This document provides material compliance statements for anchor points, pipe supports and hangers for Project Falcon. It includes specifications for anchor points, support materials, proprietary support systems, and drop rod sizes. The main contractor certifies the information has been reviewed and complies with contract drawings and specifications except as otherwise stated.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
455 views

2 Compliance Statement

This document provides material compliance statements for anchor points, pipe supports and hangers for Project Falcon. It includes specifications for anchor points, support materials, proprietary support systems, and drop rod sizes. The main contractor certifies the information has been reviewed and complies with contract drawings and specifications except as otherwise stated.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 15

DXB062-PROJECT FALCON

Ref. No.

MATERIAL'S COMPLIANCE STATEMENT Rev. No.

Date:

As per: Drawing Specification BOQ

S. N. DESCRIPTION SPECIFIED PROPOSED REMARKS

8 Anchor Points

Pipe anchors capable of


resisting the maximum
calculated applied stresses
a.
shall be of fabricated mild steel
sections or shall be proprietary
units.

All guide and anchor bracket


b.
details shall be submitted.

Calculations for all anchor loads


c.
shall be submitted.

9 Pipe Supports and Hangers

Support systems shall beg


enerally to BS3974, of correct
a. size and strength, and allow for
anchoring of the piping
systems.

Full detaills of hangers and


supports proposed for use shall
b. be submitted. A proprietary
support system may be used
subject to prior agreement.
Vertical drops shall be
c. restrained and supported to
prevent offset and sway.

Piping at all equipment and


valve positions, and at main
junctions, shall be supported to
d
prevent distortion, or
tansmission of strain to
connected equipment or valves.

Brackets and supports shall


allow sufficient safe access for
adjustment. Maintenance and
e. removal of any item of
equipment with the minimum of
dismantling and without need
for temporary supports.

Where two or more pipes are to


be carried by a single support,
f.
the support spacing shall be for
the shorter interval.

Hangers for insulated chilled


and cooling water piping shall
be provided with hardwood or
high density rigid foam
g.
insulation inserts, reinforced
where necessary, capable of
withstanding the clamp
compression.

Inserts shall be of insulation


thickness with extended shields
of galvanized sheet steel or
h. glass fibre reinforced plastics,
not less than 1 mm thickness,
with sealed joints to maintain
the vapour barrier.

10 Support Materials
Supports and hangers for steel
piping shall be ferrous. Those
for copper piping shall either be
non-ferrous, or have a liner to
a. prevent electrolytic action.
Supports and hangers for
chromium plated or stainless
steel piping shall be chromium
plated.
11 Electrical Trace Heating

12 Support Spacing

The maximum spacing for


a. piping supports shall be as per
indicated in the table below.
13 Drop Rod Sizes

The minimum support drop rod


a. diameters shall be as indicated
in the table below.

Proprietary Pipe Support


14
Systems

Support systems may be slotted


steel (insert) sections with
spring-loaded fixing retained in
a. the slot. Pipes up to DN 100
shall be suspended from, and
larger pipes supported by, cross
members of the frameworks.
Steelwork shall be hot-dip
b. galvanized after manufacture to
BS EN ISO 1461:2009

At anchor points. Junctions and


changes of pipe direction, the
c. frameworks shall be braced to
accommodate all loads and
forces imposed by the piping.
15 Sliding Supports

Steel piping DN250 and above


in trenches, shall be carried on
a.
supports to BS 3974-1, Section
6, Fig.16 spaces as tabulated.

Supports shall also have a


protectively coated floor
b.
mounted channel guide to
control direction of movement.

16 Buried Pipe Work

C. Mild Steel PipeWork

1 Materials

2 Fittings

PART 2 - PRODUCTS

2.1 PIPEWORK

a. Pipe

1 General Requirements

All pipework and associated


pipeline equipment and fittings
shall have the appropriate
a.
temperature and pressure rating
for the system in which it is
operating.

All fittings and pipeline


equipment shall be installed in
b.
accordance with the
manufacturer's instructions.
All materials used in connection
hot and domestic water systems
c. shall be listed in the Water
Research Centre 'Water Fittings
and Materials Directory'.

All pipework material and


systems (i.e. copper tube etc.)
d.
shall be supplied by a single
manufacturer.

At junctions between copper


tube and galvanized steel pipe
a separating dielectric shall be
e.
used to prevent direct contact
and consequent electrolytic
action.

Every water system shall be


tested, flushed and where
f.
necessary disinfected before it
is first used

2 Pipe Storage

Stored pipe shall be supported


a. clear of the ground on stable
secure pipe racks.

No pipe or other material shall


be placed inside another pipe or
b.
fitting if any lining or coating has
been applied to either.

Plastics pipe and components,


and rubber or compound
c. gaskets or sleeves shall be
stored in a cool area protected
from direct sunlight.
13 Drop Rod Sizes

The minimum support drop rod


a. diameters shall be as indicated
in the table below.

Proprietary Pipe Support


14
Systems

Additional test samples may be


h.
required from any welder.

6 Acceptability of Workmanship

All materials used shall be of


adequate quality and in full
a
compliance with relevant
Specifications.

The standards of acceptability


applicable to defects located by
visual inspection or NDT
b techniques of the completed
weld shall comply with BS 2971:
1991 or BS 2640 dependent
upon process.

7 Inspection and Tests

100% visual inspection of weld


preparation and completed
a
welds shall be to BS EN ISO
17637:2016.
Inspection shall be to BS EN
ISO 3923-1:2018 for ultrasonic
inspection and to BS EN ISO
17636-1:2013, BS EN ISO
17636-2: 2013 for radiographic
inspection and be carried out by
b
a member firm of the
Associated Offices Technical
Committee (AOTC). Personnel
shall be certificated under the
Personnel Certification in NDT
(PCN) Scheme.

5% of the total number of welds


in the installation in pipe of 6mm
to 10mm wall thickness, and
c 10% for thicknesses greater
than 10mm shall be randomly
selected for ultrasonic
inspection.

10% of the total number of


welds in the installation shall be
d
subjected to radiographic
inspection, selected at random.

If welds are found to be


unsatisfactory, further tests
shall be carried out. In the event
e of persistent failure, the welding
personnel concerned shall not
be permitted to carry out any
further work.

Additional welds may be


inspected by an independent
authority, and any defects found
shall be repaired. Any additional
f testing required as a result shall
be carried out without charge.
Root penetration shall comply
with the requirements of BS
2640 and BS 2971.

G Copper Pipework

1 Materials

2 Bends and Fittings

3 Jointing
4 Chromium Plating

SCHEDULE OF PIPED
2.2
SERVICES
Main Contractor Statement: We certify that the information submitted herewith has been reviewed in details and in compliance
with the contract drawings and specifications except as otherwise stated here above
DXB062-PROJECT FALCON

Ref. No. DCE-EMEA-M-SP001

MATERIAL'S COMPLIANCE STATEMENT Rev. No.

Date:

As per: Drawing Specification BOQ

S. N. DESCRIPTION SPECIFIED PROPOSED REMARKS

8 Anchor Points

Pipe anchors capable of


resisting the maximum
calculated applied stresses Not Applicable for this
a.
shall be of fabricated mild steel Submittal
sections or shall be proprietary
units.

All guide and anchor bracket Not Applicable for this


b.
details shall be submitted. Submittal

Calculations for all anchor loads Not Applicable for this


c.
shall be submitted. Submittal

9 Pipe Supports and Hangers

HD Lined Split Clamp DMC215…


HD
Support systems shall beg
Plain Split Clamp HD
enerally to BS3974, of correct
DMC133….HD
a. size and strength, and allow for Comply
HD U-Bolt DMC144…HD
anchoring of the piping
HD U-Strap DMC155…HD
systems.
Rubber Support Insert DMRSI…
HD Support Channel DMC55…
Full detaills of hangers and
supports proposed for use shall
b. be submitted. A proprietary Comply
support system may be used
subject to prior agreement.

HD Lined Split Clamp DMC215…


HD
Vertical drops shall be Plain Split Clamp HD
c. restrained and supported to Comply DMC133….HD
prevent offset and sway. HD U-Bolt DMC144…HD
HD U-Strap DMC155…HD
HD Riser Clamp DMC111…HD

Piping at all equipment and


valve positions, and at main
junctions, shall be supported to Not Applicable for this
d
prevent distortion, or Submittal
tansmission of strain to
connected equipment or valves.

Brackets and supports shall


allow sufficient safe access for
adjustment. Maintenance and
e. removal of any item of Comply by JLW
equipment with the minimum of
dismantling and without need
for temporary supports.

Where two or more pipes are to


be carried by a single support,
f. Comply by JLW
the support spacing shall be for
the shorter interval.

Hangers for insulated chilled


and cooling water piping shall
Plain Split Clamp HD
be provided with hardwood or
DMC133….HD
high density rigid foam
g. Comply as Noted HD U-Bolt DMC144…HD
insulation inserts, reinforced
HD U-Strap DMC155…HD
where necessary, capable of
Rubber Support Insert DMRSI…
withstanding the clamp
compression.

Inserts shall be of insulation


thickness with extended shields
of galvanized sheet steel or
Rubber Support Insert
h. glass fibre reinforced plastics, Comply
DMRSI…
not less than 1 mm thickness,
with sealed joints to maintain
the vapour barrier.

10 Support Materials
Supports and hangers for steel
piping shall be ferrous. Those
for copper piping shall either be
non-ferrous, or have a liner to
HD Lined Split Clamp DMC215…
a. prevent electrolytic action. Comply
HD
Supports and hangers for
chromium plated or stainless
steel piping shall be chromium
plated.

Not Applicable for this


11 Electrical Trace Heating
Submittal

12 Support Spacing

The maximum spacing for


a. piping supports shall be as per
indicated in the table below.
HD Lined Split Clamp DMC215…
HD
Plain Split Clamp HD
DMC133….HD
Comply as Noted
HD U-Bolt DMC144…HD
HD U-Strap DMC155…HD
Rubber Support Insert DMRSI…

HD Lined Split Clamp DMC215…


HD
Plain Split Clamp HD
DMC133….HD
Comply as Noted
HD U-Bolt DMC144…HD
HD U-Strap DMC155…HD
Rubber Support Insert DMRSI…

13 Drop Rod Sizes

The minimum support drop rod


a. diameters shall be as indicated
in the table below.

HD Threaded Rod
Comply as Noted
DMC330…HD
HD Threaded Rod
Comply as Noted
DMC330…HD

Proprietary Pipe Support


14
Systems

Support systems may be slotted


steel (insert) sections with
spring-loaded fixing retained in
HD Support Channel
a. the slot. Pipes up to DN 100 Comply
DMC55…HD
shall be suspended from, and
larger pipes supported by, cross
members of the frameworks.

Steelwork shall be hot-dip


HD Support Channel
b. galvanized after manufacture to Comply
DMC55…HD
BS EN ISO 1461:2009

At anchor points. Junctions and


changes of pipe direction, the
Not Applicable for this
c. frameworks shall be braced to
Submittal
accommodate all loads and
forces imposed by the piping.

15 Sliding Supports

Steel piping DN250 and above


in trenches, shall be carried on Not Applicable for this
a.
supports to BS 3974-1, Section Submittal
6, Fig.16 spaces as tabulated.

Supports shall also have a


protectively coated floor HD Support Channel
b. Comply as Noted
mounted channel guide to DMC55…HD
control direction of movement.

Not Applicable for this


16 Buried Pipe Work
Submittal

Not Applicable for this


C. Mild Steel PipeWork
Submittal

Not Applicable for this


1 Materials
Submittal

Not Applicable for this


2 Fittings
Submittal
Main Contractor Statement: We certify that the information submitted herewith has been reviewed in details and in compliance
with the contract drawings and specifications except as otherwise stated here above