2021 Budget Capital Proposed
2021 Budget Capital Proposed
FUNDING SOURCES
Federal Funding
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
Total Interfund Transfers & Bal. Application 0 0 0 0 0
Proposed Borrowing
Serial Bonds
BAN (new)
. . .
GRAND TOTAL FUNDING SOURCES 7,648,934 1,677,036 1,272,534 1,272,534 1,272,534
CAPITAL IMPROVEMENT PROGRAM 2021 CAPITAL BUDGET PROPOSED
CITY OF ELMIRA, NEW YORK
2021 - 2025 2021 FIVE-YEAR PROJECTION
PROPOSED PROPOSED PROPOSED PROPOSED PROPOSED
Description 2021 2022 2023 2024 2025
CAPITAL PROJECTS:
Details:
3. Transportation
Bridge Maintenance (NYSDOT flagged Items) 10,000 10,000 10,000 10,000 10,000
Storm Sewers & Culvert Maintenance 60,000 195,000 195,000 195,000 195,000
Levee Penetration Culvert/Pipe Remediation (DEC) 500,000
Centertown Parking - Lighting & General Rehab - - - - -
Parking Meter & Enforcement Upgrades 60,000 - - -
KV Lot/Rounding Third - Pay Station Replacements
Centertowne Elevator Replacement (Phase III) 225,000
ADA Sidewalk Ramps 35,000 15,000 15,000 15,000 15,000
50/50 Commercial Sidewalk Replacements - - - - -
City Owned Sidewalk Replacements 15,000 15,000 15,000 15,000 15,000
Pavement Markings 190,000 190,000 190,000 190,000 190,000
Road Program 1,750,000 2,000,000 2,000,000 2,000,000 2,000,000
Woodlawn Paving Program 20,000 20,000 20,000 20,000
Woodlawn Crematorium Concrete Pad
Fire HQ Paving back lot 90,000
KV Parking Lot Slurry Seal 35,000
City Owned Underpass Rehabilitation Project 325,000 325,000 - -
DRI Centertowne Parking Garage 146,000
N. Main Cultural Connector Project - PIN 6754.77
(FHWY 80%, Marchiselli 15%; Local Match 5%) - - - - -
N. Main Street Bridge Rehabilitation - PIN 6754.90
(FHWY 80%) 6,712,000 - - - -
W. Water Street Downtown Reconstruction - PIN
6754.68 (FHWY: 80%) - non-DRI portion - - - - -
Walnut & Madison BRIDGE NY Rehabilitation
Project - PIN 6754.98/99 (FHWY 95%) - - - - -
DRI & TAP Grant - Lake St. Bridge Pedestrian
Bridge Conversion (NYSDOT TAP) - 6755.09
(DRI Fund Match, No Marchiselli) - - - - -
Industrial Park Blvd Culvert over Badger Brook
E. Water Street Rejuvenation Project - - - - -
DRI / W. Water Street Downtown Reconstruction -
PIN 6754.68 (FHWY: 80%) - DRI portion only
Church Street - Fiber Repair
Traffic Signal Improvement 14,000 14,000
LED Street Lighting (350 Fixtures) + Fuses 65,000 65,000 65,000 65,000 65,000
Traffic Control Boxes 7,600 7,600 7,600 7,600 7,600
4. Public Buildings
Façade, Roof & Gutter Repairs 15,000 15,000 15,000 15,000 15,000
City Hall - Chiller Replacement 291,000
City Hall - Clock Tower Exterior Repairs 1,754,000 804,000
Parking Garage Inspections 35,000
Fire Headquarters Roof 195,000
Fire Station # 3 Roof 45,000
Fire Station # 3 Façade 45,000
Fire House #5 Remodel (Floor Replacement) 100,000
Fuel Station Pump Upgrade
Air Compressor Upgrade (DPW Shop)
Shop Door Replacement (DPW Shop)
Dunn Field 400,000 400,000 400,000 400,000
Dunn Field - Sound System, Speakers, Amps, Labor 45,000
Dunn Field - Stadium Lighting -
EPD Renovations to City Hall - 20,000 10,000
EPD Video Recording System Detective Bureau
Records Retention Bldg. - - - - -
5. Emergency Services
Handguns
EPD Vehicle Computers 15,000 15,000 15,000 15,000 15,000
EPD Vehicle Cameras 15,000
Police Weapons/Gear (SWAT items, Tasers, MP5 9 mm Carbines, Body
23,000
Armor, Handguns)
15,500 11,000 11,000 11,000
Police Academy Upgrades
New Tasers
MP5 9 mm Cal Carbines
Portable Police Radios & Batteries
Body Armor ( Grant - 50%) 13,000 13,000 13,000 13,000 13,000
Body Cameras 47,000
AED for PBA range
Camera Replacement - - - - -
Bail out gear (54 @ $250 ea)
Fire Dept - Hoses 25,000
Fire Dept - SCBA (AFG Grant) 449,447
Fire Dept - Gear 23,000 36,000 34,000
6. Fleet Maintenance
Streets - Garbage Trk Replacement Prgm 600,000 - 150,000
Streets - Recycling & Garbage 60-Gallon Wheeled Totes 440,000 660,000 - -
Streets - Replace Class 6 Dump Truck w/ Plow 230,000 235,000 235,000 235,000
Streets - Replace Class 7 Dump Truck w/ Plow 260,000 260,000 260,000
Streets - Replace Wheel Loader - 265,000
Streets - Mini-Wheeled Excavator (6-Ton) - - 90,000 -
Streets - One Ton Dump Truck w/ Plows 115,000 - - - -
Streets - 3/4 Pickup Truck 65,000 65,000 -
Streets - Replace Street Sweeper - 275,000
Streets - 6 Ton Tilt Bed Trailer - - -
Streets - Blacktop Tamps
Streets - Large Paver Rehab Project - 50,000 50,000
Streets - Replace Sign Truck - - -
Streets - Service Truck 120,000 -
Streets - Replace Compressor Truck 120,000 -
Streets - Replace Skidsteer - 140,000 140,000
Streets - Purchase Spray Patcher Truck - 150,000
Streets - Replace Tree Truck - 200,000
Streets - Vac Truck (Shared Purchase with County) 300,000 -
Streets - Small VMS Sign Replacement 15,000 - -
Streets - Towable Arrow Boards - - - - -
B&G - One Ton Dump Truck w/ Plow 70,000 - - - -
B&G - 3/4 Ton Truck w/ Plow - 35,000 35,000
B&G ZERO TURN MOWER 15,000 15,000 15,000 15,000
B&G LEAF SUCKER - - - - -
B&G - Ventrex (Snow Removal, Ballfield Maintenance (Dirt Grooming)) -$39K - - - -
B&G - Parks Mower (Jacobsen Large Area Mower) - - - - -
B&G - Utility Truck w/ Lift Gate
B&G Replace scissor lift truck 404
B&G replace Bucket truck 403 140,000
ENG - Van - 30,000 - - -
MTGC Work Truck - Replacement (Used OK) - - - - -
Project Totals Page 2 (excl Fleet Maintenance) 9,893,600 6,897,547 4,254,600 3,101,600 3,106,600
CAPITAL IMPROVEMENT PROGRAM 2021 CAPITAL BUDGET PROPOSED
CITY OF ELMIRA, NEW YORK
2021 - 2025 2021 FIVE-YEAR PROJECTION
PROPOSED PROPOSED PROPOSED PROPOSED PROPOSED
Description 2021 2022 2023 2024 2025
CAPITAL PROJECTS:
Summary From Page 2 (excl Fleet Maintenance) $ 9,893,600 $ 6,897,547 $ 4,254,600 $ 3,101,600 $ 3,106,600
Details:
Infrastructure 0 0 0 0 0
WiMax Replacement (10 Years)
Fiber to Fire Departments (20 Years)
8. Other Improvements