• EXPLORATION METHODS
• RESERVOIR MODELLING AND DRILLING PROGRAMME
• TYPICAL SUBSEA WELLS
• OFFSHORE DRILLING VESSELS
• DRILLING A SUBSEA WELL
• WELLHEADS – Design & Function
• WELLHEADS - Connection to BOPs and Trees
THE END PRODUCT The seismic data must be interpreted
to understand the geology and assess
the likelihood of finding oil and gas
accumulations.
Production Platform
Mobile Drilling Vessels
Xmas
tree
Flowline
Satellite
well
Development wells
Appraisal well
Original
Exploration/D
iscovery well
Note
Development wells may be
vertical wells or more
complex extended reach or
horizontal wells
Reservoir The science explores the engineering operations involved
engineering is
in analysing the production behaviour of oil and gas wells,
defined as the
application of including well performance engineering, reservoir aspects
scientific principles of well performance, restricted flow into the wellbore,
to drainage issues
arising during the rate decline analysis, and fundamentals of artificial lift.
development and
production of oil
and gas reservoirs.
* Build reservoir
architecture utilising
G&G mapping
* Populate model with
reservoir properties
utilising G&G integration
* Evaluate production
tests
* Flow analysis Water
drive, gas injection,water
flood, etc.
* Volumetrics
* Reservoir simulation
* Production history
match
DEVELOPING THE DRILLING PLAN - Bottom Hole Targets
171/2 ” HOLE
133/8” CASING SURFACE STRING
1300 m
81/2” HOLE
3200 m
7” CASING
RESERVOIR
A TYPICAL NORTH SEA CASING DESIGN
WELL COMPLETION SCHEMATIC - Simplified
TUBING HANGER
PENETRATION FOR POWER (SSSV) & INSTRUMENTALION (P & T)
ANNULUS PENETRATION (2” dia)
5 ½ ” PRODUCTION TUBING
SUB SURFACE SAFETY VALVE (Hydraulic Actuation)
CASING SEAL
ANCHOR SEAL
PACKER (Hydraulically set)
NIPPLE
RETRACTABLE BALL SEAT
ENTRY GUIDE
PERFORATIONS
JOINT OPERATORS -
CONOCOPHILLIPS AND
CHEVRONTEXACO
OFFSHORE DRILLING RIGS
Station
keeping
normally
using
Legs sit on seabed Dynamic
Positioning
JACK UP Thrusters
Shallow water
Normally Deepwater
The Jack up rig West Epsilon alongside a well head platform at the Valhall field
SEDCO EXPRESS
DRILL SHIP
• To support BOP
and seal with well
casing during
drilling
• To support and seal
the subsea
production tree
• To support and seal
the well casing
• To support and seal
the production
tubing hanger
Subsea wellheads
• Most widely size used : 18”
3/4 (Nom. Bore)
• Deepwater wellheads
designed for much higher
bending and tension loads
Cameron
hub profile
18 ¾” HP wellhead housing
13 3/8” casing
20” casing
30” conductor
A Annulus
B Annulus
C Annulus
Wellhead Housing Joint
•Provides a
mechanical
connection and
sealing preparation
for the BOP stack and
tree.
•Provides landing,
locking, and sealing
preparations for the
subsequently run
casing hangers
Permanent Guide Base
1 000 m
2 000 m
Post-Salt Layer
Bears most of Brazil’s reserves
3 000 m
2 629 m
1977
3 167 m
3 318 m
1997
1988
4 000 m
4 343 m
An irregular layer, the thickness of which
2003
Ranges from 1000 to 2000 meters
6 000 m
Pre-Salt Layer
On account of its geological characteristics, the pre-salt marks 7 000 m
the beginning of a new exploratory model, one that will 72007
000 m
involve the use of technology that is more resistant both to Santos Basin (Tupi)
corrosion and to high temperatures and pressure.