development site resulting from a 5-year
recurrence interval design storm event, of any duration from 0.25 to 24 hours; and
(c) any existing stormwater runoff upstream from a development site that will be conveyed through
that site, taking potential development upstream from the site into account.
(2)(a) In estimating a peak stormwater runoff rate used in the design of a stormwater drainage
facility contemplated in subsection (1), either the rational method as described in the manual, or a
hydrograph method of analysis approved by the Agency in writing, must be used.

68
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
Comment on this clause must be read in conjunction with comment on Clause 37.(1).
The use of the Rational Method for calculations relating to the design of stormwater
management facilities is discouraged. This method lumps all of the characteristics of the
drainage system into a single value designated the rational “C”. Such a gross lumping of
parameters militates against subtleties of design and the evaluation of the benefits of
distributed stormwater management interventions.
Some variations of the Rational Method allow for the generation of a simplified triangular
hydrograph. It should be noted that some literature suggests that the duration of the falling
limb of the hydrograph is twice duration of design storm, yielding a hydrograph with a
duration of three times the storm duration. This literature is WRONG. It can easily be shown
that, for higher values of C, the volume of runoff calculated this way (i.e. the area under the
hydrograph) can exceed the total volume of rainfall, thereby violating the continuity principle.
Other variations, for example James (1981), of the Rational Method allow the generation of a
more realistic runoff hydrograph by deducting losses from a triangular rainfall hyetograph,
multiplying the resulting effective rainfall hyetograph by the area of the catchment and
transforming the triangular hydrograph to a smooth curve using Muskingum routing. This
smoothed hydrograph is mathematically easier to route through a storage basin.
If a calculation based on the Rational Method is used, it should be noted that the critical storm
duration that yields maximum peak discharge from a detention basin is not the same as the
critical storm duration that yields maximum peak discharge in the drainage system upstream
of the basin, and that the value of the runoff coefficient “C” varies with rainfall intensity, i.e.
with both recurrence interval and storm duration.
The use of a computer based model that allows for catchment discretisation and
determination of parameters based on the physical characteristics of the drainage area
combined with a continuous record of measured rainfall data is recommended.

(b) The selection method, and all parameters or variables used in an estimation in terms of paragraph
(a), must be stated and explained in a design report contemplated in section 37(3).
(3)(a) Any existing stormwater facility and any other conveyance facility up to 500 m downstream
from a development site that falls within the downstream portion of an off-site stormwater drainage
analysis, contemplated in section 12 must have sufficient capacity to convey, without flooding or
otherwise damaging any existing or proposed structure, on or off site, a post-development peak
stormwater discharge contemplated in subsection (1)(b).
(b) Any pipe stormwater drainage system must have capacity to convey stormwater runoff from a 5-
year recurrence interval design storm event of any duration and any such system that conveys
stormwater on the surface of land must be capable of conveying the runoff from a 25-year recurrence
interval design storm event of any duration.
(4) No stormwater drainage facility utilising a closed conveyance structure such as pipes, may
discharge directly onto the surface of a public road.

69
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
Servitudes
43.(1) If the Agency at any time decides to accept responsibility for the maintenance of any
stormwater conveyance system, on any development site or property, the owner of that site or
property must, prior to commencement of such maintenance, register a servitude acceptable to and
in favour of the Council for the protection of the Council's rights of inspection and maintenance of and
its right of access to such system.
(2) Any stormwater facility that is to be maintained by the Agency and any vehicular access to such
facility must be located in a servitude contemplated in subsection (1), in favour of the Council, or
located in any open space on Council property designated by the Agency in consultation with the
Council.
(3) Any conveyance pipe for stormwater that is to be maintained by the Agency must be located
within a servitude contemplated in subsection (1), and an access structure to such pipe must be
positioned in a public road reserve so that it can be accessed for purposes of inspection, without
entering the property on which such pipe is situated.

Wetlands
44.(1) The following requirements must, in addition to the requirements of section 38, be complied
with if stormwater from any development site discharges directly, or indirectly across any intervening
property, into a wetland:
(a) The quantity and velocity of any stormwater discharge must be controlled and treated to the
extent that such discharge attains a quality in compliance with the requirements of the National
Water Act, 1998, the National Environmental Management Act, 1998 and any other applicable law;
(b) a stormwater discharge must maintain the frequency and flow of pre-development conditions, to
the extent necessary to protect the characteristic functions of the wetland;
The Stormwater Management Report shall contain an evaluation of the natural frequency and
discharge into the wetland to be used as a target value for the post development runoff, and
shall demonstrate how the post development discharge will be managed to meet that target
distribution. The Report shall include photographs and a description of the state of the
wetland prior to commencement of any construction, and a description of steps that will be
taken to ensure that the wetland does not degrade as a result of the stormwater discharge
directed into it. The Report shall include and the name and contact information for the person
who will be responsible for the maintenance of the constructed wetland.

(c) prior to discharging to a wetland, any alternative discharge location and any natural water
storage infiltration opportunity outside the wetland, must be evaluated by a professional engineer
and utilised for the stormwater discharge if reasonably practically possible;
The Stormwater Management Report shall contain a description of the investigation that was
carried out to identify possible alternative discharge points.

70
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
(2) A man-made wetland which is intended to mitigate for the loss of a natural wetland area may,
subject to the provisions of paragraph (e), be designed and used to treat stormwater;
(3) an authorised official may, after consideration of an evaluation in terms of subsection (1)(c) in
writing allow a wetland, contemplated in subsection (2) to be constructed and utilised for the
discharge of stormwater, provided it is -
(a) constructed in an area which is not designated as a wetland or wetland buffer under the National
Environmental Management Act, 1998 or any other law; and
(b) utilised in an area where it will not detrimentally affect any such designated wetland or buffer;
(4) if a wetland contemplated in subsection (3), is not maintained in accordance with the manual for a
period of three years, its status as a wetland terminates; and

The Stormwater Management Report shall contain a section describing how the constructed
wetland will be maintained, and the name and contact information for the person who will be
responsible for the maintenance of the constructed wetland. On the first anniversary of
completion of the constructed wetland, and every second anniversary thereafter, the
responsible person shall submit to the Agency a brief report including photographs showing
the state of the wetland and confirming that it is being maintained in accordance with the
original management plan.

(5) no stormwater facility relating to the discharge of stormwater to a wetland may be constructed
within a naturally vegetated buffer, unless that facility has been approved in writing by an authorised
official.
(6) The Agency may, if it considers that in any particular case the provisions of subsections (1) to (5)
do not afford adequate protection in respect of wetlands and buffers contemplated in that
subsection, by notice in writing, require the developer concerned to comply with any additional
requirement relevant to such wetland or buffer, specified in that notice.

Regional stormwater facilities


45.(1) If the Agency considers that the public would benefit by the establishment of a regional
stormwater facility which would serve as an alternative to the construction of separate on-site
stormwater drainage facilities on various properties, it may construct such facility to provide
stormwater quantity and quality control for more than one development.
(2) A regional stormwater facility must be located outside the 50-year floodline of any water course.
(3) A developer of a property who agrees in writing to such property being served by a regional
stormwater facility must prior to the time of issue of a permit in respect of such property, contribute a
reasonable pro rata amount determined by an authorised official, based on the contribution to
stormwater runoff from the development site or property concerned to the regional stormwater
facility in relation to the total stormwater discharge to that facility, taking into account the cost of the
land purchased for, and the design and construction of such facility to, the Council.
(4) If a proposed regional stormwater facility is not in operation at the time of completion of a
development on a property that is to be served by that facility, temporary stormwater quantity and
quality control facilities must be constructed to the satisfaction of an authorised official. (5) Any
71
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
temporary quantity and quality control facilities contemplated in subsection (4), must be subject to
the terms and conditions of a written agreement on a form prescribed by the Agency, entered into
between the Agency and the owners of the properties to be served by a regional stormwater facility
established in terms of subsection (1).

Planning of catchment areas


46.(1) A policy, adopted by the Council concerning the management of stormwater in any catchment
area, must be used by the Agency to develop requirements for a catchment area for the control at
source of stormwater, stormwater treatment and erosion control at any water course and
requirements relating to any wetland or other water quality sensitive area.
(2) The Agency may for the purposes of subsection (1), on the basis of a policy contemplated in that
subsection, by written notice served on a developer or owner of property, require him or her to
comply with any requirement stipulated in that notice, in addition to any requirement of these By-
laws.
(3) Any requirement of a policy contemplated in subsection (1), may by notice in terms of subsection
(2), be made applicable to the owner of a property on which a development was completed prior to
date of commencement of these By-laws, if any stormwater facility or other measure to manage
stormwater or to prevent pollution at the time of that development, did not comply with Part D –
Urban Stormwater Management of the Guidelines for the Provision of Engineering Services in
Residential Townships issued by the national Department of Community Development in 1983,
commonly referred to as the Blue Book.

72
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

CHAPTER 5: STORMWATER MANAGEMENT PART 2 THE MANUAL


Definition of Predevelopment Condition

The hydrological parameters used to determine the predevelopment runoff characteristics of the site
shall be those which would have existed prior to the discovery of gold on the Witwatersrand. These
parameters shall apply irrespective of the existing condition of the property at the commencement
of development
The SWMR shall contain target values determined by the responsible engineer, and shall include
details of how these target values were determined. Examples of the determination of some target
values are discussed below:

Pre-Development Target Values


In the absence of measured runoff from natural areas with topography, vegetation, soils, and
geology similar to the development site target values shall be determined by computer modelling or
some other acceptable calculation method. The Stormwater Management Report shall clearly set out
and motivate the valued of all parameters used for these calculations. Targets shall be set for volume
and frequency of runoff as described below.

Target Volume of Runoff


Summary and Recommended Target for Volume of Runoff
In the absence of measured data, the annual target runoff shall not vary above or below the values
given for the relevant quaternary catchment in the Surface Water Resources of South Africa (see
Table 2.5.1) by more than 10%.
The runoff values given in the Water Resources reports are for the total runoff including the
contribution of groundwater to river flow, i.e. both direct runoff and delayed runoff in terms of the
water balance calculations. The direct runoff should be regarded as 50% of the total runoff unless
there are compelling reasons given to select a different value.
The relevant values from WR90 (Midgely, et al., 1994) and WR2012 (Bailey & Pitman, 2015) are given
in Table 2.5.1. The reader is referred to WR2012 for an explanation of the differences in some of the
values. The target MAR shall be taken from the most recent available literature.
If the detailed analysis of the GSI options available on the site shows that it is not reasonably possible
to meet the target runoff volume, then runoff delayed by 48 hours or more following the storm may
be regarded as not contributing to the volume of runoff from the site.
GSIs suitable for the reduction of runoff volume include:
i. Rainwater or stormwater harvesting for domestic or irrigation use;
ii. Retention basins that incorporate infiltration and evapotranspiration measures;
iii. Permeable paving with a permeable base;
iv. Infiltration basins and trenches;
v. Rain gardens and bioswales that incorporate infiltration measures.

73
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

Table 2.5.1: Mean Annual Runoff from Quaternary Catchments


Quaternary Location WR90 WR2012
Catchment MAP MAR % MAR MAP MAR % MAR
mm mm % mm mm %
A21E North west, Crocodile River 706 54.6 7.7 707 48.4 6.3
A21C North central, includes the 682 49 7.2 682 44.7 6.6
Jukskei, Klein Jukskei,
Braamfontein Spruit, Sand
Spruit and Modderfontein
A21B North east, Kaal Spruit, 672 19.1 2.8 672 14.6 2.2
Hennops River
C22A South west, upper Klip River, 695 31.5 4.5 695 51.2 7.4
Klip Spruit
C22B South East, Natal Spruit and 691 31.7 4.6 691 49.6 7.2
tributaries
C22D South, middle Klip River 701 32.6 4.7 701 53.8 7.7
C22H Far south, Riet Spruit and 639 21.9 3.4 639 20.3 3.2
tributaries

Target Frequency of Runoff


In the absence of measured runoff data, it is necessary to use modelling to make an estimate of the
onset of runoff from a natural catchment. The values recommended below will be updated from
time to time as more detailed modelling is undertaken, or if measured values become available. Any
deviation proposed in the Stormwater Management Report shall be supported by detailed modelling
with clear explanations of the parameters used in the model.
Runoff commences under two possible conditions:
· Firstly, if the intensity of rainfall exceeds the infiltration capacity of the soil. This may occur if
the short duration rainfall intensity exceeds the instantaneous infiltration capacity of the
soil, i.e. if it > ft, where it is the instantaneous rainfall intensity and ft is the instantaneous
infiltration capacity, or when the longer duration rainfall intensity exceeds the equilibrium
infiltration capacity fe. The value of ft can be calculated from Horton’s equation or the Green
and Ampt equations using values suggested in Appendix A. This is referred to as “infiltration
excess runoff”.
· Secondly if the total rainfall exceeds the total infiltration capacity of the soil and the soil
becomes saturated and unable to accept any further infiltration. This condition can be
modelled using the Green and Ampt equations, which is known as “saturation excess
runoff”.
The commencement of runoff from natural catchments is a function of:
· Rainfall intensity and duration;
· Soil infiltration capacity, which is dependent on the soil type, with clayey or silty soils having
a lower infiltration capacity than sandy soils;

74
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

· The moisture content of the soil at the onset of the rainfall event, often referred to as the
Antecedent Moisture Content (AMC).
Two possible approaches have been considered for inclusion here: firstly, the use of a range of design
storms of various recurrence intervals an durations to estimate a rainfall intensity and duration that
would cause runoff to commence; and, secondly, a continuous analysis using a long duration data set
of short interval measured rainfall. This second approach is recommended because it eliminates the
uncertainty related to antecedent moisture content of the soil and also the error introduced by the
assumption of a design storm rainfall distribution.
As a guideline for use with this Manual, commencement of runoff has been calculated using a simple
model with Hortonian infiltration analysed using PCSWMM:

· Catchment area 1 ha catchment with overland flow length 100m


· Overland slope 2% and 5%

· Soil types: Sandy loam fo = 65 mm/h, fe = 10 mm/h k= 2.988/h1


Clayey loam fo = 30 mm/h, fe = 5 mm/h k= 2.988/h

· Triangular storm time to peak R=0.3, duration Td = 20 min to 4 h.


Sandy loam soils are typically derived from acid igneous rocks, such as the granodiorites of the
Halfway House Granite ,or from coarse grained sedimentary or metamorphic rocks such as the
Witwatersrand Quartzites. Clayey to clayey loam soils are typically derived from basic igneous rocks
such as Andesite, fine grained metamorphic or sedimentary rocks, such as the Witwatersrand Shales,
as well as the Archean Greenstones of the Swazian System. Karst type systems, such as encountered
in the areas underlain by Dolomite, have special characteristics not covered here,
By using Horton’s infiltration equation, the analysis determined only infiltration excess runoff: the
determination of saturation excess runoff would require a more sophisticated computation including
the effect of shallow ground water.

Target Frequency of Runoff Design Storm Approach


The results of the computations show that the rainfall depth required to initiate runoff is fairly
insensitive to catchment slope within the range modelled, but is sensitive to storm duration. Tables
2.5.2 and 2.5.3 give the computed values of rainfall depth required to initiate runoff from
catchments with sandy loam and clayey loam soils respectively. More details of these calculations are
given in Appendix E.
The recurrence intervals of the rainfall depths required to initiate runoff were also calculated using
the two different equations for determining rainfall depth that are in common use in Johannesburg.
These equations are: 1. the regression equations derived from the coaxial diagram of Midgley (1972)
by op ten Noord and Stephenson (1982), that have different equations for coastal and inland area
which use the mean annual precipitation (MAP) as the primary parameter; and 2. the equation of
Hershfield, as given by Adamson (1981), which uses the 2 year recurrence interval one day rainfall
depth (M2) and the average annual lightning flash density (L) at the locality as the primary
parameters. The calculated recurrence intervals are given in Tables 2.5.2 and 2.5.3, which also show

1
k = 2.988/h equivalent to k = 0.00083/s gives a decline of 95% from fo to f e over a period of 1 hour
75
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
the discrepancy between the values calculated using the two different equations. A comparison of
the rainfall depths for storm duration and recurrence interval is given in Appendix E.
Another source of storm rainfall information is the Design Rainfall Estimator of Smithers & Schulze
(2012). Rainfall depths generated by this Estimator have been compared with those yielded by the
equations of op ten Noord and Stephenson (1982) and Hershfield (Adamson, 1981). The Estimator
reports rain depths as 10th percentile, mean, and 90th percentile. The 90th percentile values should be
used for the analysis of stormwater management systems.
Ongoing research has shown that rainfall patterns vary considerably across the Johannesburg
Metropolitan Area as shown on the map in Appendix A. Cognisance should be taken of these
variations.
The values given in Tables 2.5.2 and 2.5.3 indicate that infiltration excess runoff will occur on average
about once per year from sandy loam catchments, and about ??? times per year from clayey loam
catchments. The rainfall depths required to initiate runoff that are given in Tables 2.5.2 and 2.5.3
were calculated on the assumption of initially dry conditions. The effect of antecedent rainfall is
discussed below.

Table 2.5.2 Rainfall Depth required to initiate Runoff (Dry Sandy Loam Soil)
Td Rainfall Depth Recurrence Interval
min mm Stephenson Hershfield
20 20.76 1.59 1.05
30 22.03 1.07 0.83
40 25.48 1.22 0.88
45 25.32 1.05 0.80
60 26.89 0.96 0.73
90 29.75 0.95 0.67
120 33.36 1.13 0.69
240 45.14 2.03 0.78
480 62.22 4.21 0.94

Table 2.5.3 Rainfall Depth required to initiate Runoff (Dry Clayey Loam Soil)
Td Rainfall Depth Recurrence Interval
min mm Stephenson Hershfield
20
30
40
45
60
90
120
240
480

76
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
Table 2.5.4 summarises the results of the analysis of 53 years (19 449 days) of daily rainfall record
from the rain-gauge in the Johannesburg Zoological Gardens (0476040_3). This analysis shows that
25 mm or more of rain falls on an average of 7 to 8 days per year. It is probable that on most of these
days, the depth of rain is spread over a period of longer than one hour, which is the reason that there
is an apparent discrepancy between the frequency of total rainfall depths and the frequency of
runoff.
The highlighted rows show that the rain depth exceed on average two days per year is about 44 mm
and the rain depth exceeded on average one day per year is about 58 mm.
Table 2.5.4 Rainday Frequency Zoological Gardens
Rain Depth Days out of Percent Average
Exceeding 19 449 Occurrence occurrence/year
mm days % days
1 3434 17.7% 64.4
2 3034 15.6% 56.9
5 2196 11.3% 41.2
10 1331 6.8% 25.0
25 399 2.1% 7.5
44 106 0.5% 2.0
50 82 0.4% 1.5
58 51 0.3% 1.0
75 22 0.1% 0.4
100 7 0.0% 0.1

The antecedent moisture content of the soil also affects the probability of runoff occurring; a smaller
depth of rain will be required to initiate runoff from a wet catchment than from a dry catchment. For
example, the integrated form of Horton’s equation (Green 1986) shows that for fo = 65 mm/h, fe = 10
mm/h and k =2.988/day, about 27 mm of rainfall within an hour will reduce the infiltration rate to
the equilibrium value fe = 10mm/h, and after this any rainfall at an intensity exceeding 10 mm/h will
cause runoff. Table 2.5.5 gives the probability of occurrence of combinations of some rainfall depths
over a two day period.
Table 2.5.5 Probability of a Rainday Following a Previous Rainday
Preceding Day Rain Day Rain Depth Days out of Percent Average
Depth Exceeding Exceeding 19 449 Occurrence occurrence/year
20 15 105 0.5% 1.97
15 20 101 0.5% 1.90
10 25 97 0.5% 1.82
5 30 102 0.5% 1.91

Target Frequency of Runoff Continuous Model


This approach applied 16.5 years of 5 minute rainfall data for the Botanical Gardens Weather Station
(gauge reference) to the same 1.0 ha hypothetical catchment used for the design storm approach
discussed above. Details of the methodology are contained in Appendix E.

77
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
The rainfall record showed rain to have fallen on 1 456 days out of the 6 164 days of record, i.e. on
about 24% of days, with a total depth of rain of 10 390 mm that corresponds to a mean annual
precipitation of 630 mm/year.
The modelling showed 43 occurrences of surface runoff exceeding 0.001 m3/s (i.e. 1.0 l/s). This
corresponds to about 2 to 3 times per year on average and on about 3% of rain days, as shown in
Figure 2.5.1.
Figure 2.5.1: Rainfall and computed runoff for the entire period October 1994 to December 2011

Figure 2.5.2: Relationship between peak discharge and event max rainfall intensity

There is very poor correlation between peak discharge of any event and the maximum rainfall
intensity within the storm that caused the runoff. Figure 2.5.2 is a plot of peak discharge against
maximum event rainfall intensity. The trend line has a slope of 0.000317 (m3/s per mm/h), which
corresponds to a C value of 0.114, but with R2 = 0.207. As would be expected, the peak discharge is

78
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
more closely related to the combination of depth and duration of the preceding rain. Figures
comparing the hyetographs and hydrographs of the larger runoff events are given in Appendix E.

Summary and recommended targets for frequency of runoff


· The target frequency of surface runoff should be twice per year unless the results of a
continuous analysis prove a different target.

· Any runoff that is delayed for 48 hours or more after the end of the storm can be regarded as
not being part of the storm surface runoff.

· Rainfall depths should be calculated using Hershfield’s equation as given by Adamson (1982)
with M2 = 62 mm and L = 6 /year.
· If the Design Rainfall Estimator of Smithers and Schulze (2012) is used, the 90th percentile
rain depths should be used for design

GSIs suitable for the reduction of runoff frequency include:


1. Rainwater or stormwater harvesting for domestic or irrigation use;
2. Retention basins that incorporate infiltration and evapotranspiration measures;
3. Permeable paving with a permeable base;
4. Infiltration basins and trenches;
5. Rain gardens and bioswales that incorporate infiltration measures;
6. Kerb cuts into street tree basins.

Target Peak Discharge


In most cases the target peak discharge, or flow rate, from a development site cannot be determined
by measurement because it is almost certain that the site will have undergone some sort of
transformation from its natural condition. Moreover, the target peak discharge cannot be defined for
a single, critical, storm duration because the impact is not confined to the point of outflow from the
development area alone, but may extend for a considerable distance in the downstream drainage
system, and may superimpose on stream flows with very different hydrograph shapes and critical
durations.
It is also apparent from the modelling that there is a range of storm durations for any recurrence
interval that will cause runoff from a natural catchment, but for durations outside of this range the
design storm will not cause surface runoff. The curves in Figures 2.5.3, 2.5.4 and 2.5.5 (and the
supporting tables in Appendix E) were generated for a one hectare catchment using triangular
hyetographs with a time to peak ratio R = 0.3, but the principle would hold true for any catchment
area and any design storm hyetograph.
In the absence of more detailed research, the SCS 24 hour hyetograph is regarded as unrealistic for
determination of target runoff values. The long rising limb of the hyetograph will saturate the soil
prior to the arrival of the storm peak, resulting in an over estimate of the runoff during the peak of
the storm. Until design rain distributions derived from the continuous record are available, a more
realistic evaluation is to use a range of different durations of a simplified hyetograph shape such as
the triangular form used for this analysis.

79
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
Figure 2.5.3 Computed Natural Peak Discharge 1.01yr RI (Dry Sandy Loam)

1.01 yr RI Q vs Td
0.0016
Peak Discharge [m3/s/ha]

0.0014 Slope = 5%
0.0012 Slope = 2%
0.0010
0.0008
0.0006
0.0004
0.0002
0.0000
0.00 0.50 1.00 1.50 2.00 2.50
Storm Duration [h]

Figure 2.5.4 Computed Natural Peak Discharge 2yr RI (Dry Sandy Loam)

2yr RI Q vs Td
0.020
0.018
Peak Discharge [m3/s/ha]

Slope = 5%
0.016
0.014 Slope = 2%
0.012
0.010
0.008
0.006
0.004
0.002
0.000
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00
Storm Duration [h]

Figure 2.5.5 Computed Natural Peak Discharge 5yr RI (Dry Sandy Loam)

5yr RI Q vs Td
0.070
Peak Discharge [m3/s/ha]

0.060 Slope = 5%
0.050 Slope = 2%

0.040
0.030
0.020
0.010
0.000
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
Storm Duration [h]

80
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
Peak Unit Rate of Runoff
The peak unit rate of runoff, i.e. runoff per hectare, reduces in proportion to catchment area.
Modelling of catchments with areas ranging from 1.0 ha to more than 40 ha has found this
relationship to be approximately linear, with the regression equations for catchments with dry sandy
loam soils given in Table 2.5.6. Supporting data is contained in Appendix E.
The form of the equation is:
Qp = Constant – Coefficient x Area
Qp = Peak discharge per ha [m3/s/ha]
Area = Catchment Area [ha]
Constant and coefficient from Table 2.5.6
Table 2.5.6: Equations of Variation in Peak Discharge with Catchment Area

Recurrence Interval Constant Coefficient


years
1.01 0.0008 1.0x10-5
2 0.0103 9.0x10-5
5 0.0359 2.0x10-4
25 0.1235 6.0x10-4
100 0.2613 1.2x10-3

Summary and recommended targets for peak discharge


· The Stormwater Management Report should contain a similar set of curves computed for the
specific conditions encountered on the site under evaluation.
· In the absence of such curves, the Report shall demonstrate that the proposed stormwater
management system yields post development discharges that lie below the curves in Figures
2.5.1, 2.5.2 and 2.5.3.

GSIs suitable for the reduction of peak discharge include:


1. Blue-green detention basins;
2. Rainwater or stormwater harvesting for domestic or irrigation use, provided that the storage
tanks have additional volume above the full supply level that empties automatically;
3. Retention basins that incorporate storage above the normal full supply level, and this
additional storage empties automatically;
4. Permeable paving with a permeable or impermeable base;
5. Infiltration basins and trenches that incorporate storage;
6. Rain gardens and bioswales that incorporate storage in addition to infiltration measures.

Target Water Quality


The discharge of sediment is discussed in detail in Section 2.3. Many researchers have found that a
significant proportion of pollutants are associated with suspended solids. Wakida et al (2014) cite
Morquecho and Pitt (2005) who found that the removal of suspended solids from runoff from roofs
81
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
and paved areas resulted in reductions of inter alia, 47% of COD, 23% of total nitrogen, 92% of total
phosphorous, 82% of lead and 72% of zinc. Management of stormwater quality should therefore
concentrate on the removal of suspended material.
The regulations, contained in Government Notice 1191 of 8 October 1999, relating to the discharge
of wastewater issued in terms of the National Water Act (Act 36 of 1998) permit the discharge of
stormwater:
3.7.(2) A person may discharge stormwater runoff from any premises, not containing
waste or wastewater emanating from industrial activities and premises, into a water
resource.
This regulation, which implies free discharge without concern for the quality of the stormwater, is
not in keeping with the modern concerns for the quality of stormwater runoff. Table 2.5.7 below is a
copy of Table 3.2 in the National Water Act (1998).

Recommended Target Water Quality


In the absence of better information, the quality of stormwater discharging from any development,
including during construction, should comply with the General Limit contained in Table 3.2 of the
regulations.

Table 2.5.7: Wastewater Discharge Limits (from National Water Act, 1998)
SUBSTANCE/PARAMETER GENERAL LIMIT SPECIAL LIMIT
Faecal Coliforms (per 100 ml) 1 000 0
Chemical Oxygen Demand (mg/l) 75 30
pH 5,5-9,5 5,5-7,5
Ammonia (ionised and un-ionised) as Nitrogen 3 2
(mg/l)
Nitrate/Nitrite as Nitrogen (mg/l) 15 1,5
Chlorine as Free Chlorine (mg/l) 0,25 0
Suspended Solids (mg/l) 25 10
Electrical Conductivity (mS/m) 70 mS/m above intake 50 mS/m above
<= 150 mS/m background <= 100 mS/m
Ortho-Phosphate as phosphorous (mg/l) 10 1 (med) & 2,5 (max)
Fluoride (mg/l) 1 1
Soap, oil or grease (mg/l) 2,5 0
Dissolved Arsenic (mg/l) 0,02 0,01
Dissolved Cadmium (mg/l) 0,005 0,001
Dissolved Chromium (VI) (mg/l) 0,05 0,02
Dissolved Copper (mg/l) 0,01 0,002
Dissolved Cyanide (mg/l) 0,02 0,01
Dissolved Iron (mg/l) 0,3 0,3
Dissolved Lead (mg/l) 0,01 0,006
Dissolved Manganese (mg/l) 0,1 0,1
Mercury and its compounds (mg/l) 0,005 0,001
Dissolved Selenium (mg/l) 0,02 0,02
Dissolved Zinc (mg/l) 0,1 0,04
Boron (mg/l) 1 0,5

82
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

Target Duration of Runoff


Duration of runoff can be evaluated by frequency analysis, based on continuous modelling or the
analysis of data from a long record of flow measurements. Figure 2.5.6 shows the results of a
continuous analysis for the 1.0 ha hypothetical catchment using the same parameters as previously,
but with percentage of impervious area increasing from 0% to 70%.
The curves show the cumulative duration of flow exceeding a particular value over the analysis
period of 147 936 hours.
For the pre-development condition with 0% imperviousness, the maximum peak discharge from the
catchment is about 0.11m3/s, and the flow rate from the catchment exceeds 0.10 m3/s for a total
duration of about 0.5 h. Surface runoff will occur from the catchment for a total duration of about
60 hours, or about 0.04% of the time.
Figure 2.5.6 Flow duration curves calculated for a 1.0 ha catchment for imperviousness ratios from
0% to 70%

For a development with 50% imperviousness, with no runoff management, the corresponding values
would be a peak discharge of about 0.26 m3/s, and a total duration of surface runoff of about
5 000 hours, or about 3.4%. Surface runoff exceeds 0.10 m3/s for about 5 hours. Therefore the
highest peak discharge, corresponding to an event with a recurrence interval of about 16 years,
would be increased by a factor of about 2.5, and the total duration of surface runoff exceeding
0.10 m3/s, i.e. that which may cause damage to the water course downstream, increased by a factor
of about 10.
While increase in flow durations can have a significantly adverse impact on the morphology of
receiving streams, a decrease in flow durations could similarly cause changes to the stream

83
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
morphology and stress to the aquatic ecosystem. The target should therefore be that the post-
development flow duration curve remains as close as possible to the pre-development curve.

Target Duration of Runoff


The recommended target is that the post-development duration of any discharge should not differ
from the pre-development duration by more than 10%.

84
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

CHAPTER 6: OPERATION AND MAINTENANCE : PART 1 BY-LAWS


Application
47. The provisions of this Chapter apply in respect of any stormwater drainage facility in existence at
the date of commencement of these By-laws and any such facility constructed after that date.

Duty to maintain stormwater facilities


48.(1) Any owner of a property on which any stormwater drainage facility or other measure based on
a best management practice has been constructed or provided, before or after the date of
commencement of these By-laws, is responsible for the continual effective operation, maintenance
and repair of such facility or measure, in accordance with the provisions of these By-laws and the
manual.
The Stormwater Management Report prepared in accordance with section 7 of the By-laws
shall contain a maintenance and repair section in accordance with section 51 of the By-laws.

(2) The provisions of subsection (1) do not apply in respect of any property to the extent that the
responsibility to maintain any stormwater drainage facility has been taken over by the Agency in
terms of section 49 or 50.
(3) An authorised official may, if he or she considers it appropriate, provide any owner of property
contemplated in subsection (1), with a maintenance manual, setting out the duty of the owner to
maintain as contemplated in subsection (1), and the steps to be taken by the owner to comply with
that duty.
In order to ensure that the stormwater management facility does not deteriorate, an
authorised official of the Agency, in consultation with an appropriate official of the City of
Johannesburg EISD, may instruct the owner of the property on which that stormwater
management facility is located to update the maintenance section of the Stormwater
Management Report, or provide to owner of the property with a maintenance manual or
maintenance instruction.

Acceptance by Agency of duty to maintain new stormwater facilities


49. The Agency may in writing accept the responsibility for the maintenance of the stormwater
drainage facilities on any property zoned residential 1, 2 or 3 under any applicable town planning
scheme, in respect of which a permit had been issued in terms of section 7, or otherwise approved by
the Council or the Agency, subject to the following requirements :
(a) At least 80 percent of the construction must have been completed on the development site
concerned, unless this requirement is waived in writing by an authorised official;
(b) every stormwater drainage facility must have been inspected and approved in writing by an
authorised official and must have been in operation for at least one year to the satisfaction of such
official;

85
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
(c) every stormwater drainage facility reconstructed during the maintenance period contemplated in
the contract of construction concerned, must have been approved by an authorised official;
(d) every stormwater drainage facility, as designed and constructed, must conform to the provisions
of these By-laws;
(e) written proof of registration of any servitude required in terms of section 43 must have been
furnished to the Council and the Agency;
(f) in respect of any stormwater drainage facility purpose-designed for a specific situation in respect
of which requirements for maintenance are not specified in the manual, an operation and
maintenance manual and a maintenance schedule prepared by a professional engineer, containing a
description of the operation and maintenance procedures for every stormwater drainage facility
concerned, must have been submitted to, and approved by, the Agency; and
(g) a complete and accurate set of record drawings capable of being reproduced, relating to every
stormwater drainage facility concerned , must have been furnished to the Agency.

Agency acceptance of duty to maintain existing stormwater drainage facilities


50. The Agency may on receipt of a written petition signed by at least fifty percent of the owners of
properties in the area which is the subject of such petition, accept responsibility for the maintenance
of the stormwater drainage facilities on any property in that area zoned residential 1, 2 or 3 under an
applicable town planning scheme, which was in existence on the date of commencement of these By-
laws, subject to the following requirements :
(a) at least 80 percent of the construction must have been completed on the development site
concerned;
(b) every stormwater drainage facility must have been inspected by an authorised official and found
to be functioning as designed;
(c) every stormwater drainage facility must, in the opinion of an authorised official, have had at least
one year of satisfactory operation and maintenance, unless this requirement is waived by that official
in writing;
(d) written proof of registration of any servitude required in terms of section 43 must have been
furnished by the petitioners contemplated in this section, to the Council and the Agency; and
(e) every stormwater drainage facility under consideration, must have been inspected for defects by
an authorised official and the owner concerned or in the case of a sectional title development, the
body corporate, must have satisfied an authorised that any defect revealed by such inspection has
been effectively remedied.

Inspections of privately maintained stormwater facilities


51. (1) The Agency must for the purpose of ensuring that stormwater facilities are being properly
maintained, that stormwater quality control is not detrimentally affected and that pollution is
curtailed, develop and adopt a maintenance manual applicable to all stormwater facilities which
must be maintained by the owner of the property concerned.

86
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
In the absence of a Maintenance Manual prepared by the Agency, the Stormwater
Management Report prepared in accordance with section 7 of the By-laws shall contain details
of how maintenance and repairs will be undertaken. The section of the Stormwater
Management Report that describes the maintenance and repairs shall be kept on the property
where the stormwater management facility is located, and shall be available for inspection by
an authorised official of the Agency by arrangement with the property owner.

(2) A manual contemplated in subsection (1), must contain requirements relating to –


(a) the frequency of inspections;
(b) what has to be checked in carrying out an inspection; and
(c) what action needs to be taken to properly maintain stormwater facilities.
(3) An authorised official may, if he or she is satisfied that any requirement of a manual contemplated
in subsection (1), has not been complied with, by written notice served on the owner of the property
concerned require such owner to take the steps specified in that notice within a period so specified.

Inspection schedule
52.(1) The Agency must for the purpose of ensuring regular and effective inspection of stormwater
facilities by an authorised official, adopt an inspection schedule in respect of stormwater facilities
which are not maintained by it, dealing with the frequency and extent of inspections.
(2) Any authorised official must comply with the requirements of the schedule adopted in terms of
subsection(1).

87
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

CHAPTER 6: OPERATION AND MAINTENANCE : PART 2 THE


MANUAL

88
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

CHAPTER 7: CRITICAL DRAINAGE AREAS : PART 1 BY-LAWS


Additional requirements
53.(1) In order to mitigate or eliminate any potential stormwater –related impact on any critical
drainage area, the Agency may by notice in writing served on a developer or owner of property,
require any stormwater drainage facility in excess of those required in terms of these By-laws, to be
provided by that developer or owner.
(2) For the purposes of subsection (1), “critical drainage area” means –
(a) any area underlain by, or shown on a 1:50 000 scale geological map to be within 500 m of any
dolomitic geology;
(b) land with a slope of 3 m horizontal to 1 m vertical or greater, as determined –
(i) from a topographic survey of the site prepared by a qualified land surveyor;
(ii) from a topographic map maintained by the Council, if other topographic survey information is not
available;
High quality Lidar digital terrain data are available from the City of Johannesburg Corporate GIS
Department.

(iii) from a contour map generated from a 25 m grid digital elevation data obtainable from the Chief
Director : Surveys and Mapping appointed in terms of section 2A of the Land Survey Act, 1997 (Act No
8 of 1997); or
(iv) by an authorised official based on a field investigation of the area concerned;
The SWMR shall include a plan that shows any part of the site with a slope exceeding 1:3 (V:H),
or the report shall contain a statement by the responsible engineer that no part of the
property has a slope steeper than 1:3 (V:H).

(c) any geologic area hazardous to life or property, historically documented as an unstable slope in
the records of the Council or the Agency ;
(d) land within 50 m of the high water mark of any body of water where fish spawn and which
contains a rearing habitat for fish, reflected in the records of the Council or the Agency ;
(e) land designated a critical drainage area in a comprehensive stormwater drainage plan adopted by
the Agency;

A critical drainage area may be identified by the Agency at any time. It is the obligation of the
owner of the property where development is contemplated to ascertain from the Agency
whether the property falls into a critical drainage area.

(f) any refuse disposal site or land fill site of the Council;
(g) land which is a wetland for the purpose of any National or Provincial legislation or policy;

89
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
(h) land in respect of which requirements for the management of ground water or any aquifer as
defined in the National Water Act, 1998, or sole source ground water aquifer exist under the National
Environmental Management Act, 1998, or any other law;
(i) land which drains to a natural closed depression;
(j) land used for the protection of wildlife habitat and designated by the Council as a critical drainage
area;
(k) land designated by or under any law as a conservation or protected area, a nature reserve or a
protected environment; and
(l) land determined by the Agency to have a high potential for stormwater drainage, and stormwater
quality, problems, or to be sensitive to the effects of stormwater runoff.
(3) (a) If, for the purpose of considering the applicability of subsection (2) to any land, a conflict is
found to exist between a map and any other available source of information contemplated in that
subsection, the decision as to whether or not land is a critical drainage area must be made by the
Agency.
(b) For the purposes of paragraph (a), an authorised official may by written notice require a developer
or owner of property to furnish him or her with a site inspection survey and any other topographic
data specified in that notice.

90
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

CHAPTER 7: CRITICAL DRAINAGE AREAS : PART 2 THE MANUAL

91
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

CHAPTER 8: STORMWATER POLLUTION : PART 1 BY-LAWS


Prohibition of pollution
54.(1) No person may –
(a) discharge any substance other than unpolluted stormwater runoff and other unpolluted natural
surface water runoff into a stormwater system or on to a public road or other area from which such
substance will be conveyed to a stormwater system;
(b) make or allow any connection to be made to a stormwater system which could result in the
discharge to it of any pollutant; or
(c) make any connection to a stormwater system from the interior of any building or other structure.

Maintenance of pollution control device


55. Any owner or user of an oil/water separator, wet pond, bio-filtration facility, erosion and
sediment stormwater control facility, filtration system and any other device to control pollution of
stormwater, must operate and maintain such device to ensure that the performance thereof meets
the level of pollutant removal intended by the manufacturer, in accordance with the maintenance
schedule for such device supplied by the manufacturer.

Exemptions
56. The following discharges are exempt from the provisions of section 54:
(a) Regulated effluent from any commercial or municipal facility if the discharge of such effluent is
authorised in terms of the National Water Act, 1998 or any other law;
(b) any discharge resultant upon an act of God or natural occurrence not compounded by human
negligence;
(c) any discharge from a properly operating on-site domestic sewage system approved by the
Department of Water Affairs and Forestry and the Council; and
(d) any discharge from land on which agricultural chemicals and materials have been applied.

Test procedures
57. If for the purposes of this Chapter the quality of stormwater is tested, the test procedures
specified in the South African Water Quality Guidelines, volumes 1 to 5 inclusive, issued by the
Department of Water Affairs and Forestry in 1996, as amended or substituted from time to time,
must be complied with.

Stormwater quality : not addressed


58. In any circumstances or conditions relating to stormwater quality which are not specifically
addressed in Chapter 5 and this Chapter, the preferred method for selection, design, and
implementation of any stormwater best management practice, must be in accordance with the
manual.

In the absence of detailed guidelines in this Manual, the methodology for management of
stormwater quality and the prevention of pollution must be specified (as per the Stormwater

92
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
Management Report discussed and elaborated in Section 2) by the Applicant. The Applicant
must make it clear as to what methods are being proposed and explain how they will work.

93
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

CHAPTER 8: STORMWATER POLLUTION : PART 2 THE MANUAL

Filtration and Treatment

This section has been derived from Stormwater Management Planning and Design Guidelines for
New Development (SAWE Multi-disciplinary Engineers, 2002). In addition to structural designs,
stormwater management design should also provide for more subtle forms of stormwater control,
which allow a reduction in quantity or improvement in quality of stormwater at source, rather than
symptomatic management of stormwater produced. This approach should include ongoing education
of local residents regarding water demand management principles, the effects of allowing sources of
pollution to enter stormwater systems, and the value of adhering to strategic stormwater guidelines
at the level of the individual property or residence. Examples include discharging water from gutters
onto grassed surfaces rather than directly into road stormwater drains, or minimising areas of
impervious surfaces at a development scale.
As a general principle litter, silt and other pollutants emanating from a catchment should be trapped
as close to source as possible. This is of particular importance when the stormwater discharges into a
sensitive environment, and where damage may result if the pollutant is not trapped and removed.
Note that although plastic litter is a highly visible and an unsightly pollutant, the problems it poses,
unless it is such that blockages occur, are most obviously aesthetic and social, rather than ecological.
However, excessive plastic pollution does have indirect negative ecological impacts, for example it
contributes to a perception of freshwater systems as neglected, useless and unhealthy, which in turn
results in a vicious cycle of neglect, where more harmful pollution of the system (e.g. dumping of
organic waste, toxic runoff) is also tolerated. Micro-plastic particles, whether manufactured or arising
from decomposition and abrasion of larger pieces of plastic, may have severe environmental impact.
Filtration of pollutants from stormwater is a vital component of stormwater management, although
its prominence in the overall stormwater management plan of a development will depend on the
extent to which water quality is likely to be a problem, either within the development area, or to
freshwater ecosystems and human users in the catchment downstream. Pollutants addressed during
filtration include: sediment, nutrients, heavy metals, petrol- and oil-based compounds and numerous
other pollutant types, depending on land use within the development area and in the upstream
catchment. Filtration is best by passage of water across vegetated areas. Where plants are used to
provide filtration, it should be noted that different plant species have different capacities for
absorption or assimilation of different pollutants. Many pollutants and some nutrients, for example
heavy metals and phosphorus, taken up by vegetation, are only temporarily sequestrated and may
be released back to the water body on the death and decomposition of the plants, or washed
downstream during high flow events.
Designs that rely primarily on filtration for their successful function need to take cognisance of the
following factors:
· Site topography – filtration is best achieved at very gentle gradients.
· Plant species utilised – different species have different filtering capacities, as well as
aesthetic qualities.

94
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

· Soil type – highly porous soils are often more suited to infiltration than filtration systems,
and do not always retain sufficient moisture to maintain plant growth.
· Stormwater quality and water quality of receiving water body – the degree of filtering that
can be realistically expected from a filtering device of a particular size and constitution
should be calculated. In some circumstances, water quality in surface effluent may be too
poor for treatment to acceptable standards to be a realistic option. In such cases, and
particularly where the natural receiving water body is a system with a high priority rank or
conservation importance, consideration should be given to conveying this stormwater for
treatment at a waste water treatment facility.
· Seasonal changes in water table level – groundwater should not be exposed by the swale at
any time as this will promote drainage of the groundwater resource. The bottom of the swale
should be at least 0.5m above than the high water table level.
The following are typical filtrations systems and their application that can be considered:
1. Vegetated filter strips surrounding infiltration structures, adjacent to water courses and
water bodies, between parking lots and stormwater management structures where drainage
is primarily sheet flow;
2. Natural and artificial wetlands filter pollution through absorptive and assimilative capacities
of wetland plants and their soils, promote sedimentation through filtration by plants and
spreading out of flows, and retain water, reducing stormwater volumes;
3. Litter traps;
4. Sediment traps;
5. Oil separators.

95
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

CHAPTER 9: MISCELLANEOUS : PART 1 BY-LAWS


Experimental best management practices
59.(1) If no appropriate best management practice which must be utilised for the purpose of
complying with any relevant provision of these By-laws is contained in the manual, an experimental
best management practice may be prepared by a developer and submitted to the Agency for
approval.
If an experimental BMP is proposed, the SWMR shall describe in detail why the responsible
engineer regards the measure as suitable and shall support this with detailed calculations and
examples of research into similar techniques.
While Green Infrastructure interventions are gaining wider application and experience in South
Africa, many of their applications are still being tested for suitability and performance in South
African conditions. This is particularly the case on the Highveld where many of these methods
of sustainable drainage still need to be tested under local conditions. Storm intensities,
seasonal rainfall, vegetation suitability, soils and slope conditions and even atmospheric dust
are among the concerns that have been raised about the suitability of these methods in
Johannesburg and surrounds. Hence there may be experimental aspects to the applications of
many of the BMPs identified in this Manual, and testing these in a controlled manner as part of
a site development should be welcomed.

(2) An experimental best management practice approved in terms of subsection (1) may be utilised by
the developer concerned.
(3) The Agency may, by notice in writing addressed to a developer contemplated in subsection (1),
require the operation of an approved experimental best management practice to be monitored by
that developer for a period specified in that notice, in order to ascertain the effectiveness of its
operation with a view to the future use of such practice.
(4) A developer must during the period specified in a notice in terms of subsection (3) submit a written
report to the Agency on the effectiveness of the operation of the experimental best management
practice concerned at the intervals specified in that notice.

Deviations and exemptions from By-laws


60.(1) The Agency may, on written application by the owner or a developer of a property, permit a
deviation, or grant an exemption, from any provision of these By-laws concerning the requirements
for stormwater facilities.
(2) The Agency may on receipt of an application in terms of subsection (1), by written notice, require
the applicant to furnish the Agency with any documentation and other information relevant to the
application.
(3) The Agency must within a reasonable time grant an application received in terms of subsection
(1), subject to any condition which it considers appropriate or refuse it, and the applicant must
forthwith in writing be notified of the decision and be furnished with reasons for a refusal of an
application.

96
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
(4) In granting an application in terms of subsection (3), the Agency must ensure that -
(a) the granting of the application will not produce a result which is contrary to the purpose of these
By-laws as specified in section 2; and
(b) the granting of the application will meet the objectives of safety, function, appearance,
environmental protection and maintainability based on sound engineering judgment.

Deviations and exemptions from manual


61.(1) An authorised official may on written application from an owner or developer of a property, in
writing permit a deviation, or grant an exemption, from any requirement contained in the manual.
(2) The provisions of sections 60(2) and (3), read with the necessary changes, apply to an application
in terms of subsection (1).
(3) In granting an application in terms of subsection (1) the authorised official concerned must ensure
that -
(a) no contravention of any provision of these By-laws will result;
(b) no non-compliance with any provision of, or any condition relating to the development of the
property concerned imposed in terms of, an applicable town planning scheme or any other law will
result;
(c) the granting of the application will not produce a result which is contrary to the purpose of these
By-laws as specified in section 2; and
(d) the granting of the application will meet objectives of safety, function, appearance, environmental
protection and maintainability based on sound engineering judgment.

Progress of work
62.(1) Any work required or permitted to be done under these By-laws, must proceed in an
expeditious manner and continuously to its completion : Provided that an authorised official may on
written application by an owner or developer of property, in writing grant authority that such work
may be interrupted for a period specified in that notice.
(2) Notwithstanding the provisions of subsection (1), work contemplated in that subsection may be
interrupted due to inclement weather or an act of God or the need to co-ordinate such work with
construction activities on the development site concerned.

Compliance notices
63.(1) An authorised official who becomes aware that any provision of these By-laws has been
contravened or not complied with may, on a form prescribed by the Agency, issue a compliance notice
to an owner, developer or other person who is in contravention of or has not complied with such
provision .
(2) A compliance notice issued in terms of subsection (1) must set out –
(a) the provision which has been contravened or not complied with;
(b) details of the nature and extent of the contravention or noncompliance;

97
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
(c) any steps that are required to be taken to remedy the contravention or non-compliance and the
period within which those steps must be taken; and
(d) the provisions of section 67 to the extent relevant to the contravention or non-compliance.
(3) An authorised official who is satisfied that the person to whom a compliance notice was addressed
has complied with the terms of that compliance notice, must issue a compliance certificate to that
effect to that person on a form prescribed by the Agency.
(4) A compliance notice issued in terms of subsection (1) remains in force until an authorised official
has issued a compliance certificate in respect of that notice, in terms of subsection (2).
(5) If any person fails to comply with a compliance notice within the period contemplated in
subsection (2)(c), the Agency may, if in the opinion of an authorised official, such non-compliance may
result in a danger to life or property, after having served a written notice of its intention on the
person to whom the compliance notice was addressed, enter the property concerned, do any work
that is necessary to prevent such danger and recover the cost thereof from that person.

Stop work orders


64.(1) If an authorised official reasonably believes that there has been a contravention of or failure to
comply with any provision of these Bylaws, he or she may by notice on a form prescribed by the
Agency, served on an owner or developer concerned, instruct that owner or developer, immediately to
cease all site development activities on the property concerned, except for erosion and sedimentation
control activities authorised in writing by such an official, until further notice.
(2) A notice in terms of subsection (1) –
(a) must contain the particulars specified in section 63(2)(a) and (b); and
(b) may be issued in conjunction with a compliance order in terms of section 63(1).

Serving of notices
65. Any notice that is required to, or may, be served, delivered or given in terms of, or for the
purposes of these By-laws, must be served in any of the following ways :
(a) By handing a copy of the notice at the person to whom it is addressed;
(b) by leaving a copy of the notice at the person’s place of residence or business with any other person
who is apparently at least 16 years old and in charge of the premises at the time;
(c) by faxing a copy of the notice to the person, if the person has in writing furnished a fax number to
the Agency or an authorised official;
(d) by handing a copy of the notice to any representative authorised in writing to accept service on
behalf of the person concerned;
(e) if the person concerned has chosen an address or fax number for service, by leaving a copy of the
notice at that address or by faxing it to that fax number;
(f) by sending a copy of the notice by prepaid registered or certified post to the last-known address of
the person concerned, and, unless the contrary is proved, it is deemed that service was effected on
the seventh day following the day on which the document was posted;

98
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
(g) if the person is a company or other body corporate, by serving a copy of the notice on an
employee of the company or body corporate at its registered office or its place of business or, if there
is no employee willing to accept service, by affixing a copy of the document to the main door of the
office or place of business;
(h) if the person is a partnership, firm or voluntary association, by serving a copy of the notice on a
person who at the time of service is apparently in charge of the premises and apparently at least 16
years of age, at the place of business of such partnership, firm or association or if such partnership,
firm or association has no place of business, by serving a copy of the notice on a partner, the owner of
the firm or the chairman or secretary of the managing or other controlling body of such association,
as the case may be.

Inspections
66.(1) In addition to any power of inspection which an authorised official may have in terms of these
By-laws, he or she may for any purpose relating to the implementation and enforcement of these By-
laws, between 8:00 and 17:00, enter any property and carry out an inspection for the purposes of
these By-laws.
(2) An authorised official must, before the commencement of, or during an inspection in terms of
subsection (1) or other provision of these Bylaws, at the request of the owner or developer concerned
or any other person involved with the development on the property concerned, produce written
confirmation of his or her appointment as an authorised official empowered to carry out inspections
for the purposes of these By-laws.
(3) An authorised official carrying out an inspection in terms of these Bylaws, must conduct himself or
herself with strict regard to decency and orderliness and with due regard to any person’s rights
contained in the Bill of Rights set out in Chapter 2 of the Constitution of the Republic of South Africa,
1996 (Act No 108 of 1996).

Appeals
67.(1) Any person whose rights are affected by a decision by an authorised official or any other
employee of the Agency, in terms of or for the purposes of these By-laws, may appeal against that
decision to the Agency by lodging written notice of appeal to the Chief Executive Officer of the
Agency, within 21 days of the date on which he or she was notified of that decision.
(2) The Agency, or a committee appointed by the Agency, must within 30 days of the lodging of an
appeal in terms of subsection (1), commence consideration thereof and must within a reasonable
time, take any decision in respect of the appeal which it considers appropriate.
(3) The Chief Executive Officer referred to in subsection (1), must forthwith after a decision has been
taken in terms of subsection (2), in writing notify the appellant thereof and furnish the applicant with
reasons for the decision.

Offences and penalties


68. Any person who –
(a) contravenes or fails to comply with any provision of these Bylaws;

99
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
(b) refuses or fails to comply with any notice addressed to him or her in terms of or for the purposes of
these By-laws;
(c) refuses or fails to comply with the terms or conditions of any permit issued in terms of section 7;
(d) obstructs, hinders or interferes with an authorised official in the exercise of any power or the
performance of any duty under these By-laws;
(e) fails or refuses to furnish to an authorised official with any documentation or information required
for the purposes of these By-laws or furnishes a false or misleading document or false or misleading
information;
(f) fails or refuses to comply with any instruction given for the purposes of these By-laws ;
(g) pretends to be an authorised official , is guilty of an offence and –
(i) liable on conviction to a fine or in default of payment to imprisonment for a period not exceeding
36 months;
(ii) in the case of a continuing offence, to a further fine not exceeding R3 000, or in default of payment
to imprisonment not exceeding one day for every day during the continuance of such offence after a
written notice has been served on him or her by the Agency requiring the discontinuance of such
offence.

Short title
69. These By-laws are referred to as the Stormwater Management Bylaws

100
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

CHAPTER 9: MISCELLANEOUS : PART 2 THE MANUAL

MANAGEMENT OBJECTIVES: EXPERIMENTAL BMPs

The objective will be to control stormwater runoff from developed areas within the City of
Johannesburg in accordance with the principles set out in Chapter 0. Experimental BMPs set up
within this framework should achieve the overall objectives of this Manual.

Outline for an Experimental BMP Proposal


To follow...

Which GSI and Green Infrastructure are not Experimental?


To follow...

101
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

PART 3: APPENDICES
Appendix A: Geographical information

A.1 GEOLOGY AND SOILS

Figure A.1.1 Geological map (Source of base data?) Accentuate municipal boundaries

1
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

Figure A.1.2 Soils map showing depth and % clay (Source?)

Hydrological Characteristics of Soils

Infiltration
Three different methods of calculating infiltration are in common us in South Africa and are available
for selection in SWMM. It should be noted that the values of the parameters given in the tables that
follow are guidelines only, and should be calibrated wherever possible. Considerable guidance and

2
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
detailed discussion can be found in the Stormwater Management Model Reference Manual Volume 1
– Hydrology (Rossman & Huber 2016).

Horton
Horton’s method is an empirical equation that describes the decrease of infiltration rate from water
on the surface of the soil. The decrease is an exponential decay function from an initial infiltration
rate to some equilibrium rate over a period of time. The integrated version of this equation
developed by Green (1984; 1986) takes account of conditions where the rainfall intensity is less than
the infiltration rate.

= + −
Where: f = infiltration rate
fc = minimum or equilibrium infiltration rate
f0 = initial or maximum infiltration rate
k = constant that reflects how rapidly the infiltration rate decays
t = time elapsed since infiltration began
Typical values of the parameters as suggested by Green are given in Tables A.1 and A.2
Table A.1: Typical Values for the Parameters in Horton’s Equation
Soil Type fo (dry) fc (equilibrium)
mm/h mm/h
Sandy Soil 125 15
Loam Soil 50 - 75 5 - 10
Clay Soil 5 - 25 0-5

Table A.2: Rate of Decay of Infiltration for Different values of k


k Percent of decline of infiltration capacity towards
-1 -1 -1 equilibrium value fc after 1 hour
(sec ) (hour ) (day )
0.00056 2.02 48.4 76
0.00083 2.99 71.7 95
0.00111 4.00 95.9 98
0.00139 5.00 120.1 99

Green and Ampt


The Green-Ampt equation (Green & Ampt, 1911) explains the infiltration of water through soil using
Darcy’s law. Mein and Larsen (1973) adapted the equation for steady rainfall and Chu (1978) showed
how the equation could be applied to unsteady rainfall.

3
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
The mechanism is simplified because infiltrated water is assumed to move downward through the
soil as an abrupt wetting front that separates the wetted and unwetted soils. In reality the wetted
front may not be abrupt and the soil above the front may not be fully saturated. But the approach is
preferable to that of Horton because the equation represents a realistic physical process and can be
adjusted as better information or explanations become available (Richards 1931), or to take account
of a driving head of water standing above the soil surface that is used by SWMM in the analysis of
LIDs.
The form of the Green-Ampt equation is:

æ (f - q )(d + y ) ö
f = K sat ç1 + ÷
è F ø
Where f = infiltration rate
Ksat = Hydraulic conductivity of the saturated soil
Φ = porosity of the soil
Ө = initial volumetric water content of the soil
d = depth of driving head above the soil surface (usually ignored)
ψ = capillary suction head at the wetting front
F = cumulative infiltration
The calculation is sensitive to the term (Φ – Ө), i.e. the difference between the porosity of the soil,
which is effectively equal to the total moisture capacity of the soil, and the initial moisture content of
the soil, so care should be taken in the selection of the value of Ө . The value of this parameter is
related to the field capacity of the soil, i.e. the moisture content when all available water has drained
out under gravity, and the wilting point, which is the point at which moisture is so tightly bound by
capillary tension that it is no longer available to plants.
Soil Conservation Service (SCS) Equation
The SCS equation is often incorrectly formulated as an infiltration equation because differentiation of
the equation yields an infiltration rate that is proportional to rainfall (Torno, 1992). The procedure is,
however, in common use in South Africa and available as a modelling methodology in SWMM.
Readers wishing to use this method are referred to the literature, for example Schmidt and Schulze
(1987) or Rossman and Huber (2016).

4
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
Table A.3: Suggested Green-Ampt Parameters
USDA Soil- Hydraulic Wetting Front Porosity Water Water
Texture Class Conductivity Suction Head Retained at Retained at
K1 Yf Field Capacity Wilting Point

mm/h mm m3/m3 m3/m3 m3/m3

Sand 120.40 49.02 0.437 0.062 0.024

Loamy Sand 29.97 60.96 0.437 0.150 0.047

Sandy Loam 10.92 109.22 0.453 0.190 0.085

Loamy Sand 3.30 88.90 0.463 0.232 0.116

Silt Loam 6.60 169.93 0.501 0.284 0.135

Sandy Clay
Loam 1.52 219.96 0.398 0.244 0.136

Clay Loam 1.02 210.06 0.464 0.310 0.187

Silty Clay Loam 1.02 270.00 0.471 0.342 0.210

Sandy Clay 0.51 240.03 0.430 0.321 0.211

Silty Clay 0.51 290.07 0.479 0.371 0.251

Clay 0.25 320.04 0.475 0.378 0.265

After Rawls etal (1983), Torno(Ed)(1993), and Rawls & Saxton (2006)

Problem Soils
Care should be taken to ensure that stormwater management facilities are not adversely impacted
by problem soils. For example, excessive erosion can occur where soils that are very erodible or
dispersive are not properly protected, embankments constructed of expansive clay could be
vulnerable to internal erosion of the clay dries out and cracks, or storage basins could leak
excessively and fail by piping of the subsoil if constructed on collapsing soils. The reader is referred to
the considerable body of literature on this topic, for example Diop, et al. (2011) and Department of
Public Works (2007).
Dispersive and erodible soils are potentially a significant problem on the Halfway House granite
geology of the northern part of the Johannesburg Metropolitan Area. Diop, et al. (2011) note that
soils originating from all granites and granodiorites of the Swazian Complex are potentially
dispersive.

Equivalence of Horton and Green and Ampt Parameters


Infiltration computed using Horton’s and Green and Ampt’s approaches is not directly comparable,
and approximately equivalent range of parameters can, however, be determined by using a

5
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx
continuous model to compute and compare total infiltration (or runoff), unit peak discharge, and
frequency of runoff for a representative site as shown in tables A4 and A5.
Table A4: Computed Runoff Characteristics (Horton)
Noordhang Example Catchment Area 2.8444 ha
Model duration 19/10/1994 to 31/12/2011

Parameter Horton Sand Loam Clay


Initial f mm/h 125 75 60 50 25 12 5
Final f mm/h 15 10 10 5 5 2 1
Rain Depth mm 10390.5 10390.5 10390.5 10390.5 10390.5 10390.5 10390.5
Total Infiltration mm 10358 10261 10227 9990 9824 9013 8036
Total Runoff mm 32.5 129.5 163.5 400.5 566.5 1377.5 2354.5
% Runoff % 0.3% 1.2% 1.6% 3.9% 5.5% 13.3% 22.7%
Peak Q m3/s 0.16 0.27 0.29 0.34 0.4 0.46 0.49
Unit Peak Q m3/s/ha 0.06 0.09 0.10 0.12 0.14 0.16 0.17
No of events > 1 l/s No 11 30 42 64 94 196 213

6
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

Table A5: Computed Runoff Characteristics (Green & Ampt)


Noordhang Example Catchment Area 2.8444 ha
Model duration 19/10/1994 to 31/12/2011

Parameter Green & Ampt Sand Loam Sand Loam Silt S/C/L Clay S/C/L Sandy Silty Clay
Parameter Sand Loam Loam Loam Clay Clay
Suction
Head mm 49.0 61.0 109.0 88.9 170.0 220.0 210.0 270.0 240.0 290.0 320.0
Conductivity mm/h 120.4 30 10.9 6.6 3.3 1.52 1.02 1.02 0.51 0.51 0.25
Deficit(1) m3/m3 0.413 0.390 0.368 0.347 0.360 0.262 0.277 0.261 0.219 0.228 0.210
Rain Depth mm 10390.5 10390.5 10390.5 10390.5 10390.5 10390.5 10390.5 10390.5 10390.5 10390.5 10390.5
Total Infiltration mm 10390.5 10389.4 10319 10192 9973 9437 8933 9008 7650 7761 7099
Total Runoff mm 0 1.1 71.5 198.5 417.5 953.5 1457.5 1382.5 2740.5 2629.5 3291.5
% Runoff % 0.0% 0.0% 0.7% 1.9% 4.0% 9.2% 14.0% 13.3% 26.4% 25.3% 31.7%
3
Peak Q m /s 0 0.023 0.25 0.31 0.35 0.41 0.43 0.43 0.48 0.47 0.49
Unit Peak Q m3/s/ha 0.00 0.01 0.09 0.11 0.12 0.14 0.15 0.15 0.17 0.17 0.17
No of events > 1 l/s No 0 0 14 38 57 112 151 141 204 200 248
(1) Initial moisture content deficit = porosity minus wilting point
S/C/L = Sandy clay loam

7
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

A.2 CATCHMENT AREAS

Figure A.2.1: Principal rivers (source?)

8
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

Figure A.2.2: Slope analysis (source?)

9
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

A.2.1 South flowing catchments

A.2.2 North flowing catchments

A.2.3 External catchments

10
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

A.3 CLIMATIC CONDITIONS

Rainfall and Evaporation

Figure A.3.1: Distribution of the 10 year, 24 hr rainfall (source?)

11
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

12
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

Appendix B: Rivers and riparian corridors


B.1 PRINCIPLES

B.2 RIVER CROSSINGS

B.2.1 Aquatic Organism Passage

B.3 FLOODLINES AND FLOODPLAINS

B.3.1 Land Use

1
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

Appendix C: Green stormwater infrastructure


C.1 INTRODUCTION AND DEFINITIONS

Green infrastructure is the network of natural and semi-natural areas, features and green spaces in
rural and urban, and terrestrial, freshwater, coastal and marine areas, which together enhance
ecosystem health and resilience, contribute to biodiversity conservation and benefit human
populations through the maintenance and enhancement of ecosystem services (Woods-Ballard, et
al., 2015). Individual components of this environmental network are sometimes referred to as ‘green
infrastructure assets’, and these occur across a range of landscape scales—from residential gardens
to local parks and housing estates, streetscapes and highway verges, services and communications
corridors, waterways and regional recreation areas (AILA, 2012).
‘The role of green infrastructure in addressing the challenges of the 21st century
cannot be underestimated. We define green infrastructure as the network of natural
and semi-natural features, green spaces, rivers and lakes that intersperse and
connect villages, towns and cities. It is a natural, service-providing infrastructure that
is often more cost-effective, more resilient and more capable of meeting social,
environmental and economic objectives than ‘grey’ infrastructure’. (Landscape
Institute, 2013)
A green infrastructure and landscape performance approach (AILA, 2012; EPA, date) provides a
strategic decision-making framework for green infrastructure planning, design and management of
our cities and should also be understood as a basis of surface water management. An integrated
approach for managing landscape value within the built environment can leverage existing resources
and enhance design responses to broader challenges of urban sustainability, and climate change
adaptation. High quality drainage systems that are integrated into the overall design of a
development will automatically provide a number of other services and become features themselves
attracting tourism and investment, driving local economic growth. Where such systems are designed
to make efficient use of the space available, they can often cost less to implement that underground
piped systems (Woods-Ballard, et al., 2015).
Human settlements are complex, evolving social-ecological systems which are dependent on the
health of their associated natural environments for ongoing sustainability. Our cities and towns are
currently the focus of intensive efforts to reduce resource use and maximise efficiency, in response
to escalating social, environmental and economic pressures from global development, urbanization,
population growth and climate change. How green infrastructure assets are managed, at both local
and regional scales, can significantly influence the effectiveness of our responses to such challenges.
When existing landscape assets are strategically connected and manged in an integrated manner
within and beyond settlement boundaries, this regenerative capacity increases exponentially.
Therefore, there is an urgent need to develop new design and management solutions for our built
environments which increase their capacity to adapt and respond to change, including strategies
which aim to proactively leverage landscape performance. Green infrastructure strategies provide a
framework for more holistic planning, design and monitoring of the complex interactions between
the (non-regenerative) built form and the environment within which it is situated, in order to
enhance the performance of both, and to enable human settlements to function as integral
components of larger landscape processes affecting energy, water, carbon and biodiversity.

1
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

Green infrastructure is fundamentally different from other aspects of built infrastructure, in


that it has unique, inherent capacity to enhance and regenerate natural resources, rather than
simply minimise the damage to environmental systems.

C.2 LANDSCAPE PERFORMANCE

The key to better management of landscape value in cities and settlements lies in understanding
how integrated green infrastructure planning strategies can enhance overall urban ecosystem
functionality, and contribute positively to broader landscape processes affecting air and water
quality, energy use and biodiversity. Landscape principles are fundamental to this approach.
Landscape is malleable; it can absorb a range of agendas and it fits well in a city striving to confront
(and remedy) the effects of limited resources, rapid urbanization and storm water drainage issues.
Landscape also has the capacity to organize large urban fields and in the form of parks, greenways,
street and treescapes, walkways, and gardens, is generally seen to provide the respite from the
damaging effects of urbanization. The landscape can process and remediate the land and the water,
while simultaneously creating a highly dynamic, green public realm that extends through the city and
along water courses.

C.3 ECOSYSTEM ASSETS AND SERVICES

The different physical forms of green infrastructure are very diverse; however, the main categories
are described below:

• Public parks and gardens, including urban parks, open space reserves, cemeteries and formal
gardens;
• Greenways, including river and creek corridors, cycle-ways and routes along major transport
corridors;
• Residential and other streets, comprising street verges and associated open space pockets;
• Sports and recreational facilities, including ovals, golf courses, school and other institutional
playing fields, and other major parks;
• Private/semi private gardens, including shared spaces around apartment buildings,
backyards, balconies, roof gardens and community gardens;
• Green roofs and walls, including roof gardens and living walls;
• Squares and plazas, including both public and private courtyards and forecourts;
• Natural green space, including national parks and nature reserves, wetlands and coastal
margins;
• Utility areas, including quarries, airports, and large institutional and manufacturing sites.
This category also includes unused land reserved for future use;
• Agricultural and other productive land, including vineyards, market gardens, orchards and
farms. (Symons, et al., 2015)
Whilst the list above demonstrates green infrastructure can take many forms, it also provides many
different ecosystem services which can be grouped into three main areas: social, economic and
environmental. These are consistent with the well-known triple bottom line approach. Green
infrastructure literature covers a broad range of assets and services which indicates both its high

2
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

level of complexity and its considerable potential benefits (cf. Woods-Ballard, et al., 2015; Symons,
et al., 2015, add other general refs, eg. Pahl-Worstel, et al.).
THIS SECTION DOES NOT REALLY ENGAGE WITH ITS HEADING – MAYBE PUT IN SOME OF THE CORE
MATERIAL ON ECO-SYSTEM SERVICES?

C.4 POTENTIAL BENEFITS OF GREEN INFRASTRUCTURE

Social benefits
The social benefits include human health and aesthetics. A diverse body of research shows that GI
can enhance the quality of life in urban areas (references). This includes factors such as cultural
values, aesthetics and urban amenity including the ‘walkability’ of streets and air quality. Research
has focussed on two aspects of wellbeing: the physical and mental health of individuals; and the role
of social interaction and community building. In particular, evidence suggests older people, people
recovering from illness and children would especially benefit from additional green infrastructure.
Recent research (references) has linked the presence of trees, plants, and green space to reduced
levels of inner-city crime and violence, a stronger sense of community, improved academic
performance, and even reductions in the symptoms associated with attention deficit and
hyperactivity disorders (EPA, date – health ref).

Climatic modification
A large body of research has been undertaken to examine the climatic effect of green infrastructure
in urban settings. GI, including trees, green roofs, as well as Water Sensitive Urban Design practices
have been found to modify urban climates through:
• Urban heat island mitigation. By providing increased amounts of urban green space and
vegetation, green infrastructure can help mitigate the effects of urban heat islands and
reduce energy demands. Trees, green roofs and other green infrastructure can also lower
the demand for air conditioning energy, thereby decreasing emissions from power plants.
• Reduced energy use and emissions.
• Air pollution interception and mitigation (McPherson et al., 2005). Green infrastructure has
the potential to ameliorate the effects of climate change in urban environments, thereby
increasing resilience and liveability, and reducing energy consumption.
• Increased Carbon Sequestration. The plants and soils that are part of the green
infrastructure approach serve as sources of carbon sequestration, where carbon dioxide is
captured and removed from the atmosphere via photosynthesis and other natural
processes.

Water management
The relationship between urban water management and the health of urban environments has only
recently become a focus of researchers; however, this area has developed quickly with numerous
issues being investigated (Wong, 2011). Relevant water issues include:
• access to secure and clean water supply;
• clean water environment;
• flood protection; and

3
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

• mitigating urban heat.

Green infrastructure is increasingly being recognised as an alternative to traditional engineering


approaches to urban water management through integrated water cycle management and Water
Sensitive Urban Design (Water by Design, 2010). The literature has documented the trend away
from the traditional engineering approach to urban stormwater with its sole aim being the efficient
and quick disposal of stormwater. The conventional approach has the negative environmental
consequences in that local water resources are wasted and receiving waters are polluted, with a
commensurate decline in the health of aquatic ecosystems in both local and receiving catchments
(Wong, 2011, ECO Northwest, 2007). By contrast, green infrastructure in terms of urban water
management includes:

· Reduced and Delayed Stormwater Runoff Volumes


Green infrastructure reduces stormwater runoff volumes and reduces peak flows by utilizing the
natural retention and absorption capabilities of vegetation and soils. By increasing the amount of
pervious ground cover, green infrastructure techniques increase stormwater infiltration rates,
thereby reducing the volume of runoff entering sewer systems, and ultimately lakes, rivers, and
streams.

· Enhanced Groundwater Recharge


The natural infiltration capabilities of green infrastructure technologies can improve the rate at
which groundwater aquifers are 'recharged' or replenished. This is significant because groundwater
provides a significant volume of the water needed to maintain normal base flow rates in rivers and
streams. Enhanced groundwater recharge can also boost the supply of drinking water for private and
public uses.

· Stormwater Pollutant Reductions


Green Infrastructure techniques infiltrate runoff close to its source and help prevent pollutants from
being transported to nearby surface waters. Once runoff is infiltrated into soils, plants and microbes
can naturally filter and break down many common pollutants found in stormwater.

· Reduced Sewer Overflow Events


Utilizing the natural retention and infiltration capabilities of plants and soils, green infrastructure
limits the frequency of sewer overflow events by reducing runoff volumes and by delaying
stormwater discharges.
Water sensitive urban design (WSUD) is a key form of green infrastructure, which has many benefits
that increase the resilience and network aspect of green infrastructure.

Air Quality
Green infrastructure facilitates the incorporation of trees and vegetation in urban landscapes, which
can contribute to improved air quality. Trees and vegetation absorb certain pollutants from the air
through leaf uptake and contact removal. If widely planted throughout a community, trees and

4
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

plants can even cool the air and slow the temperature-dependent reaction that forms ground-level
ozone pollution (smog). Include more on carbon sequestration and evapotranspiration?

Food production
Urban agriculture is a form of green infrastructure that can deliver a wide range of human health
and wellbeing benefits that go beyond providing a secure and healthy food supply (Marsden and
Morley, 2014). Urban agriculture commonly takes place on the peri-urban boundary, providing more
sustainable food sources for urban areas because of reduced transport to market (Houston, 2005). It
also includes community gardens, kitchen gardens, ‘edible landscapes’, productive street verges,
backyards and school vegetable gardens. Urban agriculture is considered to be part of
complementary or alternative food networks that promote more sustainable practices in food
production and distribution (Redwood, 2012). These serve as alternatives to current global food
production and distribution systems driven by supermarket chains and large-scale primary
producers. Urban food production has many benefits including: increased sense of community,
improved healthy food options, improved mental and physical wellbeing and reduction in food
miles.

C.5 CONCLUSION

‘The challenges we face today are too often approached as separate issues. There is insufficient
consideration given to the complex interactions between, for example, housing, flood management,
food growing and biodiversity. This approach prevents us from adopting more dynamic, integrated
and forward-thinking solutions. Green infrastructure offers an alternative to this narrow-minded
approach – a way not only of tackling specific challenges head on, but of realising multiple secondary
benefits at the same time. It is this integrated approach that will unlock the potential of our
landscape’ (landscape Institute, 2013).

5
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

Appendix D: Calculation methods and modelling (include


‘supporting calculations’)
D.1 MODEL SELECTION AND USE

SWMM and Derivatives

Rational Method and Derivatives

D.2 RAINFALL

D.3 MODEL PARAMETERS

D.4 DESIGN GUIDELINES FOR GSI

D.5 RAINFALL AND RUNOFF

Rainfall Depth Required to Initiate Runoff Sandy Loam Soil


Table D5.1: Rainfall and Discharge at Initiation of Runoff (Initially Dry Sandy Loam)

Td RI 1.01 2 5
P 17.2 21.15 27.86
20 min
Q 0 0.001773 0.02736
P 21.17 25.99 34.29
30 min
Q 0 0.01149 0.05026
P 29.03 38.22
40 min
Q 0.01513 0.05541
P 24.73 30.36 39.98
45 min
Q 0.000768 0.01645 0.05823
P 27.13 33.28 43.81
60 min
Q 0.001347 0.01864 0.05843
P 30.21 37.1 48.83
90 min
Q 0.000785 0.01723 0.05163
P 32.27 39.61 52.11
120 min
Q 0 0.01357 0.04397
P 36.59 44.91 59.11
240 min
Q 0 0.000774 0.021
P 49.73 65.49 103.13
480 min
Q 0 1.54E-06 0.03221

1
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

Figure D1: Runoff vs Precipitation Depth for Storm Duration (Initially Dry Sandy Loam)

Peak Discharges for Storm Duration


Tables D2, D3 and D4 are the basis for Figures 4.1, 4.2 and 4.3
In all cases the catchment area was 1.0 ha with an overland flow length of 100 m
Initially dry sandy loam soil fo = 65mm/h, fe = 10 mm/h, k =2.988/h
Triangular storm R=0.3
Table D2: Computed Natural Peak Discharge 1.01yr RI
Td Total Ave Slope = 5% Slope = 2%
Precip. Intensity Q Q
mm mm/h m3/s m3/s
20 min 17.23 51.69 0.0000 0.0000
30 min 21.17 42.34 0.0000 0.0000
45 min 24.73 32.97 0.0008 0.0005
60 min 27.13 27.13 0.0013 0.0009
90 min 30.21 20.14 0.0008 0.0005
2 hr 32.27 16.14 0.0000 0.0000
4 hr 36.59 9.15 0.0000 0.0000
6 hr 0.00 0.000 0.000
12 hr 0 0
18 hr 0 0
24 hr 0 0

2
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

Table D3: Computed Natural Peak Discharge 2yr RI

Td Total Ave Slope = 5% Slope = 2%


Precip Intensity Q Q
mm mm/h m3/s m3/s
20 min 21.15 63.45 0.002 0.001
30 min 25.99 51.98 0.012 0.008
40 min 29.03 43.55 0.015 0.010
60 min 33.28 33.28 0.019 0.013
80 min 35.97 26.98 0.018 0.013
2 hr 39.61 19.81 0.014 0.010
4 hr 44.91 11.23 0.001 0.001
6 hr 47.78 7.96 0.000 0.000
12 hr 0 0
18 hr 0 0
24 hr 0 0

Table D4: Computed Natural Peak Discharge 5yr RI

Td Total Ave Slope = 5% Slope = 2%


Precip Intensity Q Q
mm mm/h m3/s m3/s
20 min 27.86 83.58 0.027 0.019
30 min 34.22 68.44 0.050 0.036
40 min 38.22 57.33 0.055 0.041
60 min 43.81 43.81 0.058 0.045
80 min 47.47 35.60 0.055 0.044
2 hr 52.11 26.06 0.044 0.036
4 hr 59.1 14.78 0.021 0.017
6 hr 62.88 10.48 0.008 0.006
12 hr 69.06 5.76 0 0
18 hr 72.64 4.04 0 0
24 hr 75.99 3.17 0 0

Comparison of Rainfall IDF Curves


Table D5 and Figure D2 show a comparison between the values of rainfall depth for duration and
recurrence interval calculated using the equations of op ten Noord and Stephenson (1982) and of
Hershfield (Adamson 1982)
Parameters: MAP = 750 mm/year
Two year RI one day rainfall depth M2 = 62 mm
Annual Lightning flash density L = 6 strikes/year

3
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

Table D5: Comparison of Rainfall Depths Calculated Using Different Equations


Equation RI Rain Depth for Td
20 30 40 60 90 120 240 480
Steph 18.10 21.64 24.08 27.33 30.33 32.29 36.60 40.53
1.01
Hersch 19.14 22.77 25.58 29.90 34.68 38.38 48.46 60.45
Steph 22.22 26.56 29.55 33.55 37.22 39.64 44.93 49.74
2
Hersch 25.41 30.24 33.97 39.70 46.05 50.96 64.35 80.26
Steph 29.25 34.96 38.90 44.16 49.00 52.18 59.14 65.48
5
Hersch 33.83 40.25 45.21 52.85 61.30 67.83 85.65 106.84
Steph 36.01 43.04 47.90 54.37 60.33 64.24 72.81 80.62
10
Hersch 40.19 47.82 53.72 62.79 72.83 80.60 101.77 126.95
Steph 47.40 56.66 63.05 71.57 79.41 84.57 95.85 106.12
25
Hersch 48.61 57.83 64.97 75.94 88.08 97.47 123.07 153.52
Steph 58.36 69.75 77.62 88.12 97.77 104.12 118.01 130.65
50
Hersch 54.97 65.41 73.48 85.88 99.61 110.23 139.19 173.63
Steph 71.85 85.88 95.56 108.48 120.37 128.18 145.28 160.85
100
Hersch 61.34 72.98 81.98 95.83 111.15 123.00 155.31 193.74

Rain Depth for RI & Td


Hershfield vs Stephenson & Op ten Noord
250

200
Rain Depth Hershfield [mm]

1.01
150 2
5
10
100
25
50
50 100

0
0 20 40 60 80 100 120 140 160 180
Rain Depth Stephenson & Op ten Noord [mm]

Figure D2: Graph of Rain Depth for RI & Td

Variation of Unit Runoff with Catchment Area


Modelling has shown that peak runoff per unit area decreases with increasing catchment area. The
results of some of that modelling for sandy loam soils are shown in Table D7 and Figure D3.

4
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

Table D.7: Variation in Peak Discharge with Catchment Area

Location Area 1.01 yr. 2 yr. 5 yr. 25 yr. 100 yr.


ha m3/s/ha m3/s/ha m3/s/ha m3/s/ha m3/s/ha

Outfall3 1.2236 0.0013 0.0112 0.0363 0.1217 0.2596


Outfall6 15.4049 0.0001 0.0080 0.0314 0.1137 0.2492
Outfall4 31.1070 0.0001 0.0061 0.0279 0.1014 0.2086
Outfall1 46.3234 0.0002 0.0068 0.0282 0.1056 0.2349
Outfall2 59.3740 0.0001 0.0047 0.0194 0.0731 0.1668

Outfall7 72.5404 0.0000 0.0035 0.0200 0.0801 0.1864

Computed Variation in Peak Discharge with Catchment Area


0.30
Peak Discharge per ha [m3/s/ha]

1.01 yr
0.25 y = -0.0012x + 0.2613 2 yr

0.20 5 yr
25 yr
0.15
100 yr
y = -0.0006x + 0.1235
0.10 Linear (1.01 yr)
y = -0.0002x + 0.0359
0.05 y = -9E-05x + 0.0103 Linear (2 yr)
y = -1E-05x + 0.0008
Linear (5 yr)
0.00
0 10 20 30 40 50 60 70 80 Linear (25 yr)
Catchment Area [ha] Linear (100 yr)

Figure D3: Graph of Rain Depth for RI & Td

Continuous Modelling
Preliminary results of continuous model using PCSWMM for a hypothetical 1.0 hectare grassed
hillslope catchment with roughness and Hortonian infiltration characteristics commonly used for
granite soils are given below.
The results are uncalibrated because we have no suitable data set for calibration.

· Model
PCSWMM Version 6.2.2071 with SWMM 5.0.022
Catchment area 1 ha with 2% slope, overland flow length 100m.
Imperviousness 0%
Infiltration initial 65 mm/h, final 10 mm/h

5
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

Decay 5.4 /hour i.e. >99% decay in 1 hour


Drying time 7 days
Infiltration rates are within the range given by Green (1984) for loam soil
Roughness Imperv. n = 0.02 Perv. n = 0.20
The pervious area roughness corresponds to that give by Green for “Short veld grass”

· Rainfall data
Botanical Gardens 17 years of the 5 minute rain data set for the period 19 October 1994 to 21
December 2011 supplied by Weather SA.
Total number of days modelled 6164
Total raindays (P>0.0mm) 1456 % raindays 24%
Total rain depth 10 390 mm
No of rain seasons 16.5
MAP 630 mm/year
The total rain depth and number of rain days were extracted from the 5 minute data using a Python
program (Brooker?, date), so may not agree exactly with the daily record from the site. Missing data
were patched with zero values. A total of 3.1% of zero records were added with no discernible
seasonal or time pattern.

· Runoff
Total Runoff
Total runoff 198 mm Percent runoff 1.91%
This runoff can be compared with the percentage MAR given in WR2012 for the quaternary
catchment A21C that includes Jukskei River, and Klein Jukskei, Braamfontein and Sand Spruits that
drain most of the granite areas of Johannesburg
WR2012 MAP 682 mm
WR2012 MAR 44.7 mm Percent runoff 6.6%
The MAR is made up of both the surface water and ground water contributions to river flow. The
ground water contribution in quaternary catchment A21C is not known, so the computed
percentage of runoff cannot be determined, except to note that it is within the expected range.
More research in this field would be useful.
Runoff Events
The model calculated 43 events that caused runoff with a peak discharge exceeding 0.001 m3/s (i.e.
1.0 l/s). Figure D4 compares the distribution of the runoff events with the rainfall record. The
modelling showed runoff to occur on 43 out of 1 456 rain days in 16.5 years, i.e. on average 2 to 3
times per year and on about 3% of rain days.

6
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

Figure D4: Rainfall and computed runoff for the entire period October 1994 to December 2011
Rainfall Intensity vs Peak Discharge
Events were defined as 1 hour preceding and 1 hour following any occurrence of runoff exceeding
0.001 m3/s
There is very poor association between peak discharge of any event and the maximum rainfall
intensity within the storm that caused the runoff. Figure D5 is a plot of peak discharge against
maximum event rainfall intensity. The trend line has a slope of 0.000317 (m3/s per mm/h), which
corresponds to a C value of 0.114, but with R2 = 0.207.

Figure D5: Relationship between peak discharge and event max rainfall intensity Enlarge text
As would be expected the peak discharge is more closely related to the combination of depth and
duration of the preceding rain. Figures D6 to D9 show the hydrographs and hyetographs of the four
events with the greatest peak discharge. Figure D10 shows the hydrograph resulting from the storm

7
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

with the highest intensity rainfall which occurred during a storm of very short duration. The
hydrograph plot is quite coarse; the time step was set at 5 minutes to limit the size of the SWMM
output file.
The recurrence intervals (RIs) of the peak rainfall intensity and the peak discharge were calculated
using the Weibull plotting position. The plot of the RI of peak discharge against the RI of peak rainfall
intensity in the appendix to this note, and the table in the same appendix show poor correlation
between the RIs.
It is interesting to note that the four greatest discharges range from 0.1055 m3/s to 0.1101 m3/s and
differ by less than 5% while the peak rainfall intensity of the causative storms ranges from
103.2 mm/h to 144.0 mm/h, which is a difference of 40%. The total depth of rain of these storms
ranged from 52.2 mm to 64.8 mm, a difference of 24%.

Figure D6: Hydrograph and Hyetograph for Event 7 on 3 December 1996, Total Rain 55.6 mm

8
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

Figure D7: Hydrograph and Hyetograph for Event 32 on 9 January 2010, Total Rain 59.6 mm

Figure D8: Hydrograph and Hyetograph for Event 42 on 25 March 2011, Total Rain 64.8 mm

9
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

Figure E9: Hydrograph and Hyetograph for Event 19 on 29 March 2005, Total Rain 52.2 mm

Figure D10: Hydrograph and Hyetograph for Event 29 on 14 December 2009. Total rain 17.4 mm

10
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

Appendix E: Review of Design Rainfall for Johannesburg


E.1 INTRODUCTION

Storm rainfall is central to all deterministic methods for the estimation of urban runoff, and it has
the largest influence on the outcome. Different sources of design rainfall are available to the
stormwater engineer, and along with it the potential for different design runoff (peak flow, volume)
using the same deterministic method. Hence a review of literature relevant to the City of
Johannesburg area has been done in an attempt to identify an appropriate standard approach to
selecting design rainfall for the metropolitan area. In the process, the review has also looked at
weather systems, climate and orographic conditions specific to the City of Johannesburg that should
be considered in identifying critical storm conditions for design runoff estimation.

E.2 ASSUMPTION OF STATIONARITY

This assumption underpins much of stormwater design and flood risk practice, where predictions of
current or future flood risk is derived on the basis of historical record. While recognised for its flaws,
it has generally been seen to be a practical assumption for most design applications. However, in
urban drainage design, the assumption of stationarity is more vulnerable to failure. In metropolitan
areas, and particularly those experiencing rapid expansion, flood risk determination requires more
foresight and catchment management to ensure that flood risk estimations provide reasonable
cover for the design life of developments.
In recent years, the concern has extended from consideration of changing runoff responses due to
increased paved areas to include consideration of changing rainfall conditions. There has been an
increasing appreciation of natural variability at temporal scales beyond that of rainfall stations, and
there is also greater acknowledgement of changes in rainfall patterns due to anthropogenic climate
change (Westra & Sharma, 2010).
This document explores some of the recent climate and rainfall studies relevant to the Johannesburg
area with the intention of alerting engineers and planners to this part of the debate on stationarity,
and it is left to the individual professional to consider the risks in each design situation. The results of
the analysis of recent downscaled rainfall projections from climate modelling is presented, but such
is the nature of rainfall predictions in climate modelling that this information should be updated
every few years. This review has not investigated any cyclical variations in rainfall, and storm rainfall
in particular, as it has been assumed that the length of records at weather stations around
Johannesburg will cover for any effect on estimating design rainfall. However, this assumption has
not been tested for Johannesburg, and has been shown to be flawed in other locations, such as in
Australia (Thyer, et al, 2006). Hence the assumption of stationarity warrants further analysis for
application in the Johannesburg context.
Therefore, the guideline for design rainfall that is derived in this Manual does not depart too far
from the assumption of stationarity, but this first edition should alert practitioners to the issue and
provide reasonable scenarios for testing catchment responses under climate change.

1
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

E.3 DESIGN EVENT ANALYSIS VS CONTINUOUS SIMULATION

Due to the size and increasing complexity of stormwater management systems, the incorporation of
sustainable drainage techniques, and the need to understand the performance of the systems under
natural conditions, designs based on continuous simulation modelling are now seen as best practice
for modern design. This involves the simulation of the system over a period of a season, a year or a
number of years with input of a rainfall series. The benefits of this approach are numerous, though
some of the main ones include:
· Assumptions on antecedent conditions are avoided, and a more realistic performance of
stormwater infrastructure can be analysed;
· If the period of simulation is long enough, the need to determine critical storm durations is
also avoided;
· If the period of simulation is long enough the need to determine design rainfall is also
avoided as the frequency of flood responses can be analysed directly.

E.4 GENERAL CLIMATE OF JOHANNESBURG

The City of Johannesburg is located in the summer rainfall region of the country. The rain season is
October to March, though occasional rain due to frontal events can occur in winter. MAP is of the
order of 700mm and there are typically about 100 days of rain per year (Dyson, 2009). Splitting the
rain season into early summer (October to December) and late summer (January to March), Dyson
(2009) analysed seasonal summer rainfall over Gauteng (Table E1). Median values are fairly similar
between early and late summer, but the late summer rainfall shows more variability and with more
extremes. It is interesting that Dyson noted a trending decrease in early summer rainfall and an
increase in late summer rain.
Table E1: Statistics of summer rainfall (mm) over Gauteng, 1977/78 to 2008/09 (after Dyson,
2009).

Season Early Summer Late Summer Total


(Oct-Dec) (Jan-Mar)
Average 278 309 587
Median 266 279 567
Maximum 452 568 968
Minimum 159 110 341

E.5 TOPOGRAPHY OF THE CITY OFJOHANNESBURG

The metropolitan municipality straddles the Witwatersrand, a ridge that forms the watershed
between the Crocodile/Limpopo and Vaal/Orange catchments. Rain falling in the municipal area may
drain either to the Indian or Atlantic oceans. Altitude ranges from 1350m masl where the Jukskei
River crosses the municipal boundary in the north, to 1800m masl in Hillbrow on the ridge of the
Witwatersrand. A profile across the Witwatersrand, following the Braamfontein Spruit draining
north and the Klipspruit draining south is given in Figure E1. The ridge is aligned east-west across the

2
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

municipality (Figure E2) and provides for orographic uplift that is shown to have a significant
influence on the distribution of storm rainfall and intensity across the metropolitan area.

Witwatersrand South

Bra
am
fon
tei
Klipspruit/Klip River
n
Spr
uit

Figure E1: The Witwatersrand ridge and the profiles of the Braamfontein Spruit and Klipspruit
draining north and south of the ridge respectively. Provide new diagram.

E.6 WEATHER SYSTEMS AFFECTING JOHANNESBURG

There are three main weather systems that produce heavy rainfall in Gauteng, and Johannesburg in
particular, as described below.

Frontal cyclones (or mid-latitude cyclones)


These are typically associated with what are known as the cold fronts that move up from the
Western Cape, mainly in the cooler months, but which occur throughout the year (Goliger, et al,
2007). They are often accompanied by low intensity, consistent rain over a number of days. They are
also often preceded by thunderstorms, typically in a line (squall line) along the face of the front, that
can result in heavy rainfall.

Tropical Cyclones and Ridging Indian Ocean Highs


Tropical cyclones over the Indian Ocean occur annually and are mainly active east of Madagascar,
though they can move into the Mozambican channel, usually resulting in widespread rainfall along
the east coast of Southern Africa. On occasion, they push further inland and have been the cause of
some of the most severe flooding over eastern and northern South Africa, including Gauteng, in
recent past. Cyclone Eline is an example of such an event that saw widespread flooding over
Gauteng and the Limpopo Provinces in February 2000 (Dyson, 2009). These events produce the 3-
7day rainfall extremes and can be associated with wet antecedent conditions, as occurred in
February 2000 (Smithers, et al, 2001). These weather systems are of particular importance for
analysing and designing attenuation and retention systems.

3
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

Other tropical influences include the ridging of Indian Ocean Highs over the eastern and north-
eastern parts of the country, often in conjunction with a deep trough in the west (Kruger, et al,
2010). These systems can affect large areas over the central parts of the country, bringing
widespread rain and even thunderstorms. An example of this occurred in March 2014, where
Gauteng, Limpopo, and Mpumalanga provinces experienced two weeks of heavy rains and flood
damage, and a loss of 32 lives (Hill, 2014). A similar condition in February 1996 saw a persistent
supply of moist tropical air over the north-eastern parts of South Africa that produced heavy rain
over an 8-day period over parts of KwaZulu-Natal, Mpumalanga, Limpopo and Gauteng, including a
particularly high 3-day rainfall of 266mm recorded in Pretoria (de Coning, et al, 1998).

Figure E2: The Witwatersrand Scattered and isolated storm cells which are independent of each
other. (Source?)

4
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

Thunderstorm systems (and tornados)


Thunderstorms are closely associated with urban design rainfall over most of South Africa,
particularly on the Highveld. They occur over most of the country in summer, particularly in central,
northern and eastern areas of the country. The heating of the earth’s surface initiates thunderstorm
development, but other factors play a role; orographic uplift, frontal uplift, and large-scale
convergence ahead of a trough or east of a low-pressure cell. The latter forms a moisture boundary
typically aligned north-west to south-east and occurs as the moist Indian Ocean air moves over the
drier Atlantic Ocean air coming in from the south-west. A line of thunderstorms, or “line squalls”,
can form parallel to, and ahead of, trough lines (Kruger, et al, 2010).
Thunderstorms can develop into one of three (two?) arrangements:
· Squall lines of cells, usually in advance of a frontal cyclone, where the cells are organised
over hundreds of kilometres and can influence each other;
· Multi-cell clusters of storm cells which can evolve into large mesoscale systems.
Thunderstorms are the dominant weather system for urban stormwater management. The lifecycle
of a thunderstorm cell is typically less than an hour in the Johannesburg area (Mader, et al, 1986),
though the experience on the ground may be less than this if the storm cell is moving. Wind gusts
are often an indication of rainfall intensity and precede the release of the rain by the storm cell. In
the period 1993 to 2008 between 86% and 92% of the highest annual wind speeds in Johannesburg
were generated during thunderstorms.
The Gauteng Province has the highest density of recorded tornados in the country, which are a
severe form of thunderstorm. Records show that 42 were recorded in the province between 1905
and 1996 (Goliger, et al, 1997). Goliger and Retief (2007) show Gauteng to lie within the zone of
intense thunderstorms/tornados/downbursts, assigning a point probability of 1:10,000 chance of a
tornado strike. Most tornados (64%) occur between October and February, but the months of
November to January show the most activity with almost 45% of recorded occurrences. Applying the
Fujita and Pearson classification system, a summary of tornados recorded in Gauteng (1905-1996) is
given in Table E2.
Table E2: Summary of Tornado Activity Recorded in Gauteng (from Goliger, et al, 1997)
Max. wind Path length Path width
FPP Gauteng Damage
speed (m/s) (km) (m)
Scale Count Indicator From To From To From To
Light: chimney damage, sign
F0 7 20 30 0.5 1.5 5 15
boards & branches broken.

Moderate: roof surfaces


F1 18 30 50 1.5 5 15 30
peeled off, cars pushed.
Considerable: roofs torn off,
F2 12 50 70 5 16 30 160
large trees snapped.
Severe: roofs and walls torn
F3 5 70 90 16 50 60 510
off, heavy cars lifted.

5
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

E.7 STORM RAINFALL FREQUENCY

Dyson (2009) analysed the statistics of rainfall over the area of Gauteng for the summer seasons
1977/78 to 2008/09, the results of which are summarised in Table E3. Note that significant heavy
and very heavy rainfall thresholds refer to an average daily rainfall depth over the province
(16,500km2), and not to point rainfall. The data are indicative of the likelihood of wet weather and
heavy rain over the months of the wet season. They do not determine design rainfall at a site scale,
but have relevance for planning at a catchment scale.
Table E3 also suggests there is a stronger likelihood that heavy rainfall events will occur in the late
summer period, and particularly in January and February. However, Dyson’s analysis of station data
shows that extreme events may occur in any of the summer months. A summary of the maximum
recorded 24-h events in each month in Gauteng is given in Table E4.
Table E3: Statistics of monthly and daily rainfall over Gauteng (after Dyson, 2009)

Early Summer Late Summer


Season
Oct Nov Dec Jan Feb Mar
Average monthly total (mm) 72 96 109 126 97 86 587
Max. monthly rain (mm) 190 183 179 324 277 296 968
Ave. days with rain (no.) 15 20 24 23 19 17 118
Max. days with rain (no.) 25 28 29 28 26 26 142
Ave. days with significant rain
2.1 2.6 2.9 3.8 2.8 2.6 16.8
(>10mm)
Max. days with significant rain
5 7 5 11 10 10 31
(>10mm)
Ave. days heavy rain (>15mm) 1.1 1.1 1 1.6 1.7 1.3 7.8
Max. days heavy rain (>15mm) 4 5 4 8 6 5 18
Ave. days very heavy rain (>25mm) 0.3 0.3 0.2 0.5 0.4 0.4 2.2
Max. days very heavy rain (>25mm) 2 2 2 4 4 3 10

The data in Table E5 are derived from an analysis by Dyson (2009) of point rainfall records and
therefore more helpful for stormwater design. The statistics in Table E5 are collective across all
stations in Gauteng and do not refer to one station only. They show that the occurrence of 24-h,
50mm rainfall events is common across all stations within Gauteng. On average, one can expect
close to five such days across all stations in December and February, and seven such days in January.
Over an average season one would expect a collective 28 days across the province with rainfall
greater than 50mm. In rare cases, there may be as many as ten days in December, going up to 17
days each in January and February. The maximum in a season has been a collective 56 days of
rainfall above 50mm measured at stations across Gauteng. This occurred in the 1999/2000 summer
season (Dyson 2009).

6
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

Table E4: Maximum recorded 24-h rainfall at a single station in Gauteng, 1977/78 to 2008/09
(Dyson, 2009).
Max. 240h rainfall Average intensity
Month
(mm) (mm/h)
Oct 220 9.2
Nov 200 8.3
Dec 300 12.5
Jan 280 11.7
Feb 142 5.9
Mar 260 10.8

The pattern continues for higher threshold events. The average number of days expected to record
events greater than 115mm in January is 0.59 across all stations in Gauteng. This would equate to
approximately once every second year in the month of January, but the records show these events
occur in only 38% of January months (meaning that in some years, more than one event above this
threshold is experienced in January, although not necessarily at the same station). The maximum
number of days on which more than 115mm was recorded in the month of January anywhere in
Gauteng is three days, which occurred in 1996 (Dyson, 2009). Similarly, February shows an average
of 0.28 days per month with rainfall above the 115mm threshold, recorded in only 13% of the years
on record. Again, some years record more than one event in February above the 115mm threshold
and Dyson (2009) shows that as many as five days have been measured in February of a year across
the province. Dyson also notes that the record sample is probably skewed by the 1995/96 season
and the 1996 event itself. Table 4 also shows a clear distinction between the frequency of large
point-rainfall events in early summer and late summer, with the latter proving to be the more likely
period for high, and most likely more intense, rainfall events at a site.
Table E5: Summary of monthly and daily average statistics for point rainfall measurements within
Gauteng (Dyson, 2009).

Early Summer Late Summer


Season
Oct Nov Dec Jan Feb Mar
Ave. days with significant rain (>50mm) 2.3 3.5 5.1 7.0 5.1 4.6 27.6
% occurrence in all months 78% 88% 97% 100% 97% 94% 100%
Max. days with significant rain (>50mm) 10 10 10 17 17 15 56
Max. consecutive days with significant rain
5 5 5 8 9 7
(>50mm)
Ave. days heavy rain (>75mm) 0.9 1.1 1.3 2.6 1.9 1.7 9.5
% occurrence in all months 47% 66% 53% 88% 69% 63% 97%
Max. days heavy rain (>75mm) 6 4 4 7 10 10 24
Max. consecutive days with significant rain
3 2 3 5 6 5
(>75mm)
Ave. days very heavy rain (>115mm) 0.25 0.09 0.25 0.59 0.28 0.38 1.84
% occurrence in all months 19% 6% 22% 38% 13% 22% 66%
Max. days very heavy rain (>115mm) 3 2 2 3 5 4 9
Max. consecutive days with significant rain
1 1 1 2 3 2
(>115mm)

7
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

E.8 DISTRIBUTION OF STORM FREQUENCY ACROSS THE METROPOLITAN


AREA

Dyson (2009) identifies the Witwatersrand watershed that divides the Vaal catchment to the south
from the Limpopo/Crocodile catchment to the north as also being a divide in the occurrence of
heavy rainfall events. She notes that stations to the south of the watershed record about half the
number of heavy and very heavy rainfall events that are recorded to the north. Point rainfall events
greater than 75mm are estimated to occur 1.7 times more often north of the watershed than to the
south, while events greater than 115mm are likely to occur 2.6 times more.

E.9 LIKELIHOOD OF ANTECEDENT RAINFALL.

Table E4 indicates the chance of consecutive days of rainfall above the 50mm threshold. These vary
between five and nine consecutive days of rainfall above 50mm as being the maximum number in
each month observed at least at one site in the 32-year record. This is particularly significant for
stormwater design and catchment planning, especially where volume control is the default
stormwater management requirements. There is also a record of two consecutive days measuring
above 115mm in January at a station in the Gauteng area and as many as three consecutive days
above 115mm in February.
A specific analysis of the likelihood of antecedent rain in association with design rainfall conditions
was not found in the literature, but this could easily be done with the quality of data from rainfall
stations in the metropolitan area. However, the work by Dyson reported above suggests that it
would be reasonable to assume that a design storm may be preceded by one or more wet days,
including some with significant (>50mm) rainfall, and that this should be included in the tests done
on design alternatives for a site.

E.10 STORM SPEED AND TRAJECTORY

Storm movement can have an impact on the runoff response of a catchment. The effect can be small
to negligible where the catchment size is smaller than the area of the storm cell, but where
catchments are larger than the storm cell, the effect on runoff can be significant. Stephenson (1984)
reports that storm clouds can travel at wind speeds between 2km/h and 60km/h in South Africa,
while Tyson and Preston-Whyte (1998) demonstrate storm movement and trajectory over
Johannesburg covering 190km in 4 hours (47.5km/h). An analysis of radar records for the Highveld
area by Mader, et al (1986) showed the range of storm speeds to be 5km/h to 90km/h, and that the
median storm cell speed is 25km/h.
There is a view that storms travelling down the catchment will usually result in higher peak runoff
(SANRAL, 2007). Experience in the Witwatersrand area is that thunderstorm cell movement is
typically north to north-east. This is particularly the case with the squall line storm systems and
convection systems that are the main sources of thunderstorms over Johannesburg (Tyson and
Preston-Whyte, 1988). Mader, et al (1986) noted that storm cells can travel in any direction, but that
they tend to move from south-west to north-east over the region.
Many of the Johannesburg catchments flow either in a northerly or southerly direction, this storm
trajectory may have the following influence on catchment responses:

8
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

· A northerly to north-easterly trajectory will tend to reduce the time of concentration and
therefore the critical storm duration in north draining catchments, thereby increasing the
peak discharge; and
· The same storm will have a flattening effect on the flood peak on south draining catchments
as the time of concentration and critical storm duration increases.
Stephenson (1984) showed that constant rainfall storm cells larger in area than the catchment, and
moving down the catchment, will have no influence on the peak runoff. However, storm cells smaller
than the catchment area, with associated higher intensities, moving down the catchment will result
in higher peak flows. Hence, moving storms will affect the critical storm duration, and therefore
storm intensity. SANRAL (2007) proposes that the time of concentration, tc, be reduced by the travel
time of the storm along the catchment to determine the critical storm duration.
There is sufficient information for stormwater engineers to determine critical storm duration, testing
catchment sensitivity to storm movements, particularly in the north draining catchments where the
critical storm duration may be shorter than that indicated by calculations of time of concentration. A
test may be performed where the storm is assumed to be travelling in the downstream direction of
the catchment with a storm speed of the order of 25km/h. The standard tc is then reduced by this
time and the appropriate storm duration and intensity can be applied.

E.11 STORM RAINFALL INTENSITY

An indication of the potential intensity of thunderstorms in the Highveld area has already been given
through the association between thunderstorms and tornados and the record of the latter over
Gauteng. A measure of storm intensity was presented as a set of synthetic rainfall distributions for
South Africa developed by Weddepohl (1988), which were refined and published by Schmidt and
Schulze (1987). They have been widely applied to storm rainfall and stormwater calculations. The SA
Type 3 synthetic rainfall distribution is applicable to the Johannesburg area, and is second only to
the Type 4 distribution in storm intensity, which is limited to the eastern Drakensberg escarpment.
The synthetic distribution is a curve of accumulated one-day design rainfall (Figure E3), and could be
easily applied to the one-day records that are the most readily available in South Africa. Rainfall
depths for shorter durations suitable for urban catchments are then obtained by the applying the
ratio for the Type 3 distribution in the following formula to the one-day rainfall depth (Schmidt &
Schulze, 1987):
0.73402 x D
R=
(0.23 + ) .
Where R = ratio of D-hour to one-day storm depth
D = storm duration for which R is to be calculated (in hours)
In 2012, the 5-minute rainfall data at OR Tambo International Airport was tested against the Type 3
distribution. The results presented in Figure 3 suggest the SA Type 3 profile is still relevant for the
Johannesburg area (Piketh, et al, 2013).

9
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

Storm Type 3 profile vs ORT events >10mm


1
Ratio of accumulated rainfall to total event rainfall

0.9

0.8
Average of ORT Events >10mm
0.7 Type 3 Ratios from SCS

0.6

0.5

0.4

0.3

0.2

0.1

0
0 2 4 6 8 10 12 14 16 18 20 22 24
Hours

Figure E3: Comparison of storm profiles of rainfall events > 10mm at OR Tambo (1994-2010) and
the Storm Type 3 profile for the greater Johannesburg area (Piketh, et al, 2013).

E.12 DESIGN STORM EVENT DATA FOR JOHANNESBURG

The Drainage Manual (SANRAL, 2007) provides a useful summary of design rainfall sources for the
more standard deterministic design hydrology methods currently in use. The implication is that
different rainfall sources are best suited to different hydrology methods (Table E6). Two of the
commonly adopted design rainfall data sources date from the 1970s (HRU1/72) and 1980s (TR102)
(Adamson, 1981), while the SCS method presents design rainfall developed in the late 1980s
(Schmidt and Schulze, 1987). A comparison of the 20-year, 1-hour storm depths from each source
for Waterkloof, Pretoria, is given in Table E6. There is almost a 25% variation between the estimates.
A more recent review of design rainfall across the country has been undertaken by Smithers and
Schulze (2002). Referred to as the RLMA-SI approach, their analysis of over 1700 daily rainfall
stations and over 170 digitised rainfall stations included regional analysis to develop regional growth
curves across the country for storm durations <24 h to 7 days. The regression analysis accounts for
MAP, latitude and altitude, and design rainfall is presented on a minute-by-minute of arc grid across
the country. The 20-year, 1-hour storm depth for Waterkloof provided by this method is notably
lower than the values promoted by the other methods (Table E5).
Gericke and du Plessis (2011) analysed the application of the different design rainfall sources across
44 catchments in South Africa and concluded that the RLMA-SI approach should be used as the
standard source to develop Depth-Duration-Frequency (DDF) relationships for all critical storm

10
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

durations. Furthermore, they propose that the HRU1/72 and Hershfield applications are
conservatively high.
For the purposes of a consistent application of design rainfall across the City of Johannesburg, it is
recommended that the RLMA-SI data source provided by Smithers and Schulze (2002) be used.
Furthermore, the resulting distribution of rainfall appears to agree with the findings of Dyson (2009)
that the northern areas of the City will have higher storm rainfall than the southern areas (Fig E5).

Table E6: Comparison of 20-year, 1-hour point rainfall depths at Waterkloof 2 (Pretoria), as
obtained from the different methods in the Drainage Manual (SANRAL, 2007).

Peak flow or Point rainfall


Method Rainfall source
hydrograph P20y,1h (mm)

Rational Method Peak HRU 1/72 (DDF nomograph). 60

“Alternative Rational
Peak TR102 & modified Hershfield eqn. 88
Method”

Unit hydrograph Hydrograph HRU 1/72 (DDF nomograph). 60

SDF Method Peak TR102 & modified Hershfield eqn. 88

SCS Method Peak & volume Schmidt & Schulze, 1987. 76

Smithers & Schulze Point rainfall Smithers & Schulze, 2002. 50 (40.3-59.4)

E.13 RAINFALL DATA FOR CONTINUOUS SIMULATION

Data for continuous simulation should be the recorded rainfall at the nearest rainfall recording
station. The main points to consider include:
i) The frequency and magnitude of storm rainfall varies significantly across the area of the City of
Johannesburg (see for example Figure E5). A rainfall station representative of the site location
should be used.
ii) The length of record required will depend on the design and analysis requirements. However, if
flood frequency is to be analysed then the longer the rainfall record the better (the issue of non-
stationarity is relevant here). In this Manual, it is recommended that at least 20 years of rainfall
records should be used to analyse frequencies up to the 5-year event. For larger events, the
maximum record length available should be used.
iii) Most rain stations record daily totals, which is not suitable for urban stormwater analysis.
However, the daily totals may be transformed using the cumulative storm profile in Figure E5
(repeated with ordinates in Figure E6). This includes both present-day intensity distribution and
a potential climate change scenario. An alternative would be to consider using the 5-minute data

2
The selection of Waterkloof as the sample site is based on the availability of TR102 data presented in the SANRAL (2007)
Drainage Manual. Copies of TR102 rainfall data sets are not readily available.

11
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

records available at a few stations in and around the City of Johannesburg (e.g. Johannesburg
Botanical Gardens, OR Tambo International Airport, Grand Central Airport). This should be
supported by an assessment of the suitability of the data to the site.
iv) The calibration of the continuous simulation is critical. However, storm event rainfall is highly
localised within the City of Johannesburg area and if the station is more than 2km from the site,
then model calibration may need to be supported with more local records (even if only daily
totals are recorded), or by using radar imagery from the SA Weather Service.

E.14 CLIMATE CHANGE – KEY ISSUES Jen to check and comment

As mentioned earlier, the assumption of stationarity is central to most approaches to flood risk
assessment and stormwater design but that in large urban environments the flaws of this
assumption can have significant bearing on the reliability of the design. Key issues affecting design
rainfall determination include:

· Natural rainfall variability in cycles that are longer than rainfall records. The effect of this has
been assumed to be relatively small due to the length of record of stations around
Johannesburg. However, research is showing this to be a flawed assumption, and in fact
there can be significant associations between flood risk and climatic cycles such as those
influenced by the El Niño effect (Jain and Lall, 2001). Therefore this assumption needs to be
tested for Johannesburg.

· The impacts of climate change that research and climate modelling shows could influence:
o Storm frequency and magnitude, and
o Antecedent conditions.
This review has not considered the influence of natural climate cycles on design rainfall for the
Johannesburg area, but there is more information relating to climate change now available and this
is summarised here. Trends of changes in rainfall on a global and regional scale from global climate
models provide limited information to assist the stormwater manager and designer at a municipal
scale. Hence consideration is given to investigations of changing storm rainfall at a local scale. While
these are few, they at least offer a starting point for testing non-stationarity due to climate change
on stormwater systems. They are based on both the analysis of recent trends (of recorded data) and
long-range trends suggested by downscaled climate model output.

Climate Change – Recent Trends


A review of different sources shows a range of differing views on current trends in rainfall over the
Johannesburg area. The Climate Change Adaptation Plan (CoJ, 2009) proposes that there may have
been a slight general decrease in rainfall since the 1960, particularly in the late summer/autumn
period, though any such trend is small and not statistically significant. The study utilised data from a
weather station in Krugersdorp and analysed 30-day totals, daily rainfall, number of rain days, and
even number of rain days greater than 10mm. Fatti and Vogel (2011) analysed data at OR Tambo
International Airport for the same period and also pointed to no significant statistical trend,
although a plot of the seasonal totals suggest a general increase in summer rainfall. Dyson (2009)
analysed trends at stations across the Gauteng area and noted a trending decrease in early summer

12
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

rainfall and an increase in late summer rain. Hence the data relevant to the CoJ municipal boundary
need to be analysed with care.
More recently, in their CDP submission, the CoJ (2014) lists among the climate change related risks
to include:

· More frequent (storm) rainfall (a serious risk of immediate concern)


· More hot days (a serious risk of immediate concern)

· More intense rainfall (a serious risk of immediate concern)


· Flooding (a serious risk of long-term concern)
Analysing rainfall records at OR Tambo International Airport (1960-2008) in conjunction with
observed storm cloud formations, Fatti & Vogel (2011) showed a marked trend of decreasing
number of thunderstorms per year. The reduction is significant, with the number of thunderstorms
in 2000-2008 being 25% to 50% of the number of events in 1960-1970. In contrast, the average
rainfall per thunderstorm event shows an increasing trend, with the average storm rainfall in 2008
being almost 70% greater than that in 1960. However, their study showed that the number of
“heavy storm” events (comprising the top 10% of the recorded storms) has been consistent over the
period 1960 to 2008. So, there are fewer storms with more rainfall per event, but no meaningful
change in the number or magnitude of large events. This implies a significant shift in the magnitude
of the lower order events (e.g. possibly including the 2 and 5 year events) but not the larger events.

13
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

Appendix F: Review of sediment control BMPs


F.1 Background

Setting Limits for Acceptable Sediment Discharge


Sediment levels are measured as Total Suspended Solids (TSS), typically measured in mg/l, but is
often also measured by water turbidity, measured in nephelometric turbidity units (NTU). Turbidity
is more easily monitored in real time with in-stream sensors and therefore more suitable for
detection of pollution or flood incidents, whereas TSS usually requires grab sampling. However,
turbidity is not a precise measurement of sediment loads as it can be affected by inorganic and
organic loads, algae, and coloured organic compounds that will absorb light.
Targets for discharge limits should be determined by the sensitivity of the receiving stream and any
strategic objectives for the stream. These will vary with location, even within a municipality. In the
absence of any such requirements, upper limits for general conditions may be assumed. A summary
of these limits is presented in Table F3.1.
In the State of the Rivers report for the City of Johannesburg (Iliso, 2010), the range of median
turbidity measurements in streams across the metropolitan area varied between 1.2 NTU to 9 NTU,
while the 95-percentile non-exceedance values varied between 9 NTU and 30 NTU. These were spot
measurements, typically on a monthly rotation and are unlikely to have been taken during flood
events. However, they indicate very low levels of suspended sediment and suggest that normal
streamflow across Johannesburg is well within the guidelines in Table F1. The SA Water Quality
guidelines state that sediment loads should not vary by more than 10% in ideal conditions.

Table F.1: Summary of water quality guidelines for South African rivers and streams.
Source Determinand Unit Limit Comment
SA Water Quality TSS mg/l 100 All aquatic ecosystems.
Guidelines (DWA, 1996a)
50 Aquaculture, clear water fish
species.
SA Water Quality Turbidity NTU 25 Aquaculture, clear water fish
Guidelines (DWA, 1996a) species.

1
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

Figure F1: Examples of turbidity (City of Calgary, Canada, www.calgary.ca)

Flood conditions present a different picture. The reality for many South African watercourses is that
sediment loads do vary by considerably more than 10% under flood conditions. Observations at the
same location on the Braamfontein Spruit in Johannesburg early in 2015 are shown in Figures F2(a)
and F2(b). Under normal flow (Figure F2(a)) the turbidity appears to be in line with the measured 1
to 9 NTU reported in the State of Rivers Report (Iliso, 2010). After a storm event the turbidity levels
are well above 500 NTU, and most likely above 1000 NTU (Figure F2(b)). It is not clear what sediment
loads would be under natural catchment conditions, and while sediment loads may vary by more
than 10%, the conditions in Figure F2(b) are excessive and unacceptable.
The problem is not one for Johannesburg alone and setting limits for allowable sediment discharges
have proved contentious internationally. For example, in 2008 the US Environmental Protection
Agency (US-EPA) set a limit of 13 NTU for discharge from a construction site greater than 12 ha (30
acres). In 2009 this was adjusted to 280 NTU for sites greater than 4 ha (10 acres) after objections
from developers and even sediment control practitioners on the 13 NTU limit. The US-EPA then
withdrew the limit entirely in 2010 with the view that further research was required (Forester,
2015).
At present, it is not possible to set sediment discharge limits for sites in Johannesburg based on
baseline natural catchment conditions, as these are unknown, and regional research may be
required to obtain guideline values. Instead the following interim guideline is proposed in Table F3.2,
based on trapping different grades of sediment by a combination of settlement and filtration.

2
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

Figure F2(a): Braamfontein Spruit during normal flow with low turbidity (February 2015)

3
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

Figure F2(b): Braamfontein Spruit after a storm event showing high turbidity (January 2015).
Many of the soils in the CoJ area have relatively significant clay content (>15%). Clay particles are
difficult to settle in sediment traps and instead require filtration. The latter will be possible for
average storm events, but may be difficult for design events (≥2 years). Therefore, treatment of clay
particles is (0.002mm dia.) is provisionally limited to daily storm events for construction sites. Higher
clay particle trap efficiencies are possible with vegetated drainage systems.
At the other end of the scale, all sand particles ≥0.2mm should be trapped up to and including the
10-year design event, and substantial trap efficiency up to the 20 year event are also identified.
Sediment settlement is expected to be the primary treatment method to achieve these targets.
Table G.2: Interim trap efficiency of on-site sediment treatment facilities.

Treatment Trap Efficiency (per design storm event)


Particle size Category Primary(1)
1.01 yr. 5 yr. 10 yr. 20 yr.
Secondary(2)
Gravel, coarse
≥0.2mm Settlement(1) 100% 100% 100% 90%
to fine sand
Settlement(1),
≥0.075mm fine sand 100% 100% 90% 65%
filtration(2)
Settlement(1),
≥0.04mm coarse silt 100% 55% 35% 25%
filtration(2)
medium to fine Filtration(1),
≤0.04mm 50% 10% ~ ~
silt & clay settlement(2)

Trap efficiency is for the design event. This requires testing the system for the same range of design
hydrographs required for testing retention and attenuation facilities. If the system design is based on
peak flow only, the same targets will need to be achieved even though this will be more
conservative. The design of the sediment management system will also require grading analysis of
erodible material on site, including soils, excavated areas, stock piles and spoil heaps. Performance
of the system will need testing by sampling during storm events.

4
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

REFERENCES
Adamson, PT. (1982) Southern African Storm Rainfall, Report TR102. Department of Environmental
Affairs.
AILA. (2012) Adapting to Climate Change: Green Infrastructure. Australian Institute of Landscape
Architects, Canberra.

Bailey, AK & Pitman, WV. (2015) Water Resources of South Africa 2012 Study (WR2012). WRC
Report TT??.
Chu, ST. (1978) Infiltration During an Unsteady Rain. Water Resources Research, 14(3), 461-466.
Department of Public Works. (2007) Identification of Problematic Soils in Southern Africa. Technical
notes for Civil and Structural Engineers. Pretoria: Department of Public Works.
Dickens, CWS & Graham, PM. (2002) The South African Scoring System (SASS) Version 5 Rapid
Bioassessment Method for Rivers. African Journal of Aquatic Science, Vol. 7.
Diop, S; Stapelberg, F; Tegegn, K; Ngubelanga, S and Heath, L. (2011) A Review of Problem Soils in
South Africa. Council for Geosciences Report No. 2011-0062. Cape Town: Council for Geosciences.
ECO Northwest, 2007

Fatti & Vogel (2011)

Fitchett, A. (2017) SuDS for managing surface water in Diepsloot informal settlement, Johannesburg,
South Africa. Water SA, Vol 43(2)

Fletcher, T; Shuster, W; Hunt, WF; Ashley, R; Butler, D; Arthur, S; Trowsdale, S; Barraud, S;


Semadeni-Davies, A; Bertrand-Krajewskih, J-L; Mikkelsenj, PS; Rivard, G; Uhl, M; Dagenais, D 7
Viklander, M. (2015) SUDS, LID, BMPs, WSUD and more – The evolution and application of
terminology surrounding urban drainage. Urban Water Journal. 12 (7) 525-542.
http://dx.doi.org/10.1080/1573062X.2014.916314
Green, IRA. (1984) Witwatersrand Stormwater Drainage Program: Version II. Water Research
Program, Department of Civil Engineering, University of the Witwatersrand.
Green, IRA. (1986) An Explicit Solution of the Modified Horton Equation. Journal of Hydrolology, 83,
pp 23-27.
Green, WH & Ampt, G. (1911) Studies of Soil Physics, part 1 – the flow of air and water through soils.
Journal of Agricultural Science, 4, 1-24.
James CS. (1981) Estimation of Urban Flood Hydrographs. Proceedings of the 2nd International
Conference of Urban Storm Drainage. University of Illinois.
Landscape Institute. (2013) Green Infrastructure: An integrated approach to land use. London:
Landscape Institute.
Lawson, E; Thorne, C; Wright, N; Fenner, R; Arthur, S; LAmond, J; Kilsby, C; Mant, J; Smith, L;
Ahilan, S; Allen, D; Everett, G; Glenis, V; Hoang, L & Morgan, M. (2015) Evaluating the multiple
benefits of a Blue-Green Vision for urban surface water management. In: UDG Autumn Conference
and Exhibition 2015, 04-06 Nov 2015, Chester UK. URL: http://eprints.whiterose.ac.uk/92857/.

1
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

McPherson et al., 2005???


Mein, RG & Larson, CL. (1973) Modelling Infiltration During a Steady Rain. Water Resources
Research, 9(2) 384 – 394.
Mguni, P; Herslund, L & Bergen Jensen, M. (2016) Sustainable urban drainage systems: examining
the potential for green infrastructure-based stormwater management for Sub-Saharan cities.
Natural Hazards. 82 S241-S257. DOI 10.1007/s11069-016-2309-x.
Midgely, DC. (1972) Design Flood Determination in South Africa, Report 2/72. University of the
Witwatersrand, Department of Civil Engineering Hydrological Research Unit.
Midgely, DC; Pitman, WV & Middleton, BJ. (1994) Surface Water Resources of Southern Africa. WRC
Report No. 298/1/94.
Morquecho, R & Pitt, R. (2005) Pollutant associations with particulates in stormwater. Proceeding of
the Water Environment Federation, WEFTEC 2005, pp4973–4999.
Op ten Noord, TH & Stephenson, D. (1982) Flood Peak Calculation in South Africa, Report 2/1982.
University of the Witwatersrand, Department of Civil Engineering Water Systems Research
Programme.
Rawls, WJ; Barakensiek, DL & Miller, N. (1983) Green-Ampt Infiltration Parameters from Soils Data.
Journal of Hydraulic Engineering. 109:62-70
Richards, LA. (1931) Capillary conduction of liquids through porous mediums. Physics, 1(5) 318–333.
Rossman, LA & Huber, WC. (2016) Stormwater Management Model Reference Manual: Volume 1 –
Hydrology. EPA/600/R-15/162A Rev January 2016. US EPA.
SAWE Multi-disciplinary Engineers. (2002) Stormwater Management Planning and Design
Guidelines for New Developments. Cape Town: City of Cape Town Development Services, Transport,
Roads, and Stormwater Directorate, Catchment, Stormwater and River Management.

Saxton, KE & Rawls, WJ; (2006) Soil Water Characteristic Estimates by Texture and Organic Matter
for Hydrologic Solutions, Soil Science Society of America Journal. 70:1569-1578

Schmidt, EJ & Schulze, RE. (1987) Flood Volume and Peak Discharge from Small Catchments in
Southern Africa based on the SCS Technique. Agricultural Catchments Research Unit Report No. 24,
University of KwaZulu Natal (WRC Report TT31/87).
Smithers, JC & Schulze, RE. (2012) Design Rainfall and Flood Estimation in South Africa. WRC Report
1060/1/03.
Smithers & Schultze (2002)
Symons, J; Jones, RN; Young, CK and Rasmussen, B. (2015) Assessing the Economic Value of Green
Infrastructure: Literature Review. Climate Change Working Paper No 23. Victoria Institute of
Strategic Economic Studies, Victoria University, Melbourne.
Thyer, et al, 2006
Torno, HC. (1992) Design and Construction of Urban Stormwater Management Systems. ASCE
Manuals and Reports of Engineering Practice No. 77, p82.

2
REVISION CV4 AF CJB 2017/08/12
Stormwater management design guidelines AF edit cjb 2017_08_12.docx

Wakida, FT; Martinez-Huato, S; Garcia-Flores, E; Piñon-Colin, TDJ; Espinoza-Gomez, H & Ames-


López, A. (2014) Pollutant association with suspended solids in stormwater in Tijuana, Mexico.
Technology, Vol. 11(2), pp319-326
Water by Design, 2010.
Watermeyer, RB & Smith, AJ. (2016) Registration, licensing and specialist list in a civil engineering
context. Civil Engineering, Vol 24(2).

Westra & Sharma, 2010

Woods-Ballard, B; Kellagher, R; Martin, P; Jefferies, C; Bray, R & Shaffer, P. (2007) The SUDS
manual. CIRIA: London.

Wong, 2011

https://www.epa.gov/green-infrastructure/benefits-green-infrastructure

http://cfpub.epa.gov/npdes/home.cfm?program_id=298 [accessed 22 March 2016] Health benefit


ref

You might also like