This document provides the initial conditions and parameters for analyzing the mooring response of a ship at a finger pier under different wind and tide scenarios. It specifies key ship characteristics like dimensions and mooring line details. It also defines the berth layout including fender and bollard locations. Sixteen cases are then analyzed combining tide levels from -0.1 to 1.3 meters and wind speeds up to 30 meters per second to understand mooring line tensions and ship motions.

Uploaded by

d_maziero
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views

CDP AT FINGER PIER - Study

This document provides the initial conditions and parameters for analyzing the mooring response of a ship at a finger pier under different wind and tide scenarios. It specifies key ship characteristics like dimensions and mooring line details. It also defines the berth layout including fender and bollard locations. Sixteen cases are then analyzed combining tide levels from -0.1 to 1.3 meters and wind speeds up to 30 meters per second to understand mooring line tensions and ship motions.

Uploaded by

d_maziero
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 25

CIDADE DE PARATY AT FINGER PIER

(PRELIMINARY STUDY)
INDEX

1 - initial conditions................................................................................................................3
2 - MOORING RESPONSE.................................................................................................5
2.1 - CASE 1..........................................................................................................................5
2.2 - CASE 2..........................................................................................................................6
2.3 - CASE 3..........................................................................................................................8
2.4 - CASE 4..........................................................................................................................9
2.5 - CASE 5........................................................................................................................10
2.6 - CASE 6........................................................................................................................11
2.7 - CASE 7........................................................................................................................13
2.8 - CASE 8........................................................................................................................14
2.9 - CASE 9........................................................................................................................15
2.10 -CASE 10......................................................................................................................17
2.11 -CASE 11......................................................................................................................18
2.12 -CASE 12......................................................................................................................19
2.13 -CASE 13......................................................................................................................20
2.14 -CASE 14......................................................................................................................22
2.15 -CASE 15......................................................................................................................23
2.16 -Case 16.......................................................................................................................24
3

1 - INITIAL CONDITIONS

Its data is specified as follow:

Units in m, mm, & tonnes


Longitudinal datum at Midship

LBP: 310,0
Breadth: 56,0
Depth: 29,5
Target:-122,1 fwd from midship and 0,0 above deck at side
End-on projected windage area: 1700 above deck level
Side projected windage area: 3577 above deck level
Fendering possible from: 0,500 LBP aft of midship
to: 0,283 LBP fwd of midship
Current drag data based on: OCIMF (Cylindrical Bow)
Wind drag data based on: FPSO (L/B = 5.1)
Wave motion data based on: User specified circular motion

Flatside Contour
X-dist -155,0 -106,6 -106,6 -95,5 -85,3 -78,0 -60,4 -55,9 70,3 79,6 87,8 87,8
Depth 0,0 0,0 6,8 15,0 20,3 23,1 27,2 27,8 27,8 26,2 17,7 0,0

__________________________________________________________________________________
Line Fair- Fair- Ht on Dist to Brake Pre- Line Tail Segment-1
No. Lead X Lead Y Deck Winch Limit Tension Size-Type-BL Lgth-Size-Type-BL
1 148,6 15,9 0,3 5,0 0 96 ns 178
2 148,6 15,9 0,3 5,0 0 96 ns 178
3 148,6 15,9 0,3 5,0 0 96 ns 178
7 108,4 27,8 -16,5 0,0 0 96 ns 178
8 108,4 27,8 -16,5 0,0 0 96 ns 178
9 75,7 28,0 -16,5 0,0 0 96 ns 178
10 75,7 28,0 -16,5 0,0 0 96 ns 178
11 43,0 28,0 -16,5 0,0 0 96 ns 178
12 43,0 28,0 -16,5 0,0 0 96 ns 178
13 10,3 28,0 -16,5 0,0 0 96 ns 178
14 10,3 28,0 -16,5 0,0 0 96 ns 178
15 -27,9 28,0 -16,5 0,0 0 96 ns 178
16 -27,9 28,0 -16,5 0,0 0 96 ns 178
17 -66,0 28,0 -16,5 0,0 0 96 ns 178
18 -66,0 28,0 -16,5 0,0 0 96 ns 178
19 -102,9 27,6 -16,5 0,0 0 96 ns 178
20 -102,9 27,6 -16,5 0,0 0 96 ns 178
21 -138,6 20,0 -16,5 0,0 0 96 ns 178
22 -138,6 20,0 -16,5 0,0 0 96 ns 178
23 -149,0 15,5 0,3 0,0 0 96 ns 178
24 -149,0 15,5 0,3 5,0 0 96 ns 178
25 -149,0 15,5 0,3 5,0 0 96 ns 178
26 -149,0 -15,5 0,3 5,0 0 96 ns 178
27 -149,0 -15,5 0,3 5,0 0 96 ns 178
28 -149,0 -15,5 0,3 5,0 0 96 ns 178
31 -138,6 -20,0 -16,5 0,0 0 96 ns 178
32 -138,6 -20,0 -16,5 0,0 0 96 ns 178
33 -102,9 -27,6 -16,5 0,0 0 96 ns 178
34 -102,9 -27,6 -16,5 0,0 0 96 ns 178
35 -66,0 -28,0 -16,5 0,0 0 96 ns 178
36 -66,0 -28,0 -16,5 0,0 0 96 ns 178
37 -27,9 -28,0 -16,5 0,0 0 96 ns 178
38 -27,9 -28,0 -16,5 0,0 0 96 ns 178
39 10,3 -28,0 -16,5 0,0 0 96 ns 178
40 10,3 -28,0 -16,5 0,0 0 96 ns 178
41 43,0 -28,0 -16,5 0,0 0 96 ns 178
42 43,0 -28,0 -16,5 0,0 0 96 ns 178
43 75,7 -28,0 -16,5 0,0 0 96 ns 178
44 75,5 -28,0 -16,5 0,0 0 96 ns 178
45 108,4 -27,8 -17,5 0,0 0 96 ns 178
46 108,4 -27,8 -16,5 0,0 0 96 ns 178
47 148,6 -15,9 0,3 5,0 0 96 ns 178
48 148,6 -15,9 0,3 5,0 0 96 ns 178
49 148,6 -15,9 0,3 5,0 0 96 ns 178
__________________________________________________________________________________
Codes for Types of Line:
ns: nylon 3 or 8-strand (broken-in)
4

The Berth data is specified as follow:

Units in m & tonnes


Solid Pier Shields Wind

Left to Right of Screen Site Plan Points: 38°


Width of Estuary (for Current): 1000
Pier Height (Fixed) above Datum: 3,9
Dredged Depth below Datum: 13,0
Permissible Surge Excursion Fwd/Aft: ± 3,00
Permissible Sway Excursion Port/Stbd: ± 3,00
Dist of Berth Target to Right of Origin: 0,0
Wind Speed Specified at Height: 30,0
Current Specified at Depth: mean

__________________________________________
Hook/ X-Dist Dist to Ht above
Bollard to Origin Fender Line Berth
A 0,0 13,3 0,3
B 52,1 4,3 0,3
C 52,1 22,2 0,3
D 79,1 6,1 0,3
E 109,4 4,8 0,3
F 138,1 6,1 0,3
G 173,1 4,8 0,3
H 203,6 6,1 0,3
I 234,4 4,8 0,3
J 273,6 6,4 0,3
K 307,0 6,4 0,3
L 353,4 3,4 0,3
M 353,4 23,9 0,3
N 307,4 20,8 0,3
O 273,6 20,8 0,3
P 234,4 22,5 0,3
Q 203,6 20,8 0,3
R 173,1 22,5 0,3
S 138,1 20,8 0,3
T 109,4 22,5 0,3
U 79,1 20,8 0,3
__________________________________________

____________________________________________________________
Fender X-Dist Ht above Width Face Contact
to Origin Datum Along Side Area (m²)
bb 52,1 2,8 2,5
ee 109,4 2,8 2,5
gg 173,1 2,8 2,5

Fender Load-Compression Data


bb 224 tonnes
0,80 m

ee 224 tonnes
0,80 m

gg 224 tonnes
0,80 m
____________________________________________________________
5

2 - MOORING RESPONSE

For the mooring response it was considered 1 minute mean wind speed at 30 m
height in a return period of 10 years, at Angra dos Reis. Also, as the shipyard represents a
sheltered situation from waves and currents, they were not considered. The tide varies from
-0,1 to 1,3 m. The cases below represent each tide and wind combination and all the data is
collected from Optimoor Plus Version 5.4.1.

2.1 - Case 1

Water level at -0,1 m;


N wind at 18 m/s

Water Level: -0,10 above Datum


Draft: 6,1
Trim: 4,2
Bottom Clearance: 4,7
Deck Level: 17,7 above Berth (at Target)
Wind Speed: 35 knots
Wind Direction True: 0°
Wind Direction to Berth X-axis: -38°

Total End-0n Windage Area: 3104


Total Side Windage Area: 10831

Longitudinal Transverse Yaw Moment/LBP


Wind Drag Force: 71,4 -169,1 -16,3 (solid pier shields
wind)
Total Force: 71,4 -169,1 -16,3

Vessel Moves(at Target): -0,5 aft -1,2 out 2,6° stbd 0,0 up
______________________________________________________________________
Line to Pull Tot.Line In-Line Winch Inclin. Line Percent
Bollard -in Length ±Motion Slippage Down Tension Strength
1-L 0,00 91,8 14° 28,1 16%
2-L 0,00 91,8 14° 28,1 16%
3-L 0,00 91,8 14° 28,1 16%
7-J -2,10 45,9 5° 18,5 10%
8-H -3,5 31,4 7° 8,5 5%
9-I 0,00 37,1 5° 56,3 32%
10-²@G -3,0 53,8 7° 37,8 21%
11-F -2,20 30,1 6° 5,5 3%
13-G 0,00 41,1 4° 26,7 15%
14-²@E -2,00 49,3 6° 21,1 12%
15-B 0,00 42,4 3° 4,7 3%
17-E 0,00 53,5 2° 7,4 4%
19-B 0,00 33,3 2° 10,7 6%
20-²@A -1,00 48,2 3° 7,9 4%
21-A 0,00 27,0 1° 14,7 8%
22-A 0,00 27,0 1° 14,7 8%
______________________________________________________________________
Fender Thrust Compression Pressure Contact Area
bb 0 free 100%
ee 0 free 100%
gg 0 free 100%
6

________________________________________________________________
Total
Hook/ X- Y- Other Other Horiz Direction
Bollard Force Force X-Load Y-Load Force in Plan Uplift
A -6,1 33,2 33,8 -10° 1,5
B -5,9 3,2 6,7 -62° 0,6
E 29,8 20,8 36,4 55° 4,8
F 4,8 2,7 5,5 61° 0,6
G 38,3 46,6 60,4 39° 11,3
H 7,0 4,7 8,4 56° 1,1
I -52,1 20,8 56,1 -68° 5,1
J -17,0 7,1 18,4 -68° 1,6
L -77,7 26,7 82,1 -71° 19,8
________________________________________________________________

Approximate natural periods


Surge: 38 Sway: 83 Roll: 45 secs

2.2 - Case 2

Water level at -0,1 m;


NE wind at 21 m/s

Water Level: -0,10 above Datum


Draft: 6,1
Trim: 4,2
Bottom Clearance: 4,7
Deck Level: 17,7 above Berth (at Target)
Wind Speed: 41 knots
Wind Direction True: 45°
Wind Direction to Berth X-axis: 7°

Total End-0n Windage Area: 3104


Total Side Windage Area: 10831

Longitudinal Transverse Yaw Moment/LBP


Wind Drag Force: 93,5 33,1 3,5
Total Force: 93,5 33,1 3,5

Vessel Moves(at Target): -1,2 aft 0,2 inw 0,1° stbd 0,0 up
7

______________________________________________________________________
Line to Pull Tot.Line In-Line Winch Inclin. Line Percent
Bollard -in Length ±Motion Slippage Down Tension Strength
1-L 0,00 91,8 14° 6,1 3%
2-L 0,00 91,8 14° 6,1 3%
3-L 0,00 91,8 14° 6,1 3%
7-J -2,10 45,9 5° slack
8-H -3,5 31,4 9° slack
9-I 0,00 37,1 5° 17,5 10%
10-²@G -3,0 53,8 9° slack
11-F -2,20 30,1 7° slack
13-G 0,00 41,1 4° 15,3 9%
14-²@E -2,00 49,3 7° slack
15-B 0,00 42,4 3° slack
17-E 0,00 53,5 2° 11,0 6%
19-B 0,00 33,3 2° 19,5 11%
20-²@A -1,00 48,2 3° slack
21-A 0,00 27,0 2° 10,4 6%
22-A 0,00 27,0 2° 10,4 6%
______________________________________________________________________
Fender Thrust Compression Pressure Contact Area
bb 42 0,15 100%
ee 18 0,06 100%
gg 0 free 100%
________________________________________________________________
Total
Hook/ X- Y- Other Other Horiz Direction
Bollard Force Force X-Load Y-Load Force in Plan Uplift
A -13,4 15,9 20,8 -40° 0,5
B -19,3 2,5 19,5 -82° 0,7
E -10,9 0,9 11,0 -85° 0,3
G -15,2 1,7 15,3 -84° 1,0
I -17,3 2,2 17,4 -83° 1,7
L -17,5 3,3 17,8 -79° 4,5
________________________________________________________________

Approximate natural periods


Surge: 38 Sway: 83 Roll: 45 secs
8

2.3 - Case 3

Water level at -0,1 m;


E wind at 21 m/s

Water Level: -0,10 above Datum


Draft: 6,1
Trim: 4,2
Bottom Clearance: 4,7
Deck Level: 17,7 above Berth (at Target)
Wind Speed: 41 knots
Wind Direction True: 90°
Wind Direction to Berth X-axis: 52°

Total End-0n Windage Area: 3104


Total Side Windage Area: 10831

Longitudinal Transverse Yaw Moment/LBP


Wind Drag Force: 73,4 330,5 25,6
Total Force: 73,4 330,5 25,6

Vessel Moves(at Target): -1,0 aft 0,0 inw 0,2° port 0,0 up

______________________________________________________________________
Line to Pull Tot.Line In-Line Winch Inclin. Line Percent
Bollard -in Length ±Motion Slippage Down Tension Strength
1-L 0,00 91,8 14° 3,8 2%
2-L 0,00 91,8 14° 3,8 2%
3-L 0,00 91,8 14° 3,8 2%
7-J -2,10 45,9 5° slack
8-H -3,5 31,4 9° slack
9-I 0,00 37,1 5° 12,4 7%
10-²@G -3,0 53,8 9° slack
11-F -2,20 30,1 7° slack
13-G 0,00 41,1 4° 11,4 6%
14-²@E -2,00 49,3 7° slack
15-B 0,00 42,4 3° slack
17-E 0,00 53,5 2° 8,5 5%
19-B 0,00 33,3 2° 15,6 9%
20-²@A -1,00 48,2 3° slack
21-A 0,00 27,0 1° 11,7 7%
22-A 0,00 27,0 1° 11,7 7%
______________________________________________________________________
Fender Thrust Compression Pressure Contact Area
bb 60 0,21 100%
ee 116 0,42 100%
gg 179 0,64 100%
________________________________________________________________
Total
Hook/ X- Y- Other Other Horiz Direction
Bollard Force Force X-Load Y-Load Force in Plan Uplift
A -14,8 18,1 23,4 -39° 0,6
B -15,4 2,1 15,6 -82° 0,5
E -8,5 0,7 8,6 -85° 0,3
G -11,3 1,2 11,4 -84° 0,7
I -12,3 1,3 12,3 -84° 1,2
L -11,0 1,9 11,2 -80° 2,8
________________________________________________________________

Approximate natural periods


Surge: 38 Sway: 83 Roll: 45 secs
9

2.4 - Case 4

Water level at -0,1 m;


SE wind at 22 m/s

Water Level: -0,10 above Datum


Draft: 6,1
Trim: 4,2
Bottom Clearance: 4,7
Deck Level: 17,7 above Berth (at Target)
Wind Speed: 43 knots
Wind Direction True: 135°
Wind Direction to Berth X-axis: 97°

Total End-0n Windage Area: 3104


Total Side Windage Area: 10831

Longitudinal Transverse Yaw Moment/LBP


Wind Drag Force: -18,9 425,4 -1,1
Total Force: -18,9 425,4 -1,1

Vessel Moves(at Target): 1,1 fwd 0,3 inw 0,1° port 0,0 up

______________________________________________________________________
Line to Pull Tot.Line In-Line Winch Inclin. Line Percent
Bollard -in Length ±Motion Slippage Down Tension Strength
1-L 0,00 91,8 14° slack
2-L 0,00 91,8 14° slack
3-L 0,00 91,8 14° slack
7-J -2,10 45,9 5° slack
8-H -3,5 31,4 8° slack
9-I 0,00 37,1 6° slack
10-²@G -3,0 53,8 8° slack
11-F -2,20 30,1 6° slack
13-G 0,00 41,1 4° slack
14-²@E -2,00 49,3 6° slack
15-B 0,00 42,4 3° 12,0 7%
17-E 0,00 53,5 2° slack
19-B 0,00 33,3 2° slack
20-²@A -1,00 48,2 3° 4,2 2%
21-A 0,00 27,0 2° slack
22-A 0,00 27,0 2° slack
______________________________________________________________________
Fender Thrust Compression Pressure Contact Area
bb 105 0,38 100%
ee 142 0,51 100%
gg 183 0,66 100%
10

________________________________________________________________
Total
Hook/ X- Y- Other Other Horiz Direction
Bollard Force Force X-Load Y-Load Force in Plan Uplift
A 7,0 4,6 8,3 57° 0,4
B 11,9 1,1 12,0 85° 0,6
________________________________________________________________

Approximate natural periods


Surge: 38 Sway: 83 Roll: 45 secs

2.5 - Case 5

Water level at -0,1 m;


S wind at 22 m/s

Water Level: -0,10 above Datum


Draft: 6,1
Trim: 4,2
Bottom Clearance: 4,7
Deck Level: 17,7 above Berth (at Target)
Wind Speed: 43 knots
Wind Direction True: 180°
Wind Direction to Berth X-axis: 142°

Total End-0n Windage Area: 3104


Total Side Windage Area: 10831

Longitudinal Transverse Yaw Moment/LBP


Wind Drag Force: -115,9 270,7 -18,8
Total Force: -115,9 270,7 -18,8

Vessel Moves(at Target): 2,0 fwd 0,4 inw 0,0° stbd 0,0 up

______________________________________________________________________
Line to Pull Tot.Line In-Line Winch Inclin. Line Percent
Bollard -in Length ±Motion Slippage Down Tension Strength
1-L 0,00 91,8 15° slack
2-L 0,00 91,8 15° slack
3-L 0,00 91,8 15° slack
7-J -2,10 45,9 6° slack
8-H -3,5 31,4 8° slack
9-I 0,00 37,1 6° slack
10-²@G -3,0 53,8 8° 6,9 4%
11-F -2,20 30,1 6° slack
13-G 0,00 41,1 4° slack
11

14-²@E -2,00 49,3 6° 19,8 11%


15-B 0,00 42,4 3° 26,9 15%
17-E 0,00 53,5 2° slack
19-B 0,00 33,3 2° slack
20-²@A -1,00 48,2 3° 21,8 12%
21-A 0,00 27,0 2° slack
22-A 0,00 27,0 2° slack
______________________________________________________________________
Fender Thrust Compression Pressure Contact Area
bb 110 0,39 100%
ee 102 0,36 100%
gg 94 0,33 100%
________________________________________________________________
Total
Hook/ X- Y- Other Other Horiz Direction
Bollard Force Force X-Load Y-Load Force in Plan Uplift
A 36,9 23,1 43,5 58° 2,1
B 26,7 2,4 26,8 85° 1,3
E 38,8 6,9 39,4 80° 4,2
G 13,5 2,3 13,7 80° 1,8
________________________________________________________________

Approximate natural periods


Surge: 38 Sway: 83 Roll: 45 secs

2.6 - Case 6

Water level at -0,1 m;


SW wind at 27 m/s

Water Level: -0,10 above Datum


Draft: 6,1
Trim: 4,2
Bottom Clearance: 4,7
Deck Level: 17,7 above Berth (at Target)
Wind Speed: 52 knots
Wind Direction True: 225°
Wind Direction to Berth X-axis: -173°

Total End-0n Windage Area: 3104


Total Side Windage Area: 10831

Longitudinal Transverse Yaw Moment/LBP


12

Wind Drag Force: -150,9 -54,9 3,5 (solid pier shields


wind)
Total Force: -150,9 -54,9 3,5

Vessel Moves(at Target): 2,0 fwd -1,0 out 0,4° port 0,0 up

______________________________________________________________________
Line to Pull Tot.Line In-Line Winch Inclin. Line Percent
Bollard -in Length ±Motion Slippage Down Tension Strength
1-L 0,00 91,8 15° slack
2-L 0,00 91,8 15° slack
3-L 0,00 91,8 15° slack
7-J -2,10 45,9 6° slack
8-H -3,5 31,4 8° slack
9-I 0,00 37,1 6° slack
10-²@G -3,0 53,8 8° 6,3 4%
11-F -2,20 30,1 6° slack
13-G 0,00 41,1 4° slack
14-²@E -2,00 49,3 6° 21,2 12%
15-B 0,00 42,4 3° 27,3 15%
17-E 0,00 53,5 2° slack
19-B 0,00 33,3 2° slack
20-²@A -1,00 48,2 3° 43,0 24%
21-A 0,00 27,0 2° slack
22-A 0,00 27,0 2° slack
______________________________________________________________________
Fender Thrust Compression Pressure Contact Area
bb 0 free 100%
ee 0 free 100%
gg 8 0,03 100%
________________________________________________________________
Total
Hook/ X- Y- Other Other Horiz Direction
Bollard Force Force X-Load Y-Load Force in Plan Uplift
A 70,7 48,8 85,9 55° 4,0
B 27,1 2,9 27,2 84° 1,4
E 41,3 8,3 42,1 79° 4,5
G 12,2 2,1 12,4 80° 1,7
________________________________________________________________

Approximate natural periods


Surge: 38 Sway: 83 Roll: 45 secs

2.7 - Case 7

Water level at -0,1 m;


13

W wind at 22 m/s

Water Level: -0,10 above Datum


Draft: 6,1
Trim: 4,2
Bottom Clearance: 4,7
Deck Level: 17,7 above Berth (at Target)
Wind Speed: 43 knots
Wind Direction True: 270°
Wind Direction to Berth X-axis: -128°

Total End-0n Windage Area: 3104


Total Side Windage Area: 10831

Longitudinal Transverse Yaw Moment/LBP


Wind Drag Force: -102,4 -303,6 13,6 (solid pier shields
wind)
Total Force: -102,4 -303,6 13,6

Vessel Moves(at Target): 0,1 fwd -3,0 out 2,0° stbd 0,0 up

______________________________________________________________________
Line to Pull Tot.Line In-Line Winch Inclin. Line Percent
Bollard -in Length ±Motion Slippage Down Tension Strength
1-L 0,00 91,8 14° 20,8 12%
2-L 0,00 91,8 14° 20,8 12%
3-L 0,00 91,8 14° 20,8 12%
7-J -2,10 45,9 5° 8,5 5%
8-H -3,5 31,4 7° 13,9 8%
9-I 0,00 37,1 5° 42,8 24%
10-²@G -3,0 53,8 7° 51,5 29%
11-F -2,20 30,1 6° 17,0 10%
13-G 0,00 41,1 4° 19,7 11%
14-²@E -2,00 49,3 6° 44,1 25%
15-B 0,00 42,4 3° 14,3 8%
17-E 0,00 53,5 2° 4,6 3%
19-B 0,00 33,3 2° 7,8 4%
20-²@A -1,00 48,2 3° 51,6 29%
21-A 0,00 27,0 1° 47,9 27%
22-A 0,00 27,0 1° 47,9 27%
______________________________________________________________________
Fender Thrust Compression Pressure Contact Area
bb 0 free 100%
ee 0 free 100%
gg 0 free 100%
________________________________________________________________
Total
Hook/ X- Y- Other Other Horiz Direction
Bollard Force Force X-Load Y-Load Force in Plan Uplift
A 21,8 147,2 148,8 8° 7,2
B 6,3 5,4 8,3 49° 1,0
E 72,8 42,4 84,3 60° 9,3
F 14,9 8,2 17,0 61° 1,7
G 69,1 58,0 90,2 50° 14,2
H 11,6 7,5 13,8 57° 1,7
I -39,5 15,9 42,6 -68° 3,9
J -7,8 3,2 8,5 -68° 0,7
L -57,5 19,3 60,6 -71° 14,8
________________________________________________________________

Approximate natural periods


Surge: 38 Sway: 83 Roll: 45 secs
14

2.8 - Case 8

Water level at -0,1 m;


NW wind at 18 m/s

Water Level: -0,10 above Datum


Draft: 6,1
Trim: 4,2
Bottom Clearance: 4,7
Deck Level: 17,7 above Berth (at Target)
Wind Speed: 35 knots
Wind Direction True: 315°
Wind Direction to Berth X-axis: -83°

Total End-0n Windage Area: 3104


Total Side Windage Area: 10831

Longitudinal Transverse Yaw Moment/LBP


Wind Drag Force: 6,6 -258,9 -5,4 (solid pier shields
wind)
Total Force: 6,6 -258,9 -5,4

Vessel Moves(at Target): -0,3 aft -2,2 out 2,4° stbd 0,0 up

______________________________________________________________________
Line to Pull Tot.Line In-Line Winch Inclin. Line Percent
Bollard -in Length ±Motion Slippage Down Tension Strength
1-L 0,00 91,8 14° 27,5 15%
2-L 0,00 91,8 14° 27,5 15%
3-L 0,00 91,8 14° 27,5 15%
7-J -2,10 45,9 5° 18,7 11%
8-H -3,5 31,4 7° 15,4 9%
9-I 0,00 37,1 5° 57,3 32%
10-²@G -3,0 53,8 7° 49,3 28%
11-F -2,20 30,1 6° 12,7 7%
13-G 0,00 41,1 4° 27,5 15%
14-²@E -2,00 49,3 6° 34,0 19%
15-B 0,00 42,4 3° 8,0 5%
17-E 0,00 53,5 2° 7,5 4%
19-B 0,00 33,3 2° 12,0 7%
20-²@A -1,00 48,2 3° 27,0 15%
21-A 0,00 27,0 1° 33,5 19%
22-A 0,00 27,0 1° 33,5 19%
______________________________________________________________________
15

Fender Thrust Compression Pressure Contact Area


bb 0 free 100%
ee 0 free 100%
gg 0 free 100%
________________________________________________________________
Total
Hook/ X- Y- Other Other Horiz Direction
Bollard Force Force X-Load Y-Load Force in Plan Uplift
A 0,2 89,2 89,2 0° 4,3
B -3,9 4,6 6,0 -40° 0,8
E 51,8 34,0 62,0 57° 7,4
F 11,0 6,3 12,6 60° 1,3
G 56,5 60,2 82,5 43° 14,1
H 12,6 8,6 15,3 55° 1,9
I -52,7 21,8 57,1 -68° 5,2
J -17,2 7,3 18,6 -67° 1,6
L -75,8 26,4 80,2 -71° 19,4
________________________________________________________________

Approximate natural periods


Surge: 38 Sway: 83 Roll: 45 secs

2.9 - Case 9

Water level at 1,3 m;


N wind at 18 m/s

Water Level: 1,30 above Datum


Draft: 6,1
Trim: 4,2
Bottom Clearance: 6,1
Deck Level: 19,1 above Berth (at Target)
Wind Speed: 35 knots
Wind Direction True: 0°
Wind Direction to Berth X-axis: -38°

Total End-0n Windage Area: 3104


Total Side Windage Area: 10831

Longitudinal Transverse Yaw Moment/LBP


Wind Drag Force: 69,8 -177,3 -17,3 (solid pier shields
wind)
Total Force: 69,8 -177,3 -17,3
16

Vessel Moves(at Target): -0,5 aft -1,1 out 2,5° stbd 1,4 up

______________________________________________________________________
Line to Pull Tot.Line In-Line Winch Inclin. Line Percent
Bollard -in Length ±Motion Slippage Down Tension Strength
1-L 0,00 91,8 14° 30,0 17%
2-L 0,00 91,8 14° 30,0 17%
3-L 0,00 91,8 14° 30,0 17%
7-J -2,10 45,9 7° 19,0 11%
8-H -3,5 31,4 10° 9,3 5%
9-I 0,00 37,1 7° 57,7 32%
10-²@G -3,0 53,8 10° 40,1 23%
11-F -2,20 30,1 9° 6,5 4%
13-G 0,00 41,1 6° 27,8 16%
14-²@E -2,00 49,3 9° 23,8 13%
15-B 0,00 42,4 5° 5,2 3%
17-E 0,00 53,5 3° 7,9 4%
19-B 0,00 33,3 4° 12,0 7%
20-²@A -1,00 48,2 6° 8,7 5%
21-A 0,00 27,0 4° 15,3 9%
22-A 0,00 27,0 4° 15,3 9%
______________________________________________________________________
Fender Thrust Compression Pressure Contact Area
bb 0 free 100%
ee 0 free 100%
gg 0 free 100%
________________________________________________________________
Total
Hook/ X- Y- Other Other Horiz Direction
Bollard Force Force X-Load Y-Load Force in Plan Uplift
A -5,7 34,9 35,4 -9° 4,2
B -6,6 3,5 7,5 -62° 1,4
E 33,9 22,9 40,9 56° 8,1
F 5,7 3,1 6,5 61° 1,0
G 41,0 48,4 63,5 40° 16,8
H 7,7 5,1 9,2 56° 1,6
I -53,3 20,9 57,3 -69° 7,2
J -17,5 7,1 18,9 -68° 2,2
L -82,6 28,1 87,3 -71° 22,5
________________________________________________________________

Approximate natural periods


Surge: 38 Sway: 83 Roll: 45 secs
17

2.10 - Case 10

Water level at 1,3 m;


NE wind at 21 m/s

Water Level: 1,30 above Datum


Draft: 6,1
Trim: 4,2
Bottom Clearance: 6,1
Deck Level: 19,1 above Berth (at Target)
Wind Speed: 41 knots
Wind Direction True: 45°
Wind Direction to Berth X-axis: 7°

Total End-0n Windage Area: 3104


Total Side Windage Area: 10831

Longitudinal Transverse Yaw Moment/LBP


Wind Drag Force: 93,6 33,1 3,5
Total Force: 93,6 33,1 3,5

Vessel Moves(at Target): -1,1 aft 0,2 inw 0,1° stbd 1,4 up

______________________________________________________________________
Line to Pull Tot.Line In-Line Winch Inclin. Line Percent
Bollard -in Length ±Motion Slippage Down Tension Strength
1-L 0,00 91,8 15° 7,1 4%
2-L 0,00 91,8 15° 7,1 4%
3-L 0,00 91,8 15° 7,1 4%
7-J -2,10 45,9 7° slack
8-H -3,5 31,4 12° slack
9-I 0,00 37,1 8° 17,7 10%
10-²@G -3,0 53,8 12° slack
11-F -2,20 30,1 10° slack
13-G 0,00 41,1 6° 14,9 8%
14-²@E -2,00 49,3 10° slack
15-B 0,00 42,4 5° slack
17-E 0,00 53,5 3° 10,0 6%
19-B 0,00 33,3 4° 18,1 10%
20-²@A -1,00 48,2 7° slack
21-A 0,00 27,0 4° 10,4 6%
22-A 0,00 27,0 4° 10,4 6%
______________________________________________________________________
Fender Thrust Compression Pressure Contact Area
bb 39 0,14 100%
ee 21 0,07 100%
gg 0 0,00 100%
________________________________________________________________
Total
Hook/ X- Y- Other Other Horiz Direction
Bollard Force Force X-Load Y-Load Force in Plan Uplift
A -13,3 15,9 20,8 -40° 1,6
B -17,9 2,4 18,1 -82° 1,4
E -10,0 0,9 10,0 -85° 0,6
G -14,7 1,7 14,8 -84° 1,5
I -17,4 2,2 17,5 -83° 2,3
L -20,3 3,8 20,6 -79° 5,5
________________________________________________________________

Approximate natural periods


Surge: 38 Sway: 83 Roll: 45 secs
18

2.11 - Case 11

Water level at 1,3 m;


E wind at 21 m/s

Water Level: 1,30 above Datum


Draft: 6,1
Trim: 4,2
Bottom Clearance: 6,1
Deck Level: 19,1 above Berth (at Target)
Wind Speed: 41 knots
Wind Direction True: 90°
Wind Direction to Berth X-axis: 52°

Total End-0n Windage Area: 3104


Total Side Windage Area: 10831

Longitudinal Transverse Yaw Moment/LBP


Wind Drag Force: 73,4 330,5 25,6
Total Force: 73,4 330,5 25,6

Vessel Moves(at Target): -0,9 aft 0,0 inw 0,2° port 1,4 up

______________________________________________________________________
Line to Pull Tot.Line In-Line Winch Inclin. Line Percent
Bollard -in Length ±Motion Slippage Down Tension Strength
1-L 0,00 91,8 15° 4,9 3%
2-L 0,00 91,8 15° 4,9 3%
3-L 0,00 91,8 15° 4,9 3%
7-J -2,10 45,9 7° slack
8-H -3,5 31,4 12° slack
9-I 0,00 37,1 8° 12,6 7%
10-²@G -3,0 53,8 12° slack
11-F -2,20 30,1 10° slack
13-G 0,00 41,1 6° 10,9 6%
14-²@E -2,00 49,3 10° slack
15-B 0,00 42,4 5° slack
17-E 0,00 53,5 3° 7,8 4%
19-B 0,00 33,3 4° 14,3 8%
20-²@A -1,00 48,2 7° slack
21-A 0,00 27,0 4° 11,4 6%
22-A 0,00 27,0 4° 11,4 6%
______________________________________________________________________
19

Fender Thrust Compression Pressure Contact Area


bb 58 0,21 100%
ee 116 0,42 100%
gg 181 0,65 100%
________________________________________________________________
Total
Hook/ X- Y- Other Other Horiz Direction
Bollard Force Force X-Load Y-Load Force in Plan Uplift
A -14,4 17,7 22,8 -39° 1,8
B -14,1 1,9 14,2 -82° 1,1
E -7,8 0,7 7,8 -85° 0,4
G -10,8 1,1 10,8 -84° 1,1
I -12,4 1,3 12,5 -84° 1,7
L -13,9 2,4 14,1 -80° 3,8
________________________________________________________________

Approximate natural periods


Surge: 38 Sway: 83 Roll: 45 secs

2.12 - Case 12

Water level at 1,3 m;


SE wind at 22 m/s

Water Level: 1,30 above Datum


Draft: 6,1
Trim: 4,2
Bottom Clearance: 6,1
Deck Level: 19,1 above Berth (at Target)
Wind Speed: 43 knots
Wind Direction True: 135°
Wind Direction to Berth X-axis: 97°

Total End-0n Windage Area: 3104


Total Side Windage Area: 10831

Longitudinal Transverse Yaw Moment/LBP


Wind Drag Force: -18,9 425,4 -1,1
Total Force: -18,9 425,4 -1,1

Vessel Moves(at Target): 0,9 fwd 0,3 inw 0,1° port 1,4 up
20

______________________________________________________________________
Line to Pull Tot.Line In-Line Winch Inclin. Line Percent
Bollard -in Length ±Motion Slippage Down Tension Strength
1-L 0,00 91,8 15° slack
2-L 0,00 91,8 15° slack
3-L 0,00 91,8 15° slack
7-J -2,10 45,9 7° slack
8-H -3,5 31,4 11° slack
9-I 0,00 37,1 8° slack
10-²@G -3,0 53,8 11° slack
11-F -2,20 30,1 9° slack
13-G 0,00 41,1 6° slack
14-²@E -2,00 49,3 10° 0,3 0%
15-B 0,00 42,4 5° 11,5 6%
17-E 0,00 53,5 3° slack
19-B 0,00 33,3 5° slack
20-²@A -1,00 48,2 6° 4,2 2%
21-A 0,00 27,0 5° slack
22-A 0,00 27,0 5° slack
______________________________________________________________________
Fender Thrust Compression Pressure Contact Area
bb 106 0,38 100%
ee 142 0,51 100%
gg 183 0,65 100%
________________________________________________________________
Total
Hook/ X- Y- Other Other Horiz Direction
Bollard Force Force X-Load Y-Load Force in Plan Uplift
A 6,9 4,6 8,3 56° 0,9
B 11,4 1,0 11,4 85° 1,0
E 0,6 0,1 0,6 80° 0,1
________________________________________________________________

Approximate natural periods


Surge: 38 Sway: 83 Roll: 45 secs

2.13 - Case 13

Water level at 1,3 m;


S wind at 22 m/s

Water Level: 1,30 above Datum


Draft: 6,1
Trim: 4,2
Bottom Clearance: 6,1
21

Deck Level: 19,1 above Berth (at Target)


Wind Speed: 43 knots
Wind Direction True: 180°
Wind Direction to Berth X-axis: 142°

Total End-0n Windage Area: 3104


Total Side Windage Area: 10831

Longitudinal Transverse Yaw Moment/LBP


Wind Drag Force: -115,9 270,7 -18,8
Total Force: -115,9 270,7 -18,8

Vessel Moves(at Target): 1,8 fwd 0,4 inw 0,0° stbd 1,4 up

______________________________________________________________________
Line to Pull Tot.Line In-Line Winch Inclin. Line Percent
Bollard -in Length ±Motion Slippage Down Tension Strength
1-L 0,00 91,8 15° slack
2-L 0,00 91,8 15° slack
3-L 0,00 91,8 15° slack
7-J -2,10 45,9 7° slack
8-H -3,5 31,4 11° slack
9-I 0,00 37,1 8° slack
10-²@G -3,0 53,8 11° 7,9 4%
11-F -2,20 30,1 9° slack
13-G 0,00 41,1 6° slack
14-²@E -2,00 49,3 9° 20,6 12%
15-B 0,00 42,4 5° 25,6 14%
17-E 0,00 53,5 3° slack
19-B 0,00 33,3 5° slack
20-²@A -1,00 48,2 6° 20,9 12%
21-A 0,00 27,0 5° slack
22-A 0,00 27,0 5° slack
______________________________________________________________________
Fender Thrust Compression Pressure Contact Area
bb 109 0,39 100%
ee 102 0,36 100%
gg 94 0,34 100%
________________________________________________________________
Total
Hook/ X- Y- Other Other Horiz Direction
Bollard Force Force X-Load Y-Load Force in Plan Uplift
A 35,1 22,2 41,5 58° 4,3
B 25,5 2,3 25,6 85° 2,1
E 40,0 7,2 40,6 80° 6,7
G 15,3 2,6 15,5 80° 2,9
________________________________________________________________
Approximate natural periods
Surge: 38 Sway: 83 Roll: 45 secs
22

2.14 - Case 14

Water level at 1,3 m;


SW wind at 27 m/s

Water Level: 1,30 above Datum


Draft: 6,1
Trim: 4,2
Bottom Clearance: 6,1
Deck Level: 19,1 above Berth (at Target)
Wind Speed: 52 knots
Wind Direction True: 225°
Wind Direction to Berth X-axis: -173°

Total End-0n Windage Area: 3104


Total Side Windage Area: 10831

Longitudinal Transverse Yaw Moment/LBP


Wind Drag Force: -150,1 -59,0 4,4 (solid pier shields
wind)
Total Force: -150,1 -59,0 4,4

Vessel Moves(at Target): 1,8 fwd -1,2 out 0,4° port 1,4 up

______________________________________________________________________
Line to Pull Tot.Line In-Line Winch Inclin. Line Percent
Bollard -in Length ±Motion Slippage Down Tension Strength
1-L 0,00 91,8 16° slack
2-L 0,00 91,8 16° slack
3-L 0,00 91,8 16° slack
7-J -2,10 45,9 7° slack
8-H -3,5 31,4 11° slack
9-I 0,00 37,1 8° slack
10-²@G -3,0 53,8 11° 6,9 4%
11-F -2,20 30,1 9° slack
13-G 0,00 41,1 6° slack
14-²@E -2,00 49,3 9° 21,5 12%
15-B 0,00 42,4 5° 25,8 14%
17-E 0,00 53,5 3° slack
19-B 0,00 33,3 5° slack
20-²@A -1,00 48,2 6° 43,6 24%
21-A 0,00 27,0 5° 0,9 0%
22-A 0,00 27,0 5° 0,9 0%
______________________________________________________________________
Fender Thrust Compression Pressure Contact Area
bb 0 free 100%
ee 0 free 100%
gg 7 0,02 100%
________________________________________________________________
Total
Hook/ X- Y- Other Other Horiz Direction
Bollard Force Force X-Load Y-Load Force in Plan Uplift
A 70,0 51,3 86,8 54° 9,0
B 25,6 2,8 25,7 84° 2,1
E 41,6 8,5 42,5 78° 7,0
G 13,3 2,3 13,5 80° 2,5
________________________________________________________________

Approximate natural periods


Surge: 38 Sway: 83 Roll: 45 secs
23

2.15 - Case 15

Water level at 1,3 m;


W wind at 22 m/s

Water Level: 1,30 above Datum


Draft: 6,1
Trim: 4,2
Bottom Clearance: 6,1
Deck Level: 19,1 above Berth (at Target)
Wind Speed: 43 knots
Wind Direction True: 270°
Wind Direction to Berth X-axis: -128°

Total End-0n Windage Area: 3104


Total Side Windage Area: 10831

Longitudinal Transverse Yaw Moment/LBP


Wind Drag Force: -99,5 -321,0 14,9 (solid pier shields
wind)
Total Force: -99,5 -321,0 14,9

Vessel Moves(at Target): 0,0 fwd -3,0 out 2,0° stbd 1,4 up

______________________________________________________________________
Line to Pull Tot.Line In-Line Winch Inclin. Line Percent
Bollard -in Length ±Motion Slippage Down Tension Strength
1-L 0,00 91,8 15° 23,0 13%
2-L 0,00 91,8 15° 23,0 13%
3-L 0,00 91,8 15° 23,0 13%
7-J -2,10 45,9 7° 9,7 5%
8-H -3,5 31,4 10° 15,1 8%
9-I 0,00 37,1 7° 45,4 26%
10-²@G -3,0 53,8 10° 54,2 30%
11-F -2,20 30,1 8° 18,6 10%
13-G 0,00 41,1 6° 21,7 12%
14-²@E -2,00 49,3 9° 47,2 27%
15-B 0,00 42,4 5° 14,8 8%
17-E 0,00 53,5 3° 5,4 3%
19-B 0,00 33,3 4° 9,7 5%
20-²@A -1,00 48,2 6° 53,7 30%
21-A 0,00 27,0 4° 51,2 29%
22-A 0,00 27,0 4° 51,2 29%
______________________________________________________________________
24

Fender Thrust Compression Pressure Contact Area


bb 0 free 100%
ee 0 free 100%
gg 0 free 100%
________________________________________________________________
Total
Hook/ X- Y- Other Other Horiz Direction
Bollard Force Force X-Load Y-Load Force in Plan Uplift
A 20,8 154,9 156,3 8° 18,2
B 4,9 5,9 7,7 40° 2,0
E 76,9 44,8 89,0 60° 15,1
F 16,1 8,8 18,4 61° 2,7
G 71,3 60,3 93,4 50° 20,8
H 12,6 8,0 14,9 57° 2,6
I -41,9 16,6 45,1 -68° 5,8
J -8,9 3,6 9,6 -68° 1,1
L -63,4 21,1 66,8 -72° 17,4
________________________________________________________________

Approximate natural periods


Surge: 38 Sway: 83 Roll: 45 secs

2.16 - Case 16

Water level at 1,3 m;


NW wind at 18 m/s

Water Level: 1,30 above Datum


Draft: 6,1
Trim: 4,2
Bottom Clearance: 6,1
Deck Level: 19,1 above Berth (at Target)
Wind Speed: 35 knots
Wind Direction True: 315°
Wind Direction to Berth X-axis: -83°

Total End-0n Windage Area: 3104


Total Side Windage Area: 10831

Longitudinal Transverse Yaw Moment/LBP


25

Wind Drag Force: 6,1 -271,0 -5,2 (solid pier shields


wind)
Total Force: 6,1 -271,0 -5,2

Vessel Moves(at Target): -0,4 aft -2,1 out 2,4° stbd 1,4 up

______________________________________________________________________
Line to Pull Tot.Line In-Line Winch Inclin. Line Percent
Bollard -in Length ±Motion Slippage Down Tension Strength
1-L 0,00 91,8 14° 29,5 17%
2-L 0,00 91,8 14° 29,5 17%
3-L 0,00 91,8 14° 29,5 17%
7-J -2,10 45,9 7° 19,4 11%
8-H -3,5 31,4 10° 16,3 9%
9-I 0,00 37,1 7° 59,0 33%
10-²@G -3,0 53,8 10° 51,6 29%
11-F -2,20 30,1 9° 14,1 8%
13-G 0,00 41,1 6° 29,0 16%
14-²@E -2,00 49,3 9° 36,8 21%
15-B 0,00 42,4 5° 8,5 5%
17-E 0,00 53,5 3° 8,0 5%
19-B 0,00 33,3 4° 13,6 8%
20-²@A -1,00 48,2 6° 28,7 16%
21-A 0,00 27,0 4° 35,3 20%
22-A 0,00 27,0 4° 35,3 20%
______________________________________________________________________
Fender Thrust Compression Pressure Contact Area
bb 0 free 100%
ee 0 free 100%
gg 0 free 100%
________________________________________________________________
Total
Hook/ X- Y- Other Other Horiz Direction
Bollard Force Force X-Load Y-Load Force in Plan Uplift
A 0,6 94,0 94,0 0° 11,2
B -4,9 5,1 7,1 -44° 1,8
E 55,9 36,3 66,6 57° 12,1
F 12,1 6,8 13,9 61° 2,1
G 58,8 61,9 85,4 43° 20,7
H 13,3 9,0 16,1 56° 2,8
I -54,2 22,1 58,5 -68° 7,4
J -17,8 7,5 19,3 -67° 2,2
L -81,0 27,9 85,7 -71° 22,1
________________________________________________________________

Approximate natural periods


Surge: 38 Sway: 83 Roll: 45 secs