BASIC DATA
MAIN DATA
Dismantling the existing PCC Body Wall including all labour and other incidental charges etc.,
1
complete
Earthwork excavation in hard clayed soil and depossiting on bank with initial lead of 10m & lift as
2 per SS20B including all required charges, for earth work excavating to required depth, balling out of
water etc,. Complete
Filling foundation with good river sand form approved quarry including cost and conveyance of all
3 materials to work site including all labour charges etc,. Complete.
Vibrated reinforced cement concrete 1:1.5:3 mixing (M25) using 20mm, 12mm ISS.HBG metal
5 from approved quarry including cost and conveyance of all materials to site including all labour
charges for mixing,laying vibrating ,curing ,etc,. Complete.BOX CULVERT
4172.47
Vibrated Cement concrete M30 (Design mix) WEARING COAT 75mm thickness using ISS size
HBG graded metal including cost and conveyance of all materials to site, cost of cement,
8 premoulded expansion joints and fixing the same in position including formwork and centering
labour charges for laying, compacting finishing curing including all other incidental charges
etc.complete Over Deck Slab & Approach slab as per MORTH No.111,112, 2702, 900
Filling behind Abutmants and wings with clean gritty gravel including cost and conveyance of gravel
toworksite,laying,handling charges and filling in layers,tamping under optimum moisture content to
9 get the maximum density including watering,with all leads for water and all other incidental charges
etc,complete for filling behind the abutment and wings as per MORTH No.
Cement MR 5575.53
0/8 of Vridhachalam-
US Gravel 8 MR 174.29 73.28 247.57
Kattugudalore
Steel 38657.88
Sl.
Quantity Description Rate per Amount
No.
986.36 114142.00
Average rate
80766
115.72
697.94
13915
Average rate 365.76
35.24
178.75 774732.00
648552
Average rate 4334.17
149.67
156.77 691943.00
Average rate
Average rate
683444
4413.75
152.51
354.67 1993298.00
996278
Average rate 5620.15
174.75
24.88 1410496.00
746066
Average rate 56691.96
13.16
#NAME? #NAME?
134259
Average rate #NAME?
101.22
#NAME? #NAME?
7524
#NAME?
48
GRAVEL FILLING BEHIND THE ABUTMENTS
AND WING wall with clean gritty gravel including
cost and conveyance of gravel to site including
labour charges for filling in layers, Watering,
12
tamping under optimum moisture content to get
the maximum density and including watering with
all leads for water and all incidental charges etc.,
complete.
261.26 86868.00
64601
332.50
195.16
258.72 104253.00
67781
402.96
160.80
Providing and Laying Granular Sub-Base Grade-
V consisting of well graded Material confirming to
the grading given in Table No.400-1, mixing in a
mechanical mix plant at OMC, carriage of mixed
14 Material to work site, spreading in uniform layers
with motor grader on prepared surface and
compacting with vibratory roller to achieve the
desired density, etc., complete as directed by the
Engineer. as per MORTH No. 111, 112, 401, 900.
#NAME? #NAME?
54550
#NAME?
35.26
16.20 27158.00
49255
1676.42
29.38
#NAME? #NAME?
5782
#NAME?
117.50
1134
#NAME?
117.50
14307
#NAME?
117.50
Diversion Road
Excavation including removal and satisfactory
disposal of all materials necessary for the
construction of road way and side drains in
19 accordance with specifications and the lines ,
grades and cross sections shown in the drawings
or as indicated by the Engineer for Carted Eath
with a lead of 8km for formation of Diversion Road.
31638
#NAME?
546.80
#NAME? #NAME?
179248
#NAME?
107.25
Sl.
Quantity Description Rate per Amount
No.
114141.58
771417.01
691942.96
Vibrated Reinforced cement concrete M25 (design
mix) using ISS gradedhard granite crushed stone
including cost and conveyance of allmaterials to
site excluding cost and fabrication of steel but
including formwork and centering, softwater,
labour charges for mixing, transporting and
5
placing in position, vibrating and compacting,
finishing and curing,working at heights, hire,
charges for tools and plants including all other
incidental charges etc., complete as per
specification for Box Culvert - as per MORTH
No.1000,1500, 1600, 1700 1900, 2200, 900
1993297.97
1410496.28
Vibrated Cement Concrete of grade M15
(nominal mix) using 40 mm ISS HBG metal
including cost and conveyance of all materials
to site including cos t of form work, centering,
soft water, labour charges for mixing,
7 transpoting, laying and curing concrete, working
at depths, Tools and Plants shoring , strutting
etc., complete as per relevant standard
specifications for BASE COURSE BELOW
APPROACH SLAB. as per MORTH No.
1000,1500,1700,2704
#NAME?
#NAME?
80979.47
Cement concrete M30 (Design mix) WEARING
COAT 75mm thickness using ISS size HBG
graded metal including cost and conveyance of all
materials to site, cost of cement, premoulded
13 expansion joints and fixing the same in position
including formwork and centering labour charges
for laying, compacting finishing curing including
all other incidental charges etc.complete Over
Deck Slab as per MORTH No.111,112, 2702, 900
102895.64
#NAME?
Provding and Laying Wet Mix Macadam consisting
of clean crushed aggregates confirming to the
grading given in Table No.400-13, including
premixing the Material with water at OMC in
mechanical mix plant carriage of mixed Material
15
by tipper to site, laying in uniform layers with paver
on well prepared surface and compacting with
vibratory roller to achieve the desired density, etc.,
complete as directed by the Engineer. as per
MORTH No. 111, 112, 406, 900.
27158.73
#NAME?
#NAME?
#NAME?
Diversion Road
#NAME?
Supply of NP3 class RCC pipe with flush joint to a
size of 1000mm inner diameter with wall thickness
115mm. to a length of 2.5m in RCC M35 with
reinforcement as per table 5 of IS :458:2003 to a
ultimate load capacity of 71.58 KN/Linearmeter
including cost of conveyance of all matrials and
20
steel including moulding charges, all labour
charge, hire charges for all T & P including
conveyance and supply of pipe to worksite and
other incidental charges etc., as per the
specification IS : 458:2003 as per MORTH No.
111, 112, 2900, 900
#NAME?
#NAME?
#NAME?
#NAME?
1 Dismantling the existing PCC Body Wall including all labour and other incidental charges
etc., complete
92.66
2 Dismantling the existing RCC SLAB including all labour and other incidental charges etc.,
complete
6.42
306.29
Sand filling with good dry river sand from approved quarry including cost and
conveyance to site including all labour charges for filling watering and
3
consolidation etc. complete for foundation as per the drawing and standard
specification as per MORTH No. 111,112,900
21.32
Cement Concrete M15 Mix using 40mm ISS size HBG metal including cost and
conveyance of all materials to site including cost of cement, centering, soft water,
labour charges for mixing, transporting, laying and curing concrete , working at
4 depths , tools and plants employed and maintaining of protective bunds,
cofferdams, shoring, strutting etc., complete as per relevant standard
specifications as directed by the Engineer for Foundation as per MORTH No. 111,
112, 900, 1000, 1500, 1700, 2100
56.18
Vibrated Cement Concrete M15 using ISS graded metal including cost and
conveyance of all materials to site including cost of cement, centering, soft water,
labour charges for mixing, transporting, laying and curing concrete , working at
5
depths , tools and plants employed and maintaining of protective bunds,
cofferdams, shoring, strutting etc.,complete as per relevent standard specification
for for Box Culvert .as per MORTH No. 111,112,900,1000, 1500,1700,2200
Vibrated Reinforced Cement Concrete M25 (Design Mix) using ISS graded
metal including cost and conveyance of all materials to site including cost of
cement, centering, soft water, labour charges for mixing, transporting, laying and
6
curing concrete , working at depths , tools and plants employed and maintaining of
protective bunds, cofferdams, shoring, strutting etc., complete as per specification
for Box Culvert - as per MORTH No.1000,1500, 1600, 1700 1900, 2200, 900
130.46
Supply and fabrication of Fe-415 / Fe 500 / Fe 550 / Fe 600 Steel required for all
RCC items of works involved in the schedule including cost of steel and cost of
fabrication, labour charges for cleaning the rods straightening, cutting, bending,
tying grills, including over lapping to the required length wherever necessary and
7
providing to the reinforcement placing the reinforcement in position as specified in
the drawings including cost of binding wire, provision of spacer bars, cover blocks
and all other incidental charges etc. complete as directed by the Engineer as per
MORTH No. 111, 112, 900, 1000
As per steel
schedule Drawing 1 1 5.34 (19/12). 8.46
no. SD/110 for
1/33/0
8.5MT
Vibrated Cement concrete M30 (Design mix) WEARING COAT 75mm thickness
using ISS size HBG graded metal including cost and conveyance of all materials
to site, cost of cement, premoulded expansion joints and fixing the same in
8
position including formwork and centering labour charges for laying, compacting
finishing curing including all other incidental charges etc.complete Over Deck
Slab & Approach slab as per MORTH No.111,112, 2702, 900
72.96
Filling behind Abutmants and wings with clean gritty gravel including cost and
conveyance of gravel toworksite,laying,handling charges and filling in
9 layers,tamping under optimum moisture content to get the maximum density
including watering,with all leads for water and all other incidental charges
etc,complete for filling behind the abutment and wings as per MORTH No.
81.00
Provding and Laying Wet Mix Macadam consisting of clean crushed aggregates
confirming to the grading given in Table No.400-13, including premixing the
Material with water at OMC in mechanical mix plant carriage of mixed Material by
12
tipper to site, laying in uniform layers with paver on well prepared surface and
compacting with vibratory roller to achieve the desired density, etc., complete as
directed by the Engineer. as per MORTH No. 111, 112, 406, 900.
8.10
Assistant Divisional Engineer Assistant Engineer
Highways, C&M Highways, C&M
Vridhachalam (A/C) Vridhachalam (A/C)
LEAD PARTICULARS
Name of Road : Reconstruction of RCC slab culvert at Km 3/10 of
Boothavarayanpettai - Krishnapuram road
Dismantling clearing away and carefully stacking materials useful for the reuse
1 for any thickness of walls/Brick/stone masonry in cement mortar walls under 3m
h as per item no.14
106.00 Cum.
Plain cement concrete M 20 [1:1.5:3 nominal mix] in sub structure with crushed
stone aggregates 40 mm nominal size mechanically mixed, placed and
4 compacted by vibrator in super structure upto 4 Metre above 1.50 metre from
bed/ground level including curing for 14 days.etc complete as per clause
1000/1700 of MORT & H specification.
5
Cost of Vib. RCC M25
&8 1.00 Cum #REF! /m2 #REF!
Form work & centering L.S 350.00
Curing Concrete L.S 20.00
Working at heights L.S 20.00
Hire charges for T&P L.S 84.00
Sundries L.S 0.90
#REF!
Plain cement concrete M 20 [1:2:4 nominal mix] in sub structure with crushed
stone aggregates 20 mm nominal size mechanically mixed, placed and
7 compacted by vibrator in super structure upto 4 Metre above 1.50 metre from
bed/ground level including curing for 14 days.etc complete as per clause
1000/1700 of MORT & H specification.
Providing and laying Cement Concrete wearing coat M-30 grade using concrete
10 mixer and excluding reinforcement etc complete as per clause 1500. 1700 &
2200 of MORT & H specification.
Back filling behind abutment, wing walls / return wall complete as per drawing
11 and techinical specifications as per clause 710.1.4 of IRC : 78 & 2200
Specification.
Sundries 0.88
1290.00
Vibrator cement concrete M15 1:2:4 mix using 40mm ISS.HBG metal from approved quarry
3 including cost and conveyance of all materials to site including all labour charges for
mixing,laying vibrating ,curing ,etc,. Complete.(PCC)
Below sill :-
4113.47
4173.47
Above sill :-
1.00 m3 cost C.C 1:1.5:3 3989.29 /m3 3989.29
4261.29
54826.25 /m3
Rate for 1 Cum Rs 5482.62 /m3
Providing and fixing 6mm bitumen felt for expansion joint in between deck slabs over
6 abutment as shown in the drawing including cost and conveyance of expansion joint etc,.
Complete
Providing and fixing 110 mm dia PVC pipes for weep holes in abutment including cost and
7 conveyance of site labour for fixing and all other incidental charges etc,. Complete
Providing FILTER MEDIA behind abutments and wings for thick using filter materials
confirming to clause of 2.1 of IRC 78-2000 appendix and well packed smaller towards the
8 soil and bigger size towards the wall including cost and conveyance of all materials and all
other incidental etc,. complete as per standard specification.
Providing and fixing 110 mm dia PVC pipes for weep holes in abutment including cost and
10 conveyance of site labour for fixing and all other incidental charges etc,. Complete
RMR
KIND OF COST of
KM Source DISTANCE conveyance Stacking Total
METAL metal
1 2 3 4 5 6 7 8
Quarry at 3/2 of
40 mm ISS
A.Sathanur -
metal
32.00 889.52 251.00 - 1140.52
Pudukazhani road
25 mm ISS
"
metal
32.00 764.76 251.00 - 1015.76
20 mm ISS
"
metal
32.00 1238.10 251.00 - 1489.10
12 mm ISS
"
metal
32.00 1148.57 251.00 - 1399.57
10 mm ISS
"
metal
32.00 845.71 251.00 - 1096.71
3/10 6. mm ISS
"
metal
32.00 572.38 251.00 - 823.38
Cement 5575.53
Gudalaiyathur
Quarry
Sand (M) 15.00 168.00 130.80 - 298.80
Vanathirayapuram
US Gravel 8.00 174.29 73.28 247.57
Quarry
Steel 38657.88