WBS Assignment
WBS Assignment
Overall Project
Work Breakdown Structure (WBS)
WBS Activity
1.3.2 Purchase Materials Cost of labor for DroneTech and to acquire DroneTech Corporation New Drone
materials for prototyping flying drone and its Procurement;
interfaces and delivery cost.
1.3.3 Building the prototype Construct the drone with the interfaces Drone systems Engineer/ Project lead IT
according to Wilmont’s requirements, develop systems, Programmer and senior
a system to link drone tech to wilmont’s programmer of Drone Tech.
website for customers services.
1.4 Testing Test the interfaces and drone capability to Wilmont’s testing specialist, Gerald
deliver drugs prescription. Peritoni
1.4.1 Implementation Provide user’s manual and training on the new Phillip Grenberg, wilmont’s project
drone, organize first delivery trial to test the manager, Gerald Hasper , flight
ability of the drone to deliver drugs. operations manager.
1.4.2 Accounting This include justification of all expenses with the Drone tech Project Manager
labor associated.
1.4.3 close the project Prepare a final report to Wilmont’s Drone Tech Project Manager
Pharmacy