2 Compliance Statement
2 Compliance Statement
Ref. No.
Date:
8 Anchor Points
10 Support Materials
Supports and hangers for steel
piping shall be ferrous. Those
for copper piping shall either be
non-ferrous, or have a liner to
a. prevent electrolytic action.
Supports and hangers for
chromium plated or stainless
steel piping shall be chromium
plated.
11 Electrical Trace Heating
12 Support Spacing
1 Materials
2 Fittings
PART 2 - PRODUCTS
2.1 PIPEWORK
a. Pipe
1 General Requirements
2 Pipe Storage
6 Acceptability of Workmanship
G Copper Pipework
1 Materials
3 Jointing
4 Chromium Plating
SCHEDULE OF PIPED
2.2
SERVICES
Main Contractor Statement: We certify that the information submitted herewith has been reviewed in details and in compliance
with the contract drawings and specifications except as otherwise stated here above
DXB062-PROJECT FALCON
Date:
8 Anchor Points
10 Support Materials
Supports and hangers for steel
piping shall be ferrous. Those
for copper piping shall either be
non-ferrous, or have a liner to
HD Lined Split Clamp DMC215…
a. prevent electrolytic action. Comply
HD
Supports and hangers for
chromium plated or stainless
steel piping shall be chromium
plated.
12 Support Spacing
HD Threaded Rod
Comply as Noted
DMC330…HD
HD Threaded Rod
Comply as Noted
DMC330…HD
15 Sliding Supports