1. Daang Maharlika (LZ) - K0135+(-732) - 1.448 Asphalt Overlay 2.90 lane km 44,776 Q
K0135+(-492), K0135+(-332) - K0135+(- 100mm with u
268), K0135+700 - K0135+720, K0136+662 - correction e
K0136+737, K0137+513 - K0137+600, z
K0140+300 - K0140+600, K0139 + 928 - o
K0139 + 978, K0142+500 - K0142+802, n
K0144 + 709 - K0144 + 909, K0147 + 300 -
K0147 + 410 4
t
Deleted Station Limits: K0139+928 - K0139+978 h
D
Rehabilitation/ Reconstruction/ Upgrading of 15,565 E
Damaged Paved Roads - Primary Roads O
/
1. Daang Maharlika (LZ) - K0150 + 400 - K0150 0.269 Concrete 0.54 lane km 15,565
+ 484, K0150 + 518 - K0150 + 600, K0153 + Reconstruction Q
197 - K0153 + 300 with 300mm Slab u
with Drainage e
z
Change in Station Limits: K0158+100 - K0158+140 o
n
Construction/ Upgrading/ Rehabilitation of Drainage along 12,659
National Roads - Primary Roads 4
t
Deleted Station Limits: K0137+628 - K0137+810
h
Length
Type of Work/ Physical Amount
PROGRAMS / ACTIVITIES / PROJECTS (km for roads/
Scope of Work Target (P'000)
m for bridges)
1. Daang Maharlika (LZ) - K0213 + 800 - K0213 0.96 Preventive 2.00 lane km 40,363 Q
+ 834, K0214 + 100 - K0214 + 818, K0219 + Maintenance of u
200 - K0219 + 250, K0227 + 200 - K0227 + Road: Asphalt e
214, K0231 + 500 - K0231 + 528, K0235 + Overlay z
600 - K0235 + 675, K0236 + 500 - K0236 + 100mm with o
541 correction n
Q
4
u
t
e
h
3. Quirino H-way - K0257 + 062 - K0257 + 100, 0.181 Preventive 0.36 lane km 8,122
z
K0257 + 200 - K0257 + 343 Maintenance of
o
D
Road: Asphalt
n
E
Overlay
100mm with O
4
/
correction
t
Change in Station Limit: From K0257+650 to K0257+306
h
Q
u
D
e
Rehabilitation/ Reconstruction/ Upgrading of 46,858
E
z
Damaged Paved Roads - Primary Roads O
o
n
4
t
0.055 Slope Protection square h
Work (RC Wall) 220 meter
(R/S) D
E
Change in Station Limit: from K0162 + 000 - K0162 + 300 to O
K0162+225 - K0162+255
Proposed FY 2020 DPWH Infrastructure Program
Based on NEP
REGION IV-A
Length
Type of Work/ Physical Amount
PROGRAMS / ACTIVITIES / PROJECTS (km for roads/
Scope of Work Target (P'000)
m for bridges)
1. Quirino H-way - K0255 + 350 - K0255 + 400 0.05 Slope Protection 600 square 22,050
Works (Concrete meter
Slope Protection)
(R/S)
2. Daang Maharlika (LZ) - K0205 + 510 - K0205 20 Slope Protection 600 square 20,000 Q
+ 530 Works (RC Wall) meter u
(B/S) e
z
o
Additional Project n
Transferred 20.0M from: Jct MSR-Old Zigzag Rd - K0157 + 347
- K0157 + 887
4
t
h
Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse 23,170
and Landslide - Secondary Roads D
E
1. MSR Jct Lopez-Hondagua Port Rd - K0222 + 0.035 Slope Protection 420.00 square 15,940 O
700 - K0222 + 735 Works (Concrete meter /
Slope Protection)
(L/S) Q
u
e
z
o
switched amount
n
2. MSR Jct-Lopez-Buenavista Rd - K0221 + 350 0.02 Slope Protection 200.00 square 7,230 Q
- K0221 +370 Works (Concrete meter u
4
Slope Protection) e
t
(R/S) zh
o
n
D
E
Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse 38,100 4
O
and Landslide - Tertiary Roads t
h
Transferred 20.0 M to: Daang Maharlika (LZ) - K0205 + 510 - K0205 + 510, D
K0205 + 620 - K0205 + 627
E
O
2. Quezon-Alabat-Perez Rd - K0012 + 863 - 0.04 Slope Protection 280.00 square 8,100 Q
/
K0012 + 903 Works (Concrete meter u
Slope Protection) e
Q
(L/S) zu
o
e
n
z
Change in Station Limit: from K0004 + 550 - K0004 + 650,
K0012 + 800 - K0012 + 863 to K0012 + 863 - K0012 + 903
o
4
n
t
h
4
t
D
h
E
O
D
/E
O
Q
u
Proposed FY 2020 DPWH Infrastructure Program
Based on NEP
REGION IV-A
Length
Type of Work/ Physical Amount
PROGRAMS / ACTIVITIES / PROJECTS (km for roads/
Scope of Work Target (P'000)
m for bridges)
1. Daang Maharlika (LZ) - K0200 + 222 - K0200 0.718 Construction of 1,436 Lineal 20,000 Q
+ 940 concrete lined meters u
canal (BS) e
z
o
Change in Station Limit from K0201 + 022 to K0200 + 940
n
4
t
h
D
Network Development Program 584,447 E
O
Road Widening - Primary Roads 93,168 /
Q
u
2. Daang Maharlika (LZ) - K0195+000 - 0.307 Road Widening 614.00 lane km 20,408 Q
e
K0195+307 (2-4 lanes) u
z
including e
o
Drainage,sidewal zn
k, curb and o
gutter n
4
t
K0194 + 100 20 Construction of 20.00 lineal meters 4
h
Single Barrel t
RCBC h
D
Change in Station Limit and Allocation
E
D
O
From: Daang Maharlika (LZ) - K0185 + 500 - K0185 + 730,
K0197 + 650 - K0198 + 117 - P16,520M E
To: Daang Maharlika (LZ) - K0195+000 - K0195+307 O
P20,408M
Transferred 3.888M from: Rehabilitation/ Reconstruction/
/
Upgrading of Damaged Paved Roads - Primary Roads Daang
Maharlika (LZ) - K0195 + 890 - K0195 + 990 Q
u
Construction of By-Pass and Diversion Roads 300,000 e
z
1. Guinayangan-Tagkawayan Diversion Road, 1.5 Construction of 3.00 lane km 50,000 o
Package A, Quezon Gravel Road n
4
1.5 ROW Acquisition 45,000 square t
meter h
2. Guinayangan-Tagkawayan Diversion Road, 70 Construction of 667.80 lane km 50,000
Package B, Quezon Bridge
D
E
O
Additional Project -Transferred 50M from: 1.5 ROW Acquisition 45,000 square
Lopez By-Pass Road, Quezon - 30M
Pagbilao By-Pass Road, Quezon - 20M meter
3. Gumaca By-Pass Road, (Phase II), Package A, 1.5 Construction of 3.00 lane km 50,000
Quezon Concrete Road
Length
Type of Work/ Physical Amount
PROGRAMS / ACTIVITIES / PROJECTS (km for roads/
Scope of Work Target (P'000)
m for bridges)
D
E
O
Proposed FY 2020 DPWH Infrastructure Program
Based on NEP
REGION IV-A
Length
Type of Work/ Physical Amount
PROGRAMS / ACTIVITIES / PROJECTS (km for roads/
Scope of Work Target (P'000)
m for bridges)
2. Lipata Br. (B00041AB) along Quezon-Alabat- 8.2 Retrofitting / 1.00 Number of 4,000
Perez Rd Strengthening of Bridges
Bridge
Proposed FY 2020 DPWH Infrastructure Program
Based on NEP
REGION IV-A
Length
Type of Work/ Physical Amount
PROGRAMS / ACTIVITIES / PROJECTS (km for roads/
Scope of Work Target (P'000)
m for bridges)
1. Lagalag Br. (B02570LZ) along Daang 34.9 Rehabilitation / 1.00 Number of 10,000
Maharlika (LZ) Major Repair of Bridges
Bridge
1. Inagbuhan Br. (B02574LZ) along Daang 23.9 Widening of 228.01 Square 28,800
Maharlika (LZ) Bridge meters
2. Lumutan Br. (B02571LZ) along Daang 11.53 Widening of 110.00 Square 14,400
Maharlika (LZ) Bridge meters
1. Sumulong Br. (B02592LZ) along Daang 71.9 Widening of 685.93 Square 71,000 C
Maharlika (LZ) Bridge meters e
n
t
Change in Scope of Work: r
From: Widening of Permanent Bridges
To: Replacement of Permanent Weak Bridges a
l
Length
Type of Work/ Physical Amount
PROGRAMS / ACTIVITIES / PROJECTS (km for roads/
Scope of Work Target (P'000)
m for bridges)
Length
Type of Work/ Physical Amount
PROGRAMS / ACTIVITIES / PROJECTS (km for roads/
Scope of Work Target (P'000)
m for bridges)
Length
Type of Work/ Physical Amount
PROGRAMS / ACTIVITIES / PROJECTS (km for roads/
Scope of Work Target (P'000)
m for bridges)
Additional Project
Additional Project
Additional Project
Length
Type of Work/ Physical Amount
PROGRAMS / ACTIVITIES / PROJECTS (km for roads/
Scope of Work Target (P'000)
m for bridges)
Additional Project
Length
Type of Work/ Physical Amount
PROGRAMS / ACTIVITIES / PROJECTS (km for roads/
Scope of Work Target (P'000)
m for bridges)
Length
Type of Work/ Physical Amount
PROGRAMS / ACTIVITIES / PROJECTS (km for roads/
Scope of Work Target (P'000)
m for bridges)
Length
Type of Work/ Physical Amount
PROGRAMS / ACTIVITIES / PROJECTS (km for roads/
Scope of Work Target (P'000)
m for bridges)
Proposed FY 2020 DPWH Infrastructure Program
Based on NEP
REGION IV-A
Length
Type of Work/ Physical Amount
PROGRAMS / ACTIVITIES / PROJECTS (km for roads/
Scope of Work Target (P'000)
m for bridges)
Length
Type of Work/ Physical Amount
PROGRAMS / ACTIVITIES / PROJECTS (km for roads/
Scope of Work Target (P'000)
m for bridges)