The document is a bill of materials for a proposed wet stand pipe system project called BALAY PAGLAUM. It contains a list of materials needed for the project including pipes, valves, pumps, tanks, and other hardware. The total cost of materials and labor is 1,420,694 Philippine pesos or approximately $27,000 USD. Labor costs, board, and lodging add up to 230,000 pesos of the total budget.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
229 views1 page

Materials Wet Stand Pipe

The document is a bill of materials for a proposed wet stand pipe system project called BALAY PAGLAUM. It contains a list of materials needed for the project including pipes, valves, pumps, tanks, and other hardware. The total cost of materials and labor is 1,420,694 Philippine pesos or approximately $27,000 USD. Labor costs, board, and lodging add up to 230,000 pesos of the total budget.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

____________________________________________________

Project: Wet Stand Pipe System


Proposed: BALAY PAGLAUM
Owner:

BILL OF MATERIALS
No DESCRIPTION QUANTITY Unit Price Total Price
.
2 HP Jockey Pump set with controller 1 unit - 285,000
1 ½ check valve 1 pc. - 13,500
1 ½ gate valve 2 pc. 13,500 27,000
Fire Hose Cabinet set (32 x 27 x 7) 4 sets 60,000 240,000
3” B I Pipe schedule 40, 13 le 9,200 119,600
3” B I Blind Flange, (200 lbs.) 1 pcs. 5,500 5,550
3” B I elbow sched 40, 90 deg 2 pcs. 1,920 3,840
3”check valve 1 pc 84,000 84,000
3” x 2.5 FDC 1 pc. 54,000 54,000
1 ½ “ BI pipe schedule 40 12 le 6,380 76,560
1 1/2 “ B I elbow 90 degrees (threaded) 4 pcs. 427.50 1,710
1,000 liters water tank 2 units 55,500 111,000
1/8 x 6011 Fuji welding rod 10 boxes 3,750 37,500
1.0 x 4” cutting disc 70 pcs. 150 10,500
4” grinding stone 45 pcs. 160 7,200
5/8” x 3” tempered bolt and nut w/ nut and lock 39 pcs. 240 9,360
washer
3/8” x 3” expansion bolt 100 255 25,500
¼” x 2” angle bar 8 le 4,135 33,080
3” u bolt 30 pcs. 480 14,400
1 ½” u bolt 28 pcs. 360 10,080
¾ Teflon tape 30 rolls 35 1,050
QDE paint Red Oxide Primer 6 gallons 1,600 9,600
QDE paint Int’l Red 6 gallons 1,600 9,600
Paint thinner 3 gallon 900 2,700
Paint brush # 4 6 pcs. 34 204
Labor Cost 1 lot - 180,000
Board and Lodging, Perdiem, etc 1 lot - 50,000
GRAND TOTAL COST Php. 1,420,694.00

FIVE HUNDRED SEVENTY NINE THOUSAND SIX HUNDRED PESOS ONLY