Specifications-Villa Project Saudi Arabia
Specifications-Villa Project Saudi Arabia
1- Introduction: : مقدمة-1
The Contract should execute the whole عطبياعلش طع عمل يا لعتدفةقعكا عمل ش و ع
Project according to the terms and
specifications of the Contract and should ي ع منا ا ا ا ااقك العمأل العبالصا ا ا ا ااورسع:ومصا ا ا ا اافا عمل
complete the works as totally accepted by the ع ملقجع و ع نع:مل يبول عت ا اجعإل عص ا ا ا ا ا اااح عمل
Employer. This should be in conformity with
عملقتع :تطابقعمل ومصا ا ا ا ا اافا عملفدة ع قط با عمل
the technical specifications and requirements
of the offer therefor the Project is created. All ع ع ه ع منعيق ةزعبحب عملصدا ع نشئعمل ش
the items mentioned in the Project لكا عملبدو عملومر سعتجع ب ا ا ا ا ا ااقد م عمل شا ا ا ا ا ا ا ع ع ع
documents, including the layouts, technical
specifications and contractual terms which اق ع ملقجع:ططا ع ومصا ا اافا عتدة ع ا ا ا ا طعت
are considered as an integral part of the
Contract shall be executed based on good قب عهااقمعمل يا ا ع:ع ت. يا:قب ع زءعالعيقوزع عمل:ت
industry standards. This introduction shall be
an integral part of the Contract terms for . ي علقدفةقعمل ش:زءع عا طعمل
Project execution purposes.
The Project consists of a part of the a يقكونعمل شا ا ا ا ا ا ع ع زءع عحجعن ا ا ا ا ااعدجع حقوتع
residential district containing the following
facilities and works: عمل دشئا ع مأل العملقالة ع هج
(2/1) (246) Residential units which are villas )ع ح ا سعن ا ا ا ا ا ااع عتة ع عون ا ع ع246()ع ا ع1/2(
consisting of two floors and upstairs annex.
.ري ع حقع وت
(2/2) A Wall for each residential unit (frontal )عن ااورعلك ع ح سعن ااعدة ع(ن ااورع ا جع دة ع2/2(
wall and two or three walls shared with the
neighboring residential unit. This includes the ع ن ا ا ا ا اومرع شا ا ا ا ااق ك ع عملوح م عملبا ا ا ا ااعدة ع ع
execution of a wall for the side adjacent to the مل وا رسع يشا عكقلكعتدفةقعنااورعل وان عمل صااقع
residential unit).
ع.) ل وح سعملبعدة
(2/3) All the works of the general site and ااامع مل متقعمل ع ا ع:ااالعمل وق عمل )ع ة ع3/2(
utilities complementary to each villa include
the supply and installation of upper water عتوري ا ع ت كة ا عخزمنع اااءع لك ا عتة ع تشا ا ا ا ا ا ا ا ع
tank and execution of lower fiber tank وتع تدفةقعخزمنعن ا ااف جعتايب ع عاا ا ا ك ع ةانقة ع
produced by Amiantit Company of a 3
ع عمل نا ااان عمل ب ا ا ح ع كقلكعبةارسع م24 ع:نا اا
capacity of (24) m3 or made of reinforced
concrete and a septic tank of a capacity of ااجع ع:علك ع ح سعنااعدة ع يش ا عمل3م27 ع:بباا
(27) m3 per residential unit. This also ملب طع مل ش ا ا ااا ا عن ا ا ااة م ةكعحولعملوح سعملب ا ا ااعدة ع
includes the ceramic slabs and tiles
surrounding the residential unit, installed يو ع. مخ عمنا ا ااورع حب ا ا ا عمل ومصا ا اافا عمل تي
inside the walls as per the attached ع. تدفةقعهقمعمأل الع عتياجعل ومصفا ع مل ططا
specifications. These works shall be
executed in accordance with the
specifications and layouts.
3- The works should be executed in يجببببف ذنفيبببب األعمببببال واقببببا للمواصبببببببببفببببات-3
accordance with the specifications and
details stated in the Report of Soil وبالتفاصببببببيل الواردة تقرصر ااوصببببببات التربة ل ا
Investigations of such Site, attached layouts الموقع والمخططبببببات المراقبببببة وببببببالمتطل بببببات
and as per the following requirements and
specifications at least: :والمواصفات التالية على األقل
(3/1) Site preparation: The Contractor should )عتوهةزعمل وق ع و ا ا ع عمل يا ااا لعإ ا ا م ع1/3(
fully prepare and equip the Site to properly
execute the works. توهةزعمل وق عبع ااا ا ا ع ا ا ت ااهعل قدفة ااق عملص ا ا ا ا ا ااحة ع
ع.لأل ال
(3/2) Site Cleaning: The Contractor should )عنظااات ا عمل وق ع و ا ع عمل يااا لعتدظة ع2/3(
continuously clean the Site throughout the
Contract term and shall avoid any ي ع تفا تعت مكمع:مل وق عبصورسع بق سعخ لع سعمل
accumulation and piling of the execution ع ع. بيا اع وم عملقدفةقع مل ش ع غة هاع تك نهاعبال وق
materials debris, wood and otherwise
(3/3) Soil investigation and foundation level: ع ع )عتحصعملق ب ع دب ا ا ا ا ا ااوىعملق ن ا ا ا ا ا ااة3/3(
The Contractor should prepare a Report of Soil
Investigation of the Site through a specialized مل يااا لع نع يومعبااإ ا م عتي ي عتحصعملق ب ا عل وق ع
company to determine the actual soil bearing عخ لعا ا ا ا ا ك ع ق ص ا ا ا اص ا ا ا ا علقح ي ع ه عتح ع
capacity of the Site using not less than two or
three borings per block and according to the ع ب ا ا ا ا ا ااقانعمل ع جعل وق عب اعالع ي ع:ملق ب عملف
requirements of Saudi Building Code. The ع ب ا ا ا ااا عتجعملب ووعملومح ع حبا ا ا ا ا ع قط با ع
drilling should be done to the level appropriate
to the construction according to the Report of و تع يو ع نعيقمعملحف عإل عمل دب ا ااوىع:ملكو عملب ا اا
Soil Inspections so that the depth of borings ملصا ا ا ااال عل ق نا ا ا ااة ع تياجعلقي ي عتحصعملق ب عبحة ع
shall be (10) meters based on soil nature. This
includes searching for and removing site معبحب ا ا ا ا ا ا عنو عملق ب ع10عونع العملوبا ا ا ا ا ااا ع
obstacles, if any, transferring the wastes to the وم قعبال وق ع ا محقهاعإنع:عمل يش ا عذلكعملبح ع
locations allocated thereto outside the Site and
continuously keeping the Site clean during the فا عإل عمأل اك عمل صا اصا ا علهاع ع ني عمل
execution of the Project. خارجعمل وق ع حفظعمل وق عنظةفاجعبص ا ا ا ااورسع ب ا ا ا ااق سع
ع
ع. خ لعتدفةقعمل ش
(3/4) Approval of filling materials: Filling )عم ق ا ع وم عمل م ع و ع نع عونعمل معب وم ع4/3(
should be made using high-quality materials
approved by the Supervising Engineer before عقب عب ءع ة سعيقمعم ق ا هاع عمل هد سعمل ش ا ا ا ا ا ا
commencing the execution. The filling shall be ع عطبيا عالعتزي ع ملقدفةقع بحة ع عونعمل مع
on layers of not more than (30) cm. The
compaction shall be made according to the عنا ا اامع يقمعمل وعطبياجعل اع ر عبقي ي عتحوصا ا ااا ع30
Report of Soil Investigation and instructions of ع اا ا ا ا طع ة ا عمل هد سعمل شا ا ا ا:ملق ب ع طبياجعلق
the Supervisory Engineer and standards terms.
It shall be noted that the level of the ground عهقمع تو رعمإاا ا ااارسعإل ع نع دبا ا ااوىع مل ومصا ا اافا
floor finishing should not be less than such عمل دانة ع تشطة عمل رعمألرضجع و ع الع ي ع
levels specified in the layouts. This item
includes the settlement works of the Site الع مل وض ا ا ااح عتجعمل ططا عك اع شا ا ا ا عملبد ع
surrounding the residential unit and places تبااوي عمل وق عحولعملوح سعملبااعدة ع مخ عمالناومر ع
inside the walls. The drilling remains are
allowed to be used if it is suitable for filling يبا ا عبان ااق ممعناترعملحف عإذمعكانعص ااالحاجعل مع
after obtaining the approval of the ع. :ع ومتي عصاح عمل عملحصولع:ذوعب
Employer.
4- Fulfillment of Saudi Specifications : استيفاء متطل ات المواصفات السعودية-4
Requirements
All the works of the Project, including the و ع نعتكونع ة عمأل العل شا ا ا ا ا ا ا عا ا ا ا ا ا ااا ع
reinforced concrete works necessary for
constructing the concrete structure of the عملهةع ع:عل العمل نا ا ا ا ا ااان عمل ب ا ا ا ا ا ا ح عمل
building, sanitary and electrical works, مل ن ا ا ا ا ااانجعل بد ع مأل العملص ا ا ا ا ااحة ع ملكه با ة ع
buildings and finishing, etc., should meet the
Saudi standards and should be executed عإلخ ع بقوتة عل ومصفا ع....مل بانجع ملقشطةبا ع
according to the following standards, data, و ع طبياجعل يانا ا ا ااا ع ملبةانا ع مل ططا ع:ملبا ا ا اا
layouts, terms and requirements:
ملش طع بال قط با عملقالة ع
(4/1) Concrete, buildings and painting: ع )عمل نان ع مل بانجع مل هانا1/4(
(4/1/1) The concrete below the bases and )عمل نان ع نف عمليوم ع مل ة م ع(خ نان ع1/1/4(
beams (blinding concrete) shall be made of
Portland cement resistant to sulfate of 10-cm ملدظات )عتكونع عمالنا ا ا ا ا ا ا د عملبورت ن تعمل يا مع
thickness and cement level shall not be less ةارعمالنا ا ا د عالع ي ع: ن ا اامع10ل كب يقا عببا ا ا كع
than 250 kg/m3 such a way that gives a load
capacity not less than 200 kg/m3 (28) days طجعقوسعتح عإ ها م ع:عبحة عت3م/كوم250ع
after pouring the standard cube. عيومع ع28 ع:عب3نم/كوم200ع مل غطعالعتي ع
ع. عمليةانج:ملص عل ع
(4/1/2) All concretes adjacent to the soil and/or با ا ا عل ق ب ع )عتكونع ة عمل ن ا ااانا عمل2/1/4(
water, including without limited to the bases,
column necks, beams, concrete floorings, عن ا ا ا ا ا اابةا عمل هاالعالع عمل ااءع ملقجعتشا ا ا ا ا ا ا ا ع/
ground water tanks and inspection rooms shall سع مل ة م ع مألرضةا ع ملحص عمليوم ع رقاىعمأل
be made of Portland cement resistant to
sulfate, Type (5) with a cement standard not be عملقفقة ع مل نا ااانة ع خزمنا عمل ةامعمألرضا ااة ع غ
less than 350 kg/m3 such a away that gives a عمالن ا ا د عملبورت ن تعمل يا معل كب يقا ع–عملدو ع
load capacity not less than 300 kg/m3 (28)
days after pouring the standard cube. ع3م/كوم350ع ةارعمن د عالع ي ع: ع–عب مل ا
طجعقوسعتح عإ ها م عمل ا ا ااغطعالعتي ع:بحة عت
ع:يومع عملصا عل ع28 ع:عب3نام/كوم300ع
ع.مليةانج
(4/1/3) The concrete required for the reaming ع )عتكونعمل نا ااان علباقجع داص ا ا عمل ش ا ا3/1/4(
elements of the Project shall be made of
ordinary Portland cement. The cement ةارعمن ا د عالع: ا تعب:عمالن ا د عملبورت ن تعمل
standard shall not be less than 350 kg/m3 such طجعقوسعتح ا ا ع: ع بحة ا ا عت3م/كوم350ع ياا ع
a way that gives a load capacity not less than
300 kg/m3 (28) days after pouring the standard ع:عب3نا اام/كوم300ع إ ها م عمل ا ااغطعالعتي ع
cube. ع. عمليةانج:عيومع عملص عل ع28
(4/1/4) All concretes adjacent to the soil )ع ة عمل ن ا ااانا عمل با ا ا عل ق ب ع و ع4/1/4(
should be insulated by double-face painting;
using thick bituminous cold painted. زلهاعب هانهاعبو هة ع ع هانعملبةقو ة عملب ا ا ا ا ةكع
ع. عملبار
(4/1/5) Floorings concrete (Slab on grade) )عSlab On Grade()عخ نان عمألرضةا ع5/1/4(
shall be of a thickness of (10) cm and
reinforcement shall not be less than 5 of 8 mm ع ناامع تب ا ة عالع ي ع10ع تكونعبب ا كعالع ي ع
diameter/ linear meter along both directions عتااج عمالت او ا ا اااه اة ا ع ب اد اف ا ع.ط. عم/ ا اام8 عق اط ا ع5
and shall be made according to the same
standards of the above-mentioned concrete. A ع عت م ع يم ومصا ا ا ا اافا عمل نا ا ا ا ااان عملومر سع
moisture insulation coating of a thickness not مع0.25ع ااا لعل طوبا عذ عنا ا ا ا ا ا ا اااكا عالعتيا ع
less than 0.25 mm shall be fixed under the
concrete and necessary joints shall be made عبهاعطبياجعلشا ا طع عملفومصا ا عمل ن ااف هاع ع
according to the standard terms and approval ع. مل ومصفا ع م ق ا عمل هد سعمل ش
of the Supervisory Engineer.
(4/1/6) The Contactor should prepare the عمل يا ااا ل عإ ا ا م عتص ا ا ا ا ا ا ا ااا ةمع ) ع و ا ا ع6/1/4(
designs of concrete mixtures and mortar and
construction material standards, including the مل طا عمل نانة ع مل ون ع ومصفا ع وم عمإنشاءع
steel for concrete reinforcement and submit عم ع:ب اعتةهاعح ي عملقبا ا ا ة ع تي هاعلص ا اااح عمل
them to the Employer or its representative for
approval before the execution of the works ع ه ااهعال ق ااا هاااعقبة ا عتدفةااقعمأل ااالعمل دوط ا ع
delegated thereto. ع.لها
(4/1/7) The external walls shall be constructed )ع و ع نع عونعبداءعملو رمنعمل ار ة ع ع7/1/4(
of thermal insulating blocks - cement blocks
having a middle layer of thermal insulation of ز لعح مرياجع–عملب ووعمإن ا ا دقجعمل حقوتع: ملب ووعمل
20) cm size of the best qualities × 40 ×(20 ااا لعملح مرتع–ب ياااسع:عطبي ا ع ن ا ا ا ا ا ااط ع عمل
available in the market and according to the
approval of the Engineer supervising the ع ت ا ا ا ا ا ا ا ا عملدو ةااا ع )عن ا ا ا ا ا اامع20× ع40× ع20(
execution. ع مل و و سعباألنوملع طبياجعال ق ا عمل هد سعمل ش
ع.عملقدفةق
(4/1/8) The internal walls, wall and roof )ع وا ا ع نع عون عبد اااءعملوا ا رمنعملا ا مخ ةا ا ع8/1/4(
surface should be made of cement blocks of
15) cm size. The Supervisory × 40 ×(20 ملب ااورع ر سعملب ااط ع عملب ووعمإنا ا دقجعب ياسع
Engineer shall approve the quality of the same ع نعيقمعم ق ا عملدو ة ع )عن ا ا اامع15×ع40×ع20(
before the execution of the works.
ع.عمل هد سعمل ش عقب عب ءعملقدفةق
(4/1/9) The whole Building should be )ع و ع نعتكونعلةان علكا عمل بد ع مخ ة جاع9/1/4(
internally, externally, lining and facing
plastered. The plastering should be done خار ةاجعبطان ع ظهارس ع يو ع نعتكونعمل ةان ا ا ا ا ا ا ا ع
according to the best Saudi standards by using و ع ع مع:طبياجعألت ا عا ا طعمل ومصاافا عملباا
the lime or gypsum in plastering mortar.
Galvanized metal gratings should be used for من ا ا ا ا ااق ممعملوة ع عملوب عتجع ون عمل ةانا ا ا ا ا ا عهقمع
joining the concrete structure with the block نجعمل و ف ع د ع داطقع: يو عمنق ممعملشبكعمل
buildings. The galvanized reinforcing angles
should be used with galvanized gratings of the ملوصا ا ا ا ا عبة عملهةع عمل ن ا ا ا ااانجع بانجعملب ووع ع
edges and interior corners.
منا ا ااق ممع م اعملقيوي عمل و فد ع عملشا ا اابكعمل و ف ع
ع ع. ل حوم ع مألركانعمل مخ ة
(4/1/10) The interior plastering should be ع )ع و عصاادف سعمل ةان ا عمل مخ ة ع ة مجع10/1/4(
properly sanded, then its surface should be
processed by a basic painting, then double- وونع: الو عنطحهاعب هانع نانجع مع هة ع: مع
face paste then the same shall be properly طجع با ا ا ا ااجعنا اجع معيقمع:معتص ا ا ا اادف ع ة مجعحق عت
sanded to be smooth. After that, the same shall
be painted by double-face plastic painting of هاانهااعبطبيقة ع عملا هااناا عب ن ا ا ا ا ا ااقةاكعباالدو ةا ع
an approved quality and shall be cleanable ق سع ملياب عل قدظة عبال اءع ملصا ا ااابون ع يو ع: مل
with water and soap. All materials and their
colors should be approved by the Employer or ع ع:م ق ا ع ة عمل وم ع لومنهاع عصا ا ا ا ا اااح عمل
its representative before the beginning of the ع.ع ه هعقب عب ءعملقدفةق
execution.
(4/1/11) The exterior plastering should be )عص ا اادف سعمل ةانا ا ا عمل ار ة ع هانهاعبو هع11/1/4(
properly sanded and painted, then sprayed by
an American spray and double painted by an معراهاعرا ع يعة ع هانهاع
عمألناسعمل دان ع ع
exterior plastic painting. The exterior بطبيقة ع ع هااانعب ن ا ا ا ا ا ااقةااكعخااار ج ع يو ا ع نع
paintings should be of the best qualities
resistant to humidity and weather conditions. تكون عمل ا هااانااا عمل ااار ة ا ع ع ت ا ا ا ا ا ا ا ا عملدو ةااا ع
All materials and their colors should be وم ا عملووي ا ع يو ا عم ق ااا ع:مل يااا ا عل طوب ا ع مل
approved by the Employer or its representative
before the beginning of the execution. ا ع ع ع ه ااهع:مل وم ع لومنهاااع عص ا ا ا ا ا ا اااح ا عمل
ع.عقب عب ءعملقدفةق مل ش
ع
(4/2) Floors and insulation :) األرضيات والعزل2/4(
×(4/2/1) Supplying the porcelain slabs of 40 )عتوري ع ت كة ع ة ع رض ا ا ا ااةا عملص ا ا ا ااال ع1/2/4(
40 cm size and applying the same on all halls,
rooms, bathrooms and kitchens floors; such نمع ملح ا ا ع40×40ع عب طعملبورن نع ملغ
ceramic should be of a high quality that is مل طابخع عملب ا ا ا ااة م ةكع عمألنوم عملوة سعمل قوت سع
available in the market and as per the approval
of the Employer or its representative. The ع ع ع:باألنا اوملع حبا ا عم ق ا ع عص اااح عمل
work includes the installation of skirting to all عكااا ا ع ا عت كة ا ع مر ع:ه ااه ع يشا ا ا ا ا ا ا ا عمل
the walls of the rooms and halls.
ع. ع ملصاال حةطعملو رمنعل غ
(4/2/2) Supplying and installing the stairs of )عتوريا ا ع ت كةا ا ع رجعمل ا ا مخا ا عمل ااار ةا ا ع2/2/4(
the exterior gates of the villa and staircase of
Bianco marble of the best qualities available in ل فة ع رجعملبا ا ا ا ا ا ا مع عمل خااامع منة ا عبةااانكوع ع
the market. ع.م و عمألنوم عحب عملبول
(4/2/3) Supplying and installing the ceramic to )عتوري ع ت كة عن ا ا ا ا ا ااة م ةكعل و رمنعبعا ع3/2/4(
the full height of the walls of bathrooms,
laundries and kitchens. The quality, color and مالرتفا عتجع ة ع مر عمل ةامع مل غان ع مل طابخ ع
dimensions of such ceramic shall be approved ا ع عصا ا ا ا ا اااح ع:يو عم ق ا عملدو ة ع مل ونع مألب
by the Employer or its representative.
ع. ع ع ع ه ه:مل
(4/2/4) The work shall include the execution of عتدفةقعمالرض ااةا ع مل ش ااا ا ع:)ع شا ا عمل4/2/4(
ceramic floors and tiles surrounding the
Building of the Residential Unit. ع.حولع بد عملوح سعملبعدة ع عملبة م ةك
(4/5/2) The Contract should prepare shop عمل ي ااا لع ا ا م عرن ا ا ا ا ا ااو ااا ع )ع وا ا ع2/5/4(
drawings related to the fitting and installation
details required to be used in the execution of )عمل اصا ا عبقفاصا ااة عShop Drawings(ملقش ااغة ع
work items according to the contracting الهاعتجعتدفةقع:ملقوهة مز ع ملق كةبا عمل ط وىعمن ا ا ااق
documents, including the contractual
drawings. Such specifications shall be اق ع:بدو عمأل العحبا ا ا ا ع اع اءعتجع ب ا ا ااقد م عملق
according to the proper scale of the Engineer ع هقمعمل ومص ا ا ا ا ا اافا ع اق:ب اعتةهاعمل ن ا ا ا ا ا ااو ا عملق
supervising the execution and shall be subject
to its approval before the supply and ع ع ب يةاسعرن ا اامع دانا ا ا عإل عمل هد سعمل شا ا ا
installation and in conformity with the ق ا عقب عملقوري ع ملق كة ع ب اعيقفقع ع ملقدفةقعل
execution time schedule. The drawings shall
include the following elements without ع تش ا ا عرنا ااو ا عملقشا ااغة ع.ملب نا رعملز دجعل قدفةق
limitation: عنبة عمل هالع لة عملحص ع اعي ج ع
a- Details of installing sanitary appliances and تفاص ااة عت كة عمأل هزسعملص ااحة ع ا ص ااالهاع-
linking them to feeding and sanitary pipes and
otherwise. .ب ومنة عملقغق ع ملص ع خ ته
b- Details of installing pipes and methods of تفاصا ا ا ااة عت كة عمل ومنا ا ا ااة ع ط لعتهبةقهاع-ى
installing and hanging them.
. ةيها:ت
c- Details of installing ground and upper water تفاص ا ااة عت كةبا عخزمنا عمل ةامعمألرض ا ااجع-
tanks.
. وت:مل
d- Details of installing the water pump. .عمل ةام تفاصة عت كة ع-ث
f- Details of installing the valves and electrical تفاصا ااة عت كة عمل حاب ع ن ا ا انا عمل ةامع-
water heaters.
. ملكه با ة
h- Details of executing and installing the septic ع. تفاصة عتدفةقع ت كة عملبةارس-
tank.
(4/5/3) The Contract should observe that no عمل ي ااا لع م اااسع العيدقرع ع )ع وا ا ع3/5/4(
noise shall arise from the operation of the
sanitary installations. ااالعملق كةبااا عملص ا ا ا ا ا ااحة ا ع تع تش ا ا ا ا ا ااغة ا ع ة ع
.ضوضاء
(4/5/4) The Contractor should use highly )ع و ع عمل يا لعمنااق ممع الع تدةة ع4/5/4(
skilled labors and technicians in executing the
sanitary installation works. ذ ت ع ه ا ااارس ع ا ااالةا ا ا عتج عتدفة ا ااق ع ا ااال عملق كةب ا ااا ع
ع. ملصحة
(4/5/5) The materials used in the execution of عتجع )ع و عني ع ت زي عمل وم عمل ب ا ا ا ااق5/5/4(
the sanitary installation works should be
transferred and stored in a way preventing العملق كةبا عملصا ا ا ا ااحة عبط لعتحفظهاع ع تدفةقع
them from pollutions, humidity, damage, اجع تحاتظع:ع ملكب ا ا ا ا ا ع مالنب ملق وثع مل طوب ع ملق
breakage and indentation and maintaining the
exterior appearance thereof together with their ع عملش ا ا ا ا ا ااع ع مل ظه عمل ار جعلهاع تحاتظع
mechanical and physical characteristics. The خومصا ا ا ا ا ا اهاااعمل ةعااانةعةا ع ملفةزيااا ةا عك اااع وا عني ا ع
materials used in the execution of sanitary
installation works should be transferred and العملق كةبا ع عتجعتدفةقع ت زي عمل وم عمل باق
stored according to the instructions of its ع. علها: ة ا عملوها عملصان:ملصحة عحب عت
manufacturers.
(4/5/6) The Contractor should take all the )ع عمل ي ااا لعمت اااذعك اااتا ا عمالحقة اااط ااا ع6/5/4(
precautions required for protecting the works
and appliances from any damages or blockage لح ا عمأل الع مأل هزسع ع تع ض ا ا ا مرع عت فةا ع
throughout the execution term. Besides, the عمنبا ا ا ا ا ا م عطوملعتق سعملقدفةق ع ةهعتبا ا ا ا ا ا ةمع ة ع
Contractor should deliver all works and
appliances in a safe and clean condition. ع. مأل الع مأل هزسعتجعحال عن ة ع نظةف
(4/5/7) All sanitary installation works should العملق كةبا ع اااا ع ة ع )ع و ع نعت7/5/4(
be subject to the necessary experiments and
operation and performance testing indicating ملص ا ا ا ا ا ااحة ا عل قوااارىع مخقبااا مر عملقش ا ا ا ا ا ااغة ا ع مأل مءع
their validity, efficiency and conformity with عملقجعتبة عص ا ا ا ا ا حةقهاع كفاءتهاع عمل ملب ا ا ا ا ا
the Standards according to the general
technical specifications for designing and ط ااابيقه اااعل اااع اااءعتجعه ااقمعمل ومصا ا ا ا ا ا اف ااا ع تيا ااجع
executing the buildings (Unified Arab ا علقص ا ا ا ا ا ةمع تدفةقعمل بانجع:ل ومصا ا ا ا اافا عملفدة عمل
Standards).
ع.)( ومصفا ع بة ع وح س
(4/5/8) Water feeding pipes shall be made of a )عتكونع نابة عملقغق عل ةامع عنو عح مرتع8/5/4(
thermal green type by performing a pressure
test of 6-bar according to the professional عبارعحب ا ا ا ا ع6خ ا ا ا ا ع ع عمخقبارعل ا ا ا ااغطع
principles. A warranty certificate of 15 years عنااد علألنااط ع15مألصااولعمل هدة عبشااها سعض ا انع
shall be provided for the surfaces and
bathrooms. ع. ملح ا ا
(4/5/9) The sanitary drainage pipes shall be of )عتكون ع نااابة ا عملصا ا ا ا ا ا ا عملص ا ا ا ا ا ااحجع ع9/5/4(
Al-Rajhi, Al-Tayar, Al-Munif model or other
pipes having equivalent specifications ااا له اااعتجع: مل م حجع عملطةااارع عمل دة ع ع اااع
(According to the Saudi Standards) – Pressure و )ع:مل ومصاافا ع(حبا عمل ومصاافا عمليةانااة عملباا
(40).
ع.40ضغطع
(4/5/10) All sanitary work items shall include )عتش ا ا ا ااق ع ة عبدو عمأل العملص ا ا ا ااحة ع10/5/4(
the supply, installation and construction,
including all accessories necessary for the عملقوريا ا ع ملق كةا ا ع ملبد اااءعب اااعتجعذل ااكع ة ع
sanitary appliances and pipes, such as siphons, علأل هزسعملص ااحة ع مل ومن ااة ع ه ع مل حيا عمل
basins, sinks, flexible convolutions for feeding
the sanitary appliances, valves, pipe ع مل والجع مل ةا ع ن ا ا ا ا ااةفونا عمل غانا ا ا ا ا ا ع مألحوم
connection fittings, discharge box machines مل نا علقغااق ا عمأل هزسعملص ا ا ا ا ا ااحةا ع مل حاااب ع قط ع
and the required works according to Project
layouts, standards and the general technical ص ا عمل ومنااة ع اكةدا عصاادا يقعملط ع مأل الع
specifications. عحب ا ا ا عمل ططا ع مل ومصا ا اافا عمل اص ا ا ا ع مل
ع. ا:ع مل ومصفا عملفدة عمل بال ش
(4/5/11) The Contractor should ask the ةدا عمل اص ا ا ا ا ا ا ع:عمل يا لعم ق ا عمل )ع11/5/4(
Supervisory Engineer to approve the
samples relating to the sanitary works before عقب عملقوري ع باأل العملصحة ع عمل هد سعمل ش
the supply and installation and follow the عتجع ة ااا عمل هد ا سعمل شا ا ا ا ا ا ا:ملق كة ا ع اتبااا عت
instructions of the Supervisory Engineer
ع:عن ا ا ا ا ا اا تدفةااقعمأل ااالع مخقبااارهااا عك اااع ح ا ع
regarding the execution and testing of the
works. The Contractor should add the price مل ومنا ا ا ااة عملهوم ا ع طبا عملقب ا ا ا ا ةكع مل نا ا ا ااانا ع
of the necessary ventilators, cleaning plugs عكف ا اااسع عتغطة عل ومن ااة ع عتهبة ع: عل مل
and concretes, including the brush or
coverage of the pipes and installation of the ع.مأل هزسع مخ عملح ام
appliances inside the bathroom to the pipes
price.
(4/5/12) Sanitary appliances saving water and )ع و عمنا ا ا ا ا ااق ممع هزسعصا ا ا ا ا ااحة عتكونع12/5/4(
supplied by a ceramic or similar company
should be used, and all means reducing the ا ا ا ا ا ا ا ا سعل ةااامع عاا ا ا ا ا ا ا كا عخزتةا ع ع اااع ااا هاااع
consumption of water should be used منا ا ا ااق ممعكات عملونا ا ا ااا عملقجعتي ع عمنا ا ا ااقه وع
according to the instructions issued in this
regard by the competent body. ة ااا عملص ا ا ا ا ا ا ااا رسعبهااقمع:مل ةااامع تقعملقو ةهااا ع ملق
ع. مل صوصع عملوه عمل قص
(4/5/13) The bathrooms and kitchens shall be )عيقمعتز ي ا عملح ااا ااا ع مل طبخعباااأل هزسع13/5/4(
provided with the following sanitary
equipment according to the drawings and bills ملصا ا ا ااحة عملقالة ع ذلكعحب ا ا ا ا عمل نا ا ا ااو ا ع م لع
of quantities: ملك ةا ع
a- the clogged toilet: it shall be a glazed toilet عإتا ناواج عملا از ار ع ا ع ملا ا ح ا ا ااا-
equipped with all water and drainage
connections. This shall include all necessary ع يش ع عمل ةامع ملص كا عتوصة
accessories. The color of the same shall be ع يعونعمل ونع عمالكببوم مر عمال:مل
white according to the distribution of toilet
colors. .مبةضعحب عتو ي عمأللومنعتجعملح ام
b- A white hand washbasin equipped with all عغب ا ا ا ا ااة عمألي تع بةضع ع حو-ى
water and drainage connections shall be
provided. This shall include all necessary ع يش ع عمل ةامع ملص كا عتوصة
accessories. . عمالكببوم مر عمال:مل
c- A white bathtub equipped with all water and حو عمالنا ااقح امع(ملبانةو)ع بةضع-
drainage connections shall be provided. This
shall include all necessary accessories. عكا عتوصا ا ا ااة عمل ةامععملص ا ا ا ا ع
. عمالكببوم مر عمل:يش عمل
d- Ground shower basin equipped with all حو ع عمرض ا ا ا ا ا ااجع عك ااا ا ا ع-ث
water connections, shower supplies for cold
and hot water and drainage connections shall توص ا ا ا ا ا ااة عمل ةااامع ت ا ي ا م عمل ا )ع
be provided. ل ةامعملبار سع ملبا ا ا ا ا اااخد ع توص ا ا ا ا ا اة ع
. ملص
e- Electrical water heater: The work shall not ن ا ا انعمل ةامعملكه با ج عالع ش ا ا ع-ج
include the installation of water heaters. The
Contractor should arrange the place proper for عت كة عنا ا ا ا ا ا ا انا عمل ةامع يو ع:مل
the electrical heater and should execute the عمل يا لعتهةئ عمل عانعمل دان ا ا ا ا ا ا ا ع
electrical, water feeding and water
connections, including sanitary parts, ل وق عملب ا ا انعملكه با جع تدفةقع اعي زمع
according to the requirements and technical ع عكه با ة ع ملقوص ا ا ااة عتوص ا ا ااة
specifications, whether there is a central heater
or multiple heaters in the residential unit. عمل ةاامع دهاع تغاق عمل ةاامع توص ا ا ا ا ا ااة
مل عمليط عملص ا ااحة ع حبا ا ا ع قط با ع
مل ومص ا اافا عملفدة عنا ا اومءعكانعنا ا ا انع
سعتجعملوح سع:كزتع عن ا ا ا ا انا ع ق
. ملبعدة
f- Water supply pump for the residential unit: ا ا ا ا ا ا ا ا ا عتز ي ا ا عمل ةا ااام عل وح ا ا سع -
A pump of 2 m3/ hour and a 25-meter
manometer capacity head for vertical water ع/ع3عم2ا ا ا ع ملب ا ااعدة ع و عتز ي ع
should be supplied to draw the water from the ع ق ع و ع25ملبا ا ااا ع رت ع انو ق تع
ground tank to the upper tank. The pump and
its connections, including pipes and electrical عمل زمنع ا ا اااء ع ذل ا ا ااك عل ت عمل ة ا ا ااام ع
feeding system, shall be installed as per the وتع نا ا ا ا ا ااةقمع:مألرضا ا ا ا ا ااجعإل عمل زمنعمل
layouts. The operation of the same shall be
automatically controlled using two buoys; one ا ا ا ا ا ا ا ع توص ا ا ا ا ا ااة تهاع ع ت كة عمل
of them shall be installed to the ground tank, مل ومنا ا ا ا ا ااة ع ملقغق عبالكه باءعحب ا ا ا ا ا ا ع
while the other shall be installed to the upper
tank to automatically operate with a 30-Amp ع ن عيقم عملقحعم عتجع مل طط ا ا ااا ع
breaker without a panel and manual operation تش ا ا ااغة هاع تو اتةعةاعبومن ا ا ااط ع وم قة ع
and shutdown board. The pump suction pipe
shall be of UPVC model, fifth category, and إح مه اعتجعمل زمنعمألرضا ا ا ا ااجع مألخ اع
shall be installed as shown in the layouts. ا ا ع تو ا اااتةعة ا ااجع: وتعلق:تجعمل زمنعمل
ع بة عب ا ن علوح ا ع30 ا ع:بياااط عنا ا ا ا ا ا ا
ملقش ا ا ا ا ا ااغة عملة تع مإغ لع منعتكونع
ع.عبج.ع عملا ااعيو انورسعنح عمل
ع
عملفئ عمل ا ب ا ع تهب عحب ا ع.عنااج.تج
. اعهوع وض عبال ططا
g- Suction fans for bathrooms and kitchens: م عملشا ا ا اافطعل ح ا ا ع مل طبخ ع-خ
This shall include the test and installation of
the suction fans to check its conformity with عمخقةارع ت كة ع م ع:يشا ا ا ا ا ا ا عمل
the Saudi Standards and that shall be suitable و ع:ملشا ا اافطع طابقعل ومصا ا اافا عملبا ا اا
for the weather conditions of the region. The
24) ×suction fans shall have openings of (24 عمل داخة عملب ا ا ا ا ااا سع ملقجعت معملظ
cm. The capacity of suction fan installed in the تجعمل دطي ع تكونع م عملشا ا اافطعذم ع
kitchen shall be of 200 cubic feet/ second and
100 cubic feet/ second for the suction fan of )عن ا ا ا ا ا اامع تكونع24×24(ا ع:تقحا عب ب
the kitchens. ع200ح عملش ا اافطعتجعمل طبخع ع:ن ا اا
ع100عمل قةيا ع ل ح اا ا ع/ا ع:ق مع ع
. عمل قةي/ ع:ق مع ع
h- Upper water tank: It shall be covered and سع وت ع عملفايب: خزمنعمل ةامعمل-
insulated and made of fiberglass for each
residential unit with a capacity of 3000 liters. ع:ز لعلك ع ح سعنااعدة عبباا: غط ع
It shall be installed at the top of the staircase. علق ع يوضا ا ا ا ا ا ا ع عبة عمل رجع3000
The tank shall be equipped with surplus pipes
يوهزعمل زمنعب ومن ااة عتا ضع خطوطع
and drainage lines having valves. The surplus ص ا ا عذم عص ا ا ا ا عبحة عتص ا ا ع
pipe shall discharge the drainage in roof sink.
ع عب ااالو ا ا ع ااان ا ا ا ا ا ااورسعملف ااا ضع
ع. ملبط
ع
(4/6) Electrical work specifications: )ع ومصفا عمأل العملكه با ة ع6/4(
(4/6/1) The cables shall be of Bahra, Elsewedy )ع عكاب عبح سع عملبوي تع عملفدارع ع1/6/4(
or Al-Fanar model or their equivalents and
shall be according to the Saudi specifications و ع:ا لهاع حبا ا عمل ومص اافا ع مل ياية عملب اا: اع
and Standards as well as the specifications of ع.و عل كه باء:ومصفا عملش ك عملب
Saudi Electricity Company.
(4/6/2) The Contactor should take into عمل يا لع نع خقعتجعمال قبارع )ع و ع2/6/4(
consideration that it should obtain the approval
of the Employer or its representatives ع ع:ع ومتي عصا ا ا اااح عمل نع ةهعملحصا ا ا ااولع
regarding all the materials to be used before ع ة عمل وم عمل م عمنا ا ااق م هاع ذلكع ع ه هع
the supplying the same to the Site. As for the
materials to be visible after the installation قب عتوري هاعل وق ع بالدبب عل وم عملقجعنو عتكونع
thereof such as the lighting units, sockets, ا ا عت كةبه اااع ها ا ع حا ا م عمإن ااارسع مل ي اااب ع:ةا ا عب
switches, panels, etc. should be agreed by the
Employer or its representative. Consequently, مل فاتة ع مل وحا ع خ تهاعتإنهعي زمع نعيومتقع ةهع
the Contractor should provide material ع ا ا ااجع لقلكعتإنع ع ع ع ه هع:ص ا اااح عمل
samples according to its time schedule.
مل ي ااا لعتيا ا مع ةد ااا عمل وم ع تقعملب ن ااا رعملز دجع
.مل اصعبه
(4/6/3) The capacities and dimensions of the ا ع ة عمل وم عتكونعحبا ا ا ا ع:ا ع ب:)عن ا ا اا3/6/4(
materials shall be as mentioned in the
drawings and bills of quantities. . مل قكورسعتجعمل نو ا ع م لعملك ةا
(4/6/4) The Contractor should provide all عمل يا ااا لعتوتة عكا ااات ا ا عمل وم ع ) ع و ا ا ع4/6/4(
materials, appliances, equipment, tools, labors
and electrical energy required for conducting ا ااالا ا ا ع ملط ا اااقا ا ا ع:ا ا ا م ع مأل م ع مل: مأل هزس ع مل
the tests specified in the Standards ا عإ مءعمالخقبااا مر عمل ح ا سعتجع ملكه بااا ة ا عمل
specifications applied to all works; either for
the tests that shall be conducted during the عب و بهاعبالدبب ع:مل ومصفا عمليةانة عملقجعيقمعمل
execution phase in the presence of the لو ة عمأل العنا ا ا ا ا اومءعل خقبا مر عملقجعتو اع داءع
supervisory body or upon initial or final
delivery of the Project. مل قدفةقعبح ا ا ا ااورعملوه عمل ش ا ا ا ا ت ع ع داءعمنا ا ا ااق مع
.مل ش عمبق م ةاع نها ةا
(4/6/5) The price shall include the costs of all ع ش ا ا ا ا ا عتكالة ع ة عمل حيا ع: )عملبا ا ا ا اا5/6/4(
annexes and installation accessories specified
in the drawings or to be extracted therefrom or لوم معملقهبة عمل بةد ع عمل نااو ا ع عملقجع ع ع
required according to the manufacturing ع:من ااق ص ااهاع دهاع ع اعتيق ااةهاع ص ااولعملص ااد
principles guaranteeing the quality and good
performance of the installations. . ملقجعتؤ ع و سع حب ع مءعملق كةبا
(4/6/6) All materials and installations should )ع و ا ا ع نعتكون ع ة عمل وم ع ملق كةبا ااا ع6/6/4(
be suitable for operation under the weather
conditions prevailing in the Project area and عمل داخة عملبا ا ا ا ا ا ااا سعتجع عتجعملظ: عل
should govern voltage and current values دطي عمل شا ا ا ا ا ا ع يدد عليةمعملوه ع ملقةارعمل ح سع
determined in the Project documents.
. ب بقد م عمل ش ع
(4/6/7) The lines connecting the different عباةا عملاوحا ا ا ا م ع ) عخاطاوط عملاقاوص ا ا ا ا ا ا اةا7/6/4(
electrical units as shown in the layouts shall
not represent the actual routes; they only م لكه ب ا ااا ةا ا ا عمل ق فا ا ا عتج عمل طط ا ااا عال عت ها ا ا ع
clarify the units fed by a common sub-circuit. ة علهاع ان اعتوض عتيطعملوح م عملقجع:مل با مر عملف
The Contractor should determine the actual
routes of the lines and places of the actual عمل يا لعتح ي ع تقغقاع ع م سعت ة ع شااق ك ع
electrical units upon preparing the shop ا ا ا ا ا ا ااج ع اك ع ةا علهاقمعمل طوطع:مل با ا ا ا ا ا ااا مر عملف
drawings taking into consideration site
conditions in terms of the constructional and ة ا ع د ا عإ ا م عمل ططااا ع:ملوح ا م عملكه بااا ة ا عملف
architectural requirements and other facilities. عمل وق ع ع عمألخقعتجعمال قبارعظ:ملقدفةق عب
This shall apply to electrical feeding cables,
telephone and television routes. ا ع اري ع مل: حة عمل قط با عمإنشا ا ا ا ا ا ااا ة ع مل
عملقغق ع ع ب ا ا ااا مر عكاب مألخ اع يدطبقعذلكع
. ملكه با ة ع ملهات ع ملق فا
(4/6/8) The Contractor should prepare a layout عمل ي ا ااا ل عإ ا ا ا م ع طط عيوضا ا ا ا ا ا ا ع ) ع8/6/4(
indicating the units fed by each secondary
breaker in electricity distribution panels and ملوح ا م عملقجع غااقيهاااعك ا عقاااط عت جعتجعلوحااا ع
should pack the same using plastic packages ملقو ي عملكه با ة ع تغ ةفهعبغ عب نا ا ا ا ااقةكع تهبة ع
and placing the layout into the interior side of
the panel cap. ع. مل ططع عملو هعمل مخ جعلغطاءعمل وح
(4/6/9) Electrical consumption meter box: A )عصا ااد لع م عمالنا ااقه وعملكه با ج عيقمع9/6/4(
wooden frame of a thickness of not less than
(2cm) shall be installed inside a cavity existing ع2(ت كة عب م ع عمل شا ا ا ا عببا ا ا ا اك عالعتي ع ع
in the exterior side of the front wall wall of the نا ا ا اام)ع مخ عتوويدعتجعملوان عمل ار جع ع مرع
residential unit.
ع. ملبورعمأل ا جعل وح سعملبعدة
(4/6/10) Pipes, outlet boxes and connections :) األنا يف وعلف المخارج والتوصيالت10/6/4(
a- All wires and cables shall be extended inside ع مخ ع ومنة ع يقمعت ي ع ة عمألن وع ملكاب-
PVC pipes of (50) mm diameter of Class 3
cables and (25) mm and (20) mm diameter for ع قط ع3عك سع ع م)عل ك اااب50()عقط عPVC(
the wires related to the feeding extensions, ع م)علألنا ا ا وعمل اصا ا ا عبق ي م ع25(ع م)ع ع20(
outlets and circuits. The pipe ends existing at
the outlets, connections, electrical panels and ملقغااق ا ع مل ااارجع مل ا م ع تز عنهااا ااا عمألنااابة ا ع
meter box shall be provided with the wires and دا ع ا عمل ااارجع ملقوصا ا ا ا ا ا اةا ع لوحااا عملكه باااءع
cables.
. م:صد لعمل
b- Sockets shall be installed at a height of (30 ن ا ا ا ا ا اام)عتولع30(عمرتف ااا ع تهبةا ا عمل ي اااب ع-ى
cm) above the level of work bench in the
kitchen and at a height of (30) cm above slab عمرتفااا ع ا عتجعمل طبخع:ب ا ا ا ا ا ااقواعطااا ل ا عمل
surface level in other rooms. While in the عمألخ ا ع اع ناام)عتولعنااط عملب طعتجعملغ30(
bathrooms and surface, such sockets shall be
installed at the same level of the lighting تجعملح ا ا ع ملب ا ا ا ا ا ااط عتقهب عتجعنف ع ب ا ا ا ا ا ااقواع
switches. .فاتة عمإنارس
c- Lighting switches shall be installed at a ع عمرتف ااا عالع يا ا ع تهبةا ا ع ف اااتة عمإن ااارسع-
height of not less than (125) cm above the tile
surface. .نم)عتولعنط عملب ط125(
d- As for the heaters, air-conditioners, suction م عملشا ا ا اافطع بالدبا ا ا ااب عل ب ا ا ا ا انا ع مل عةفا ع-ث
fans, electrical ovens and washing machines;
the connection box shall be installed near مألت منعملكه بااا ة ا ع ملغب ا ا ا ا ا ا اااال عيقمعت كة ا ع ب ا ع
them. The relevant boxes shall be covered with ب عبغطاءع با عب خولع:توصااة عبوومرهاع تغط عمل
a cap allowing the entry of feeding connection
through it. ع. سع ب ها: وص عتغق عمل
(4/6/11) As for electrical current feeding, )عب الدب ا ا ا ا ا ااب عل قغق عبالقةارعملكه با جعيقمع11/6/4(
copper cables and insulated copper wires shall
35+16 ×be used and non-concrete cables of (4 ز ل ع يقمعت ي ع: ع ن وعنحانة ع منق ممعكاب
mm2) shall be extended from the meter box to )ع ع2 م16+35×4(كاااب ا عغة ع با ا ا ا ا ا ا ع ي اااسع
the main electricity distribution panel installed
to the wall. In addition, non-concrete cables of م ع حق علوح عملقو ي عمل ةبااة عبالبااورع:صااد لعمل
16+10 mm2) shall be extended from the ×(4 )ع ع2 م10+16×4(كااابا عغة ع با ا ا ا ا ا ا ع ياااسع
main electricity distribution panel installed to
the wall to the secondary electricity لوح عملقو ي عمل ةب ا ا ااة عبالب ا ا ااورع حق علوح عملقو ي ع
distribution panel installed in the ground floor ملف ة عبال رعمألرضا ا ااج ع كاب عغة ع ب ا ا ا ع ياسع
(b). In addition, non-concrete cables of
10+6 mm2) shall be extended from the ×(4 علوح ا ا عملقو ي عمل ةبا ا ا ا ا ا اة ا ا ع )ع2 ع م10+16×4(
main electricity distribution panel installed to بالبورع حق علوح عملقو ي عملف ة عىع ع كاب عغة ع
the wall to the secondary electricity
distribution panel installed in the roof. Non- )ع علوح ا عملقو ي ع2 م6+10×4(با ا ا ا ا ا ا ع ياااسع
6+6 mm2) shall be ×concrete cables of (4 مل ةبة عبالبورع حق علوح عملقو ي عملف ة عبالبط ع
extended from the main electricity distribution
panel installed to wall to the water pump of the )ع علوح ع2 م6+6×4(ع كاب عغة ع ب ع ياسع
ground tank.
ا عمل اءعل زمنع ملقو ي عمل ةبااة عبالبااورع حق ع
ع.مالرضجع
(4/6/12) Telephone cable shall be made of )عكاب عملهات ع عونع عماللةا عملبص ي ع12/6/4(
fiber optic and of not less than (0.5mm2). The
telephone cable, extended from the telephone )ع يوا ا ع نع حقوتعك ااابا ا ع2 ع م0.5(ع الع يا ا ع
connection box installed to the exterior wall to ع ع ب عتوص ا ا ا ا ا ااة عملهات عتجعملب ا ا ا ا ا ااورع-ملهات ع
the telephone connection box installed in the
ground floor, shall contain wires for (2) مل ااار جع حق ع با ا عتوصا ا ا ا ا ا اةا ا عمله ااات عب ااالا ا رع
telephone lines. While, the telephone outlet )عخطعهات ع اع2( ع:ع ن ا ا ا وعل ع-مألرضا ا ااجع
wires shall be for one telephone only.
ع. ن وع ارجعملهات عتقكونعل طعهات ع مح
(4/6/14) Providing electricity distribution )علوحا عملقو ي عملكه با ة ع عنو عمل م ع14/6/4(
panels of Al-Raed or Al-Fanar model or their
equivalents and as per the Saudi Standards and اا له ااع حب ا ا ا ا ا ا ا عمل ومصا ا ا ا ا ا افااا ع: عملفداارع ع ااع
submitting a warranty certificate. ع.و ع عتي معاها سعمل ان:ملب
(4/6/15) The main and secondary circuit )عملياط عمل ةب ا ااجع قومط عمل م عملف ة ع15/6/4(
breakers shall be of a magnetic thermal
protection, quick make-and-break and shall be تكون عذم عح ااا ا عح مري ا ع غداااطةبا ا ا ا ا ا اة ا ع نعتكونع
equipped with a system preventing the breaker عملوص ا ا ا ع مليط ع ز سعبدظامع د عملياط ع:ن ا ا ا ي
from connection in case of increased load and
short circuit or connection with the ground. عملقوصة عتجعحال ع يا سعملح ع قص عمل م سع ع
The connection points should be made of ع ملق اسعباألرض ا ا ا ا ااج ع يو ع نعتكونعنياطعملق
silver and tungsten and the acre-sparking
locations should be covered to prevent عملف ا ا ع ملقدوبا ااق ع اك عا ا ا مرسعمليوسع غطاسع
ionization. There should be a complete بص ا ا ا ا ا ااورسعت د عملق ي ع ي زمع نع عونعهدالكعت مز ع
synchronization regarding the connection and
breakage for the poles of dual and triple كا عتجعملوص ا ا ا ععمليط عبالدبا ا ااب عألقطاىعمليومط ع
breakers. The number of secondary breakers عمليومط عملف ة عحب ا ا ا ع ملهدا ة ع مله ة ع يعونع
shall be as specified in load tables and bills of
quantities. ع. مل وض عتجع م لعمألح الع ملك ةا
(4/6/16) Lighting units: The lighting units )ع حا م عمإنااارس ع وا ع نعتكون ع حا م ع16/6/4(
should be of the best quality and according to
the Saudi Standards, and it should be ones of و ع:مإنارسع ع و عمألنوم ع حب عمل ومصفا عملب
the qualities using power-saving lamps عمألنوم عملقجع يو ا ا ع ن عتكون ع ح ا ا م عمإنا ااارس ع
supplied by Pan Lighting Co. or its
equivalents. The work shall not include the تب ا ااق معتةهاعل با ع يقصا ا ا سعتجعمن ا ااقه وعملطاق ع
installation of decorative chandeliers. ع:عا ا ك عبانعلانارسع ع اع ا هاع الع ش ا عمل
ع. ت كة عمله يا عمل عوري
(4/6/17) Switches and sockets: :) المفاذيح والمقابس17/6/4(
a- Lighting switches shall be quick make-and- عمليط ع ملوصا ا ع ع: فاتة عمإنارسعتكونعنا ا ي-
break and of a quality appropriate to the
alternating current feeding lighting circuits. ملدو عمل معل قة ااارعمل ق ع مل غ ااقتعلا ا م عإن ااارسع
. مل صابة
b- The sockets of air-conditioners, water فاتة ع عةفا عملهومءع نا ا ا ا انا عمل ةامع م ع-ى
heaters, suctions fans, electrical ovens and
washing machines shall be designed according ملشاافطع مألت منعملكه با ة ع ملغباااال عتكونع صا ع
to the technical bases. . تقعمألن عملفدة
c- The switches shall be of double-pole and تكون عمل يا ا اااب ع عملدو عذ عقطبة ع قط ا ا ا ع-
ground pole type and submersible pole shall be
installed to the wall. .مرضجع ت ك عغاطب عتجعملو مر
d- The sockets protected from weather وم ا ا عملوويا ا عت كا ا ع: مل ي اااب عمل ح ةا ا ع عمل-ث
conditions shall be installed on the exterior
wall of the villa. ع. عملبورعمل ار جعل فة