Manifestation WHEREAS, Presented To This Body For Appropriate Action, Is The Request of The

The document is a request from the Provincial Governor to modify the amounts in several contracts with construction companies. Upon review, some contract prices did not match the actual project costs audited by the Commission on Audit. The governor seeks to update the contract prices to match the actual project costs in order to avoid confusion over the true costs of the projects. A table lists 6 projects, their original contract prices, actual costs, contractors, and status. The total contract modification amounts to over PHP 776 million to match the actual costs of over PHP 777 million.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views

Manifestation WHEREAS, Presented To This Body For Appropriate Action, Is The Request of The

The document is a request from the Provincial Governor to modify the amounts in several contracts with construction companies. Upon review, some contract prices did not match the actual project costs audited by the Commission on Audit. The governor seeks to update the contract prices to match the actual project costs in order to avoid confusion over the true costs of the projects. A table lists 6 projects, their original contract prices, actual costs, contractors, and status. The total contract modification amounts to over PHP 776 million to match the actual costs of over PHP 777 million.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

MANIFESTATION

WHEREAS, presented to this Body for appropriate action, is the request of the
Provincial Governor, Honorable Jayvee Tyron L. Uy, MPA for the modification of
the amounts reflected in the ratified Contracts entered into by the undersigned with
the following Contractors;

WHEREAS, upon scrutiny on the Contracts, it was found out that the some of the
figures appearing therein were not the same with the Project Cost as audited by the
Commission on Audit (COA);

WHEREAS, such deviation or variance from the Contract Price is allowed on


account of untoward or extraordinary circumstances and upon prior approval of the
Government Procurement Policy Board (GPPB);

WHEREAS, to avoid variance or area of confusion of the costs of the subject


projects, the undersigned would like to modify the amount of the Contract Price to
the amount of the actual Project Costs, to wit:
PROJECT Contract Price PROJECT CONTRACTOR STATUS
DESCRIPTION COST
Upgrading/ 25,770,824.63 25,770,824.63 Legacy Completed
improvement of Construction
Alegria-Panag- Corporation
Camanlangan
Provincial Road, New
Bataan
Upgrading/ 29,618,804.65 29,656,239.00 Legacy On-going
improvement of Construction
Alegria-Panag- Corporation
Camanlangan
Provincial Road,
Phase II, Compostela
and New Bataan
(Panag-Fatima
Section)
Upgrading/ 46,912,458.46 47, 000.000.00 Legacy On-going
improvement of Gabi- Construction
Cabacungan-Sto. Corporation
Niño Provincial Road
with bridge widening
(Gabi-Cabacungan
Section), Compostela
and Nabunturan
Upgrading/ 33,724,433.46 33,800,000.00 Alonzo Completed
improvement of Construction
Libaylibay-New
Visayas-Sangab-
Limbo Provincial
Road (Dumlan-
Libaylibay Section)
Furnishing labor, 75,713,481.71 75,900,000.00 Alonzo Completed
equipment and Construction
materials for the
upgading/ improvement
of Nabunturan-Nuevo
Iloco Provincial Road,
Phase II, Nabunturan
and Mawab
Upgrading/ 125,459,975.18 125,459,975.18 FFJJ Completed
improvement of Construction &
Compostela-Tubo- Supply
tubo-Monkayo
Provincial Road
Bridge Component
Upgrading/ 63,902,579.62 64,000,000.00 FFJJ On-going
improvement of Construction &
Libaylibay-New Supply
Visayas-Sangab-
Limbo Provincial
Road Phase II with
bridge widening
Furnishing labor, 199,150,999.98 199,999,999.99 FFJJ Completed
equipment and Construction &
materials for the Supply
upgading/ improvement
of Mayaon-San
Antonio Provincial
Road, Phase II
Montevista and Laak
Furnishing labor, 175,861,133.10 176,255,188.00 Tagum Builders Completed
equipment and Contractors
materials for the Corporation
upgading/improvement
of Elizalde-Panamin-
Anitapan Provincial
Road, Maco and
Mabini
GRAND TOTAL 776,114,690.79 777,824,226.80
PRAYER

WHEREFORE, premises considered, it is most respectfully prayed that this


Honorable Office takes notice of the foregoing Manifestation.

Nabunturan, Davao de Oro Province. July 27, 2020.