It's 3D! No-Cut No-Sew: Manufacturing Checklist

The document outlines the estimated production timelines and checklist of assets needed for manufacturing a new or re-order style at Clothier Design Source. The estimated timelines are 8-12 weeks for new styles and 4-8 weeks for re-orders. The checklist includes finalized labels, approved fabric and trim samples, production patterns in all sizes, a tech pack blueprint, and a purchase order specifying quantities.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
51 views

It's 3D! No-Cut No-Sew: Manufacturing Checklist

The document outlines the estimated production timelines and checklist of assets needed for manufacturing a new or re-order style at Clothier Design Source. The estimated timelines are 8-12 weeks for new styles and 4-8 weeks for re-orders. The checklist includes finalized labels, approved fabric and trim samples, production patterns in all sizes, a tech pack blueprint, and a purchase order specifying quantities.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

It’s 3D!

STEP 4 No-Cut
No-Sew
MANUFACTURING CHECKLIST Virtual
Estimated Production Timeline for New Style Orders: 8-12 weeks Prototyping
Estimated Production Timeline for Re-Orders: 4-8 weeks

Clothier Design Source can assist you in acquiring all items below.
Note: Production timeline & work cannot begin until all assets are in hand

ALL ASSETS AT FACTORY Step 1


DESIGN
LABELS: Finalize the details
Including care,content, size, and brand. of your product
with your personal
Must be finalized, placement approved, and ordered. project manager.
Approximate Order Time- 6-8 weeks.

COLORWAYS:
All colorway layouts must be submitted to the
manufacturer and approved.
Special thread fee may apply.

FABRIC:
Cannot be substituted without testing Step 2
PROTOTYPE
Approximate Order Time 2-6 weeks, 4-10 for custom colors.
We turn your design
TRIMS: into a prototype.
Virtual prototyping
Cannot be substituted without testing. available for pre-
sales and marketing.
Must be finalized, placement approved, and ordered.
Approximate Order Time 2-6 weeks, 4-10 for custom colors.

APPROVED SAMPLE:
Final sample in any size.
Typically sample comes from the size set.
Production units will match (must be in final fabrics & trims)

FINAL PATTERNS: Step 3


TECH DESIGN
Production ready patterns in every size.
We create a
TECH PACK: universal production
blueprint to control
Blueprint of all information. quality.

PURCHASE ORDER
Quantity to be produced, by size & color.
Template can be provided by CDS.

Step 4
MANUFACTURING
Produce your final
product with us

WANT TO LEARN MORE?


in Minnesota.

Download the full 17 page Manufacturing Guide at


www.clothierdesignsource.com/manufacturing-guide