at Km 2.50 on Bhairoghati
Nelong -
dated 09.05.2019
Reference: LOA No. :85026/EPC/Hawa More/36/EPC Cell
Appointed Date: 31.05.2019
dated 06.08.2020
Your Letter No.- 8000/Hawa More/ 42/ EPC Cell,
22.08.2020
Our Letter No.- BCIPL/CE/BRO/2020-21/877, dated
Dear Sir,
Pursuant to the direction of Authority we have carried out the Topographical Survey by Drone
submitted to the Design Consultant M/s Maccaferry
and the Survey Details/ Contour Plan was
Environment Solution Private Limited. The modified Design & Drawing duly vetted by the Proof
Consultant & Safety Consultant as has been prepared by the Design Consultant based on the
Drone Survey are being sent in triplicate to you.
Rate Analysis & Cost
The COS-01 Proposal along with Geological Investigation Report,
Estimate is being submitted for your approval. The Detailed Design Report for Slope Mitigation
referred above.
Work have already submitted vide our Letter No.- 877, dated 22.08.2020,
are requested to process the COS-01 & provide the Change of Scope
Order so that we
Hence you
commence the work at our earliest.
may
Thanking you,
Yours faithfully,
For Bharat ucionP
Construiotior () Pvt. Ltd.
(Uk)
Rajeev Garg
(Authorized Signatory
CC: Chief Engineer, Project Shivalik, BRO, Rishikesh, Email - brust gnicm
CC Commanding Officer- Enmail-oe:1H4 2bced bro.gov.iu
Ministry of Road Transport
ane
Highways
Border tonds Orgunisation
BORDER ROAD ORGANIZATION,
PROJECT SHIVALIK, IDPL, VIRBHADRA, RISHIKESH, UTTARAKHANDd
CHANGE OF SCOPE-01
EPCCONTRACTOR:
BHARAT CONSTRUCTIONS (I) PVT. LTD.
PROJECT
LANDSLIDE TREATMENT WORKS AT HAWA MORE AT KM 2.50 ON BHAIROGHATI
NELONG ROAD IN 36 BRTF AREA UNDER PROJECT SHIVALIK IN UTTARKHAND STATE
ON EPCMODE
ANNEX- A
NAME OF THE AUTHORITY BORDER ROAD ORGANISATION (BRO)
COMMANDER - SE (C), 36 BRTF
NAME OF THE AUTHORITY ENGINEER
NAME OF THE CONTRACTOR BHARAT CONSTRUCTION () PVT. LTD.
PROJECT ANDSLIDE TREATMENT WORKS AT HAWA MORE AT KM 2.50 ON BHAIROGHATI -NELONGROAD IN 36 BRTF AREA UNDER PROJECT SHIVALIKIN
UTTARKHAND STATE ON EPC MODE.
ABSTRACT OF COST FOR ADDITIONAL AREA UNDER CHANGE OF SCOPE -01
SR. NO. DESCRIPTION OF ITEMs ESTIMATED
UNIT QUANTITY coST (INR) REMARK
AMOUNT (INR)
Surface Anchors -(Length= 6m, Spacing= 2m in both direction)
Installation of continuously threaded Anchors of
Supply and Annex-CRate
diameter 32mm and average Approved in COS -01
1 vield strength more than 500 N/mm2, including grouting for full length of drilled RM 1542 6090.00 9390780 in the package form
hole, all anchor bars, nuts, epoxy coated washer plates, drill bit, coupler, etc.
Km 28.60 to Km
compiete 59.42
High resistance steel wire grid/mesh geocomposite consisting of hexagonal
double twisted wire mesh type 8x10 woven with steel wire with a diameter of
2.70 mm (EN 10223-3; EN 10218), Zn-5%Al coated (EN 10244-2 class A),
longitudinaly weaved with steel cable type 6x7 WC+ WSC, grade 1770 MPa, Annex-DRate
having a diameter of 8 mm (EN 12385-4) ZI-5%Al coated (EN 10244-2 class A), at Analysis enclosed
2
spacing of 0.3 m (specifications as per clause 5.3.3 of IRC HRB Special Report SQM 1028 3300.00 3392400
23)including top and bottom support rope, lacing wire or rope required to Annex-E _Quotation
connect the nets and all accessories such as U-damps, thimbles, as per of material supplier
particular/technical specifications (test to be carried out as per clause 4.4 and endosed
|5.3.3 of IRC HRB special report 23 respectively).
(A) TOTAL (Sr. No. 1 to 6) 12783180
(B) ADD DESIGN CHARGES 1% ON (A) 127832
C) ADD CGST@ 6% ON (A) 766991
(D) ADD SGST 6% ON (A) 766991
(E) TOTAL (A +
B+C +D) 14444993
Gonst
ANNEX- B
1. Area required for Land Slide Protection as per Drawing enclosed (2000+900+2300) = 5100 SOM
2. Area for Land Slide Protection as given in Schedule - B in Scope of Work = 4072 sQM
3. Additional Area for Land Slide Protection required Treatment under COS as per Clause - 13 1028 SQM
ABSTRACT OF QUANTITIES
SR. LENGTH OF |LENGTH OF
TOTAL SPACINGG
DESCRIPTION OF ITEM UNIT STRETCHH ROCK QTY IN NO'S
NO.
AREA(SQM) (METER)
QTY. REMARK
(METER) BOLTS
Surface Anchors - (Length= 6m, Spacing= 2m in both direction) Supply
and Installation of continuously threaded Anchors of diameter and
32mm
average yield strength more than 500 N/mm2, including grouting for full RM 1028 6 2.0 1542
length of drilled hole, all anchor bars, nuts, epoxy coated washer plates, 25/|
|drill bit, coupler, etc. complete
Annex- F
High resistance steel wire grid/mesh geocomposite consisting of Drawing
hexagonal double twisted wire mesh type 8x10 woven with steel wire
with a diameter of 2.70 mm (EN 10223-3; EN 10218), Zn-5%Al coated (EN
Approved
by Safety
10244-2- dass A), longitudinally weaved with steel cable type 6x7 WC+
WSC, grade 1770 MPa, having a diameter of 8 mm (EN 12385-4) ZI-5%AI and Proof
coated (EN 10244-2 class A), at a spacing of 0.3 m (specifications as per sQM L028 Consultant
clause 5.3.3 of IRC HRB Special Report 23), including top and bottom 1028 attached
support rope, lacing wire or rope required to connect the nets and all
accessories such as U-damps, thimbles, as per particular/technical
specifications (test to be carried out as per clause 4.4 and 5.3.3 of IRC HRB
special report 23 respectively).
clions
Dch un
Page 1 of 15>
EEESE SEESEEL
ANNEX - D
requirements: Longitudinal Tensile Strength of High Resistance Steel Wire mesh /Grid Geocomposite: 120 kN/m including top and
bottom support rope, lacing wire or rope required to connect the nets and all accessories such as
U-clamps, thimbles, including
safety, all other ancillary works, material, machinery, labour, etc., with all leads and lifts and as per detailed technical specifications
andas directed by Engineer- In Charge
Unit- Sqm Unit Qauntity Rate Amount
Taking output= 3x40 SQM
a) Material
Material Cost 120.00
Sqm 2000.00 240000.00
accessories Cost (@ Rs600/Sqm) LS
120.00 596.00 71520.00
Labour
Highly skilled Climber 1.00 2400.00 2400.00 |
day
Mate day 1.00 666.00 666.00
Mazdoor (Skilled) day 5.00 569.00 2845.00
Mazdoor day 20.00 403.008060.00
Total
325491.00
c)Overhead charges @6% 19529.5
d)Contractor Profit@10% 34502.05
e)Labour Cess@1% 3254.91
Cost for 116 Sqm= atbtctd 382777.42
Rate per SQM = (a+b+c+d)}/116 3299.81
say 3300
Quotation of Service/ Solution Provider M/s Maccaferry Environment Solution Pvt. Ltd. Is enclosed for Rs (3300+ GST)/SQM
Considered the lowest rate as per rate analysis in the Cost i.e; Rs 3300/sQM
Constru ns ()P
ructio,
(UK)
ehradu
ANNEX-E
01 JANUARY 2020
To,
Bharat Construction
Dehradun, Uttarakhand
Dear Sir,
With reference to your requirement, we are pleased to submit our quotation as per mentioning the
division in scope of work and Terms & Conditions.
PRICES:
PRICE VARIATION:
The prices quoted by us are based on the prevailing raw material prices of polymer. Any variation in the
prices of polymer and associated items would result in variation of the quoted prices.
DELIVERY:
Delivery for materials is commence immediately from the date of receipt of your technically and
commercially clear order along with required financial arrangements and shall be completed as per
schedule mutually agreed at the time of finalization of order.
INSPECTION/ TESTING:
The goods supplied shall conform to our Technical Specification Sheet attached. In support of the same
we shall furnish the Certificate of conformity along with every lot. We will help you in organizing third
party testing based on the requirement, for which contractor will be liable to pay the charges. Any
complaint on account of quality or quantity must be raised in writing not later than 7 days from the date
of receipt of material.
PAYMENT TERMS:
100% advance by Demand Draft/ Pay Order or Irrevocable and confirmed letter ofcredit (L/C) at sight
from Bank of repute. LC charges to be borne by purchaser.
VALIDITY:
Our offer is valid for your acceptance for a period of 30 days from the date of this offer. Please contact us
for the updated prices when the quotation is about expired.
<<Page 1 of 15>>
ANNEX-E
GST:
JURISDICTION:
The Laws ot India for the time being in force shall govern the contract. Irrespective of p of
delivery, the place of performance or the place of payment unteRn contract, the eontract shall be
deemed to have been made at New Delhi. The Courtsot New Delhi shall alone have jurisdiction to decide
any dispute arising out of or in respect of the contract.
FORCE MAJUR:
Neither party shall be responsible to the other for any delay or failure in performance of its obligations
due to any occurrence commonly known as Force Majeure that is beyond the control of any of the parties
including, but not limited to, fire, flood, explosion, acts of God or any Government body, public disorder,
roits, embargoes, strikes, act of military authority, epidemics, lockouts or other labour disputes,
Insurrections, civil commotion, war, enemy actions. In the event of such circumstances the afected party
shall inform the other within a reasonable time frame of the occurrence of the same and the likely delay
which may arise on this account.
The goods offered by us may originate from any of the MACCAFERRI factories worldwide.
We are sure you shall find the above in order and in line with your requirements and look forward for
valued order at your earliest. Kindly feel free to contact us in case of any other clarifications.
Thanking you and assuring you of our best service at all time.