Specifications-Villa Project Saudi Arabia

The document outlines the specifications for East Gate Villas project which includes 246 residential units of various designs. It details the scope of works such as constructing walls, utilities, and septic tanks for each unit. It emphasizes that all works must be completed according to the specifications, soil reports, and layouts. It provides requirements for site preparation, cleaning, soil testing, and approval of filling materials.

Uploaded by

jatin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
650 views17 pages

Specifications-Villa Project Saudi Arabia

The document outlines the specifications for East Gate Villas project which includes 246 residential units of various designs. It details the scope of works such as constructing walls, utilities, and septic tanks for each unit. It emphasizes that all works must be completed according to the specifications, soil reports, and layouts. It provides requirements for site preparation, cleaning, soil testing, and approval of filling materials.

Uploaded by

jatin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 17

East Gate Villas – Specifications

Article (57): Scope of Work ‫ نطاق العمل‬57 ‫المادة رقم‬

1) Scope of work: The Project consists of ‫ع ع ا ع‬ ‫ ا عتكون عمل شا ا ا ا ا ا ا‬:‫) نطااالعمل‬1


(246) residential units spread over several
designing forms according to the needs of ‫ع ا سع‬ ‫)ع ح ا سعن ا ا ا ا ا ااعدة ا ع و ا ع‬246(
the Saudi families (according to the attached ‫ن اذجعتص ا ا ا ا ة ة ع قدو ع تياجعل حقةا ا ع‬
layouts) and as per the agreed terms,
‫و ع(حب ا ا ا ا ا عمل ططا ع‬:‫مالن ا ا ا ا ا سعملبا ا ا ا اا‬
specifications and work plan.
‫مل تي )ع طبياجعل ش طع مل ومصفا ع خط ع‬
‫ ع‬.‫ عمل قفقع ةها‬:‫مل‬
2) Technical requirements: All required works ‫) مل قط با ااا عملفدة ا ا ع و ا ا ع نعتكون ع ة ع‬2
and fittings shall be totally in conformity with
the terms and specifications of the Employer ‫مأل الع ملقوهة مز عمل ط وب ع طابي عت ا اجع‬
and specifications presented and undertook by ‫ع ل اع‬ :‫لش ا ا طع ومصا اافا عصا اااح عمل‬
the Contractor and Employer before it.
‫ه عبهعمل يا لع قب هعصا ا ا ا ا ا اااح ع‬:‫تي مع عت‬
‫ع ع‬. :‫مل‬
3) If the Contractor shall implement any ‫ع‬ ‫ع‬ ‫ا ااال عت ق‬ ‫) إذم عنف ا ااق عمل ي ا ااا ل ع ت ع‬3
works differing from the contracted ones
without the approval of the Employer or its ‫اااق ا عب و بهااا ع نع‬:‫مأل ااالعملقجع اعملق‬
representative or in violation of the terms ‫ ع ع ع ه ه ع ع‬:‫ومتي ع عصاااح عمل‬
and specifications, the Employer shall be
‫عت ص ا اااح ع‬ ‫الف عل شا ا ا طع مل ومص ا اافا‬
absolutely entitled to refuse such works and
delegate the Contractor to remove them and ‫ ع ط قعملحقعتجعرتضعت كعمأل الع‬:‫مل‬
provide other works according to the ‫تك ة عمل يا علعبإ ملقهاع توري عغة هاعطبياجع‬
provisions of the Contract at the expense of
the Contractor. ‫ ع‬.‫عحبابه‬ ‫يا ع تدفةقعذلكع‬:‫لدصوصعمل‬

Technical Speficiations ‫المواصفات الفنية‬

1- Introduction: :‫ مقدمة‬-1

The Contract should execute the whole ‫عطبياعلش طع‬ ‫عمل يا لعتدفةقعكا عمل ش‬ ‫و ع‬
Project according to the terms and
specifications of the Contract and should ‫ي ع منا ا ا ا ااقك العمأل العبالصا ا ا ا ااورسع‬:‫ومصا ا ا ا اافا عمل‬
complete the works as totally accepted by the ‫ ع ملقجع و ع نع‬:‫مل يبول عت ا اجعإل عص ا ا ا ا ا اااح عمل‬
Employer. This should be in conformity with
‫عملقتع‬ :‫تطابقعمل ومصا ا ا ا ا اافا عملفدة ع قط با عمل‬
the technical specifications and requirements
of the offer therefor the Project is created. All ‫ع ع ه ع منعيق ةزعبحب عملصدا ع‬ ‫نشئعمل ش‬
the items mentioned in the Project ‫لكا عملبدو عملومر سعتجع ب ا ا ا ا ا ااقد م عمل شا ا ا ا ا ا ا ع ع ع‬
documents, including the layouts, technical
specifications and contractual terms which ‫اق ع ملقجع‬:‫ططا ع ومصا ا اافا عتدة ع ا ا ا ا طعت‬
are considered as an integral part of the
Contract shall be executed based on good ‫قب عهااقمعمل يا ا ع‬:‫ع ت‬. ‫يا‬:‫قب ع زءعالعيقوزع عمل‬:‫ت‬
industry standards. This introduction shall be
an integral part of the Contract terms for . ‫ي علقدفةقعمل ش‬:‫زءع عا طعمل‬
Project execution purposes.

2- Project Description and Scope of Works :‫ وصف للمشروع ونطاق األعمال‬-2

The Project consists of a part of the a ‫يقكونعمل شا ا ا ا ا ا ع ع زءع عحجعن ا ا ا ا ااعدجع حقوتع‬
residential district containing the following
facilities and works: ‫عمل دشئا ع مأل العملقالة ع هج‬
(2/1) (246) Residential units which are villas ‫)ع ح ا سعن ا ا ا ا ا ااع عتة ع عون ا ع ع‬246(‫)ع ا ع‬1/2(
consisting of two floors and upstairs annex.
.‫ري ع حقع وت‬
(2/2) A Wall for each residential unit (frontal ‫)عن ااورعلك ع ح سعن ااعدة ع(ن ااورع ا جع دة ع‬2/2(
wall and two or three walls shared with the
neighboring residential unit. This includes the ‫ع ن ا ا ا ا اومرع شا ا ا ا ااق ك ع عملوح م عملبا ا ا ا ااعدة ع‬ ‫ع‬
execution of a wall for the side adjacent to the ‫مل وا رسع يشا عكقلكعتدفةقعنااورعل وان عمل صااقع‬
residential unit).
‫ ع‬.) ‫ل وح سعملبعدة‬
(2/3) All the works of the general site and ‫ااامع مل متقعمل ع ا ع‬:‫ااالعمل وق عمل‬ ‫)ع ة ع‬3/2(
utilities complementary to each villa include
the supply and installation of upper water ‫عتوري ا ع ت كة ا عخزمنع اااءع‬ ‫لك ا عتة ع تشا ا ا ا ا ا ا ا ع‬
tank and execution of lower fiber tank ‫وتع تدفةقعخزمنعن ا ااف جعتايب ع عاا ا ا ك ع ةانقة ع‬
produced by Amiantit Company of a 3
‫ع عمل نا ااان عمل ب ا ا ح ع كقلكعبةارسع‬ ‫م‬24‫ ع‬:‫نا اا‬
capacity of (24) m3 or made of reinforced
concrete and a septic tank of a capacity of ‫ااجع‬ ‫ ع‬:‫علك ع ح سعنااعدة ع يش ا عمل‬3‫م‬27‫ ع‬:‫بباا‬
(27) m3 per residential unit. This also ‫ملب طع مل ش ا ا ااا ا عن ا ا ااة م ةكعحولعملوح سعملب ا ا ااعدة ع‬
includes the ceramic slabs and tiles
surrounding the residential unit, installed ‫ يو ع‬. ‫مخ عمنا ا ااورع حب ا ا ا عمل ومصا ا اافا عمل تي‬
inside the walls as per the attached ‫ ع‬. ‫تدفةقعهقمعمأل الع عتياجعل ومصفا ع مل ططا‬
specifications. These works shall be
executed in accordance with the
specifications and layouts.
3- The works should be executed in ‫ يجببببف ذنفيبببب األعمببببال واقببببا للمواصبببببببببفببببات‬-3
accordance with the specifications and
details stated in the Report of Soil ‫وبالتفاصببببببيل الواردة تقرصر ااوصببببببات التربة ل ا‬
Investigations of such Site, attached layouts ‫الموقع والمخططبببببات المراقبببببة وببببببالمتطل بببببات‬
and as per the following requirements and
specifications at least: :‫والمواصفات التالية على األقل‬

(3/1) Site preparation: The Contractor should ‫)عتوهةزعمل وق ع و ا ا ع عمل يا ااا لعإ ا ا م ع‬1/3(
fully prepare and equip the Site to properly
execute the works. ‫توهةزعمل وق عبع ااا ا ا ع ا ا ت ااهعل قدفة ااق عملص ا ا ا ا ا ااحة ع‬
‫ ع‬.‫لأل ال‬
(3/2) Site Cleaning: The Contractor should ‫)عنظااات ا عمل وق ع و ا ع عمل يااا لعتدظة ع‬2/3(
continuously clean the Site throughout the
Contract term and shall avoid any ‫ي ع تفا تعت مكمع‬:‫مل وق عبصورسع بق سعخ لع سعمل‬
accumulation and piling of the execution ‫ع ع‬. ‫بيا اع وم عملقدفةقع مل ش ع غة هاع تك نهاعبال وق‬
materials debris, wood and otherwise
(3/3) Soil investigation and foundation level: ‫ع‬ ‫ع‬ ‫ )عتحصعملق ب ع دب ا ا ا ا ا ااوىعملق ن ا ا ا ا ا ااة‬3/3(
The Contractor should prepare a Report of Soil
Investigation of the Site through a specialized ‫مل يااا لع نع يومعبااإ ا م عتي ي عتحصعملق ب ا عل وق ع‬
company to determine the actual soil bearing ‫عخ لعا ا ا ا ا ك ع ق ص ا ا ا اص ا ا ا ا علقح ي ع ه عتح ع‬
capacity of the Site using not less than two or
three borings per block and according to the ‫ع ب ا ا ا ا ا ااقانعمل ع‬ ‫ جعل وق عب اعالع ي ع‬:‫ملق ب عملف‬
requirements of Saudi Building Code. The ‫ع ب ا ا ا ااا عتجعملب ووعملومح ع حبا ا ا ا ا ع قط با ع‬
drilling should be done to the level appropriate
to the construction according to the Report of ‫و تع يو ع نعيقمعملحف عإل عمل دب ا ااوىع‬:‫ملكو عملب ا اا‬
Soil Inspections so that the depth of borings ‫ملصا ا ا ااال عل ق نا ا ا ااة ع تياجعلقي ي عتحصعملق ب عبحة ع‬
shall be (10) meters based on soil nature. This
includes searching for and removing site ‫معبحب ا ا ا ا ا ا عنو عملق ب ع‬10‫عونع العملوبا ا ا ا ا ااا ع‬
obstacles, if any, transferring the wastes to the ‫وم قعبال وق ع ا محقهاعإنع‬:‫عمل‬ ‫يش ا عذلكعملبح ع‬
locations allocated thereto outside the Site and
continuously keeping the Site clean during the ‫فا عإل عمأل اك عمل صا اصا ا علهاع‬ ‫ع ني عمل‬
execution of the Project. ‫خارجعمل وق ع حفظعمل وق عنظةفاجعبص ا ا ا ااورسع ب ا ا ا ااق سع‬
‫ع‬
‫ع‬. ‫خ لعتدفةقعمل ش‬

(3/4) Approval of filling materials: Filling ‫)عم ق ا ع وم عمل م ع و ع نع عونعمل معب وم ع‬4/3(
should be made using high-quality materials
approved by the Supervising Engineer before ‫عقب عب ءع‬ ‫ة سعيقمعم ق ا هاع عمل هد سعمل ش ا ا ا ا ا ا‬
commencing the execution. The filling shall be ‫ع‬ ‫عطبيا عالعتزي ع‬ ‫ملقدفةقع بحة ع عونعمل مع‬
on layers of not more than (30) cm. The
compaction shall be made according to the ‫عنا ا اامع يقمعمل وعطبياجعل اع ر عبقي ي عتحوصا ا ااا ع‬30
Report of Soil Investigation and instructions of ‫ع اا ا ا ا طع‬ ‫ ة ا عمل هد سعمل شا ا ا ا‬:‫ملق ب ع طبياجعلق‬
the Supervisory Engineer and standards terms.
It shall be noted that the level of the ground ‫عهقمع تو رعمإاا ا ااارسعإل ع نع دبا ا ااوىع‬ ‫مل ومصا ا اافا‬
floor finishing should not be less than such ‫عمل دانة ع‬ ‫تشطة عمل رعمألرضجع و ع الع ي ع‬
levels specified in the layouts. This item
includes the settlement works of the Site ‫الع‬ ‫مل وض ا ا ااح عتجعمل ططا عك اع شا ا ا ا عملبد ع‬
surrounding the residential unit and places ‫تبااوي عمل وق عحولعملوح سعملبااعدة ع مخ عمالناومر ع‬
inside the walls. The drilling remains are
allowed to be used if it is suitable for filling ‫يبا ا عبان ااق ممعناترعملحف عإذمعكانعص ااالحاجعل مع‬
after obtaining the approval of the ‫ ع‬. :‫ع ومتي عصاح عمل‬ ‫ عملحصولع‬:‫ذوعب‬
Employer.
4- Fulfillment of Saudi Specifications :‫ استيفاء متطل ات المواصفات السعودية‬-4
Requirements

All the works of the Project, including the ‫و ع نعتكونع ة عمأل العل شا ا ا ا ا ا ا عا ا ا ا ا ا ااا ع‬
reinforced concrete works necessary for
constructing the concrete structure of the ‫ عملهةع ع‬:‫عل‬ ‫العمل نا ا ا ا ا ااان عمل ب ا ا ا ا ا ا ح عمل‬
building, sanitary and electrical works, ‫مل ن ا ا ا ا ااانجعل بد ع مأل العملص ا ا ا ا ااحة ع ملكه با ة ع‬
buildings and finishing, etc., should meet the
Saudi standards and should be executed ‫عإلخ ع بقوتة عل ومصفا ع‬....‫مل بانجع ملقشطةبا ع‬
according to the following standards, data, ‫و ع طبياجعل يانا ا ا ااا ع ملبةانا ع مل ططا ع‬:‫ملبا ا ا اا‬
layouts, terms and requirements:
‫ملش طع بال قط با عملقالة ع‬

(4/1) Concrete, buildings and painting: ‫ع‬ ‫)عمل نان ع مل بانجع مل هانا‬1/4(

(4/1/1) The concrete below the bases and ‫)عمل نان ع نف عمليوم ع مل ة م ع(خ نان ع‬1/1/4(
beams (blinding concrete) shall be made of
Portland cement resistant to sulfate of 10-cm ‫ملدظات )عتكونع عمالنا ا ا ا ا ا ا د عملبورت ن تعمل يا مع‬
thickness and cement level shall not be less ‫ةارعمالنا ا ا د عالع ي ع‬: ‫ن ا اامع‬10‫ل كب يقا عببا ا ا كع‬
than 250 kg/m3 such a way that gives a load
capacity not less than 200 kg/m3 (28) days ‫طجعقوسعتح عإ ها م ع‬:‫عبحة عت‬3‫م‬/‫كوم‬250‫ع‬
after pouring the standard cube. ‫عيومع ع‬28‫ ع‬:‫عب‬3‫نم‬/‫كوم‬200‫ع‬ ‫مل غطعالعتي ع‬
‫ ع‬.‫ عمليةانج‬:‫ملص عل ع‬

(4/1/2) All concretes adjacent to the soil and/or ‫با ا ا عل ق ب ع‬ ‫)عتكونع ة عمل ن ا ااانا عمل‬2/1/4(
water, including without limited to the bases,
column necks, beams, concrete floorings, ‫عن ا ا ا ا ا اابةا عمل هاالعالع‬ ‫ عمل ااءع ملقجعتشا ا ا ا ا ا ا ا ع‬/
ground water tanks and inspection rooms shall ‫سع مل ة م ع مألرضةا ع‬ ‫ملحص عمليوم ع رقاىعمأل‬
be made of Portland cement resistant to
sulfate, Type (5) with a cement standard not be ‫عملقفقة ع‬ ‫مل نا ااانة ع خزمنا عمل ةامعمألرضا ااة ع غ‬
less than 350 kg/m3 such a away that gives a ‫عمالن ا ا د عملبورت ن تعمل يا معل كب يقا ع–عملدو ع‬
load capacity not less than 300 kg/m3 (28)
days after pouring the standard cube. ‫ع‬3‫م‬/‫كوم‬350‫ع‬ ‫ةارعمن د عالع ي ع‬: ‫ع–عب‬ ‫مل ا‬
‫طجعقوسعتح عإ ها م عمل ا ا ااغطعالعتي ع‬:‫بحة عت‬
‫ ع‬:‫يومع عملصا عل ع‬28‫ ع‬:‫عب‬3‫نام‬/‫كوم‬300‫ع‬
‫ ع‬.‫مليةانج‬

(4/1/3) The concrete required for the reaming ‫ع‬ ‫)عتكونعمل نا ااان علباقجع داص ا ا عمل ش ا ا‬3/1/4(
elements of the Project shall be made of
ordinary Portland cement. The cement ‫ةارعمن ا د عالع‬: ‫ا تعب‬:‫عمالن ا د عملبورت ن تعمل‬
standard shall not be less than 350 kg/m3 such ‫طجعقوسعتح ا ا ع‬:‫ ع بحة ا ا عت‬3‫م‬/‫كوم‬350‫ع‬ ‫ياا ع‬
a way that gives a load capacity not less than
300 kg/m3 (28) days after pouring the standard ‫ ع‬:‫عب‬3‫نا اام‬/‫كوم‬300‫ع‬ ‫إ ها م عمل ا ااغطعالعتي ع‬
cube. ‫ ع‬.‫ عمليةانج‬:‫عيومع عملص عل ع‬28

(4/1/4) All concretes adjacent to the soil ‫)ع ة عمل ن ا ااانا عمل با ا ا عل ق ب ع و ع‬4/1/4(
should be insulated by double-face painting;
using thick bituminous cold painted. ‫زلهاعب هانهاعبو هة ع ع هانعملبةقو ة عملب ا ا ا ا ةكع‬
‫ ع‬. ‫عملبار‬
(4/1/5) Floorings concrete (Slab on grade) ‫)ع‬Slab On Grade(‫)عخ نان عمألرضةا ع‬5/1/4(
shall be of a thickness of (10) cm and
reinforcement shall not be less than 5 of 8 mm ‫ع‬ ‫ناامع تب ا ة عالع ي ع‬10‫ع‬ ‫تكونعبب ا كعالع ي ع‬
diameter/ linear meter along both directions ‫ عتااج عمالت او ا ا اااه اة ا ع ب اد اف ا ع‬.‫ط‬.‫ عم‬/‫ ا اام‬8‫ عق اط ا ع‬5
and shall be made according to the same
standards of the above-mentioned concrete. A ‫ع‬ ‫عت‬ ‫م ع يم‬ ‫ومصا ا ا ا اافا عمل نا ا ا ا ااان عملومر سع‬
moisture insulation coating of a thickness not ‫ مع‬0.25‫ع‬ ‫ااا لعل طوبا عذ عنا ا ا ا ا ا ا اااكا عالعتيا ع‬
less than 0.25 mm shall be fixed under the
concrete and necessary joints shall be made ‫عبهاعطبياجعلشا ا طع‬ ‫عملفومصا ا عمل‬ ‫ن ااف هاع ع‬
according to the standard terms and approval ‫ع‬. ‫مل ومصفا ع م ق ا عمل هد سعمل ش‬
of the Supervisory Engineer.
(4/1/6) The Contactor should prepare the ‫عمل يا ااا ل عإ ا ا م عتص ا ا ا ا ا ا ا ااا ةمع‬ ‫ ) ع و ا ا ع‬6/1/4(
designs of concrete mixtures and mortar and
construction material standards, including the ‫مل طا عمل نانة ع مل ون ع ومصفا ع وم عمإنشاءع‬
steel for concrete reinforcement and submit ‫ عم ع‬:‫ب اعتةهاعح ي عملقبا ا ا ة ع تي هاعلص ا اااح عمل‬
them to the Employer or its representative for
approval before the execution of the works ‫ع ه ااهعال ق ااا هاااعقبة ا عتدفةااقعمأل ااالعمل دوط ا ع‬
delegated thereto. ‫ ع‬.‫لها‬

(4/1/7) The external walls shall be constructed ‫)ع و ع نع عونعبداءعملو رمنعمل ار ة ع ع‬7/1/4(
of thermal insulating blocks - cement blocks
having a middle layer of thermal insulation of ‫ز لعح مرياجع–عملب ووعمإن ا ا دقجعمل حقوتع‬: ‫ملب ووعمل‬
20) cm size of the best qualities × 40 ×(20 ‫ااا لعملح مرتع–ب ياااسع‬:‫عطبي ا ع ن ا ا ا ا ا ااط ع عمل‬
available in the market and according to the
approval of the Engineer supervising the ‫ع ت ا ا ا ا ا ا ا ا عملدو ةااا ع‬ ‫ )عن ا ا ا ا ا اامع‬20×‫ ع‬40×‫ ع‬20(
execution. ‫ع‬ ‫مل و و سعباألنوملع طبياجعال ق ا عمل هد سعمل ش‬
‫ ع‬.‫عملقدفةق‬

(4/1/8) The internal walls, wall and roof ‫)ع وا ا ع نع عون عبد اااءعملوا ا رمنعملا ا مخ ةا ا ع‬8/1/4(
surface should be made of cement blocks of
15) cm size. The Supervisory × 40 ×(20 ‫ملب ااورع ر سعملب ااط ع عملب ووعمإنا ا دقجعب ياسع‬
Engineer shall approve the quality of the same ‫ع نعيقمعم ق ا عملدو ة ع‬ ‫)عن ا ا اامع‬15×‫ع‬40×‫ع‬20(
before the execution of the works.
‫ ع‬.‫عمل هد سعمل ش عقب عب ءعملقدفةق‬

(4/1/9) The whole Building should be ‫)ع و ع نعتكونعلةان علكا عمل بد ع مخ ة جاع‬9/1/4(
internally, externally, lining and facing
plastered. The plastering should be done ‫خار ةاجعبطان ع ظهارس ع يو ع نعتكونعمل ةان ا ا ا ا ا ا ا ع‬
according to the best Saudi standards by using ‫و ع ع مع‬:‫طبياجعألت ا عا ا طعمل ومصاافا عملباا‬
the lime or gypsum in plastering mortar.
Galvanized metal gratings should be used for ‫من ا ا ا ا ااق ممعملوة ع عملوب عتجع ون عمل ةانا ا ا ا ا ا عهقمع‬
joining the concrete structure with the block ‫ نجعمل و ف ع د ع داطقع‬: ‫يو عمنق ممعملشبكعمل‬
buildings. The galvanized reinforcing angles
should be used with galvanized gratings of the ‫ملوصا ا ا ا ا عبة عملهةع عمل ن ا ا ا ااانجع بانجعملب ووع ع‬
edges and interior corners.
‫منا ا ااق ممع م اعملقيوي عمل و فد ع عملشا ا اابكعمل و ف ع‬
‫ع ع‬. ‫ل حوم ع مألركانعمل مخ ة‬

(4/1/10) The interior plastering should be ‫ع‬ ‫)ع و عصاادف سعمل ةان ا عمل مخ ة ع ة مجع‬10/1/4(
properly sanded, then its surface should be
processed by a basic painting, then double- ‫وونع‬: ‫الو عنطحهاعب هانع نانجع مع هة ع‬: ‫مع‬
face paste then the same shall be properly ‫طجع با ا ا ا ااجعنا اجع معيقمع‬:‫معتص ا ا ا اادف ع ة مجعحق عت‬
sanded to be smooth. After that, the same shall
be painted by double-face plastic painting of ‫هاانهااعبطبيقة ع عملا هااناا عب ن ا ا ا ا ا ااقةاكعباالدو ةا ع‬
an approved quality and shall be cleanable ‫ق سع ملياب عل قدظة عبال اءع ملصا ا ااابون ع يو ع‬: ‫مل‬
with water and soap. All materials and their
colors should be approved by the Employer or ‫ ع ع‬:‫م ق ا ع ة عمل وم ع لومنهاع عصا ا ا ا ا اااح عمل‬
its representative before the beginning of the ‫ ع‬.‫ع ه هعقب عب ءعملقدفةق‬
execution.
(4/1/11) The exterior plastering should be ‫)عص ا اادف سعمل ةانا ا ا عمل ار ة ع هانهاعبو هع‬11/1/4(
properly sanded and painted, then sprayed by
an American spray and double painted by an ‫معراهاعرا ع يعة ع هانهاع‬
‫عمألناسعمل دان ع ع‬
exterior plastic painting. The exterior ‫بطبيقة ع ع هااانعب ن ا ا ا ا ا ااقةااكعخااار ج ع يو ا ع نع‬
paintings should be of the best qualities
resistant to humidity and weather conditions. ‫تكون عمل ا هااانااا عمل ااار ة ا ع ع ت ا ا ا ا ا ا ا ا عملدو ةااا ع‬
All materials and their colors should be ‫وم ا عملووي ا ع يو ا عم ق ااا ع‬:‫مل يااا ا عل طوب ا ع مل‬
approved by the Employer or its representative
before the beginning of the execution. ‫ ا ع ع ع ه ااهع‬:‫مل وم ع لومنهاااع عص ا ا ا ا ا ا اااح ا عمل‬
‫ ع‬.‫عقب عب ءعملقدفةق‬ ‫مل ش‬

‫ع‬
(4/2) Floors and insulation :‫) األرضيات والعزل‬2/4(

×(4/2/1) Supplying the porcelain slabs of 40 ‫)عتوري ع ت كة ع ة ع رض ا ا ا ااةا عملص ا ا ا ااال ع‬1/2/4(
40 cm size and applying the same on all halls,
rooms, bathrooms and kitchens floors; such ‫نمع ملح ا ا ع‬40×40‫ع عب طعملبورن نع‬ ‫ملغ‬
ceramic should be of a high quality that is ‫مل طابخع عملب ا ا ا ااة م ةكع عمألنوم عملوة سعمل قوت سع‬
available in the market and as per the approval
of the Employer or its representative. The ‫ ع ع ع‬:‫باألنا اوملع حبا ا عم ق ا ع عص اااح عمل‬
work includes the installation of skirting to all ‫عكااا ا ع‬ ‫ ا عت كة ا ع مر ع‬:‫ه ااه ع يشا ا ا ا ا ا ا ا عمل‬
the walls of the rooms and halls.
‫ ع‬. ‫ع ملصاال‬ ‫حةطعملو رمنعل غ‬

(4/2/2) Supplying and installing the stairs of ‫)عتوريا ا ع ت كةا ا ع رجعمل ا ا مخا ا عمل ااار ةا ا ع‬2/2/4(
the exterior gates of the villa and staircase of
Bianco marble of the best qualities available in ‫ل فة ع رجعملبا ا ا ا ا ا ا مع عمل خااامع منة ا عبةااانكوع ع‬
the market. ‫ ع‬.‫م و عمألنوم عحب عملبول‬

(4/2/3) Supplying and installing the ceramic to ‫)عتوري ع ت كة عن ا ا ا ا ا ااة م ةكعل و رمنعبعا ع‬3/2/4(
the full height of the walls of bathrooms,
laundries and kitchens. The quality, color and ‫مالرتفا عتجع ة ع مر عمل ةامع مل غان ع مل طابخ ع‬
dimensions of such ceramic shall be approved ‫ا ع عصا ا ا ا ا اااح ع‬:‫يو عم ق ا عملدو ة ع مل ونع مألب‬
by the Employer or its representative.
‫ ع‬.‫ ع ع ع ه ه‬:‫مل‬

(4/2/4) The work shall include the execution of ‫ عتدفةقعمالرض ااةا ع مل ش ااا ا ع‬:‫)ع شا ا عمل‬4/2/4(
ceramic floors and tiles surrounding the
Building of the Residential Unit. ‫ ع‬.‫حولع بد عملوح سعملبعدة ع عملبة م ةك‬

(4/2/5) Supplying and installing of water ‫ وتع‬:‫)عتوري ع ت كة ع ا لع ا جعل با ااط عمل‬5/2/4(


insulation for the upper surface of one layer
made of the best bitumen strengthened rolls of ‫ع ت ا ا ا ا ا ع نوم عر ال عملبةقو ة ع‬ ‫عطبيهع مح سع‬
a quality that is not less than the one ‫ ت ا ا ع‬: ‫عملدو ة ا ا عمل‬ ‫عنو ة ا ا عالعتي ا ا ع‬ ‫مل يواع‬
commercially known and according the
approval of the Employer or its ‫ ع‬.‫ ع ع ع ه ه‬:‫توارياع طبياعال ق ا عصاح عمل‬
representative.
(4/2/6) Supplying and installing a thermal ‫)عتوري ع ت كة ع ا لعح مرتع عملبولبق ي ع‬6/2/4(
insulation made of porcelain of 5 cm size and
a pressure of 35 kg/m2. ‫ ع‬.2‫نم‬/‫عكوم‬35‫عنمعضغطع‬5

(4/3) Windows and doors :‫) النواا وأل واب‬3/4(


(4/3/1) According to the sizes, data and ‫)ع تياعل يانا ا ا ا ا ا ااا ع ملبةانا عبال ططا ع‬1/3/4(
layouts, double glass should be supplied and
installed to aluminum windows for the rooms. ‫و ا ا عتوري ا ا ع ت كة ا ا عملدومتا ااق عمألل دةوم عبا ااالز ا اااجع‬
The full thickness of the glass shall be (18) mm ‫ع نعتكون عملبا ا ا ا ا ا ا ا اااك ا ا عملك ة ا ا ع‬ ‫ع‬ ‫مل ز جعل غ‬
and thickness of glass for each panel shall be
(6) mm. the Contractor should ask the ‫ معلك ا علو ع‬6‫ مع نا ا ا ا ا ا ا اااك ا عملز اااجع‬18‫ل ز اااجع‬
Engineer to approve the aluminum sample ‫عمل يااا لعم ق ااا ع ةد ا عمألل دةومع عمل هد ا سع‬
before the execution, provided that the same
shall be of the best aluminum sections ‫قبا عبا ءعتدفةااقهاااع عبشا ا ا ا ا ا ا طع نعتكون ع ع ت ا ا ا ا ا ا ا ع‬
available in the market, and thickness per ‫قطا ا عمألل دةومعمل قوت سعباألنا اوملع نا ا كعمليطا ع‬
section shall be not be less than (1.5) mm for
the frame and (1.3) cm for the leaf. The ‫ع‬1.3‫ن ا ا ا ا ا اام ع‬10‫ع‬ :‫ معل ح قع ب‬1.5‫ع‬ ‫الع ي ع‬
windows shall be provided by additional leaf ‫ف عإضاتة ع ك ع ةهاع‬ ‫ف ع تز عملشبابةكعب‬ ‫ل‬
on which an insect resistant of stainless steel
shall be fixed and should be of the best quality ‫ااان عملحشا ا ا ا ا ا ا م ع ع ت ا ا ا ا ا ا ا ا عملدو ةااا عمل قوت سع‬
available in the market. The handles and locks ‫باألنا ا اوملع ملغة عقاب عل صا ا ا ع عك اع و ع نعتكونع‬
of all the doors and windows should be of the
best quality available in the market and that ‫مل يااابضع مألقفااالعلو ة عمألبومىع ملشا ا ا ا ا ا ابااابةااكع ع‬
should be subject to the approval of the ‫ت ا ا ا ا ا عمألنوم عمل و و سعباألنا ا ا ا اوملع طبياعال ق ا ع‬
Employer or its representative. The work shall
also include the installation of protection ‫ عت كة عااابابةكع‬:‫مل هد سع ع ع ه هع يش ا عمل‬
windows for the ground floor only as per the ‫ح ا عل رعمالرضجعتيطعبحب عماق مطا عمل تا ع‬
requirements of the Civil Defense.
‫ ع‬.‫مل نج‬
(4/3/2) supplying and installing the wooden ‫ نمعكب ع‬5‫)عمألبومىعمل شبة عبب كعمل رت ع‬2/3/4(
doors of a thickness of (5) cm per leaf of
Syrian or foreign pressing. The work shall also ‫ عتوري ع‬:‫ا ا ااا جع ع ع تع ه ع دبة ع يشا ا ا عمل‬
include the supply and installation of handles, ‫عت كة عمل يابضع مألقفالع مإكب اب اوم مر ع عنو ة ع‬
locks and accessories of a high quality as per
the approval of the Employer or its ‫ ع ع ع ه هع‬:‫ة سع حب ا ا ا ا عم ق ا عصا ا ا اااح عمل‬
representative. All accessories required for ‫ ع ة عمإكب ا ا ا اب ا ا ا اوم مر ع‬:‫ي خ عض ا ا ا ا عنطالعمل‬
installing the doors shall be included within
the scope of the work. ‫ ع‬.‫علقهبة عمألبومى‬ ‫مل‬
(4/5) Mechanical and sanitary work ‫)ع ومصفا عمأل العمل ةعانةعة ع ملصحة ع‬5/4(‫ع‬
specifications:
(4/5/1) All sanitary works shall be executed ‫ )عتدفةقع ة عمأل العملص ا ا ا ا ا ااحة عحبا ا ا ا ا ا ا ع‬1/5/4(
according to the Saudi Specifications. The
sequence of sanitary installation works ‫و ع يو عتدبةا ا ا ااقعتب ب ا ا ا ا عتدفةقع‬:‫مل ومصفا عملب‬
execution should be coordinated with the ‫العملق كةبا عملصحة ع ا ا ا ا ا ا ا عتب ب عتدفةقع ة ع‬
sequence of the execution of all other works
(constructional, architectural and electrical ‫ع‬.... ‫ اري ع ااعكه با ة‬: ‫مأل ا ا العمألخا ا اع(إنشا ة ع ااع‬
works, etc.) so as that all sanitary works shall ‫ملخ)عبحة عيقمعت كة ع ة عمأل العملصا ا ا ااحة عتجع‬
be installed in the proper places and at the
appropriate timing for the progress of works ‫مل عانعملص ا ا ا ا ا ااحة ع مل دانا ا ا ا ا ا ا ع كقلكعتجعملقوقة ع‬
on site. ‫ ع‬. ‫مل دان علقي معمأل العتجعمل وق‬

(4/5/2) The Contract should prepare shop ‫عمل ي ااا لع ا ا م عرن ا ا ا ا ا ااو ااا ع‬ ‫ )ع وا ا ع‬2/5/4(
drawings related to the fitting and installation
details required to be used in the execution of ‫)عمل اصا ا عبقفاصا ااة ع‬Shop Drawings(‫ملقش ااغة ع‬
work items according to the contracting ‫ الهاعتجعتدفةقع‬:‫ملقوهة مز ع ملق كةبا عمل ط وىعمن ا ا ااق‬
documents, including the contractual
drawings. Such specifications shall be ‫اق ع‬:‫بدو عمأل العحبا ا ا ا ع اع اءعتجع ب ا ا ااقد م عملق‬
according to the proper scale of the Engineer ‫ع هقمعمل ومص ا ا ا ا ا اافا ع‬ ‫اق‬:‫ب اعتةهاعمل ن ا ا ا ا ا ااو ا عملق‬
supervising the execution and shall be subject
to its approval before the supply and ‫ع‬ ‫ع‬ ‫ب يةاسعرن ا اامع دانا ا ا عإل عمل هد سعمل شا ا ا‬
installation and in conformity with the ‫ق ا عقب عملقوري ع ملق كة ع ب اعيقفقع ع‬ ‫ملقدفةقعل‬
execution time schedule. The drawings shall
include the following elements without ‫ع تش ا ا عرنا ااو ا عملقشا ااغة ع‬.‫ملب نا رعملز دجعل قدفةق‬
limitation: ‫عنبة عمل هالع لة عملحص ع اعي ج ع‬
a- Details of installing sanitary appliances and ‫ تفاص ااة عت كة عمأل هزسعملص ااحة ع ا ص ااالهاع‬-
linking them to feeding and sanitary pipes and
otherwise. .‫ب ومنة عملقغق ع ملص ع خ ته‬

b- Details of installing pipes and methods of ‫ تفاصا ا ا ااة عت كة عمل ومنا ا ا ااة ع ط لعتهبةقهاع‬-‫ى‬
installing and hanging them.
.‫ ةيها‬:‫ت‬

c- Details of installing ground and upper water ‫ تفاص ا ااة عت كةبا عخزمنا عمل ةامعمألرض ا ااجع‬-
tanks.
.‫ وت‬:‫مل‬
d- Details of installing the water pump. .‫عمل ةام‬ ‫ تفاصة عت كة ع‬-‫ث‬

e- Details of installing the electrical control ‫ ا م عملقحعمع‬: ‫ تفاااصا ا ا ا ا ا اة ا عت كة ا ع هزسع‬-‫ج‬


appliances and equipment of the sanitary
works. . ‫ملكه با ة عمل اص عباأل العملصحة‬

f- Details of installing the valves and electrical ‫ تفاصا ااة عت كة عمل حاب ع ن ا ا انا عمل ةامع‬-
water heaters.
. ‫ملكه با ة‬

g- Details of installing the fittings included in ‫ تفاصة عت كة ع ة ع اع اءعتجع بقد م ع‬-‫خ‬


the contracting documents, including the
contractual drawings and such specifications. ‫ اااقا ا ا ا ع ه ااقمع‬:‫ اااقا ا عب اااعتةه اااعمل نا ا ا ا ا ا ا عو ااا عملق‬:‫ملق‬
. ‫مل ومصفا‬

h- Details of executing and installing the septic ‫ ع‬.‫ تفاصة عتدفةقع ت كة عملبةارس‬-
tank.
(4/5/3) The Contract should observe that no ‫عمل ي ااا لع م اااسع العيدقرع ع‬ ‫)ع وا ا ع‬3/5/4(
noise shall arise from the operation of the
sanitary installations. ‫ااالعملق كةبااا عملص ا ا ا ا ا ااحة ا ع تع‬ ‫تش ا ا ا ا ا ااغة ا ع ة ع‬
.‫ضوضاء‬

(4/5/4) The Contractor should use highly ‫)ع و ع عمل يا لعمنااق ممع الع تدةة ع‬4/5/4(
skilled labors and technicians in executing the
sanitary installation works. ‫ذ ت ع ه ا ااارس ع ا ااالةا ا ا عتج عتدفة ا ااق ع ا ااال عملق كةب ا ااا ع‬
‫ ع‬. ‫ملصحة‬

(4/5/5) The materials used in the execution of ‫عتجع‬ ‫)ع و عني ع ت زي عمل وم عمل ب ا ا ا ااق‬5/5/4(
the sanitary installation works should be
transferred and stored in a way preventing ‫العملق كةبا عملصا ا ا ا ااحة عبط لعتحفظهاع ع‬ ‫تدفةقع‬
them from pollutions, humidity, damage, ‫اجع تحاتظع‬:‫ع ملكب ا ا ا ا ا ع مالنب‬ ‫ملق وثع مل طوب ع ملق‬
breakage and indentation and maintaining the
exterior appearance thereof together with their ‫ع‬ ‫عملش ا ا ا ا ا ااع ع مل ظه عمل ار جعلهاع تحاتظع‬
mechanical and physical characteristics. The ‫خومصا ا ا ا ا ا اهاااعمل ةعااانةعةا ع ملفةزيااا ةا عك اااع وا عني ا ع‬
materials used in the execution of sanitary
installation works should be transferred and ‫العملق كةبا ع‬ ‫عتجعتدفةقع‬ ‫ت زي عمل وم عمل باق‬
stored according to the instructions of its ‫ ع‬.‫ علها‬:‫ ة ا عملوها عملصان‬:‫ملصحة عحب عت‬
manufacturers.
(4/5/6) The Contractor should take all the ‫)ع عمل ي ااا لعمت اااذعك اااتا ا عمالحقة اااط ااا ع‬6/5/4(
precautions required for protecting the works
and appliances from any damages or blockage ‫لح ا عمأل الع مأل هزسع ع تع ض ا ا ا مرع عت فةا ع‬
throughout the execution term. Besides, the ‫عمنبا ا ا ا ا ا م عطوملعتق سعملقدفةق ع ةهعتبا ا ا ا ا ا ةمع ة ع‬
Contractor should deliver all works and
appliances in a safe and clean condition. ‫ ع‬. ‫مأل الع مأل هزسعتجعحال عن ة ع نظةف‬
(4/5/7) All sanitary installation works should ‫العملق كةبا ع‬ ‫اااا ع ة ع‬ ‫)ع و ع نعت‬7/5/4(
be subject to the necessary experiments and
operation and performance testing indicating ‫ملص ا ا ا ا ا ااحة ا عل قوااارىع مخقبااا مر عملقش ا ا ا ا ا ااغة ا ع مأل مءع‬
their validity, efficiency and conformity with ‫عملقجعتبة عص ا ا ا ا ا حةقهاع كفاءتهاع‬ ‫عمل‬ ‫ملب ا ا ا ا ا‬
the Standards according to the general
technical specifications for designing and ‫ط ااابيقه اااعل اااع اااءعتجعه ااقمعمل ومصا ا ا ا ا ا اف ااا ع تيا ااجع‬
executing the buildings (Unified Arab ‫ا علقص ا ا ا ا ا ةمع تدفةقعمل بانجع‬:‫ل ومصا ا ا ا اافا عملفدة عمل‬
Standards).
‫ ع‬.)‫( ومصفا ع بة ع وح س‬

(4/5/8) Water feeding pipes shall be made of a ‫)عتكونع نابة عملقغق عل ةامع عنو عح مرتع‬8/5/4(
thermal green type by performing a pressure
test of 6-bar according to the professional ‫عبارعحب ا ا ا ا ع‬6‫خ ا ا ا ا ع ع عمخقبارعل ا ا ا ااغطع‬
principles. A warranty certificate of 15 years ‫عنااد علألنااط ع‬15‫مألصااولعمل هدة عبشااها سعض ا انع‬
shall be provided for the surfaces and
bathrooms. ‫ ع‬. ‫ملح ا ا‬

(4/5/9) The sanitary drainage pipes shall be of ‫)عتكون ع نااابة ا عملصا ا ا ا ا ا ا عملص ا ا ا ا ا ااحجع ع‬9/5/4(
Al-Rajhi, Al-Tayar, Al-Munif model or other
pipes having equivalent specifications ‫ااا له اااعتجع‬: ‫مل م حجع عملطةااارع عمل دة ع ع اااع‬
(According to the Saudi Standards) – Pressure ‫و )ع‬:‫مل ومصاافا ع(حبا عمل ومصاافا عمليةانااة عملباا‬
(40).
‫ ع‬.40‫ضغطع‬

(4/5/10) All sanitary work items shall include ‫)عتش ا ا ا ااق ع ة عبدو عمأل العملص ا ا ا ااحة ع‬10/5/4(
the supply, installation and construction,
including all accessories necessary for the ‫عملقوريا ا ع ملق كةا ا ع ملبد اااءعب اااعتجعذل ااكع ة ع‬
sanitary appliances and pipes, such as siphons, ‫علأل هزسعملص ااحة ع مل ومن ااة ع ه ع‬ ‫مل حيا عمل‬
basins, sinks, flexible convolutions for feeding
the sanitary appliances, valves, pipe ‫ع مل والجع مل ةا ع‬ ‫ن ا ا ا ا ااةفونا عمل غانا ا ا ا ا ا ع مألحوم‬
connection fittings, discharge box machines ‫مل نا علقغااق ا عمأل هزسعملص ا ا ا ا ا ااحةا ع مل حاااب ع قط ع‬
and the required works according to Project
layouts, standards and the general technical ‫ص ا عمل ومنااة ع اكةدا عصاادا يقعملط ع مأل الع‬
specifications. ‫عحب ا ا ا عمل ططا ع مل ومصا ا اافا عمل اص ا ا ا ع‬ ‫مل‬
‫ ع‬. ‫ا‬:‫ع مل ومصفا عملفدة عمل‬ ‫بال ش‬

(4/5/11) The Contractor should ask the ‫ةدا عمل اص ا ا ا ا ا ا ع‬:‫عمل يا لعم ق ا عمل‬ ‫)ع‬11/5/4(
Supervisory Engineer to approve the
samples relating to the sanitary works before ‫عقب عملقوري ع‬ ‫باأل العملصحة ع عمل هد سعمل ش‬
the supply and installation and follow the ‫عتجع‬ ‫ ة ااا عمل هد ا سعمل شا ا ا ا ا ا ا‬:‫ملق كة ا ع اتبااا عت‬
instructions of the Supervisory Engineer
‫ ع‬:‫عن ا ا ا ا ا اا‬ ‫تدفةااقعمأل ااالع مخقبااارهااا عك اااع ح ا ع‬
regarding the execution and testing of the
works. The Contractor should add the price ‫مل ومنا ا ا ااة عملهوم ا ع طبا عملقب ا ا ا ا ةكع مل نا ا ا ااانا ع‬
of the necessary ventilators, cleaning plugs ‫ عكف ا اااسع عتغطة عل ومن ااة ع عتهبة ع‬: ‫عل‬ ‫مل‬
and concretes, including the brush or
coverage of the pipes and installation of the ‫ ع‬.‫مأل هزسع مخ عملح ام‬
appliances inside the bathroom to the pipes
price.
(4/5/12) Sanitary appliances saving water and ‫)ع و عمنا ا ا ا ا ااق ممع هزسعصا ا ا ا ا ااحة عتكونع‬12/5/4(
supplied by a ceramic or similar company
should be used, and all means reducing the ‫ا ا ا ا ا ا ا ا سعل ةااامع عاا ا ا ا ا ا ا كا عخزتةا ع ع اااع ااا هاااع‬
consumption of water should be used ‫منا ا ا ااق ممعكات عملونا ا ا ااا عملقجعتي ع عمنا ا ا ااقه وع‬
according to the instructions issued in this
regard by the competent body. ‫ ة ااا عملص ا ا ا ا ا ا ااا رسعبهااقمع‬:‫مل ةااامع تقعملقو ةهااا ع ملق‬
‫ ع‬. ‫مل صوصع عملوه عمل قص‬

(4/5/13) The bathrooms and kitchens shall be ‫)عيقمعتز ي ا عملح ااا ااا ع مل طبخعباااأل هزسع‬13/5/4(
provided with the following sanitary
equipment according to the drawings and bills ‫ملصا ا ا ااحة عملقالة ع ذلكعحب ا ا ا ا عمل نا ا ا ااو ا ع م لع‬
of quantities: ‫ملك ةا ع‬
a- the clogged toilet: it shall be a glazed toilet ‫عإتا ناواج عملا از ار ع ا ع‬ ‫ ملا ا ح ا ا ااا‬-
equipped with all water and drainage
connections. This shall include all necessary ‫ع يش ع‬ ‫عمل ةامع ملص‬ ‫كا عتوصة‬
accessories. The color of the same shall be ‫ع يعونعمل ونع‬ ‫ عمالكببوم مر عمال‬:‫مل‬
white according to the distribution of toilet
colors. .‫مبةضعحب عتو ي عمأللومنعتجعملح ام‬
b- A white hand washbasin equipped with all ‫عغب ا ا ا ا ااة عمألي تع بةضع ع‬ ‫ حو‬-‫ى‬
water and drainage connections shall be
provided. This shall include all necessary ‫ع يش ع‬ ‫عمل ةامع ملص‬ ‫كا عتوصة‬
accessories. . ‫ عمالكببوم مر عمال‬:‫مل‬
c- A white bathtub equipped with all water and ‫ حو عمالنا ااقح امع(ملبانةو)ع بةضع‬-
drainage connections shall be provided. This
shall include all necessary accessories. ‫عكا عتوصا ا ا ااة عمل ةامععملص ا ا ا ا ع‬
. ‫ عمالكببوم مر عمل‬:‫يش عمل‬
d- Ground shower basin equipped with all ‫ حو ع عمرض ا ا ا ا ا ااجع عك ااا ا ا ع‬-‫ث‬
water connections, shower supplies for cold
and hot water and drainage connections shall ‫توص ا ا ا ا ا ااة عمل ةااامع ت ا ي ا م عمل ا )ع‬
be provided. ‫ل ةامعملبار سع ملبا ا ا ا ا اااخد ع توص ا ا ا ا ا اة ع‬
. ‫ملص‬
e- Electrical water heater: The work shall not ‫ ن ا ا انعمل ةامعملكه با ج عالع ش ا ا ع‬-‫ج‬
include the installation of water heaters. The
Contractor should arrange the place proper for ‫ عت كة عنا ا ا ا ا ا ا انا عمل ةامع يو ع‬:‫مل‬
the electrical heater and should execute the ‫عمل يا لعتهةئ عمل عانعمل دان ا ا ا ا ا ا ا ع‬
electrical, water feeding and water
connections, including sanitary parts, ‫ل وق عملب ا ا انعملكه با جع تدفةقع اعي زمع‬
according to the requirements and technical ‫ع‬ ‫عكه با ة ع ملقوص ا ا ااة‬ ‫عتوص ا ا ااة‬
specifications, whether there is a central heater
or multiple heaters in the residential unit. ‫عمل ةاامع دهاع‬ ‫تغاق عمل ةاامع توص ا ا ا ا ا ااة‬
‫مل عمليط عملص ا ااحة ع حبا ا ا ع قط با ع‬
‫مل ومص ا اافا عملفدة عنا ا اومءعكانعنا ا ا انع‬
‫ سعتجعملوح سع‬:‫كزتع عن ا ا ا ا انا ع ق‬
. ‫ملبعدة‬
f- Water supply pump for the residential unit: ‫ا ا ا ا ا ا ا ا ا عتز ي ا ا عمل ةا ااام عل وح ا ا سع‬ -
A pump of 2 m3/ hour and a 25-meter
manometer capacity head for vertical water ‫ع‬/‫ع‬3‫عم‬2‫ا ا ا ع‬ ‫ملب ا ااعدة ع و عتز ي ع‬
should be supplied to draw the water from the ‫ع ق ع و ع‬25‫ملبا ا ااا ع رت ع انو ق تع‬
ground tank to the upper tank. The pump and
its connections, including pipes and electrical ‫عمل زمنع‬ ‫ا ا اااء ع ذل ا ا ااك عل ت عمل ة ا ا ااام ع‬
feeding system, shall be installed as per the ‫ وتع نا ا ا ا ا ااةقمع‬:‫مألرضا ا ا ا ا ااجعإل عمل زمنعمل‬
layouts. The operation of the same shall be
automatically controlled using two buoys; one ‫ا ا ا ا ا ا ا ع توص ا ا ا ا ا ااة تهاع ع‬ ‫ت كة عمل‬
of them shall be installed to the ground tank, ‫مل ومنا ا ا ا ا ااة ع ملقغق عبالكه باءعحب ا ا ا ا ا ا ع‬
while the other shall be installed to the upper
tank to automatically operate with a 30-Amp ‫ع ن عيقم عملقحعم عتجع‬ ‫مل طط ا ا ااا ع‬
breaker without a panel and manual operation ‫تش ا ا ااغة هاع تو اتةعةاعبومن ا ا ااط ع وم قة ع‬
and shutdown board. The pump suction pipe
shall be of UPVC model, fifth category, and ‫إح مه اعتجعمل زمنعمألرضا ا ا ا ااجع مألخ اع‬
shall be installed as shown in the layouts. ‫ ا ا ع تو ا اااتةعة ا ااجع‬:‫ وتعلق‬:‫تجعمل زمنعمل‬
‫ ع بة عب ا ن علوح ا ع‬30‫ ا ع‬:‫بياااط عنا ا ا ا ا ا ا‬
‫ملقش ا ا ا ا ا ااغة عملة تع مإغ لع منعتكونع‬
‫ع‬.‫عبج‬.‫ع عملا ااعيو‬ ‫انورسعنح عمل‬
‫ع‬
‫عملفئ عمل ا ب ا ع تهب عحب ا ع‬.‫عنااج‬.‫تج‬
. ‫اعهوع وض عبال ططا‬
g- Suction fans for bathrooms and kitchens: ‫ م عملشا ا ا اافطعل ح ا ا ع مل طبخ ع‬-‫خ‬
This shall include the test and installation of
the suction fans to check its conformity with ‫ عمخقةارع ت كة ع م ع‬:‫يشا ا ا ا ا ا ا عمل‬
the Saudi Standards and that shall be suitable ‫و ع‬:‫ملشا ا اافطع طابقعل ومصا ا اافا عملبا ا اا‬
for the weather conditions of the region. The
24) ×suction fans shall have openings of (24 ‫عمل داخة عملب ا ا ا ا ااا سع‬ ‫ملقجعت معملظ‬
cm. The capacity of suction fan installed in the ‫تجعمل دطي ع تكونع م عملشا ا اافطعذم ع‬
kitchen shall be of 200 cubic feet/ second and
100 cubic feet/ second for the suction fan of ‫)عن ا ا ا ا ا اامع تكونع‬24×24(‫ا ع‬:‫تقحا عب ب‬
the kitchens. ‫ع‬200‫ح عملش ا اافطعتجعمل طبخع‬ ‫ ع‬:‫ن ا اا‬
‫ع‬100‫عمل قةيا ع ل ح اا ا ع‬/‫ا ع‬:‫ق مع ع‬
. ‫عمل قةي‬/‫ ع‬:‫ق مع ع‬
h- Upper water tank: It shall be covered and ‫سع‬ ‫ وت ع عملفايب‬:‫ خزمنعمل ةامعمل‬-
insulated and made of fiberglass for each
residential unit with a capacity of 3000 liters. ‫ ع‬:‫ز لعلك ع ح سعنااعدة عبباا‬: ‫غط ع‬
It shall be installed at the top of the staircase. ‫علق ع يوضا ا ا ا ا ا ا ع عبة عمل رجع‬3000
The tank shall be equipped with surplus pipes
‫يوهزعمل زمنعب ومن ااة عتا ضع خطوطع‬
and drainage lines having valves. The surplus ‫ص ا ا عذم عص ا ا ا ا عبحة عتص ا ا ع‬
pipe shall discharge the drainage in roof sink.
‫ع عب ااالو ا ا ع‬ ‫ااان ا ا ا ا ا ااورسعملف ااا ضع‬
‫ ع‬. ‫ملبط‬

(4/5/12) Separated air-conditions ‫)عتوصة عمل عةفا عمل دفص ع‬12/5/4(‫ع‬


connections:
Empty channel connections with a diameter of ‫ م)ع ع‬75(‫عبوصا ا ا ع‬3‫توص ا ااة عقداسعتارغ عبيط ع‬
3 inches (75 mm) from the air-conditioner
exterior unit to the interior unit shall be ‫ملوح سعمل ار ة عل عة عإل عملوح سعمل مخ ة ع كقلكع‬
installed. A water drainage pipe shall be ‫تدفةقع انا ا ا ا ااورسعلقص ا ا ا ا ا يدعمل ةامع توتة عمل ص ا ا ا ا ا رع‬
executed and electrical source for the unit shall
be provided. This shall not include the supply ‫ ع‬. ‫ملكه با جعل وح سع الع ش عتعوري عملدحاسع مل عةفا‬
of copper and air-conditioners.

‫ع‬
(4/6) Electrical work specifications: ‫)ع ومصفا عمأل العملكه با ة ع‬6/4(
(4/6/1) The cables shall be of Bahra, Elsewedy ‫)ع عكاب عبح سع عملبوي تع عملفدارع ع‬1/6/4(
or Al-Fanar model or their equivalents and
shall be according to the Saudi specifications ‫و ع‬:‫ا لهاع حبا ا عمل ومص اافا ع مل ياية عملب اا‬: ‫اع‬
and Standards as well as the specifications of ‫ ع‬.‫و عل كه باء‬:‫ومصفا عملش ك عملب‬
Saudi Electricity Company.
(4/6/2) The Contactor should take into ‫عمل يا لع نع خقعتجعمال قبارع‬ ‫)ع و ع‬2/6/4(
consideration that it should obtain the approval
of the Employer or its representatives ‫ ع ع‬:‫ع ومتي عصا ا ا اااح عمل‬ ‫نع ةهعملحصا ا ا ااولع‬
regarding all the materials to be used before ‫ع ة عمل وم عمل م عمنا ا ااق م هاع ذلكع‬ ‫ع ه هع‬
the supplying the same to the Site. As for the
materials to be visible after the installation ‫قب عتوري هاعل وق ع بالدبب عل وم عملقجعنو عتكونع‬
thereof such as the lighting units, sockets, ‫ا ا عت كةبه اااع ها ا ع حا ا م عمإن ااارسع مل ي اااب ع‬:‫ةا ا عب‬
switches, panels, etc. should be agreed by the
Employer or its representative. Consequently, ‫مل فاتة ع مل وحا ع خ تهاعتإنهعي زمع نعيومتقع ةهع‬
the Contractor should provide material ‫ع‬ ‫ا ا ااجع لقلكعتإنع‬ ‫ ع ع ع ه هع‬:‫ص ا اااح عمل‬
samples according to its time schedule.
‫مل ي ااا لعتيا ا مع ةد ااا عمل وم ع تقعملب ن ااا رعملز دجع‬
.‫مل اصعبه‬

(4/6/3) The capacities and dimensions of the ‫ا ع ة عمل وم عتكونعحبا ا ا ا ع‬:‫ا ع ب‬:‫)عن ا ا اا‬3/6/4(
materials shall be as mentioned in the
drawings and bills of quantities. . ‫مل قكورسعتجعمل نو ا ع م لعملك ةا‬

(4/6/4) The Contractor should provide all ‫عمل يا ااا لعتوتة عكا ااات ا ا عمل وم ع‬ ‫) ع و ا ا ع‬4/6/4(
materials, appliances, equipment, tools, labors
and electrical energy required for conducting ‫ ا ااالا ا ا ع ملط ا اااقا ا ا ع‬:‫ا ا ا م ع مأل م ع مل‬: ‫مأل هزس ع مل‬
the tests specified in the Standards ‫ا عإ مءعمالخقبااا مر عمل ح ا سعتجع‬ ‫ملكه بااا ة ا عمل‬
specifications applied to all works; either for
the tests that shall be conducted during the ‫ عب و بهاعبالدبب ع‬:‫مل ومصفا عمليةانة عملقجعيقمعمل‬
execution phase in the presence of the ‫لو ة عمأل العنا ا ا ا ا اومءعل خقبا مر عملقجعتو اع داءع‬
supervisory body or upon initial or final
delivery of the Project. ‫مل قدفةقعبح ا ا ا ااورعملوه عمل ش ا ا ا ا ت ع ع داءعمنا ا ا ااق مع‬
.‫مل ش عمبق م ةاع نها ةا‬

(4/6/5) The price shall include the costs of all ‫ ع ش ا ا ا ا ا عتكالة ع ة عمل حيا ع‬:‫ )عملبا ا ا ا اا‬5/6/4(
annexes and installation accessories specified
in the drawings or to be extracted therefrom or ‫لوم معملقهبة عمل بةد ع عمل نااو ا ع عملقجع ع ع‬
required according to the manufacturing ‫ ع‬:‫من ااق ص ااهاع دهاع ع اعتيق ااةهاع ص ااولعملص ااد‬
principles guaranteeing the quality and good
performance of the installations. . ‫ملقجعتؤ ع و سع حب ع مءعملق كةبا‬

(4/6/6) All materials and installations should ‫)ع و ا ا ع نعتكون ع ة عمل وم ع ملق كةبا ااا ع‬6/6/4(
be suitable for operation under the weather
conditions prevailing in the Project area and ‫عمل داخة عملبا ا ا ا ا ا ااا سعتجع‬ ‫ عتجعملظ‬: ‫عل‬
should govern voltage and current values ‫دطي عمل شا ا ا ا ا ا ع يدد عليةمعملوه ع ملقةارعمل ح سع‬
determined in the Project documents.
. ‫ب بقد م عمل ش ع‬

(4/6/7) The lines connecting the different ‫عباةا عملاوحا ا ا ا م ع‬ ‫ ) عخاطاوط عملاقاوص ا ا ا ا ا ا اةا‬7/6/4(
electrical units as shown in the layouts shall
not represent the actual routes; they only ‫م لكه ب ا ااا ةا ا ا عمل ق فا ا ا عتج عمل طط ا ااا عال عت ها ا ا ع‬
clarify the units fed by a common sub-circuit. ‫ ة علهاع ان اعتوض عتيطعملوح م عملقجع‬:‫مل با مر عملف‬
The Contractor should determine the actual
routes of the lines and places of the actual ‫عمل يا لعتح ي ع‬ ‫تقغقاع ع م سعت ة ع شااق ك ع‬
electrical units upon preparing the shop ‫ا ا ا ا ا ا ااج ع اك ع‬ ‫ ةا علهاقمعمل طوطع‬:‫مل با ا ا ا ا ا ااا مر عملف‬
drawings taking into consideration site
conditions in terms of the constructional and ‫ ة ا ع د ا عإ ا م عمل ططااا ع‬:‫ملوح ا م عملكه بااا ة ا عملف‬
architectural requirements and other facilities. ‫عمل وق ع ع‬ ‫ عمألخقعتجعمال قبارعظ‬:‫ملقدفةق عب‬
This shall apply to electrical feeding cables,
telephone and television routes. ‫ا ع‬ ‫ اري ع مل‬: ‫حة عمل قط با عمإنشا ا ا ا ا ا ااا ة ع مل‬
‫عملقغق ع‬ ‫ع ب ا ا ااا مر عكاب‬ ‫مألخ اع يدطبقعذلكع‬
. ‫ملكه با ة ع ملهات ع ملق فا‬

(4/6/8) The Contractor should prepare a layout ‫عمل ي ا ااا ل عإ ا ا ا م ع طط عيوضا ا ا ا ا ا ا ع‬ ‫ ) ع‬8/6/4(
indicating the units fed by each secondary
breaker in electricity distribution panels and ‫ملوح ا م عملقجع غااقيهاااعك ا عقاااط عت جعتجعلوحااا ع‬
should pack the same using plastic packages ‫ملقو ي عملكه با ة ع تغ ةفهعبغ عب نا ا ا ا ااقةكع تهبة ع‬
and placing the layout into the interior side of
the panel cap. ‫ ع‬. ‫مل ططع عملو هعمل مخ جعلغطاءعمل وح‬

(4/6/9) Electrical consumption meter box: A ‫)عصا ااد لع م عمالنا ااقه وعملكه با ج عيقمع‬9/6/4(
wooden frame of a thickness of not less than
(2cm) shall be installed inside a cavity existing ‫ع‬2(‫ت كة عب م ع عمل شا ا ا ا عببا ا ا ا اك عالعتي ع ع‬
in the exterior side of the front wall wall of the ‫نا ا ا اام)ع مخ عتوويدعتجعملوان عمل ار جع ع مرع‬
residential unit.
‫ ع‬. ‫ملبورعمأل ا جعل وح سعملبعدة‬
(4/6/10) Pipes, outlet boxes and connections :‫) األنا يف وعلف المخارج والتوصيالت‬10/6/4(
a- All wires and cables shall be extended inside ‫ع مخ ع ومنة ع‬ ‫يقمعت ي ع ة عمألن وع ملكاب‬-
PVC pipes of (50) mm diameter of Class 3
cables and (25) mm and (20) mm diameter for ‫ ع قط ع‬3‫عك سع‬ ‫ ع م)عل ك اااب‬50(‫)عقط ع‬PVC(
the wires related to the feeding extensions, ‫ع م)علألنا ا ا وعمل اصا ا ا عبق ي م ع‬25(‫ع م)ع ع‬20(
outlets and circuits. The pipe ends existing at
the outlets, connections, electrical panels and ‫ملقغااق ا ع مل ااارجع مل ا م ع تز عنهااا ااا عمألنااابة ا ع‬
meter box shall be provided with the wires and ‫دا ع ا عمل ااارجع ملقوصا ا ا ا ا ا اةا ع لوحااا عملكه باااءع‬
cables.
. ‫ م‬:‫صد لعمل‬
b- Sockets shall be installed at a height of (30 ‫ن ا ا ا ا ا اام)عتولع‬30(‫عمرتف ااا ع‬ ‫تهبةا ا عمل ي اااب ع‬-‫ى‬
cm) above the level of work bench in the
kitchen and at a height of (30) cm above slab ‫عمرتفااا ع‬ ‫ ا عتجعمل طبخع‬:‫ب ا ا ا ا ا ااقواعطااا ل ا عمل‬
surface level in other rooms. While in the ‫عمألخ ا ع اع‬ ‫ناام)عتولعنااط عملب طعتجعملغ‬30(
bathrooms and surface, such sockets shall be
installed at the same level of the lighting ‫تجعملح ا ا ع ملب ا ا ا ا ا ااط عتقهب عتجعنف ع ب ا ا ا ا ا ااقواع‬
switches. .‫فاتة عمإنارس‬
c- Lighting switches shall be installed at a ‫ع‬ ‫عمرتف ااا عالع يا ا ع‬ ‫تهبةا ا ع ف اااتة عمإن ااارسع‬-
height of not less than (125) cm above the tile
surface. .‫نم)عتولعنط عملب ط‬125(
d- As for the heaters, air-conditioners, suction ‫م عملشا ا ا اافطع‬ ‫ بالدبا ا ا ااب عل ب ا ا ا ا انا ع مل عةفا ع‬-‫ث‬
fans, electrical ovens and washing machines;
the connection box shall be installed near ‫مألت منعملكه بااا ة ا ع ملغب ا ا ا ا ا ا اااال عيقمعت كة ا ع ب ا ع‬
them. The relevant boxes shall be covered with ‫ ب عبغطاءع با عب خولع‬:‫توصااة عبوومرهاع تغط عمل‬
a cap allowing the entry of feeding connection
through it. ‫ ع‬.‫ سع ب ها‬: ‫وص عتغق عمل‬

(4/6/11) As for electrical current feeding, ‫)عب الدب ا ا ا ا ا ااب عل قغق عبالقةارعملكه با جعيقمع‬11/6/4(
copper cables and insulated copper wires shall
35+16 ×be used and non-concrete cables of (4 ‫ز ل ع يقمعت ي ع‬: ‫ع ن وعنحانة ع‬ ‫منق ممعكاب‬
mm2) shall be extended from the meter box to ‫)ع ع‬2‫ م‬16+35×4(‫كاااب ا عغة ع با ا ا ا ا ا ا ع ي اااسع‬
the main electricity distribution panel installed
to the wall. In addition, non-concrete cables of ‫ م ع حق علوح عملقو ي عمل ةبااة عبالبااورع‬:‫صااد لعمل‬
16+10 mm2) shall be extended from the ×(4 ‫)ع ع‬2‫ م‬10+16×4(‫كااابا عغة ع با ا ا ا ا ا ا ع ياااسع‬
main electricity distribution panel installed to
the wall to the secondary electricity ‫لوح عملقو ي عمل ةب ا ا ااة عبالب ا ا ااورع حق علوح عملقو ي ع‬
distribution panel installed in the ground floor ‫ملف ة عبال رعمألرضا ا ااج ع كاب عغة ع ب ا ا ا ع ياسع‬
(b). In addition, non-concrete cables of
10+6 mm2) shall be extended from the ×(4 ‫علوح ا ا عملقو ي عمل ةبا ا ا ا ا ا اة ا ا ع‬ ‫)ع‬2‫ ع م‬10+16×4(
main electricity distribution panel installed to ‫بالبورع حق علوح عملقو ي عملف ة عىع ع كاب عغة ع‬
the wall to the secondary electricity
distribution panel installed in the roof. Non- ‫)ع علوح ا عملقو ي ع‬2‫ م‬6+10×4(‫با ا ا ا ا ا ا ع ياااسع‬
6+6 mm2) shall be ×concrete cables of (4 ‫مل ةبة عبالبورع حق علوح عملقو ي عملف ة عبالبط ع‬
extended from the main electricity distribution
panel installed to wall to the water pump of the ‫)ع علوح ع‬2‫ م‬6+6×4(‫ع كاب عغة ع ب ع ياسع‬
ground tank.
‫ا عمل اءعل زمنع‬ ‫ملقو ي عمل ةبااة عبالبااورع حق ع‬
‫ ع‬.‫مالرضجع‬

(4/6/12) Telephone cable shall be made of ‫)عكاب عملهات ع عونع عماللةا عملبص ي ع‬12/6/4(
fiber optic and of not less than (0.5mm2). The
telephone cable, extended from the telephone ‫)ع يوا ا ع نع حقوتعك ااابا ا ع‬2‫ ع م‬0.5(‫ع‬ ‫الع يا ا ع‬
connection box installed to the exterior wall to ‫ع ع ب عتوص ا ا ا ا ا ااة عملهات عتجعملب ا ا ا ا ا ااورع‬-‫ملهات ع‬
the telephone connection box installed in the
ground floor, shall contain wires for (2) ‫مل ااار جع حق ع با ا عتوصا ا ا ا ا ا اةا ا عمله ااات عب ااالا ا رع‬
telephone lines. While, the telephone outlet ‫)عخطعهات ع اع‬2(‫ ع‬:‫ع ن ا ا ا وعل‬ ‫ع‬-‫مألرضا ا ااجع‬
wires shall be for one telephone only.
‫ ع‬. ‫ن وع ارجعملهات عتقكونعل طعهات ع مح‬

(4/6/13) setting up a satellite system for ‫)عت نة عنظامعنات ي عالنقيبالعمالرنالع‬13/6/4(


receiving space transmission, and setting up a
communication system. ‫ ع‬. ‫ملف ا جع ت نة عنظامعمالتصاال‬

(4/6/14) Providing electricity distribution ‫)علوحا عملقو ي عملكه با ة ع عنو عمل م ع‬14/6/4(
panels of Al-Raed or Al-Fanar model or their
equivalents and as per the Saudi Standards and ‫اا له ااع حب ا ا ا ا ا ا ا عمل ومصا ا ا ا ا ا افااا ع‬: ‫عملفداارع ع ااع‬
submitting a warranty certificate. ‫ ع‬.‫و ع عتي معاها سعمل ان‬:‫ملب‬

(4/6/15) The main and secondary circuit ‫)عملياط عمل ةب ا ااجع قومط عمل م عملف ة ع‬15/6/4(
breakers shall be of a magnetic thermal
protection, quick make-and-break and shall be ‫تكون عذم عح ااا ا عح مري ا ع غداااطةبا ا ا ا ا ا اة ا ع نعتكونع‬
equipped with a system preventing the breaker ‫ عملوص ا ا ا ع مليط ع ز سعبدظامع د عملياط ع‬:‫ن ا ا ا ي‬
from connection in case of increased load and
short circuit or connection with the ground. ‫عملقوصة عتجعحال ع يا سعملح ع قص عمل م سع ع‬
The connection points should be made of ‫ع‬ ‫ملق اسعباألرض ا ا ا ا ااج ع يو ع نعتكونعنياطعملق‬
silver and tungsten and the acre-sparking
locations should be covered to prevent ‫عملف ا ا ع ملقدوبا ااق ع اك عا ا ا مرسعمليوسع غطاسع‬
ionization. There should be a complete ‫بص ا ا ا ا ا ااورسعت د عملق ي ع ي زمع نع عونعهدالكعت مز ع‬
synchronization regarding the connection and
breakage for the poles of dual and triple ‫كا عتجعملوص ا ا ا ععمليط عبالدبا ا ااب عألقطاىعمليومط ع‬
breakers. The number of secondary breakers ‫عمليومط عملف ة عحب ا ا ا ع‬ ‫ملهدا ة ع مله ة ع يعونع‬
shall be as specified in load tables and bills of
quantities. ‫ ع‬. ‫مل وض عتجع م لعمألح الع ملك ةا‬

(4/6/16) Lighting units: The lighting units ‫)ع حا م عمإنااارس ع وا ع نعتكون ع حا م ع‬16/6/4(
should be of the best quality and according to
the Saudi Standards, and it should be ones of ‫و ع‬:‫مإنارسع ع و عمألنوم ع حب عمل ومصفا عملب‬
the qualities using power-saving lamps ‫عمألنوم عملقجع‬ ‫يو ا ا ع ن عتكون ع ح ا ا م عمإنا ااارس ع‬
supplied by Pan Lighting Co. or its
equivalents. The work shall not include the ‫تب ا ااق معتةهاعل با ع يقصا ا ا سعتجعمن ا ااقه وعملطاق ع‬
installation of decorative chandeliers. ‫ ع‬:‫عا ا ك عبانعلانارسع ع اع ا هاع الع ش ا عمل‬
‫ ع‬. ‫ت كة عمله يا عمل عوري‬
(4/6/17) Switches and sockets: :‫) المفاذيح والمقابس‬17/6/4(
a- Lighting switches shall be quick make-and- ‫ عمليط ع ملوصا ا ع ع‬:‫ فاتة عمإنارسعتكونعنا ا ي‬-
break and of a quality appropriate to the
alternating current feeding lighting circuits. ‫ملدو عمل معل قة ااارعمل ق ع مل غ ااقتعلا ا م عإن ااارسع‬
. ‫مل صابة‬
b- The sockets of air-conditioners, water ‫ فاتة ع عةفا عملهومءع نا ا ا ا انا عمل ةامع م ع‬-‫ى‬
heaters, suctions fans, electrical ovens and
washing machines shall be designed according ‫ملشاافطع مألت منعملكه با ة ع ملغباااال عتكونع صا ع‬
to the technical bases. . ‫تقعمألن عملفدة‬
c- The switches shall be of double-pole and ‫ تكون عمل يا ا اااب ع عملدو عذ عقطبة ع قط ا ا ا ع‬-
ground pole type and submersible pole shall be
installed to the wall. .‫مرضجع ت ك عغاطب عتجعملو مر‬
d- The sockets protected from weather ‫وم ا ا عملوويا ا عت كا ا ع‬:‫ مل ي اااب عمل ح ةا ا ع عمل‬-‫ث‬
conditions shall be installed on the exterior
wall of the villa. ‫ ع‬. ‫عملبورعمل ار جعل فة‬

(4/6/18) Secondary distribution panels ‫)عنظااامعت ا ريضعلوحااا عملقو ي عملف ة ا ع‬18/6/4(


grounding system: This system shall consist of
a ground pole of copper bar of a length of (3) ‫يقكونعملدظامع عقط ع رضا ا ا ا ا ااجع عق ا ا ا ا ا ااة ع ع‬
meters and thickness of ¾ inches. Pulverized ‫عبوصا ا ا ع ي معحولع‬4/3‫مع نا ا ا كع‬3‫ملدحاسعبطولع‬
coal and salt shall be filled around the bar. An
×operational concrete inspection room of (30 ‫عغ ت ع‬ ‫امع‬:‫عملط‬ ‫ملي ا ااة عب با ااحولعملفحمع‬
30) cm shall be constructed. A twisted copper ‫عنمع ي بطعبالي ة ع‬30×30‫تفقة عخ نانة ع اهزسع‬
wire of 16 mm2 clip shall be connected to the
bar; where it shall be provided with a binding ‫ع عغ ت ع‬ ‫ع‬2‫ع م‬16‫ن ا ا كعنحاسع و لع يط ع‬
post for connecting a similar wire and to be ‫ملقفقة عحة عيز عب بطعلقوص ا ا ا ا ااة عنا ا ا ا ا ا كع ا ع‬
extended to the ground bar installed to the
secondary distribution panel in the ground ‫ت ي معحق عق ة عمألرضجعب وح عملقو ي عملف ة ع‬
floor, first floor and roof. ‫ ع‬. ‫ل رعمألرضجع بال رعمال لع ملبط‬