Bidding Document
Bidding Document
MINISTRY OF FINANCE
National Procurement Commission
BIDDING DOCUMENTS
NCB/027/MOP-2020
August 2020
Section I: Instruction to Bidders
PART I
BIDDING PROCEDURE
2
Section I: Instruction to Bidders
Table of Clauses
A. General ........................................................................................................................... 3
1.
Scope of Bid ............................................................................................................. 3
2.
Source of Funds ........................................................................................................ 3
3.
Fraud and Corruption................................................................................................. 4
4.
Eligible Bidders ......................................................................................................... 5
B. Contents of Bidding Documents.................................................................................... 5
5. Sections of Bidding Documents ................................................................................. 5
6. Clarification of Bidding Documents........................................................................... 6
7. Pre-Bid Meeting and Site Visit .................................................................................. 6
8. Amendment of Bidding Documents ........................................................................... 6
C. Preparation of Bids ........................................................................................................ 7
9. Cost of Bidding ........................................................................................................ 7
10. Language of Bid ........................................................................................................ 7
11. Documents Comprising the Bid ................................................................................. 7
12. Letters of Bid and Schedules ..................................................................................... 8
13. Alternative Bids......................................................................................................... 8
14. Bid Prices ................................................................................................................. 8
15. Currencies of Bid and Payment.................................................................................. 8
16. Documents Comprising the Technical Proposal ......................................................... 8
17. Period of Validity of Bids ......................................................................................... 10
18. Bid Security .............................................................................................................. 10
19. Format and Signing of Bid ......................................................................................... 11
D. Submission and Opening of Bids .................................................................................. 11
20. Sealing and Marking of Bids...................................................................................... 11
21. Deadline for Submission of Bids................................................................................ 12
22. Late Bids ................................................................................................................... 12
23. Opening of Technical Bids ....................................................................................... 12
24. Opening of Price Bids ............................................................................................... 12
E. Evaluation and Comparison of Bids.......................................................................................................................................................... 13
25. Process to be Confidential ................................................................................................................................................................................... 13
26. Clarification of Bids ...................................................................................................................................................................................................... 13
27. Preliminary Examination of Technical Bids ............................................................................................................................... 14
28. Responsiveness of Technical Bid ............................................................................................................................................................... 14
29. Evaluation of Price Bids .......................................................................................................................................................................................... 14
30. Employer’s Right to Accept Any Bid, and to Reject Any or All Bids .................................................. 15
F. Award of Contract………………………………………….…………..………………..15
31. Award Criteria ....................................................................................................................................................................................................................... 15
32. Notification of Award ................................................................................................................................................................................................. 15
33. Signing of Contract ....................................................................................................................................................................................................... 15
34. Performance Security .................................................................................................................................................................................................. 15
2
Section I: Instruction to Bidders
INSTRUCTION TO BIDDER
A. GENERAL
1. Scope of Bid 1.1 In connection with the Invitation for Bids indicated in the Bid Data
Sheet (BDS), the Employer, as indicated in the BDS, issues these
Bidding Documents for the procurement of Works as specified in
Section 5 (Works Requirements). The name and identification
number of this tender package are provided in the BDS.
1.2 Throughout these Bidding Documents:
(a) the term “in writing” means communicated in written form and
delivered against receipt;
(b) except where the context requires otherwise, words indicating
the singular also include the plural and words indicating the
plural also include the singular;
(c) bid” shall also mean “tender” and “bidder” shall also mean
“tenderer”; and
(d) “day” means calendar day.
2. Source of Funds 2.1 The Employer has allocated funds from its current budget year
appropriations toward the cost of the project named in the BDS. The
Employer intends to apply a portion of the funds to eligible
payments under the contract(s) for which these Bidding Documents
is issued.
3. 3. Fraud and 3.1 The Employer requires bidders, suppliers, and contractors to
Corruption observe the highest standard of ethics during the procurement and
execution of contracts. In pursuance of this policy, the Employer:
(a) defines, for the purposes of this provision, the terms set forth
below:
(i) “corrupt practice” means the offering, giving, receiving, or
soliciting, directly or indirectly, anything of value to
influence improperly the actions of another party;
3
Section I: Instruction to Bidders
(b) will reject a Bid for award if it determines that the Bidder
recommended for award has, directly or through an agent,
engaged in corrupt, fraudulent, collusive, or coercive practices
in competing for the Contract; and
(d) will have the right to inspect the bidder’s accounts and records and
other documents relating to the Bid submission and contract
performance and to have them audited by auditors
appointed by the Employer.
4. Eligible Bidders 4.1 Only those contractors licensed and domiciled in the national
territory of the Democratic Republic of Timor-Leste are eligible to
participate in this bidding.
4.2 A Bidder may be a natural person or a private entity or a
combination of them with a formal intent to enter into an agreement
or under an existing agreement in the form of a Joint Venture (JV).
In the case of a JV:
(a) all partners shall be jointly and severally liable, and
(b) the JV shall nominate a Representative who shall have the
authority to conduct all business for and on behalf of any and all
the parties of the JV during the bidding process and, in the event
the JV is awarded the Contract, during contract execution.
4
Section I: Instruction to Bidders
any of them; or
(c) they have the same legal representative for purposes of this bid;
or
(d) they have a relationship with each other, directly or through
common third parties, that puts them in a position to have
access to information about or influence on the Bid of another
Bidder, or influence the decisions of the Employer regarding
this bidding process; or
(e) a Bidder participates in more than one bid in this bidding
process. Participation by a Bidder in more than one Bid will
result in the disqualification of all Bids in which the party is
involved. However, this does not limit the inclusion of the
same subcontractor in more than one bid; or
(f) a Bidder participated as a consultant in the preparation of the
design or technical specifications of the contract that is the
subject of the Bid; or
(g) a Bidder was affiliated with a firm or entity that has been hired
(or is proposed to be hired) by the Employer as Engineer for the
contract.
5. Sections of 5.1 The Bidding Documents consist of Parts I, II, and III, which include
Bidding all the Sections indicated below, and should be read in conjunction
Documents with any Addenda issued in accordance with ITB 8.
PART II Requirements
5
Section I: Instruction to Bidders
5.2 The Invitation for Bids issued by the Employer is not part of the
Bidding Documents.
5.3 The Employer is not responsible for the completeness of the
Bidding Documents and its Addenda, if they were not obtained
directly from the source stated by the Employer in the Invitation for
Bids.
5.4 The Bidder is expected to examine all instructions, forms, terms,
and specifications in the Bidding Documents. Failure to furnish all
information or documentation required by the Bidding Documents
may result in the rejection of the bid.
7. Pre-Bid Meeting , 7.1 Unless otherwise specified in the BDS, the Bidder is required to
Site Visit attend the Pre-Bid Meeting as specified in the BDS.
7.2 The Bidder is advised to visit and examine the Site of Works and its
surroundings and obtain for itself on its own responsibility all
information that may be necessary for preparing the bid and
entering into a contract for construction of the Works. The costs of
visiting the Site shall be at the Bidder’s own expense.
8. Amendment of 8.1 At any time prior to the deadline for submission of bids, the
Bidding Employer may amend the Bidding Documents by issuing addenda.
Documents
8.2 Any addendum issued shall be part of the Bidding Documents and
shall be communicated in writing to all who have obtained the
Bidding Documents from the Employer in accordance with ITB
5.3.
6
Section I: Instruction to Bidders
C. PREPARATION OF BIDS
9. Cost of Bidding 9.1 The Bidder shall bear all costs associated with the preparation and
submission of its Bid, and the Employer shall not be responsible or
liable for those costs, regardless of the conduct or outcome of the
bidding process.
10. Language of Bid 10.1 The Bid, as well as all correspondence and documents relating to the
bid exchanged by the Bidder and the Employer, shall be written in
the language specified in the BDS. Supporting documents and
printed literature that are part of the Bid may be in another
language provided they are accompanied by an accurate translation
of the relevant passages in the language specified in the BDS, in
which case, for purposes of interpretation of the Bid, such
translation shall govern.
11. Documents 11.1 The Bid shall comprise two envelopes submitted simultaneously,
Comprising the one called the Technical Bid containing the documents listed in ITB
Bid 11.2 and the other the Price Bid containing the documents listed in
ITB 11.3, both envelopes enclosed together in an outer single
envelope.
7
Section I: Instruction to Bidders
12. Letters of Bid, 12.1 The Letters of Technical Bid and Price Bid, and the Schedules, and
and Schedules all documents listed under ITB 11, shall be prepared using the
relevant forms furnished in Section 4 (Bidding Forms). The forms
must be completed without any alterations to the text, and no
substitutes shall be accepted. All blank spaces shall be filled in with
the information requested.
13. Alternative Bids 13.1 Unless otherwise indicated in the BDS, alternative bids shall not be
considered.
14. Bid Prices 14.1 The prices quoted by the Bidder in the Letter of Price Bid and in the
Bill of Quantities shall conform to the requirements specified
below.
14.2 The Bidder shall fill in rates and prices for all items of the Works
described in the Bill of Quantities. Items for which no rate or price
is entered by the Bidder will not be paid for by the Employer when
executed and its cost shall be deemed covered by the other rates and
prices in the Bill of Quantities.
14.3 The price to be quoted in the Letter of Price Bid, in accordance with
ITB 12.1, shall be the total price of the Bid.
14.4 Unless otherwise provided in the BDS and the Contract, the rates
and prices quoted by the Bidder are fixed and not subject to
adjustment during the performance of the Contract.
14.5 All duties, taxes, and other levies payable by the Contractor under
the Contract, or for any other cause, as in force at the date 10
working days prior to the deadline for submission of bids, shall be
included in the rates and prices and the total Bid Price submitted by
the Bidder.
15. Currencies of Bid 15.1 The unit rates and the prices shall be quoted by the bidder entirely
and Payment in the currency specified in the BDS.
16. Documents 16.1 The documents comprising the Technical Bid shall contain all
Comprising the information required to establish the Bidder’s technical and
Technical financial capabilities to successfully implement the works. In
Proposal preparing the technical proposal documents, the Bidder should
refer to Section 3 (Evaluation Criteria) and the information sheets
included in Section 4 (Bidding Forms).
8
Section I: Instruction to Bidders
The Bidder shall fill-in the form and provides the basic
information and documentation required to prove the Bidder’s
legal status.
(c) Personnel
The Bidder shall list the key personnel it will employ from
headquarters and from Site office to superintend the works,
together with their qualifications, experience and position held.
All relevant curricula vitae shall be attached.
9
Section I: Instruction to Bidders
17. Period of Validity 17.1 Bids shall remain valid for the period specified in the BDS after the
of Bids bid submission deadline date prescribed by the Employer. A bid
valid for a shorter period shall be rejected by the Employer as
nonresponsive.
17.2 In exceptional circumstances, the Employer may request that the
bidders extend the period of validity for a specified additional
period. The request and the bidders’ responses shall be made in
writing or by cable. A Bidder may refuse the request without
forfeiting the Bid Security. A Bidder agreeing to the request will not
be required or permitted to otherwise modify the Bid, but will be
required to extend the validity of Bid Security for the period of the
extension, and in compliance with Clause 18 in all respects.
18. Bid Security 18.1 The Bidder shall furnish as part of its bid, a Bid Security in the form
as specified in the BDS
18.2 The Bid Security shall use the form included in Section 4 (Bidding
Forms)
18.3 Any Bid not accompanied by a substantially compliant Bid Security
shall be rejected by the Employer as nonresponsive.
18.4 The Bid Security shall be executed:
(a) if a Bidder withdraws its bid during the period of bid validity
specified by the Bidder on the Letters of Bid, except as provided
in ITB 17.2 or
10
Section I: Instruction to Bidders
18.5 The Bid Security of a JV shall be in the name of the JV that submits
the Bid. If the JV has not been legally constituted at the time of
bidding, the Bid Security shall be in the names of all future partners
as named in the letter of intent mentioned in ITB 4.2.
19. Format and 19.1 The Bidder shall prepare one original of the Technical Bid and one
Signing of Bid original of the Price Bid comprising the Bid as described in ITB 11
and clearly mark it “ORIGINAL - TECHNICAL BID” and
“ORIGINAL - PRICE BID”. Alternative bids, if permitted in
accordance with ITB 13, shall be clearly marked
“ALTERNATIVE”. In addition, the Bidder shall submit copies of
the Technical and Price Bids, in the number specified in the BDS,
and clearly mark each of them “COPY.” In the event of any
discrepancy between the original and the copies, the original shall
prevail.
19.2 The original and all copies of the Bid shall be typed or written in
indelible ink and shall be signed by a person duly authorized to sign on
behalf of the Bidder. This authorization shall consist of a written
confirmation as specified in the BDS and shall be attached to the
bid. The name and position held by each person signing the
authorization must be typed or printed below the signature. All
pages of the Bid, except for unamended printed literature, shall be
signed or initialed by the person signing the bid.
20. Sealing and 20.1 The Bidder shall enclose the original of the Technical Bid, the
Marking of Bids original of the Price Bid, and each copy of the Technical Bid and
each copy of the Price Bid, in separate sealed envelopes, duly
marking the envelopes as “ORIGINAL - TECHNICAL BID”,
“ORIGINAL - PRICE BID” and “COPY NO… - TECHNICAL
BID” and “COPY NO…. - PRICE BID.” These envelopes, the first
containing the originals and the others containing copies, shall then
be enclosed in one single envelope per set. If permitted in
accordance with ITB 13, alternative bids shall be similarly sealed,
marked and included in the sets.
20.3 If all envelopes are not sealed and marked as required, the
Employer will assume no responsibility for the misplacement or
11
Section I: Instruction to Bidders
21. Deadline for 21.1 Bids must be received by the Employer at the address and no later
Submission of than the date and time indicated in the BDS. When so specified in
Bids the BDS, Bidders shall have the option of submitting their Bids
electronically. Bidders submitting bids electronically shall follow
the electronic bid submission procedures specified in the BDS.
21.2 The Employer may, at its discretion, extend the deadline for the
submission of bids by amending the Bidding Documents in
accordance with ITB 8, in which case all rights and obligations of
the Employer and Bidders previously subject to the deadline shall
thereafter be subject to the deadline as extended.
22. Late Bids 22.1 The Employer shall not consider any bid that arrives after the
deadline for submission of bids, in accordance with ITB 21. Any
bid received by the Employer after the deadline for submission of
bids shall be declared late, rejected, and returned unopened to the
Bidder.
23. Opening of 23.1 The Employer shall open the Technical Bids in public at the
Technical Bids address, date and time specified in the BDS in the presence of
Bidders` designated representatives and anyone who choose to
attend. The Price Bids will remain unopened and will be held in
custody of the Employer until the specified time of their opening.
23.2 The envelopes holding the Technical Bids shall be opened one at a
time, and the following read out and recorded:
(a) the name of the Bidder;
(b) the presence of a Bid Security, if required; and
(c) any other details as the Employer may consider appropriate.
Only Technical Bids read out and recorded at bid opening shall be
considered for evaluation. No Bid shall be rejected at the opening of
Technical Bids except for late bids, in accordance with ITB Sub-
Clause 22.1.
23.3 The Employer shall prepare a record of the opening of Technical
Bids that shall include, as a minimum: the name of the Bidder and
whether there is a withdrawal, substitution, or modification;
alternative proposals; and the presence or absence of a bid security,
if one was required. The Bidders’ representatives who are present
shall be requested to sign the record. The omission of a Bidder’s
signature on the record shall not invalidate the contents and effect of
the record. A copy of the record shall be distributed to all Bidders.
24. Opening of Price 24.1 At the end of the evaluation of the Technical Bids, the Employer
Bids will invite only the bidders with top two technical scores to attend
the opening of the Price Bids. The date, time, and location of the
opening of Price Bids will be advised in writing by the Employer.
12
Section I: Instruction to Bidders
24.2 In accordance with the applicable law, the Employer shall open the
Price Bids of only the Bidders with the top two technical scores
based on the result of the Technical Evaluation conducted in
accordance with ITB-27.
24.3 The Employer will notify, in writing, Bidders who are not in top
two technical scores list, and return their Price Bids unopened after
announcement (Notification of Award) of the successful bidder..
24.4 The Employer shall conduct the opening of Price Bids in the
presence of Bidders’ representatives who choose to attend at the
address, date and time specified by the Employer. The Bidder’s
representatives who are present shall be requested to sign a register
evidencing their attendance.
24.5 The Employer shall prepare a record of the opening of Price Bids
that shall include, as a minimum: the name of the Bidder, the Bid
Price (per lot if applicable), any discounts, and alternative offers.
The Bidders’ representatives who are present shall be requested to
sign the record. The omission of a Bidder’s signature on the record
shall not invalidate the contents and effect of the record. A copy of
the record shall be distributed to all Bidders.
E. EVALUATION AND COMPARISON OF BIDS
25.2 Notwithstanding ITB 25.1, from the time of bid opening to the time
of Contract award, if any Bidder wishes to contact the Employer on
any matter related to the bidding process, it may do so in writing.
26. Clarification of 26.1 To assist in the examination, evaluation, and comparison of the
Bids Technical and Price Bids, the Employer may, at its discretion, ask
any Bidder for a clarification of its bid. Any clarification submitted
by a Bidder that is not in response to a request by the Employer
shall not be considered. The Employer’s request for clarification
and the response shall be in writing. No change in the substance of
the Technical Bid or prices in the Price Bid shall be sought, offered,
or permitted, except to confirm the correction of arithmetic errors
discovered by the Employer in the evaluation of the Price Bids, in
accordance with ITB 29.
26.2 If a Bidder does not provide clarifications of its Bid by the date and
time set in the Employer’s request for clarification, its bid may be
rejected.
13
Section I: Instruction to Bidders
27. Preliminary 27.1 The Employer shall examine the Technical Bid to confirm that all
Examination documents and technical documentation requested in ITB Sub-
of Technical Bids Clause 11.2 have been provided, and to determine the completeness
of each document submitted.
27.2 The Employer shall confirm that the following documents and
information have been provided in the Technical Bid. If any of
these documents or information is missing, the bid shall be rejected.
(a) Letter of Technical Bid;
(b) written confirmation of authorization to commit the Bidder;
(c) Bid Securing Declaration and
(d) Technical Proposal in accordance with Evaluation and
Qualification Criteria in Section 3
29. Evaluation of 29.1 The evaluation scoring for price bids shall be conducted in
Price Bids accordance with the procedure specified under Section 3 – Bid
Evaluation Procedure.
29.3 If the Bidder who submitted the highest combined evaluated bid
does not accept the correction of errors, its Bid shall be disqualified
14
Section I: Instruction to Bidders
30. Employer’s Right 30.1 The Employer reserves the right to accept or reject any bid, and to
to Accept Any annul the bidding process and reject all bids at any time prior to
Bid, and to Reject contract award, without thereby incurring any liability to Bidders.
Any or All Bids In case of annulment, all bids submitted and specifically, bid
securities, shall be promptly returned to the Bidders.
D. Award of Contract
31. Award Criteria 31.1 The Employer shall award the contract to the Bidder with the
highest combined score evaluated in accordance with the procedure
specified under Section 3 – Bid Evaluation Procedure, provided
further that the Bidder has remained qualified to perform the
Contract satisfactorily.
32. Notification of 32.1 Prior to the expiration of the period of bid validity, the Employer
Award shall notify the successful Bidder, in writing, via the Letter of
Acceptance included in the Contract Forms, that its bid has been
accepted.
32.2 Until a formal contract is prepared and executed, the notification of
award shall constitute a binding Contract
32.3 At the same time, the Employer will notify all other Bidders in
writing and return their Price Bids unopened.
32.4 After publication of the award, unsuccessful bidders may request in
writing to the Employer for a debriefing seeking explanations on
the grounds on which their bids were not selected. The Employer
shall promptly respond in writing to any unsuccessful Bidder who,
after publication of contract award, requests a debriefing.
33. Signing of 33.1 Promptly after notification, the Employer shall send the successful
Contract Bidder the Contract Agreement.
33.2 Within seven (7) days of receipt of the Contract Agreement, the
successful bidder shall sign, date, and return it to the Employer.
34. Performance 34.1 Within seven (7) days of the receipt of notification of award from
the Employer, the successful Bidder shall furnish the performance
15
Section I: Instruction to Bidders
16
Section 2: Bid Data Sheet
This section consists of provisions that are specific to each procurement and supplement the
information or requirements included in Section 1 - Instructions to Bidders.
A. Introduction
ITB 1.1 The Employer is: Electricidade de Timor-Leste (EDTL) under Ministry of
Public Works on Behalf of the Government of the Democratic Republic of
Timor-Leste
ITB 1.1 The Project Name is: NEW CONSTRUCTION OF WALL PROTECTION
TOWER NO.15, SECTION MALIANA-SUAI MUNICIPALITY OF
BOBONARO, TIMOR-LESTE
The number and identification of lots comprising this tender are: N/A
ITB 2.1 The Employer has allocated funds from its current budget year appropriations
from Infra Structure Fund
B. Bidding Documents
The written confirmation of authorization to sign on behalf of the Bidder shall
ITB 4.2.2 consist of:
(a) Special Power of Attorney or Certified Authorization under oath for
Single Proprietorship.
(b) Board Resolution or Secretary’s Certificate, for Corporation
A Joint Venture shall include an undertaking signed by all parties (i) stating that
all parties shall be jointly and severally liable, and (ii) nominating a
Representative who shall have authority to conduct all business for and on behalf
of any and all the parties of the Joint Venture during the bidding process and, in
the event the Joint Venture is awarded the Contract, during contract execution.
ITB 6.1 For clarification purposes only, the Employer’s address is:
[email protected]
National Procurement Commission
Avenida de Balide, Dili, Timor-Leste
Tel.: +670 333-1101
Request for clarification should be received by the Employer no later than:
Fourteen (14) calendar days before the deadline for bid submission.
ITB 7.1 A Pre-Bid meeting shall take place at the following date, time and place:
Date: 07 September 2020 Time: 10:00 hours local time
Place: National Procurement Commission
Avenida de Balide, Dili, Timor-Leste
1
Section 2: Bid Data Sheet
Bidder who wants to conduct a site visit shall coordinate with the Employer,
and the cost of visiting the site shall be at the Bidder’s own expense.
C. Preparation of Bids
ITB 11.2 (g) The Bidder shall submit with its Technical Bid the following additional
documents:
a. Authenticated copy of current Business Registration Certificate
b. Company Ownership Documents
c. Authenticated Certidão de Dividas
d. Authenticated copy of previous quarter tax statement from Timor-Leste
Revenue Service (TIN)
e. Estatutos
ITB 11.3 (d) The Bidder shall submit with its Price Bid the following additional documents:
Unit Price Analysis of each item of work in the Bill of Quantities
ITB 15.1 The unit rates and prices shall be: United States Dollar
ITB 20.1 In addition to the original of the bid, the number of copies is:
Technical Bid 1 original and 1 copy
Price Bid 1 original and 1 copy + 1 CD
2
Section 2: Bid Data Sheet
ITB 23.1 The Technical bid opening shall take place at the office of the:
ITB 31.1 One Contractor can be awarded, at maximum, two contracts/projects subject
to the result of the evaluation.
In case of the Contractor, after the evaluation, turns out to be the lowest
evaluated and substantially responsive one (winning company) for more than
two contracts/projects, it must choose only two among the other (s).
3
Section 3: Evaluation and Qualification Criteria
Section 3
This Section contains all the criteria that the Employer shall use to evaluate bids and qualify Bidders.
No other methods, criteria and factors shall be used. The Bidder shall provide all the information
requested in the forms included in Section 4 (Bidding Forms).
Section 3: Evaluation and Qualification Criteria
The evaluation shall be based on the documents that the Bidder has submitted with its Bid.
Therefore, the Bidder is reminded to submit all the necessary information and documentation
to enable the Employer to make an evaluation. Failure of the Bidder to provide the necessary
information may result in the rejection of the Bid.
Bid evaluation shall be undertaken in two stages. The first stage will be the Evaluation of
Technical Bids applying the technical evaluation criteria, sub-criteria, and scoring system
specified below. The passing score for bidder qualification is 375 points.
a) TECHNICAL EVALUATION
The technical evaluation will be undertaken in two steps. The first step will be the
Determination of the Bidder’s compliance to the basic bid and eligibility requirements to
be
Undertaken on a “Pass or Fail” basis.
Only those Bidders which passed the Step 1 evaluation shall be considered further in the
Step 2 – Technical evaluation which is to evaluate and score the technical proposals on
the criteria and scoring system provided below:
2
1
Section I: Instruction to Bidders
Dump Truck 1
Compactor 1
Mini Excavator/ 1
Backhoe Loader
Concrete Mixer 1
5. TECHNICAL PROPOSAL 20
3
Section I: Instruction to Bidders
TOTAL 100
b) FINANCIAL EVALUATION
The second stage will be the evaluation of the price proposals of only the Bidders with the top two
technical scores based on the result of the first stage evaluation above. The price evaluation will be
undertaken in accordance with the provisions of Clause ITB-34.
To determine the "price score", the lowest evaluated bid price X will automatically score 500 points for
the price component evaluation. Other bidders with bid price Y will be assigned a price proposal score =
500 * (X / Y).
The final ranking shall be determined by combining the Technical and Price scores, applying a
Technical: Price Ratio of 40:60
4
Section 4: Bidding Forms (BF)
Section 4.
Bidding Forms
This Section contains the forms which are to be completed by the Bidder and submitted as part of his Bid.
Section 4: Bidding Forms (BF)
Table of Forms
Date: ................................................
NCB No.: NCB/027/MOP-2020
To: Ministry of Public Works
We, the undersigned, declare that:
(a) We have examined and have no reservations to the Bidding Documents, including
Addenda issued in accordance with Instructions to Bidders (ITB) 8;
(b) We offer to execute in conformity with the Bidding Documents the following Works:
NEW CONSTRUCTION OF WALL PROTECTION TOWER NO.15, SECTION
MALIANA-SUAI MUNICIPALITY OF BOBONARO, TIMOR-LESTE
(c) Our Bid consisting of the Technical Bid and the Price Bid shall be valid for a period of
90 days from the date fixed for the bid submission deadline in accordance with the
Bidding Documents, and it shall remain binding upon us and may be accepted at any
time before the expiration of that period;
(d) We, including any subcontractors or suppliers for any part of the contract, do not have
any conflict of interest in accordance with ITB 4.3;
(e) We are not participating, as a Bidder or as a subcontractor, in more than one bid in this
bidding process in accordance with ITB 4.3 (e) other than alternative offers submitted in
accordance with ITB 13;
(f) Our firm, its affiliates or subsidiaries, including any Subcontractors or Suppliers for any
part of the contract, has not been declared ineligible under the Employer’s country laws
or official regulations or by an act of compliance with a decision of the United Nations
Security Council;
Name ...........................................................................................................................................
In the capacity of ........................................................................................................................
Signed .........................................................................................................................................
Duly authorized to sign the Bid for and on behalf of .................................................................
Date ..............................................................................................................................................
2
Section 4: Bidding Forms (BF)
Date: ................................................
NCB No.: NCB/027/MOP-2020
To: Ministry of Public Works
We, the undersigned, declare that:
(a) We have examined and have no reservations to the Bidding Documents, including
Addenda issued in accordance with Instructions to Bidders (ITB) 8;
(b) We offer to execute in conformity with the Bidding Documents and the Technical Bid
submitted for the following Works:
NEW CONSTRUCTION OF WALL PROTECTION TOWER NO.15, SECTION
MALIANA-SUAI MUNICIPALITY OF BOBONARO, TIMOR-LESTE
_____________________________________________________________________
(c) Our Bid shall be valid for a period of 90 days from the date fixed for the bid submission
deadline in accordance with the Bidding Documents, and it shall remain binding upon
us and may be accepted at any time before the expiration of that period;
(d) If our Bid is accepted, we commit to obtain a performance security in accordance with
the Bidding Documents;
(e) We understand that this bid, together with your written acceptance thereof included in
your notification of award, shall constitute a binding contract between us, until a formal
contract is prepared and executed; and
(f) We understand that you are not bound to accept the l highest evaluated combined bid or
any other bid that you may receive.
Name ...........................................................................................................................................
In the capacity of ........................................................................................................................
Signed .........................................................................................................................................
Duly authorized to sign the Bid for and on behalf of .................................................................
Date ..............................................................................................................................................
3
Section 4: Bidding Forms (BF)
Date: __________
Tender ID No.: NCB/027/MOP-2020
Tender Description: NEW CONSTRUCTION OF WALL PROTECTION TOWER NO.15,
SECTION MALIANA-SUAI MUNICIPALITY OF BOBONARO, TIMOR-LESTE
We understand that, according to your conditions, bids must be supported by a Bid Securing
Declaration.
We accept that we will automatically be suspended from being eligible for bidding in any contract
with the Government of the Democratic Republic of Timor-Leste for the period of time of One
Year, if we are in breach of our obligation(s) under the bid conditions, because we:
(a) have withdrawn our Bid during the period of bid validity specified in the Form of Bid; or
(b) having been notified of the acceptance of our Bid by the Employer during the period of bid
validity, (i) fail or refuse to execute the Contract, if required, or (ii) fail or refuse to furnish
the Performance Security, in accordance with the ITB.
We understand this Bid Securing Declaration shall expire if we are not the successful Bidder, upon
the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii)
twenty-eight days after the expiration of our Bid.
Signed: _____________________________________________________________________
In the capacity of ______________________________________________________________
Name: ___________________________________________________________________________________________
Duly authorized to sign the bid for and on behalf of: [insert complete name of
Bidder] Dated on _____ day of _______
Corporate Seal [where appropriate]
Note:
In case of a Joint Venture, the Bid-Securing Declaration must be in the name of all
partners to the Joint Venture that submits the bid.
4
Section 4: Bidding Forms (BF)
Specify proposed sources of financing, such as available cash in bank, lines of credit, account
receivable, and other financial means available to meet the total construction cash flow demands of
the subject contract or contracts as indicated in Section 3 (Evaluation and Qualification Criteria)
Financial Resources
No. Source of financing Amount (US$ equivalent)
1
Supporting document (Bank Statements, Credit line Certificates, Account Receivable, etc)
must be attached.
5
Section 4: Bidding Forms (BF)
Bidders and each partner to a JV should provide information on their current commitments on all
contracts that have been awarded, or for which a letter of intent or acceptance has been received, or
for contracts approaching completion, but for which an unqualified, full completion certificate has
yet to be issued.
6
Section 4: Bidding Forms (BF)
7
Section 4: Bidding Forms (BF)
8
Section 4: Bidding Forms (BF)
Personnel
Bidders should provide the names of suitably qualified personnel to meet the requirements specified
in Section 3 (Evaluation and Qualification Criteria). The data on their experience should be supplied
using the Form below for each candidate.
Form PER – 1: Proposed Personnel
1. Title of position:
Name
2. Title of position:
Name
9
Section 4: Bidding Forms (BF)
Position
Summarize professional experience in reverse chronological order. Indicate particular technical and
managerial experience relevant to the project.
10
Section 4: Bidding Forms (BF)
Equipment
The Bidder shall provide adequate information to demonstrate clearly that it has the capability to
meet the requirements for the key equipment listed in Section 3 (Evaluation and Qualification
Criteria). A separate Form shall be prepared for each item of equipment listed, or for alternative
equipment proposed by the Bidder.
Item of Equipment
Address of owner
Fax Telex
11
Section 4: Bidding Forms (BF)
Technical Proposal
Site Organization
Method Statement
Construction Schedule
12
Section 4: Bidding Forms (BF)
Site Organization
The Bidder should include an Organization Chart showing the relationship between the Director, the
Engineer/Supervisor and the administration staff.
13
Section 4: Bidding Forms (BF)
Method Statement
The bidder must provide a work method statement encompassing the requirements of the Works
under this tender.
14
Section 4: Bidding Forms (BF)
Construction Schedule
Bidder must submit its propose works schedule (bar Chart) detailing the critical work items
and providing a clear timeline for completing the works.
15
Section 4: Bidding Forms (BF)
Bidder must provide a statement that outlines its plan to support local communities
16
Section 4: Bidding Forms (BF)
Bidder’s Information
Bidder’s country of
constitution
Bidder’s year of
constitution
17
Section 4: Bidding Forms (BF)
JV Partner’s or
Subcontractor’s
legal name
JV Partner’s or
Subcontractor’s
country of
constitution
JV Partner’s or
Subcontractor’s year
of constitution
JV Partner’s or
Subcontractor’s
legal address in
country of
constitution
JV Partner’s or
Subcontractor’s
authorized
representative
information
(name, address,
telephone numbers,
fax numbers, e-mail
address)
Attached are copies of the following original documents.
1. Articles of incorporation or constitution of the legal entity named above, in accordance
with ITB 4.1 and 4.2.
2. Authorization to represent the firm named above, in accordance with ITB 4.2.
18
Section 4: Bidding Forms (BF)
GRAND SUMMARY
A CONSTRUCTION COST
B Profit (10% X A)
C OVERHEAD
D TOTAL (A+B+C)
E TAX (2% X D)
F GRAND TOTAL (D+E)
19
Section 4: Bidding Forms (BF)
BILL OF QUANTITY
Sub Total I
20
Section 4: Bidding Forms (BF)
Project Name : New Construction of Wall Protection Tower No.15, SECTION MALIANA-
SUAI MUNICIPALITY OF BOBONARO, TIMOR-LESTE
Location : Bobonaro Municipality
Project No. : NCB/027/MOP-2020
BILL OF QUANTITY
Sub Total I
Total Construction
21
Section 5: Works Requirements
1
Section 5: Works Requirements
Table of Contents
Specifications
Drawings
Personnel Requirements
Equipment Requirements
2
Section 5: Works Requirements
Specifications
EDTL-MOP Standard specifications
3
Section 5: Works Requirements
Drawings
Separately attached
4
Section 5: Works Requirements
Personnel Requirements
Using Form PER-1 and PER-2 in section 4 (Bidding Forms), the bidder must demonstrate it has
personnel that meet the following requirements
5
Section 5: Works Requirements
Equipment Requirements
Using Form Equipment in Section 4 (Bidding Forms), the Bidder must demonstrate it has the key
equipment listed below:
6
Section 6: General Condition of Contract
Section 6
Table of Clauses
A. General.................................................................................... …………………….……..... 5
1. Definitions .......................................................................................................................... 5
2. Interpretation ..................................................................................................................... 7
3. Language and Law.............................................................................................................. 7
4. Project Manager’s Decisions ............................................................................................. 7
5. Delegation ......................................................................................................................... 8
6. Communications ................................................................................................................. 8
7. Subcontracting .................................................................................................................... 8
8. Other Contractors ............................................................................................................... 8
9. Personnel and Equipment ................................................................................................... 8
10. Employer’s and Contractor’s Risks .................................................................................... 8
11. Employer’s Risks................................................................................................................ 8
12. Contractor’s Risks .............................................................................................................. 9
13. Insurance ............................................................................................................................ 9
14. Site Investigation Reports ................................................................................................... 9
15. Contractor to Construct the Works ..................................................................................... 9
16. The Works to Be Completed by the Intended Completion Date ......................................... 9
17. Designs by Contractor and Approval by the Project Manager ............................................ 9
18. Safety................................................................................................................................ 10
19. Discoveries ....................................................................................................................... 10
20. Possession of the Site........................................................................................................ 10
21. Access to the Site .............................................................................................................. 10
22. Instructions, Inspections and Audits ................................................................................. 10
23. Appointment of the Adjudicator ....................................................................................... 10
24. Procedure for Disputes...................................................................................................... 11
B. Time Control ....................................................................................................................... 11
2
Section 6: General Condition of Contract
A. General
1. Definitions 1.1 Boldface type is used to identify defined terms.
3
Section 6: General Condition of Contract
ee. The Start Date is given in the PCC. It is the latest date when
the Contractor shall commence execution of the Works. It
does not necessarily coincide with any of the Site Possession Dates.
ii. The Works are what the Contract requires the Contractor to
construct, install, and turn over to the Employer, as defined in the
PCC.
2. Interpretation 2.1 In interpreting these GCC, singular also means plural, male
also means female or neuter, and the other way around. Headings have no
significance. Words have their normal meaning under the language of
the Contract unless specifically defined. The Project Manager shall
provide instructions clarifying queries about these GCC.
5
Section 6: General Condition of Contract
(a) Agreement,
(b) Letter of Acceptance,
(c) Contractor’s Bid,
(d) Particular Conditions of Contract,
(e) General Conditions of Contract,
(f) Specifications,
(g) Drawings,
(h) Bill of Quantities, and
(i) any other document listed in the PCC as forming part of the
Contract.
3. Language and 3.1 The language of the Contract and the law governing the Contract
Law are stated in the PCC.
4. Project 4.1 Except where otherwise specifically stated, the Project Manager
Manager’s shall decide contractual matters between the Employer and the
Decisions Contractor in the role representing the Employer.
6. Communication 6.1 Communications between parties that are referred to in the Conditions
s shall be effective only when in writing. A notice shall be effective
only when it is delivered.
7. Subcontracting 7.1 The Contractor may subcontract with the approval of the
Project Manager, but may not assign the Contract without the approval
of the Employer in writing. Subcontracting shall not alter the
Contractor’s obligations.
8. Other 8.1 The Contractor shall cooperate and share the Site with other
Contractors contractors, public authorities, utilities, and the Employer between the
dates given in the Schedule of Other Contractors, as referred to in the
PCC. The Contractor shall also provide facilities and services for
them as described in the Schedule. The Employer may modify the
Schedule of Other Contractors, and shall notify the Contractor of
any such modification.
9. Personnel and 9.1 The Contractor shall employ the key personnel and use the equipment
Equipment identified in its Bid to carry out the Works, or other personnel and
equipment approved by the Project Manager. The Project Manager
shall approve any proposed replacement of key personnel and
equipment only if their relevant qualifications or characteristics are
substantially equal to or better than those proposed in the Bid.
6
Section 6: General Condition of Contract
9.2 If the Project Manager asks the Contractor to remove a person who
is a member of the Contractor’s staff or work force, stating the
reasons, the Contractor shall ensure that the person leaves the Site
within seven days and has no further connection with the work in
the Contract.
10. Employer’s and 10.1 The Employer carries the risks which this Contract states are
Contractor’s Employer’s risks, and the Contractor carries the risks which this
Risks Contract states are Contractor’s risks.
11. Employer’s 11.1 From the Start Date until the Defects Liability Certificate has been
Risks issued, the following are Employer’s risks:
(a) The risk of personal injury, death, or loss of or damage to
property (excluding the Works, Plant, Materials, and Equipment),
which are due to
i. use or occupation of the Site by the Works or for the
purpose of the Works, which is the unavoidable result of
the Works or
ii. negligence, breach of statutory duty, or interference with any
legal right by the Employer or by any person employed by or
contracted to him except the Contractor.
(b) The risk of damage to the Works, Plant, Materials, and
Equipment to the extent that it is due to a fault of the Employer
or in the Employer’s design, or due to war or radioactive
contamination directly affecting the location where the Works
are to be executed.
11.2 From the Completion Date until the Defects Liability Certificate
has been issued, the risk of loss of or damage to the Works, Plant,
and Materials is an Employer’s risk except loss or damage due to
(b) an event occurring before the Completion Date, which was not
itself an Employer’s risk, or
(c) the activities of the Contractor on the Site after the Completion
Date.
12. Contractor’s 12.1 From the Starting Date until the Defects Liability Certificate has been
Risks i ssu ed , t he ri sk s o f p er sonal inj ur y, d ea th , a nd lo s s of
o r da ma ge t o property (including, without limitation, the Works,
Plant, Materials, and Equipment) which are not Employer’s risks are
Contractor’s risks.
13. Insurance 13.1 The Contractor shall provide, in the joint names of the
Employer and the Contractor, appropriate insurance cover to
protect against Contractor’s risks, including:
(a) loss of or damage to the Works, Plant, and Materials;
7
Section 6: General Condition of Contract
14. Site 14.1 The Contractor, in preparing the Bid, shall rely on any Site
Investigation Investigation Reports referred to in the PCC, supplemented by any
Reports information available to the Bidder.
15. Contractor to 15.1 The Contractor shall construct and install the Works in accordance
Construct the with the Specifications and Drawings.
Works
16. The Works to 16.1 The Contractor may commence execution of the Works on the Start
be Completed Date and shall carry out the Works in accordance with the Program
by the Intended submitted by the Contractor, as updated with the approval of the
Completion Project Manager, and complete them by the Intended Completion
Date Date.
17. Designs by 17.1 The Contractor shall carry out design to the extent specified in the
Contractor and PCC. The Contractor shall promptly submit to the Employer all
Approval by the designs prepared by him. Within 14 days of receipt, the Employer
Project shall notify any comments. The Contractor shall not construct any
Manager element of the permanent work designed by him within 14 days after
the design has been submitted to the Employer or where the design
for that element has been rejected. Design that has been rejected shall
be promptly amended and resubmitted. The Contractor shall resubmit all
designs commented on taking these comments into account as
necessary.
17.3 The Contractor shall submit Specifications and Drawings showing the
proposed Temporary Works to the Project Manager, who is to approve
them if they comply with the Specifications and Drawings.
17.4 The Project Manager’s approval shall not alter the Contractor’s
responsibility for design of the Temporary Works.
17.5 The Contractor shall obtain approval of third parties to the design
of the Temporary Works, where required.
17.6 All Drawings prepared by the Contractor for the execution of the
temporary or permanent Works, are subject to prior approval by the
Project Manager before this use.
18. Safety 18.1 The Contractor shall be responsible for the safety of all activities on
the Site.
8
Section 6: General Condition of Contract
20. Possession of the 20.1 The Employer shall give possession of all parts of the Site to the
Site Contractor. If possession of a part is not given by the date stated
in the PCC, the Employer shall be deemed to have delayed the start
of the relevant activities, and this shall be a Compensation Event.
21. Access to the 21.1 The Contractor shall allow the Project Manager and any person
Site authorized by the Project Manager access to the Site and to any place
where work in connection with the Contract is being carried out or is
intended to be carried out.
22. Instructions, 22.1 The Contractor shall carry out all instructions of the Project
inspections and Manager which comply with the applicable law
Audits
22.2 The Contractor shall permit the Employer to inspect the Contractor’s
accounts, records and other documents relating to the submission of
bids and contract performance and to have them audited by auditors
appointed by the Employer. The Contractor shall maintain all
documents and records related to the Contract for a period of three (3)
years after completion of the Works. The Contractor shall provide any
documents necessary for the investigation of allegations of fraud,
collusion, coercion, or corruption and require its employees or agents
with knowledge of the Contract to respond to questions from the
Employer.
23. Appointment of 23.1 The Adjudicator shall be appointed jointly by the Employer and the
Adjudicator Contractor, at the time of the Employer’s issuance of the Letter of
Acceptance. If, in the Letter of Acceptance, the Employer does not
agree on the appointment of the Adjudicator, the Employer will
request the Appointing Authority designated in the PCC, to appoint
the Adjudicator within 14 days of receipt of such request.
23.2 Should the Adjudicator resign or die, or should the Employer and the
Contractor agree that the Adjudicator is not functioning in
accordance with the provisions of the Contract, a new Adjudicator shall
be jointly appointed by the Employer and the Contractor. In case
of disagreement between the Employer and the Contractor, within
30 days, the Adjudicator shall be designated by the Appointing
Authority at the request of either party, within 14 days of receipt of such
request.
24. Procedure for 24.1 If the Contractor believes that a decision taken by the Project
Disputes Manager was either outside the authority given to the Project Manager
by the Contract or that the decision was wrongly taken, the decision shall
9
Section 6: General Condition of Contract
24.3 The Adjudicator shall be paid by the hour at the rate specified in
the PCC, together with reimbursable expenses of the types specified
in the Contract Data, and the cost shall be divided equally
between the Employer and the Contractor, whatever decision is
reached by the Adjudicator. Either party may refer a decision of the
Adjudicator to an Arbitrator within 28 days of the Adjudicator’s
written decision. If neither party refers the dispute to arbitration
within the above 28 days, the Adjudicator’s decision shall be final
and binding.
B. Time Control
25. Program 25.1 Within the time stated in the PCC, after the date of the
Letter of Acceptance, the Contractor shall submit to the Project
Manager for approval a Program showing the general methods,
arrangements, order, and timing for all the activities in the Works.
25.3 The Contractor shall submit to the Project Manager for approval
an updated Program at intervals no longer than the period stated in
the PCC. If the Contractor does not submit an updated Program
within this period, the Project Manager may withhold the amount
stated in the PCC from the next payment certificate and continue to
withhold this amount until the next payment after the date on which
the overdue Program has been submitted.
25.4 The Project Manager’s approval of the Program shall not alter the
Contractor’s obligations. The Contractor may revise the Program and
submit it to the Project Manager again at any time. A revised
Program shall show the effect of Variations and Compensation
Events.
26. Extension of the 26.1 The Project Manager shall extend the Intended Completion Date if a
intended Compensation Event occurs or a Variation is issued which makes it
Completion impossible for Completion to be achieved by the Intended
10
Section 6: General Condition of Contract
26.2 The Project Manager shall decide whether and by how much to
extend the Intended Completion Date within 21 days of the
Contractor asking the Project Manager for a decision upon the effect of
a Compensation Event or Variation and submitting full supporting
information. If the Contractor has failed to give early warning of a delay
or has failed to cooperate in dealing with a delay, the delay by this
failure shall not be considered in assessing the new Intended
Completion Date.
27. Acceleration 27.1 When the Employer wants the Contractor to finish before the
Intended Completion Date, the Project Manager shall obtain priced
proposals for achieving the necessary acceleration from the
Contractor. If the Employer accepts these proposals, the Intended
Completion Date shall be adjusted accordingly and confirmed by both
the Employer and the Contractor.
28. Delays Ordered 28.1 The Project Manager may instruct the Contractor to delay the start
by the Project or progress of any activity within the Works.
Manager
29. Management 29.1 Either the Project Manager or the Contractor may require the other to
Meetings a t te n d a m an a ge m en t m e et i n g. T h e bu si n e ss o f a
m a n a ge me n t meeting shall be to review the plans for remaining
work and to deal with matters raised in accordance with the early
warning procedure.
30. Early Warning 30.1 The Contractor shall warn the Project Manager at the earliest
opportunity of specific likely future events or circumstances that may
adversely affect the quality of the work, increase the Contract Price, or
delay the execution of the Works. The Project Manager may
require the Contractor to provide an estimate of the expected
effect of the future event or circumstance on the Contract Price and
Completion Date. The estimate shall be provided by the Contractor as
soon as reasonably possible.
11
Section 6: General Condition of Contract
30.2 The Contractor shall cooperate with the Project Manager in making
and considering proposals for how the effect of such an event or
circumstance can be avoided or reduced by anyone involved in the
work and in carrying out any resulting instruction of the Project
Manager.
C. Quality Control
31. Identifying 31.1 The Project Manager shall check the Contractor’s work and notify the
Defects Contractor of any Defects that are found. Such checking shall not
affect the Contractor’s responsibilities. The Project Manager may
instruct the Contractor to search for a Defect and to uncover and test
any work that the Project Manager considers may have a Defect.
32. Tests 32.1 If the Project Manager instructs the Contractor to carry out a
test not specified in the Specification to check whether any work has
a Defect and the test shows that it does, the Contractor shall pay for
the test and any samples. If there is no Defect, the test shall be a
Compensation Event.
33. Correction of 33.1 The Project Manager shall give notice to the Contractor of any Defects
Defects before the end of the Defects Liability Period, which begins at
Completion, and is defined in the PCC. The Defects Liability Period
shall be extended for as long as Defects remain to be corrected.
33.2 Every time notice of a Defect is given, the Contractor shall correct
the notified Defect within the length of time specified by the
Project Manager’s notice.
34. Uncorrected 34.1 If the Contractor has not corrected a Defect within the time specified
Defects in the Project Manager’s notice, the Project Manager shall assess
the cost of having the Defect corrected, and the Contractor shall pay
this amount.
D. Cost Control
35. Contract Price 35.1 The Bill of Quantities shall contain priced items for the Works to be
performed by the Contractor. The Bill of Quantities is used to
calculate the Contract Price. The Contractor will be paid for the
quantity of the work accomplished at the rate in the Bill of Quantities
for each item.
(b) The Project Manager shall not adjust rates from changes in
quantities if thereby the Initial Contract Price is exceeded by
more than 15 percent, except with the prior approval of the
Employer.
37. Variations 37.1 All Variations shall be included in updated Programs produced by the
Contractor.
37.2 The Contractor shall provide the Project Manager with a quotation for
carrying out the Variation when requested to do so by the Project
Manager. The Project Manager shall assess the quotation, which
shall be given within seven (7) days of the request or within any
longer period stated by the Project Manager and before the
Variation is ordered
37.4 If the Project Manager decides that the urgency of varying the work
would prevent a quotation being given and considered without
delaying the work, no quotation shall be given and the Variation shall
be treated as a Compensation Event.
37.5 The Contractor shall not be entitled to additional payment for costs
that could have been avoided by giving early warning.
38. Cash Flow 38.1 When the Program is updated, the Contractor shall provide the Project
Forecasts Manager with an updated cash flow forecast. The cash flow
forecast shall include different currencies, as defined in the
Contract, converted as necessary using the Contract exchange rates.
39. Payment 39.1 The Contractor shall submit to the Project Manager monthly
Certificates statements of the estimated value of the work executed less the
cumulative amount certified previously.
13
Section 6: General Condition of Contract
39.4 The value of work executed shall comprise the value of the
quantities of work in the Bill of Quantities that have been
completed.
39.6 The Project Manager may exclude any item certified in a previous
certificate or reduce the proportion of any item previously certified
in any certificate in the light of later information.
40. Payments 40.1 Payments shall be adjusted for deductions for advance
payments and retention. The Employer shall pay the Contractor the
amounts certified by the Project Manager within 28 days of the date of
each certificate. If the Employer makes a late payment, the
Contractor shall be paid interest on the late payment in the next
payment. Interest shall be calculated from the date by which the
payment should have been made up to the date when the late
payment is made at the prevailing rate of interest for commercial
borrowing for each of the currencies in which payments are made.
40.2 If an amount certified is increased in a later certificate or as a result
of an award by the Adjudicator or an Arbitrator, the Contractor shall
be paid interest upon the delayed payment as set out in this
clause. Interest shall be calculated from the date upon which the
increased amount would have been certified in the absence of dispute.
40.3 Unless otherwise stated, all payments and deductions shall be paid or
charged in the proportions of currencies comprising the Contract Price.
40.4 Items of the Works for which no rate or price has been entered in shall
not be paid for by the Employer and shall be deemed covered by other
rates and prices in the Contract.
(c) The Project Manager orders a delay or does not issue Drawings,
Specifications, or instructions required for execution of the
Works on time.
14
Section 6: General Condition of Contract
42. Tax 42.1 The Project Manager shall adjust the Contract Price if
taxes, duties, and other levies are changed between the date 28 days
before the submission of bids for the Contract and the date of the last
Completion certificate. The adjustment shall be the change in the
amount of tax payable by the Contractor, provided such changes are
not already reflected in the Contract Price or are a result of GCC
44.1.
43. Currencies 43.1 All payments shall be made in the currency specified in the PCC.
44. Price 44.1 Prices shall be adjusted for fluctuations in the cost of inputs only
Adjustment if provided for in the PCC. If so provided, the amounts certified in
each payment certificate, before deducting for Advance Payment,
shall be adjusted by applying the respective price adjustment factor
to the payment amounts due in each currency. A separate formula of
the type indicated below applies to each Contract currency:
Pc = Ac + Bc lmc/Ioc
where:
Pc is the adjustment factor for the portion of the Contract Price
payable in a specific currency “c.”
Ac and Bc are coefficients specified in the PCC, representing the
nonadjustable and adjustable portions, respectively, of the
Contract Price payable in that specific currency “c;” and
Imc is a consolidated index prevailing at the end of the month being
invoiced and Ioc is the same consolidated index prevailing 28
days before Bid opening for inputs payable; both in the specific
currency “c.”
44.2 If the value of the index is changed after it has been used in a
calculation, the calculation shall be corrected and an adjustment
made in the next payment certificate. The index value shall be
deemed to take account of all changes in cost due to fluctuations in
costs.
45. Retention 45.1 The Employer shall retain from each payment due to the
Contractor the proportion stated in the PCC until Completion of the
whole of the Works.
16
Section 6: General Condition of Contract
46. Liquidated 46.1 The Contractor shall pay liquidated damages to the Employer at
Damages the rate per day stated in the PCC for each day that the Completion
Date is later than the Intended Completion Date. The total
amount of liquidated damages shall not exceed the amount defined
in the PCC. The Employer may deduct liquidated damages from
payments due to the Contractor. Payment of liquidated damages
shall not affect the Contractor’s liabilities.
47. Bonus 47.1 The Contractor shall be paid a Bonus calculated at the rate
per calendar day stated in the PCC for each day (less any days for
which the Contractor is paid for acceleration) that the Completion is
earlier than the Intended Completion Date. The Project Manager shall
certify that the Works are complete, although they may not be due to
be complete.
48. Advance 48.1 The Employer shall make advance payment to the Contractor of the
Payment amounts stated in the PCC by the date stated in the PCC, against
provision by the Contractor of an unconditional bank guarantee in a
form and by a bank acceptable to the Employer in amounts and
currencies equal to the advance payment. The guarantee shall remain
effective until the advance payment has been repaid, but the amount
of the guarantee shall be progressively reduced by the amounts
repaid by the Contractor. Interest shall not be charged on the advance
payment.
48.2 The Contractor is to use the advance payment only to pay for
Equipment, Plant, Materials, and mobilization expenses required
specifically for execution of the Contract. The Contractor shall
demonstrate that advance payment has been used in this way by
supplying copies of invoices or other documents to the Project
Manager.
49. Securities 49.1 The Performance Security shall be provided to the Employer
no later than the date specified in the Letter of Acceptance and shall
17
Section 6: General Condition of Contract
50. Dayworks 50.1 If applicable, the Dayworks rates in the Contractor’s Bid shall
be used for small additional amounts of work only when the Project
Manager has given written instructions in advance for additional
work to be paid for in that way.
50.3 The Contractor shall be paid for Dayworks subject to obtaining signed
Dayworks forms.
51. Cost of Repairs 51.1 Loss or damage to the Works or Materials to be incorporated in
the Works between the Start Date and the end of the Defects
Correction periods shall be remedied by the Contractor at the
Contractor’s cost if the loss or damage arises from the Contractor’s
acts or omissions.
52. Completion 52.1 The Contractor shall request the Project Manager to issue a
certificate of Completion of the Works, and the Project Manager shall
do so upon deciding that the work is completed.
53. Taking Over 53.1 The Employer shall take over the Site and the Works within seven
days of the Project Manager’s issuing a certificate of Completion.
54. Final Account 54.1 The Contractor shall supply the Project Manager with a
detailed account of the total amount that the Contractor considers
payable under the Contract before the end of the Defects Liability
Period. The Project Manager shall issue a Defects Liability
Certificate and certify any final payment that is due to the
Contractor within 56 days of receiving the Contractor’s account if
it is correct and complete. If it is not, the Project Manager shall
issue within 56 days a schedule that states the scope of the
corrections or additions that are necessary. If the Final Account is
still unsatisfactory after it has been resubmitted, the Project Manager
shall decide on the amount payable to the Contractor and issue a
payment certificate.
55. Operating
50. and 55.1 If “as built” Drawings and/or operating and maintenance manuals are
Maintenance required, the Contractor shall supply them by the dates stated in the
18
Section 6: General Condition of Contract
Manuals PCC.
55.2 If the Contractor does not supply the Drawings and/or manuals by the
dates stated in the PCC pursuant to GCC 55.1, or they do not receive
the Project Manager’s approval, the Project Manager shall withhold the
amount stated in the PCC from payments due to the Contractor.
56. Termination 56.1 The Employer or the Contractor may terminate the Contract if the other
party causes a fundamental breach of the Contract.
(g) the Contractor has delayed the completion of the Works by the
number of days for which the maximum amount of liquidated
damages can be paid, as defined in the PCC, and
56.4 Notwithstanding the above, the Employer may terminate the Contract
for convenience.
19
Section 6: General Condition of Contract
57. Fraud and 57.1 The Employer requires that the Contractor including subcontractors
Corruption observe the highest standard of ethics during the procurement and
execution of contracts. In pursuit of this policy, the Employer:
(a) defines, for the purposes of this provision, the terms set forth
below as follows:
58. Payment and 58.1 If the Contract is terminated because of a fundamental breach of
Termination Contract by the Contractor, the Project Manager shall issue a
certificate for the value of the work done and Materials ordered less
advance payments received up to the date of the issue of the
certificate and less the percentage to apply to the value of the work
not completed, as indicated in the PCC. Additional Liquidated
Damages shall not apply. If the total amount due to the Employer
exceeds any payment due to the Contractor, the difference shall be a
debt payable to the Employer.
59. Property 59.1 All Materials on the Site, Plant, Equipment, Temporary
Works, and Works shall be deemed to be the property of the
Employer if the Contract is terminated because of the Contractor’s
default.
60. Release from 60.1 If the Contract is frustrated by the outbreak of war or by any
Performance other event entirely outside the control of either the Employer or the
Contractor, the Project Manager shall certify that the Contract has
been frustrated. The Contractor shall make the Site safe and stop
work as quickly as possible after receiving this certificate and shall
be paid for all work carried out before receiving it and for any work
carried out afterwards to which a commitment was made.
21
Section 7: Particular Conditions of Contract
The following Particular Conditions of Contract shall supplement the General Conditions of Contract
(GCC). Whenever there is a conflict, the provisions herein shall prevail over those in the GCC.
Section 7: Particular Conditions of Contract
A. General
GCC 1.1 Please refer to the Drawings, Technical Specifications, and Bill of
(o) Quantities.
GCC 8.1 Schedule of other contractors shall be advised by the Employer before the
Start Date.
GCC 14.1 Site Investigation Reports are: NIL
GCC 17.1 The following shall be designed by the Contractor: NOT APPLICABLE
GCC 20.1 The Contractor is deemed given Possession of Site when the Contractor
receives the Notice to Proceed from the Employer.
GCC 24.4 Any dispute between the Employer and the Contractor arising in
connection with the Contract shall be resolved in accordance with the laws
of the democratic Republic of Timor-Leste.
B. Time Control
GCC 25.1 The Contractor shall submit any proposed updates to the Work
Completion Program submitted with the bid within 14 DAYS from the
Start Date.
Section 7: Particular Conditions of Contract
C. Quality Control
GCC 33.1 The Defects Liability Period is: ONE HUNDRED EIGHTY (180) DAYS
D. Cost Control
GCC 43.1 The currency for payment is: UNITED STATES DOLLAR (USD)
GCC 45.1 The proportion of payments retained is: TEN PERCENT (10%)
GCC 46.1 The liquidated damages for the whole of the Works are ONE-TENTH
OF ONE PERCENT OF THE INITIAL CONTRACT PRICE PER
DAY. The maximum amount of liquidated damages for the whole of the
Works is ten percent (10%) of the final Contract Price.
GCC 47.1 Not Applicable
The Employer shall recoup the advance payment by deducting from each
progress payment an amount equivalent to 25 % of the gross value of each
progress payment, until such time as the advance payment has been repaid.
GCC 49.1 The Performance Security amount is FIVE PERCENT (5%) OF THE
ACCEPTED CONTRACT PRICE.
3
Section 8: Contract Forms
Table of Forms
Letter of Acceptance………………………………………………………………………………..2
Contract Agreement………………………………..……………………………………………….3
Performance Security……………………………………………………………………………..4
Letter of Acceptance
[on letterhead paper of the Employer]
. . . . . . . date. . . . . . .
This is to notify you that your Bid dated . . . . date . . . . consisting of the Technical and Price Bids for
execution of the . . . . . . . . . .name of the contract and identification number, as given in the Contract
Data . . . . . . . . . . for the Accepted Contract Amount of the equivalent of . . . . . . . . .amount in
numbers and words and name of currency . . . . . . . . ., as corrected and modified in accordance with
the Instructions to Bidders is hereby accepted by the Employer.
You are requested to furnish the Performance Security within 7 days in accordance with the
Conditions of Contract, using for that purpose the of the Performance Security Form included in
Section 8 (Contract Forms) of the Bidding Documents.
Authorized Signature:
………………………………………………………
Attachment: Contract
Agreement
2
Section 8: Contract Forms
Contract Agreement
WHEREAS the Employer desires that the Works known as . . . . . name of the Contract. . . . .should be executed by
the Contractor, and has accepted a Bid by the Contractor for the execution and completion of these Works and the
remedying of any defects therein,
1. In this Agreement words and expressions shall have the same meanings as are respectively
assigned to them in the Contract documents referred to.
2. The following documents shall be deemed to form and be read and construed as part of this
Agreement. This Agreement shall prevail over all other Contract documents.
4. The Employer hereby covenants to pay the Contractor in consideration of the execution
and completion of the Works and the remedying of defects therein, the Contract Price or
such other sum as may become payable under the provisions of the Contract at the times
and in the manner prescribed by the Contract.
IN WITNESS whereof the parties hereto have caused this Agreement to be executed in accordance
with the laws of the Democratic Republic of Timor Leste on the day, month and year indicated above.
Witness, Name, Signature, Address, Date Witness, Name, Signature, Address, Date
3
Section 8: Contract Forms
Performance Security
We have been informed that . . . . . name of the Contractor. . . . . (hereinafter called "the
Contractor") has entered into Contract No. . . . . . reference number of the Contract. . . . . dated . . . . .
. . .with you, for the execution of . . . . . . name of contract and brief description of Works. . . . . (hereinafter
called "the Contract").
At the request of the Contractor, we . . . . . name of the Bank. . . . . hereby irrevocably undertake to pay
you any sum or sums not exceeding in total an amount of . . . . . name of the currency and amount in
figures*. . . . . . (. . . . . amount in words. . . . . ) such sum being payable in the types and proportions of
currencies in which the Contract Price is payable, upon receipt by us of your first demand in writing
accompanied by a written statement stating that the Contractor is in breach of its obligation(s)
under the Contract, without your needing to prove or to show grounds for your demand or the sum
specified therein.
This guarantee shall expire, no later than the . . . . . Day of . . . . . . . . . . , . . . . . . **, and any
demand for payment under it must be received by us at this office on or before that date.
This guarantee is subject to the Uniform Rules for Demand
Guarantees, ICC Publication No. 758, except that subparagraph (ii) of Sub-article 20(a) is
- Note -
All italicized text is for guidance on how to prepare this demand guarantee and shall be deleted from the final document.
1 The Guarantor shall insert an amount in USD representing the percentage of the Contract Price.
2 Insert the date twenty-eight days after the expected completion date.
4
Section I: Instruction to Bidders
At the request of the Contractor, we . . . . . name of the Bank. . . . . hereby irrevocably undertake to
pay you any sum or sums not exceeding in total an amount of . . . . . name of the currency and
amount in figures*. . . . . . (. . . . . amount in words. . . . . ) upon receipt by us of your first demand in
writing accompanied by a written statement stating that the Contractor is in breach of its obligation
under the Contract because the Contractor used the advance payment for purposes other than the
costs of mobilization in respect of the Works.
It is a condition for any claim and payment under this guarantee to be made that the advance
payment referred to above must have been received by the Contractor on its account number . . . . .
Contractor’s account number. . . . . at . . . . . name and address of the Bank. . . . . .
The maximum amount of this guarantee shall be progressively reduced by the amount of the advance
payment repaid by the Contractor as indicated in copies of interim statements or payment certificates
which shall be presented to us. This guarantee shall expire, at the latest, upon our receipt of a copy of
the interim payment certificate indicating that eighty (80) percent of the Contract Price has been
certified for payment, or on the ……... day of ……………..……….**, whichever is earlier.
Consequently, any demand for payment under this guarantee must be received by us at this office on
or before that date.
This guarantee is subject to the Uniform Rules for Demand Guarantees, ICC Publication No.
758.
Seal of Bank and Signature(s)
All italicized text is for guidance on how to prepare this demand guarantee and shall be deleted from the final document.
1 The Guarantor shall insert an amount in USD representing the amount of the advance payment.
2 Insert the expected expiration date of the Tim