Setup
Load the project file named “Arc Flash Example5”. The solution to this example is located in a directory
called “Solution5”. Open the solution project only to compare against your exercise once completed.
The system being analyzed can be considered to be Enclosed (Cubic Box). Typical working distance for a
0.480 kV system can be 18.0 in.
Procedure
Step1
Switch to Protective Device Coordination Mode. Using the Sequence of Operation tool, place faults at
bus “SWGR B”.
1.1 In revision “Base”, Fault bus “SWGR B”. Use output report “SWGRB_MaxSC”. Record the
operating time of CB5 (Fault Clearing Time) and the fault current in Table1 (see Figure 1).
1.2 Switch to revision “MinRev”. Fault bus “SWGR B”. Use output report “SWGRB_MinSC”. Record
the operating time of CB5 (Fault Clearing Time) and the fault current in Table1.
Step2
Switch to Short-circuit Analysis Mode. Using study case NFPA 70E run the arc flash calculation for the
following situations:
2.1 In revision “Base”, Fault bus “SWGR B”. Use output report “NFPA70E_Max”. Determine the
incident energy released at for a fault at the Bus at the time recorded from step 1.1. Record in the results
in Table1.
2.2 Switch to revision “MinRev”. Fault bus “SWGR B”. Use output report “NFPA70E_Min”.
Determine the incident energy released at for a fault at the Bus at the time recorded from step 1.2. Record
the results in Table1.
2.3 Switch back to base revision. Select study case IEEE 1584. Use output report “IEEE1584”. Run AF
Calculation. Determine the Fault Clearing Time and the Incident Energy for a fault at the bus. Record the
results in Table1.
Table1: Tabulated results for Low Voltage Arc Flash Result for NFPA70E and IEEE1584
Step SWGR B Ibf / Ia Fault Clearing Incident Energy
(kA) Time (FCT) sec. (cal/cm²)
NFPA Max SC (1.1)(2.1)
NFPA Min SC (1.2)(2.2)
IEEE 1584 (2.3)