Variables-OC Settings - PCC-21: Relay Details: ABB MAKE REF 615 (Catalouge Is Attached As Annex) O/C

1. The document provides settings for overcurrent protection on a 5000A ACB. It calculates settings for high current, low current, and earth fault protection based on the relay details, system data including fault levels, CT ratio, and coordination considerations. 2. For high current protection, a pick-up of 1.8A is calculated based on a fault current of 9000A. The time delay is set to 0.04s. 3. For low current protection, a pick-up of 0.4A is calculated based on a fault current of 2000A and a time delay is set to 0.4s. 4. For earth fault protection, a pick-up of 0.

Uploaded by

susovan bIswas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
483 views4 pages

Variables-OC Settings - PCC-21: Relay Details: ABB MAKE REF 615 (Catalouge Is Attached As Annex) O/C

1. The document provides settings for overcurrent protection on a 5000A ACB. It calculates settings for high current, low current, and earth fault protection based on the relay details, system data including fault levels, CT ratio, and coordination considerations. 2. For high current protection, a pick-up of 1.8A is calculated based on a fault current of 9000A. The time delay is set to 0.04s. 3. For low current protection, a pick-up of 0.4A is calculated based on a fault current of 2000A and a time delay is set to 0.4s. 4. For earth fault protection, a pick-up of 0.

Uploaded by

susovan bIswas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

A PCC-21 5000A ACB ( Buscoupler) Variables-OC Settings - PCC-21

( Fault Current as per ETAP Report) Protection Curve Over Current


Relay Details: ABB MAKE REF 615 ( Catalouge is attached as Annex) Rated CTR Current Setting-1 Current Setting-2 Current Setting-3
Feeder Name
O/C (51) Volt. Pri Sec. Curve PSM TMS(k) Curve PSM TMS(k) Curve PSM TMS(k)
PCC-22
Incomer 415 5000 1 SI 2 0.05 SI 0.6 0.5 SI 2.5 0.02
1 System Data: Incomer
System Voltage 0.415 KV BC BC 415 5000 1 SI 1.8 0.04 SI 0.4 0.4 SI 2.5 0.02
Selected CT ratio 5000 /1A
Max. Load Current 4377 A
Rated Voltage 0.433 KV
1000
Sym. SC Cuurrent
( Minimum Fault Lavel as per ETAP)
during 3 ph fault 24.09 KA
50% Fault level
choosen to reduce 12.045 KA ( Fault Current Set 50 % for BC)
stress of the system 100
12045 A
Max. Load Current 4377 A

PS = 10 % above of Actual Load Current


CT ratio 10
PCC-22

Time In Sec.
= 0.96
Incomer
POC ( Pick of Current) = CTR * PS
= 4814.7 A BC
Proposed PSM = Fault current
POC 1
2.5
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


0.1
ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 7.6 s
Minimum Operating time of Breaker 20 ms
Grading Margine for next upstream 0.01
breaker 100 ms 0.1 1 10 100 1000 10000 100000
Hence, Total Delay Operating time delay
(DOTR) 0.12 S
Fault MVA
TMS = DOTR
ROT
= 0.02
2 Setting Calculation for Instantanious OC (50)>>
COORDINATION GRAPH - OC -PCC-21
High Current to be set 1.5 to 5 times full load current.

Fault Current Consider for setting = 9000 A

Phase fault 50 Pick up secondary = 1.8 A


Pick up setting in the Relay = 1.8 x ln

Setting time = 0.04 s


Variables - OCE Settings-PCC-21
3 Setting Calculation for Instantanious OC (50) > Protection Curve
Current Setting-2 -
Rated CTR Current Setting-1 Current Setting-3
Feeder Name ( OC SETTING)
Volt.
Low Current to be set 0.5 to 5 times full load current. Pri Sec. Curve PSM TMS(k) Curve PSM TMS(k) Curve PSM TMS(k)
PCC-22
Incomer 415 5000 1 SI 0.2 0.5 SI 4.30 0.03
Incomer
Fault Current Consider for setting = 2000 A BC BC 415 5000 1 SI 0.15 0.4 SI 4.30 0.03

Phase fault 50 Pick up secondary = 0.4 A


1000
Pick up setting in the Relay = 0.4 x ln

Setting time = 0.4 s

4 Setting Calculation for Instantanious Earth Fault (50N) > 100

Fault Current Consider for setting = 750 A

Phase fault 50 Pick up secondary = 0.15 A


PCC-22
10 Incomer
Pick up setting in the Relay = 0.15 x ln

Time In Sec.
BC

Setting time = 0.4 s 0

5 Setting Calculation for Earth Fault (51N) 1 0

Earth Fault setting of 75% of CT primary = 3750 0

Earth Fault Pick up Secondary = 0.75 A


0.1
Pick up setting in the Relay (PS) = 0.75 x ln

POC ( Pick of Current) = 75% CTR * PS


= 2812.5 A
0.01
Proposed PSM = Fault current 0.1 1 10 100 Fault MVA 1000 10000 100000
(50% Fault Current choosen to
POC
reduce stress of the system for BC)
4.3
Proposed Time Setting:
COORDINATION GRAPH - PCC-21
Considering, NI curve as Per IEC 60255 -4 - Standard Inverse
ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 4.7 S
Minimum Operating time of Breaker 20 ms
Grading Margine for next upstream
breaker 100 ms
Hence, Total Delay Operating time delay
(DOTR) 0.12 S

TMS = DOTR
ROT
= 0.03
B PCC-21 5000A ACB ( Incomer)
( Fault Current as per ETAP Report)
Relay Details: ABB MAKE REF 615 ( Catalouge is attached as Annex)
O/C (51)
1 System Data:
System Voltage 0.415 KV
Selected CT ratio 5000 /1A
Max. Load Current 4377 A
Rated Voltage 0.433 KV
Sym. SC Cuurrent
( Minimum Fault Lavel as per ETAP)
during 3 ph fault 24.09 KA
50% Fault level
choosen to reduce 12.045 KA ( Fault Current Set 50% for Incomer)
stress of the system
12045 A
Max. Load Current 4377 A

PS = 10 % above of Actual Load Current


CT ratio
= 0.96
POC ( Pick of Current) = CTR * PS
= 4814.7 A
Proposed PSM = Fault current
POC
2.5
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 7.6 s
Minimum Operating time of Breaker 20 ms
Grading Margine for next upstream
breaker 100 ms
Hence, Total Delay Operating time delay
(DOTR) 0.12 S
TMS = DOTR
ROT
= 0.02
2 Setting Calculation for Instantanious OC (50) > >

High Current to be set 1.5 to 5 times full load current.

Fault Current Consider for setting = 10000 A


Phase fault 50 Pick up secondary = 2A

Pick up setting in the Relay = 2 x ln

Setting time = 0.05 s

3 Setting Calculation for Instantanious OC (50) >

Low Current to be set 0.5 to 5 times full load current.

Fault Current Consider for setting = 3000 A

Phase fault 50 Pick up secondary = 0.6 A

Pick up setting in the Relay = 0.6 x ln

Setting time = 0.5 s

4 Setting Calculation for Instantanious Earth Fault (50N) >

Fault Current Consider for setting = 1000 A

Phase fault 50 Pick up secondary = 0.2 A

Pick up setting in the Relay = 0.2 x ln

Setting time = 0.5 s

5 Setting Calculation for Earth Fault (51N)

Earth Fault setting of 75% of CT primary = 3750

Earth Fault Pick up Secondary = 0.75 A

Pick up setting in the Relay (PS) = 0.75 x ln

POC ( Pick of Current) = 75% CTR * PS


= 2812.5 A

Proposed PSM = Fault current (50% Fault Current choosen to


POC reduce stress of the system for
Incomer)
4.3
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 4.7 s
Minimum Operating time of Breaker 20 ms
Grading Margine for next upstream
breaker 100 ms
Hence, Total Delay Operating time delay
(DOTR) 0.12 S
TMS = DOTR
ROT
= 0.03

You might also like