0% found this document useful (0 votes)
131 views

How To Use Loader Software - Rev3

The document provides instructions for using various software tools to monitor, program, and transfer parameters and files to different types of programmable logic controllers (PLCs) and inverters. It describes how to use loader software to open projects, monitor PLCs online, transfer new parameters to PLCs, read software and screens from portable data organizers (PODs), and read and write parameters to variable frequency drives (VFDs).

Uploaded by

Ngà Nguyễn
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
131 views

How To Use Loader Software - Rev3

The document provides instructions for using various software tools to monitor, program, and transfer parameters and files to different types of programmable logic controllers (PLCs) and inverters. It describes how to use loader software to open projects, monitor PLCs online, transfer new parameters to PLCs, read software and screens from portable data organizers (PODs), and read and write parameters to variable frequency drives (VFDs).

Uploaded by

Ngà Nguyễn
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 19

How to use loader software

1 / 19
How to use SX-Programmer standard V3

①PLC online monitor


1. Connect PC and PLC with USB cable.

2. Launch “SX-Programmer standard V3”.

2 / 19
3. Left click on the “Open Project”.

Open Project

4. Select and open PLC software (ZPJ3).

3 / 19
5. Left click on the “Monitor”
Monitor

6. PLC online monitor will be started

4 / 19
②How to transfer to PLC of New parameter
0. Turn off the crane’s main power.

OFF

1, Carry out from 1 to 4 steps above


2,Click Conversion all

5 / 19
3, Click this icon.               4,Click Load to PLC

5, Click load to PLC →  6, Click Yes →   7,  Click Yes  

  

6 / 19
7 / 19
How to use V-SFTV5

①Reading software from POD


1. Connect PC and POD with USB cable.

2. Launch “V-SFTV6”

8 / 19
3. After launch V-SFTV6, click on “Transfer”.

4. Select “PC〈-” .

9 / 19
②Transferring screen date to POD
1. Carry out from 1 to 2 steps above “①Reading software from POD”.

2. After launch V-SFTV6, click on “Open”.

10 / 19
3. Change V9→V8 after select the file.

4.Click on“Transfer”

5.Click on“Download”

11 / 19
6.Click on“PC->”

12 / 19
13 / 19
How to use FRENIC VG Loader

①Reading parameter from Inverter


1. Power on crane’s main power to get control source of Inverter.

ON

2. Connect PC and Inverter with mini B type USB cable.

3. Launch “FRENIC VG Loader”.

14 / 19
4. Select “Function code”.

15 / 19
5. Select “Read from the Inverter”.

16 / 19
②Transferring of Inverter’s parameter to Inverter
1. Carry out from 1 to 6 steps above “①Reading parameter from Inverter”.

2. Select “Read from the file”.

3. Open the file which you will transfer.

17 / 19
4. Left click on “Write”.

5. Select “All function code data” and left click on”OK”.

18 / 19
6. If you’d like to confirm transferred parameter, select “Comparison”.

7. Select “Compared with inverter” or “Compared with File”.

19 / 19

You might also like