SFP 512 Conventional Fire Alarm System: Notes

This document provides information on installing a new conventional fire alarm system at SFP 512. It notes that existing isolations must be verified before construction begins. New cables will be run within the building to required locations using the preferred site method. All equipment and cables will be properly labelled and identified before energization. Construction check sheets identified in inspection documents must be completed before energization. Existing fire system cables currently coiled in the JK warehouse will be located and rerouted to the new fire alarm panel 07-FG-52002.

Uploaded by

mounr
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
151 views1 page

SFP 512 Conventional Fire Alarm System: Notes

This document provides information on installing a new conventional fire alarm system at SFP 512. It notes that existing isolations must be verified before construction begins. New cables will be run within the building to required locations using the preferred site method. All equipment and cables will be properly labelled and identified before energization. Construction check sheets identified in inspection documents must be completed before energization. Existing fire system cables currently coiled in the JK warehouse will be located and rerouted to the new fire alarm panel 07-FG-52002.

Uploaded by

mounr
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1 2 3 4 5 6 7 8 9 10

NOTES

SFP 512 CONVENTIONAL FIRE ALARM SYSTEM 1. SITE TO VERIFY THAT ALL EQUIPMENT ISOLATIONS ARE
07-FG-52002 IN PLACE PRIOR TO ANY CONSTRUCT WORK COMMENCING.

A 2. NEW CABLES TO BE RUN USING PREFERRED METHOD OF SITE A


SFP 512
WITHIN BUILDING TO REQUIRED LOCATIONS.
B1 TERMINAL
3. ALL EQUIPMENT TO BE LABELLED AS SHOWN.
24V DC 1
OUTPUT 4. ALL EQUIPMENT & CABLE IDENTIFICATIONS TO BE INSTALLED
0V 2
PRIOR TO ENERGISATION.
3
NO 3k8 1 REFER TO DRG.
4 3k8 6877-DQ-KK-07-81-79813
NC 1k5 2 5. ALL CONSTRUCTION CHECK SHEETS IDENTIFIED ON
NO 5 (CABLE No. C07-DMC-511111)
OUTPUT TO MWGL F&G SYSTEM ELECTRICAL INSPECTION & TEST MATRIX
GENERAL C 3 SEE NOTE 6
NC 6 REFER TO DRG.
ALARM 7329-QC-NN-07-79-17742 TO BE CARRIED OUT PRIOR TO
C 7 6877-DQ-KK-07-81-79847
+ - 07-UA-520005 07-UA-520006 ENERGISATION.
(CABLE No. 07-511-E-004B)
NO 8
SEE NOTE 6

SOUNDER

SOUNDER
GENERAL
NC 9 6. THESE EXISTING FIRE SYSTEM CABLES ARE COILED
FAULT
B B
C 10 SOMEWHERE WITHIN THE JK WAREHOUSE.
ALARM 1 (OC) 11 THEY SHALL BE LOCATED AND REROUTED TO NEW FIRE
ALARM 2 (OC) 12 ALARM PANEL 07-FG-52002.
+ - + -
ALARM 3 (OC) 13 IF THERE IS INSUFFICIENT LENGTH ON THESE CABLES

3k8
ALARM 4 (OC) 14 THEY SHALL BE CUT BACK TO AN APPROPRIATE LOCATION
+ 15 AND TERMINATED IN A NEW JUNCTION BOX.
SOUNDER
- 16
THEN RUN NEW CABLES FROM J.B. TO FIRE PANEL
07-FG-52002 AND CONNECT CABLES AS SHOWN.

JB-Y(ST)-Y 4x2x0.8
1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3
B2 TERMINAL

1k5

1k5

1k5

1k5

1k5

1k5
C + 1 LINE 1 C
LINE 1 2/1 USB501/SSD521 2/2 USB501/SSD521 2/3 USB501/SSD521
- 2 3k LEGEND
+ 3
LINE 2 1/1 1/2 1/3 1/4 1/5 1/6
- 4 LINE 2 SFP 512 SECURITON CONVENTIONAL FIRE ALARM SYSTEM
SHIELD 5 6 5 4 3 2 1 6 5 4 3 2 1 6 5 4 3 2 1 FT513 FT513 FT513 FT513 FT513 FTN516 USB501 OPTICAL SMOKE DETECTOR BASE
+ 6 3k 07-DMC-52014-1 07-DMC-52014-2 07-DMC-52014-3 07-DMC-52014-4 07-DMC-52014-5 07-DMC-52014-6 SSD521 CONVENTIONAL OPTICAL SMOKE DETECTOR
LINE 3
- 7 FT513 MANUAL CALL-POINT (INDOOR)
07-DSO-520205 07-DSO-520206 07-DSO-520207
+ 8 FTN516 MANUAL CALL-POINT (OUTDOOR)
LINE 4
- 9
3/1 USB501/SSD521 3/2 USB501/SSD521

SFP-4ZE-1
LINE 3
D D
+ 1 6 5 4 3 2 1 6 5 4 3 2 1
LINE 1
- 2 3k

+ 3
LINE 2 07-DSO-520208 07-DSO-520209
- 4
SHIELD 5
+ 6
4/1 USB501/SSD521 4/2 USB501/SSD521 4/3 USB501/SSD521
LINE 3
- 7
+ 8 LINE 4
LINE 4
- 9 6 5 4 3 2 1 6 5 4 3 2 1 6 5 4 3 2 1
THIS DRAWING IS BASED ON
3k
ATCO DRG. No. 94341-62-FA-02 REV.2

07-DSO-520210 07-DSO-520211 07-DSO-520212 (6877-PF0002-1118)


E 230V E
SUPPLY

DRAWING NUMBER REFERENCE DRAWING


N E L 5/1 USB501/SSD521 5/2 USB501/SSD521 5/3 USB501/SSD521 5/4 USB501/SSD521 5/5 USB501/SSD521 5/6 USB501/SSD521 5/7 USB501/SSD521
7329-LC-NN-07-79-17740
ELECTRICAL CABLE SCHEDULE
9621-CO7-0043-E-RG-0002-000
7329-DE-NN-07-79-17736
6 5 4 3 2 1 6 5 4 3 2 1 6 5 4 3 2 1 6 5 4 3 2 1 6 5 4 3 2 1 6 5 4 3 2 1 6 5 4 3 2 1 CABLE ROUTING LAYOUT GROUND FLOOR
9621-CO7-0043-E-LY-0001-000
7329-DE-NN-07-79-17737
CABLE ROUTING LAYOUT ROOF LEVEL
9621-CO7-0043-E-LY-0002-000
07-DSO-520213 07-DSO-520214 07-DSO-520215 07-DSO-520216 07-DSO-520217 07-DSO-520218 07-DSO-520219
TO MDB-WH
JK WAREHOUSE
DISTRIBUTION BOARD
F

5/8 USB501/SSD521 5/9 USB501/SSD521 5/10 USB501/SSD521 5/11 USB501/SSD521 5/12 USB501/SSD521 5/13 USB501/SSD521 5/14 USB501/SSD521

6 5 4 3 2 1 6 5 4 3 2 1 6 5 4 3 2 1 6 5 4 3 2 1 6 5 4 3 2 1 6 5 4 3 2 1 6 5 4 3 2 1 C02 ISSUED FOR CONSTRUCTION TA AG DGB DGB 06.02.08

R01 ISSUED FOR REVIEW/COMMENT TA AG EC DGB 21.12.07

07-DSO-520220 07-DSO-520221 07-DSO-520222 07-DSO-520223 07-DSO-520224 07-DSO-520225 07-DSO-520226 REV DESCRIPTION DRWN CHKD CHKD APPD DATE

G
IN AMENAS

5/15 USB501/SSD521 5/16 USB501/SSD521 5/17 USB501/SSD521 5/18 USB501/SSD521 5/19 USB501/SSD521 5/20 USB501/SSD521
WOOD GROUP JOB NO. : CO7-0043

LINE 5
ORIGINAL DWG SIZE : A1
6 5 4 3 2 1 6 5 4 3 2 1 6 5 4 3 2 1 6 5 4 3 2 1 6 5 4 3 2 1 6 5 4 3 2 1

3k SCALE : NTS

07-DSO-520227 07-DSO-520228 07-DSO-520229 07-DSO-520230 07-DSO-520231 07-DSO-520232 TITLE

NO
WIRING DIAGRAM
H INPUT FROM MWGL F&G SYSTEM C FIRE ALARM SYSTEM H
3k

REFER TO DRG. NC JK WAREHOUSE (CONSTRUCT)


1k5
6877-DQ-KK-07-81-79831 FOR
(CABLE No. 07-511-E-004B) CONSTRUCTION CLIENT : BP / STATOIL / SONATRACH
SEE NOTE 6
WG DWG. No. : 9621-C07-0043-E-WD-0001-000

DWG.7329-DP-NN-07-79-17739 REV C02 IND

1 2 3 4 5 6 7 8 9 10

You might also like