Installation & Cabling Manual: Osdr / PTP Node / PTMP Terminal / PTMP Hub
Installation & Cabling Manual: Osdr / PTP Node / PTMP Terminal / PTMP Hub
Edition 3a
Confidential
The information contained in this document is subject to change without prior notice.
All copyright, intellectual and industrial rights in this document and in the technical knowledge it contains
are owned by INTRACOM S.A. TELECOM SOLUTIONS and/or their respective owners.
This document is made available to the end users only for their internal use.
No part of this document nor any data herein may be published, disclosed, copied, reproduced,
redistributed by any form or means, electronically or mechanically, or used for any other purpose
whatsoever without the prior written approval of INTRACOM S.A. TELECOM SOLUTIONS.
Information as well as drawings and specifications contained in this document are subject to change
without prior notice.
All trademarks and copyrights mentioned herein are the property of INTRACOM S.A. TELECOM
SOLUTIONS and/or their respective owners.
Any rights not expressly granted herein are reserved.
Printed in Greece.
INTRACOM TELECOM
19.7 km Markopoulou Ave., Peania, Athens, GR 19002
T +30 210 667 1000, F +30 210 667 1001
http://www.intracom-telecom.com
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Contents
1. Introduction.................................................................................................. 5
2. Prior to Installation ...................................................................................... 6
List of Materials (StreetNode PtP Node / PtMP Terminal / PtMP Hub) ........... 7
List of Materials (OSDR Aggregation Hub)..................................................... 9
Connections................................................................................................. 15
Equipment Anchor Points ............................................................................ 19
Site Prerequisites......................................................................................... 20
Recommended Tools................................................................................... 25
3. Installation Procedure ............................................................................... 28
Overview...................................................................................................... 29
Installing the StreetNode PtP Node / PtMP Terminal / PtMP Hub ................ 31
Installing the OSDR Aggregation Hub.......................................................... 41
Installing the PonE Device ........................................................................... 58
Appendix A: Installing StreetNode on a Wall Surface ........................................ 64
Appendix B: Terminating S-FTP Cable ................................................................ 65
Appendix C: Removing StreetNode ..................................................................... 70
1
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
2
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Equipment Disposal
3
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Safety Precautions
RF EXPOSURE
Locally applicable national and international radio safety
requirements must be adhered to when installing the OSDR
aggregation hub.
Distance
Band Worker Public
26 GHz
28 GHz
0.5 m 1.0 m
32 GHz
42 GHz
4
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
1. Introduction
(1)
Point to Point.
(2)
Point to Multi Point.
5
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
2. Prior to Installation
6
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Introduction The list of materials is given below. At the installation site, the
technician should first unpack the delivered equipment and then
store the packing material in a safe place for future use.
(1)
Comes equipped with the AC power module.
7
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
List of
materials
Part Description
(continued)
Screw M5x10 (ISO 7380)
and lock washer with
internal safety pin for
securing StreetNode onto
the mounting plate.
Ethernet cable (S-FTP,
Cat5e, UV-rated, black,
4x2xAWG24).
8
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Introduction The list of materials is given below. At the installation site, the
technician should first unpack the delivered equipment and then
store the packing material in a safe place for future use.
9
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Equipment
(continued)
Part Description
PonE device for use at OSDR
installation locations where DC
power supply is already available.(1)
Suitable for outdoor installations.
Packaging also includes
accessories for mounting the PonE
device onto a wall surface.
(1)
PonE is wired to the OSDR with a single Ethernet cable when the distance between PonE
and OSDR is less than 100 m.
PonE is wired to the OSDR with two Ethernet cables when:
· the distance between PonE and OSDR exceeds 100 m (but is less than 200 m), or
when
· inband and outband management are needed concurrently.
10
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
11
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
12
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
OSDR pole This kit will be used to install the OSDR onto a pole using the
installation kit appropriate pair of hose clamps. Two clamp sizes are supplied for
poles having diameter between:
· 60 mm and 100 mm.
· 100 mm and 120 mm.
PonE pole This kit will be used to install the PonE device onto a pole.
installation kit
13
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
14
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Connections
1 2 3
5
4
6
15
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Connections, Continued
(1)
When connected with PonE (i.e. DC powered FO-HUB), this receptacle can be used to
allow:
· outband management of the FO-HUB, and
· longer distances between the PonE device and FO-HUB (practically x2).
16
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Connections, Continued
PoE device The PoE device accepts the AC Mains voltage (through an IEC
input) and the Ethernet traffic (through the IN port) and outputs the
Ethernet traffic together with superimposed DC voltage (through
the OUT port) toward the OSDR.
PoE also includes three status LEDs located above the RJ-45
ports.
17
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Connections, Continued
PonE device (Below, the PonE is shown opened to view its hidden connection
terminals).
(1)
When used, the NMS (IN / OUT) receptacle allows:
· outband management of the OSDR, and
· longer distances between the PonE device and OSDR (practically x2).
18
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
OSDR’s anchor The handle on top serves as the OSDR’s anchor point:
point
StreetNode’s The upper 10 mm hole located on the safety bracket on the side
anchor point (see below) serves as the StreetNode’s anchor point. This point
can be used to install an appropriate safety leash.
19
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Site Prerequisites
PoE device:
The PoE device will be installed indoors close to the OSDR
aggregation hub location. The Ethernet cable length between PoE
device and OSDR should not exceed 100 m.
PonE device:
The PonE device will be installed outdoors close to the OSDR
aggregation hub location.
The Ethernet cable length connecting the PonE device with the
OSDR should not exceed 100 m.
In case of longer distances (up to 200 m), a second Ethernet
cable can be used to interconnect PonE with the OSDR.
20
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
AC power cable Routing of the AC power cable, which connects the StreetNode
routing PtP / PtMP terminal / PtMP hub node to the local AC distributor or
socket, should be implemented as prescribed by the local
regulations regarding outdoor electrical installations.
DC power cable Routing of the DC power cable, which connects the PonE device
routing to the OSDR aggregation hub node, should be implemented as
prescribed by the local regulations regarding outdoor electrical
installations.
21
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Line Of Sight Prior to installation, the installer must verify LOS availability
(LOS) toward the service area or toward specific StreetNode nodes.
verification
Each StreetNode terminal node needs to be in LOS with the
assigned hub (StreetNode hub or OSDR aggregation hub).
OSDR needs to be tilted downwards, according to radio planning
directives, so that its street-level service footprint includes all the
assigned StreetNode terminal nodes.
22
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
23
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Maximum cable Below, the recommended maximum lengths are given for all the
lengths cables that will be used in the installation:
Cable Scope Maximum Length
Ethernet Traffic / (DC) 100 m
power /
StreetNode
management.
AC Power Power supply. 100 m
Grounding Connects Depends on the distance
StreetNode between the StreetNode
equipment to the equipment and the grounding
local grounding terminal position, as well as on
system. the recommended wire gauge
to be used.
24
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Recommended Tools
Adjustable torque
wrench with socket
R.13.
U-type wrenches:
· R.13
· R.24
Adjustable torque
spanners:
· R.8 (2 Nm /
4.2 Nm)
· R.7 (2 Nm)
PH-2 screwdriver.
Flat-headed
screwdriver.
25
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Equipment
installation
Tool Description
tools
(continued)
Drill machine with
appropriate 8 mm
bits (for wall
mounting and for
lamp post
mounting).
Tamper-proof torx
screwdriver T10.
26
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Ethernet cable
termination Tool Description
tools
Blade
Cable cutter.
Ethernet cable
tester.
27
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
3. Installation Procedure
Contents · Overview
· Installing StreetNode PtP node / PtMP terminal / PtMP
hub.
· Installing OSDR aggregation hub.
28
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Overview
29
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Overview, Continued
30
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
(1)
For instructions on how to install StreetNode on a wall surface, kindly refer to Appendix A:
Installing StreetNode on a Wall Surface.
31
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Procedure
(continued)
Step Action
3 Using the electrical screwdriver, extension and 7 mm
bit, install the mounting plate and clamps onto the pole.
Beware of the correct positioning of the mounting
plate. The latter must be installed as shown below
and coarsely point toward the planned direction.
Mounting plate’s safety point should be on the right
(see arrow below).
A StreetNode PtMP terminal node must
NOTE have Line Of Sight (LOS) with the
assigned hub.
A StreetNode PtP node must have Line
Of Sight (LOS) with the far-end
StreetNode PtP Node.
Narrow side is
facing up
Toward the
planned
direction
Wide side is
facing down
32
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Procedure
(continued)
Step Action
5 a. Lift the StreetNode up to the pole.
b. Loosen the four screws at the back of
StreetNode.
c. Insert and slide StreetNode downwards through
the intended mounting plate openings.
33
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Procedure
(continued)
Step Action
6 Using the electrical screwdriver, extension and 8 mm
bit, tighten the four screws.
34
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Procedure
(continued)
Step Action
7 Using the electrical screwdriver, extension and 3 mm
bit, tighten the safety screw and lock washer (supplied)
into the intended hole on the safety bracket at the side.
This screw secures StreetNode onto the mounting
plate in case an accidental external brute force is
applied.
35
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Procedure
(continued)
Step Action
8 From the bottom of StreetNode, unscrew and remove
only those protective caps corresponding to the
receptacles to be used, i.e. from the:
· Receptacle to plug the AC power cable.
· Receptacle(s) to plug the traffic / management
cable(s).
36
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Procedure
(continued)
Step Action
9 Prepare the grounding cable and install it onto the
StreetNode’s grounding terminal (see arrow below).
Using the electrical screwdriver with extension and
8 mm bit, tighten the M5 screw.
Do not overtighten. Adjust the electrical screwdriver
for tightening of M5 screws.
37
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Procedure
(continued)
Step Action
11 Proceed as below for each electrical traffic cable:
38
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Procedure
(continued)
Step Action
12 Connect the:
· Ethernet cable(s) to the small cell or the
interconnected StreetNode / OSDR, or the
customer’s Ethernet equipment.
· AC power cable to the respective terminals on
the local AC distributor. In case of availability of
an AC Mains socket, terminate the cable to the
appropriate plug. Termination of the AC power
cable will be as follows:
39
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Procedure
(continued)
Step Action
13 Power up StreetNode and wait until the STAT LED starts
blinking green.
Proper commissioning of the assigned OSDR or
StreetNode PtMP hub or the StreetNode PtP node should
be preceded in order to complete this step successfully.
StreetNode will automatically connect to the network and
will be self-brought into backhaul service.
Throughout the automated process, the functioning of status
LED at the bottom of the StreetNode is as described below:
StreetNode Condition
Status of
STAT LED PtMP
PtP Node PtMP Hub
Terminal
Stable StreetNode is StreetNode
Major alarm.
ON, red idle. is idle.
Antenna
Antenna self- self-
Blinking
alignment in alignment –
red
progress. in
progress.(1)
Reception ok
Stable StreetNode is
– not yet
ON, – muted (i.e. not
invited by the
orange transmitting).
hub.
StreetNode is
StreetNode operational but
Link
Blinking node not all assigned
operational
green operates terminals are
.
normally. synchronized
yet.
StreetNode is
Stable operational and
ON, – – all assigned
green terminals are
synchronized.
End of procedure.
(1)
For the StreetNode PtP node (with fixed antenna orientation), stable ON red indicates
that link is not yet established.
40
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Preparing To prepare the OSDR (using the respective part of the mounting
OSDR kit), proceed as follows:
(mounting kit)
Step Action
1 Using the PH-2 screwdriver, remove the four screws
from the back of the OSDR.
(1)
This cable carries traffic, management and DC power.
41
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Preparing
OSDR
Step Action
(mounting kit)
(continued) 2 Position the mating plate of the mounting kit at the back
of the OSDR and re-install the four screws.
Take care of the correct positioning of this plate
before fastening. Do not overtighten screws.
As reference, keep the RSSI input at OSDR’s bottom
(see arrow below) for correct positioning.
42
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Preparing
OSDR
Step Action
(mounting kit)
(continued) 3 Using a flat-headed screwdriver, remove the protective
cap from the traffic receptacle (GbE2) at the bottom of
the OSDR.
End of procedure.
Continued on next page
43
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Attaching the To attach the antenna onto the OSDR, proceed as follows:
antenna (onto
OSDR) Step Action
1 Position the OSDR onto a stable flat surface with the
antenna receptacle facing up.
2 Position and fully hand-tighten the three headless
screws (supplied).
To correctly position the screws, take the OSDR
handle as reference (see bottom arrow below).
44
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Attaching the
antenna (onto
Step Action
OSDR)
(continued) 3 Install the supplied M4 nuts over all three screws and
tighten for one full turn.
45
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Attaching the
antenna (onto
Step Action
OSDR)
(continued) 5 a. Apply greasing paste (supplied) around the
circumference of the sealing o-ring.
b. Slide and position the antenna into the cavity of
the OSDR flange.
46
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Attaching the
antenna (onto
Step Action
OSDR)
(continued) 6 Hand-tighten all three nuts.
47
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Attaching the
antenna (onto
Step Action
OSDR)
(continued) 8 a. Position the M4 screw and hand-tighten.
b. Use the adjustable torque spanner R.7 to fully
tighten and secure screw.
Apply a maximum 2 Nm tightening torque.
End of procedure.
Continued on next page
48
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
49
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Installing the
mounting kit
Step Action
(continued)
2 Carry out the assembly on the mounting kit’s plate:
a. Install bracket arm (used for azimuth alignment)
and top cap.
End of procedure.
50
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
51
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Installing the
OSDR / antenna
Step Action
assembly
(continued) 2 a. Safely carry the OSDR / antenna assembly to
the installation position.
b. Remove the karabiner (previously installed).
c. Install OSDR / antenna onto the assembled
mounting kit by using two screws and four
washers (supplied) at elevator’s side.
d. Tighten the screws by using the adjustable
torque wrench with socket R.13. Apply a
maximum 20 Nm tightening torque.
52
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Installing the
OSDR / antenna
Step Action
assembly
(continued) 3 a. By using the adjustable torque wrench with
socket R.13, slightly loosen the elevation and
azimuth screws (see below).
b. Carry out small movements in both planes so
that OSDR points toward the center of the
assigned service area.
c. Re-tighten the two adjustment screws. Apply a
maximum 20 Nm tightening torque.
End of procedure.
Continued on next page
53
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
3 Insert and install the RJ-45 jack of the cable into the
mating receptacle at the bottom of the OSDR.
Listen for a “click” when inserting. This verifies that
the jack has been secured in place.
54
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Preparing /
installing the
Step Action
Ethernet cable
(continued) 4 Assemble all the cable gland items together.
Using the U-type wrench R.24, fully tighten the metallic
nut (last item).
End of procedure.
Continued on next page
55
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
End of procedure.
Continued on next page
56
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
End of procedure.
57
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Introduction This procedure will be carried out only in the case that the OSDR
aggregation hub is to be connected to a DC power supply source.
The PonE installation and wiring procedure is as follows:
1. Installation of the PonE device (onto the wall or pole).
2. Connection of PonE to the grounding bar.
3. Wiring of PonE (DC power supply / Ethernet cables).
58
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Ethernet cable(s):
One or two runs of S-FTP cables will be needed to interconnect
the PonE device with the OSDR. For cable termination, refer to
the detailed instructions given in Appendix B.
The other end of the power supply cable will be terminated onto
an available circuit breaker (MCB), within the DC power
switchboard, as specified in site requirements.
59
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Wall mounting Using the supplied accessories (found in the PonE packaging)
and a drill bit 5 mm, mount the PonE onto a wall surface at the
four points shown below.
60
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Pole mounting Use the PonE pole mounting kit (supplied) to install the PonE as
follows:
a. Install the PonE onto the mounting bracket.
61
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
PonE wiring
overview
62
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Cable fastening Use the PonE’s metallic clamps and cable ties to secure cables as
shown:
63
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
64
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Parts of RG-45 The RJ-45 jack (for terminating the S-FTP cable) is composed of
jack two parts:
· the main body and
· the wire guide (with numbering).
65
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
66
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Termination
procedure
Step Action
(continued)
3 Carefully insert the eight wires into the cavity of the wire
guide so that its numbering is visible from the top.
67
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Termination
procedure
Step Action
(continued)
5 a. Fold back the crimping terminal of the connector.
b. Fully insert wire guide and cable into the
connector’s body until the shield (overlapping
the jacket’s end) reaches the crimping position.
68
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Termination
procedure
Step Action
(continued)
7 With the pliers, bring the terminal of the connector back,
over the exposed shield, and press gently around the
terminal to form. This will achieve good contact with the
shield.
End of procedure.
69
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
70
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Procedure
(continued)
Step Action
3 Using the electrical screwdriver, extension and 8 mm
bit, remove the safety screw from the side of the
StreetNode.
71
StreetNode PtMP Terminal / PtMP Hub / PtP Node / OSDR
Installation & Cabling Manual – Edition 3.0a
Procedure
(continued)
Step Action
5 Lift and extract StreetNode.
You can now safely transport StreetNode to ground
level.
End of procedure.