Quality System Procedure: Title: Earthwork in Excavation

This document outlines procedures for earthwork excavation at a construction site. It defines responsibilities, references relevant documents, and provides a 10-step process for excavation. Key steps include: 1) Receiving and reviewing drawings before starting work, 2) Setting control lines and recording existing levels, 3) Excavating to the desired depth manually or mechanically, and 4) Checking the excavation for approval or consulting an engineer if needed. It also includes a checklist for excavation work with items to check before, during, and after excavation for safety and quality requirements.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views

Quality System Procedure: Title: Earthwork in Excavation

This document outlines procedures for earthwork excavation at a construction site. It defines responsibilities, references relevant documents, and provides a 10-step process for excavation. Key steps include: 1) Receiving and reviewing drawings before starting work, 2) Setting control lines and recording existing levels, 3) Excavating to the desired depth manually or mechanically, and 4) Checking the excavation for approval or consulting an engineer if needed. It also includes a checklist for excavation work with items to check before, during, and after excavation for safety and quality requirements.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 5

QUALITY SYSTEM PROCEDURE

TITLE : EARTHWORK IN EXCAVATION PROCEDURE No. : P /CON/7.5/01


REV. / ISSUE No. : 03/04
EFFECTIVE FROM : Nov.02

PURPOSE : To exercise control over earthwork in excavation carried out at site .

SCOPE : To cover all earthwork in excavation carried out at site

RESPONSIBILITY: Project In-charge

DEFINITIONS AND SYMBOLS :

1 GFC Good For Construction

REFERENCE / EXHIBITS :

1 Contract specifications Sample


2 Drawings Sample
3 Drawing register F/CON/01/R1
4 Level book Sample

DISTRIBUTION :

1 Management Representative
2 Project co-ordinator
3 Project in charge
4 Site in charge

REVIEWED BY .................... APPROVED BY .................... ISSUED BY ....................

1
PAGE 01 OF 02
QUALITY SYSTEM PROCEDURE

TITLE : EARTHWORK IN EXCAVATION PROCEDURE No. : P /CON/7.5/01


REV. / ISSUE No. : 03/04
EFFECTIVE FROM : Nov.02

Sr.No. Activity Responsibility Frequency / Time Cross - Reference


1 Receive drawings from Head Office Project In-charge before F/CON/01/R1
( GFC ). commencement of works.

2 Study drawings for details. Site In-charge Immediately on receipt of GFC Drawings
drawings.

3 Set out and fix control lines by Site In-charge before GFC Drawings
erecting masonary pillars ( Burjis ). commencement of works. Checklist W/CON/01

4 Record existing levels with Site In-charge Before starting Level book (sample)
subcontractor. excavation. Checklist W/CON/01

5 Mark out for excavation. Site In-charge Before starting Drawings


excavation.
6 Do excavation upto desired level Site In-charge As the work progresses. Checklist W/CON/01
manually or by mechanical means.

7 Check strata. Project In-charge As the work progresses. Checklist W/CON/01

8 If O.K..Record final level with Site In-charge On completion of Level book (sample)
subcontractor. excavation.

9 If not O.K. ,consult structural Project In-charge On completion of W/CON/01


engineer at Head Office ( in case of excavation.
high rise structure, consult
structural consultant ) for advice.

10 Act as per the advice given by Site In-charge On completion of


structural engineer / structural excavation.
consultant based on circumstances.

REVIEWED BY .................... APPROVED BY .................... ISSUED BY ....................

2
QUALITY SYSTEM PROCEDURE

PAGE 02 OF 02
QUALITY SYSTEM WORK INSTRUCTION

WORK INSTRUCTIONS CHECKLIST No. : W/CON/01


REV. / ISSUE No. : 03/04
EFFECTIVE FROM : Nov.02

CHECKLIST FOR EARTHWORK IN EXCAVATION


SITE : LOCATION : DATE :
FROM :
TO :
Check YES NO N.A. DATE
A BEFORE EXCAVATION
1 Dimension of block as per drawing
2 Masonary pillars ( burjis )are erected as reference points.
3 Excavation is set out to line , curve , slope required
4 Provision of fences / barricades / caution tapes , if required.
5 Provision of adequate lighting arrangement for night work.
6 Benchmark for levels established
B DURING EXCAVATION
1 Excavated pits are adequately shored / timbered , if required.
2 Excavation is done from top to bottom to prevent cave in.
( underpinning & undermining shall not be allowed ).
3 Presence of underground utilities like sewer,water lines,cables.
( If YES then bring to the notice of Project Manager & take
adequate precautions while excavation )
4 Required level of excavation
5 Means of access & exit from work area.
6 Excavated material is kept away from edge of pit.
7 Heavy equipments like cranes, shovels etc.are kept atleast 6m
away from pit.
8 Danger signs are provided near area of excavation (for depth
greater than 1m.).
9 In trench excavation for pipes ,grips are dug to take socket ,
collars and joints of pipes.
10 Bed strata is as per design considerations (for high rise structures)
C AFTER EXCAVATION
1 Surplus earth ( less required for backfilling ) is disposed
off and area is kept clean

Project In-charge Site In-charge Site Engineer

Note :- Check list is for guidance only, keeping record of check list is not mandatory

PAGE 01 OF 01
QUALITY SYSTEM WORK INSTRUCTION