0% found this document useful (0 votes)
322 views

Relay Setting Calculation For 0.415 KV Panel-Ecr-1 Variables-OC Settings - PCC-11

1. The document provides settings calculations for overcurrent protection relays for the 0.415kV PCC-11 panel incomer and bus coupler circuits. It includes system data, fault current calculations, and settings determined for instantaneous and time-delayed overcurrent elements. 2. Calculations determine a pick-up setting of 4348A for the time-delayed overcurrent element based on 10% above the maximum load current and a time dial setting of 0.02s. A pick-up of 1.8A and time delay of 0.04s are set for the high-current instantaneous element. 3. For the low-current instantaneous element, pick-up is set

Uploaded by

susovan bIswas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
322 views

Relay Setting Calculation For 0.415 KV Panel-Ecr-1 Variables-OC Settings - PCC-11

1. The document provides settings calculations for overcurrent protection relays for the 0.415kV PCC-11 panel incomer and bus coupler circuits. It includes system data, fault current calculations, and settings determined for instantaneous and time-delayed overcurrent elements. 2. Calculations determine a pick-up setting of 4348A for the time-delayed overcurrent element based on 10% above the maximum load current and a time dial setting of 0.02s. A pick-up of 1.8A and time delay of 0.04s are set for the high-current instantaneous element. 3. For the low-current instantaneous element, pick-up is set

Uploaded by

susovan bIswas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 11

RELAY SETTING CALCULATION FOR 0.

415 KV PANEL- ECR-1


A PCC-11 5000A ACB ( Buscoupler) Variables-OC Settings - PCC-11
( Fault Current as per ETAP Report) Protection Curve Over Current
Relay Details: ABB MAKE REF 615 ( Catalouge is attached as Annex) CTR Current Setting-1 Current Setting-2 Current Setting-3
Feeder Name Rated Volt.
O/C (51) Pri Sec. Curve PSM TMS(k) Curve PSM TMS(k) Curve PSM TMS(k)

PCC-11
Incomer 415 5000 1 SI 2 0.05 SI 0.6 0.5 SI 3.6 0.02
Incomer
1 System Data:
System Voltage 0.415 KV BC BC 415 5000 1 SI 1.8 0.04 SI 0.4 0.4 SI 3.6 0.02
Selected CT ratio 5000 /1A
Max. Load Current 3953 A
Rated Voltage 0.433 KV 1000
Sym. SC Cuurrent during 3
( Minimum Fault Lavel as per ETAP)
ph fault 63.34 KA
25% Fault level choosen to
reduce stress of the 15.835 KA ( Fault Current Set 25 % for BC)
100
system
15835 A
Max. Load Current 3953 A

PS = 10 % above of Actual Load Current 10


PCC-11

Time In Sec.
CT ratio
Incomer
= 0.87
POC ( Pick of Current) = CTR * PS BC
= 4348.3 A
Proposed PSM = Fault current 1
POC
3.6
Proposed Time Setting:
0.1
Considering, NI curve as Per IEC 60255 -4 - Standard Inverse
ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 5.3 s
Minimum Operating time of Breaker 20 ms 0.01
Grading Margine for next upstream breaker 100 ms 0.1 1 10 100 1000 10000 100000
Hence, Total Delay Operating time delay (DOTR) 0.12 S Fault MVA

TMS = DOTR
ROT
= 0.02
2 Setting Calculation for Instantanious OC (50)>>

COORDINATION GRAPH - OC -PCC-11


High Current to be set 1.5 to 5 times full load current.

Fault Current Consider for setting = 9000 A

Phase fault 50 Pick up secondary = 1.8 A

Pick up setting in the Relay = 1.8 x ln

Setting time = 0.04 s

3 Setting Calculation for Instantanious OC (50) >


Low Current to be set 0.5 to 5 times full load current.
Variables - OCE Settings-PCC-11
Fault Current Consider for setting = 2000 A Protection Curve

Over
CTR Current Setting-1 Current Current Setting-3
Feeder Name Rated Volt.
Setting-2

Phase fault 50 Pick up secondary = 0.4 A Pri Sec. Curve PSM TMS(k) Curve PSM TMS(k) Curve PSM TMS(k)
PCC-11
Incomer 415 5000 1 SI 0.2 0.5 SI 5.60 0.03
Incomer
Pick up setting in the Relay = 0.4 x ln BC BC 415 5000 1 SI 0.15 0.4 SI 5.60 0.03

Setting time = 0.4 s


1000
4 Setting Calculation for Instantanious Earth Fault (50N) >

Fault Current Consider for setting = 750 A

Phase fault 50 Pick up secondary = 0.15 A 100

Pick up setting in the Relay = 0.15 x ln

Setting time = 0.4 s PCC-11


10 Income
5 Setting Calculation for Earth Fault (51N) r

Time In Sec.
BC
Earth Fault setting of 75% of CT primary Current
= 3750
Considered
1
Earth Fault Pick up Secondary = 0.75 A

Pick up setting in the Relay (PS) = 0.75 x ln

POC ( Pick of Current) = 75% CTR * PS 0.1


= 2812.5 A

Proposed PSM = Fault current (25% Fault Current choosen to reduce


POC stress of the system for BC)
5.6 0.01
Proposed Time Setting: 0.1 1 10 100 1000 10000 100000
Fault MVA

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


COORDINATION GRAPH - OCE-PCC-11
ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 4.0 S
Minimum Operating time of Breaker 20 ms
Grading Margine for next upstream breaker 100 ms
Hence, Total Delay Operating time delay (DOTR) 0.12 S

TMS = DOTR
ROT
= 0.03
B PCC-11 5000A ACB ( Incomer)
( Fault Current as per ETAP Report)
Relay Details: ABB MAKE REF 615 ( Catalouge is attached as Annex)
O/C (51)
1 System Data:
System Voltage 0.415 KV
Selected CT ratio 5000 /1A
Max. Load Current 3953 A
Rated Voltage 0.433 KV
Sym. SC Cuurrent during 3
( Minimum Fault Lavel as per ETAP)
ph fault 63.34 KA
25% Fault level choosen to
reduce stress of the 15.835 KA ( Fault Current Set 25% for Incomer)
system
15835 A
Max. Load Current 3953 A

PS = 10 % above of Actual Load Current


CT ratio
= 0.87
POC ( Pick of Current) = CTR * PS
= 4348.3 A
Proposed PSM = Fault current
POC
3.6
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 5.3 s
Minimum Operating time of Breaker 20 ms
Grading Margine for next upstream breaker 100 ms
Hence, Total Delay Operating time delay (DOTR) 0.12 S
TMS = DOTR
ROT
= 0.02
2 Setting Calculation for Instantanious OC (50) > >

High Current to be set 1.5 to 5 times full load current.

Fault Current Consider for setting = 10000 A

Phase fault 50 Pick up secondary = 2A

Pick up setting in the Relay = 2 x ln

Setting time = 0.05 s

3 Setting Calculation for Instantanious OC (50) >

Low Current to be set 0.5 to 5 times full load current.

Fault Current Consider for setting = 3000 A

Phase fault 50 Pick up secondary = 0.6 A

Pick up setting in the Relay = 0.6 x ln

Setting time = 0.5 s


4 Setting Calculation for Instantanious Earth Fault (50N) >

Fault Current Consider for setting = 1000 A

Phase fault 50 Pick up secondary = 0.2 A

Pick up setting in the Relay = 0.2 x ln Variables-OC Settings - PCC-12


Protection Curve Over Current
Setting time = 0.5 s CTR Current Setting-1 Current Setting-2 Current Setting-3
Feeder Name Rated Volt.
Pri Sec. Curve PSM TMS(k) Curve PSM TMS(k) Curve PSM TMS(k)
PCC-12
Incomer 415 5000 1 SI 2 0.05 SI 0.6 0.5 SI 3.9 0.02
5 Setting Calculation for Earth Fault (51N) Incomer
BC BC 415 5000 1 SI 1.8 0.04 SI 0.4 0.4 SI 3.9 0.02
Earth Fault setting of 75% of CT primary Current
= 3750
Considered
1000
Earth Fault Pick up Secondary = 0.75 A

Pick up setting in the Relay (PS) = 0.75 x ln


100
POC ( Pick of Current) = 75% CTR * PS
= 2812.5 A

Proposed PSM = Fault current (25% Fault Current choosen to reduce


POC stress of the system for Incomer) 10
PCC-12

Time In Sec.
5.6
Incomer
Proposed Time Setting:
BC
Considering, NI curve as Per IEC 60255 -4 - Standard Inverse
1
ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 4.0 s
Minimum Operating time of Breaker 20 ms
Grading Margine for next upstream breaker 100 ms 0.1
Hence, Total Delay Operating time delay (DOTR) 0.12 S
TMS = DOTR
ROT
= 0.03
0.01
C PCC-12 5000A ACB ( Buscoupler)
0.1 1 10 100 1000 10000 100000
( Fault Current as per ETAP Report)
Relay Details: ABB MAKE REF 615 ( Catalouge is attached as Annex) Fault MVA

O/C (51)
1 System Data:
System Voltage 0.415 KV
Selected CT ratio 5000 /1A COORDINATION GRAPH - OC -PCC-21
Max. Load Current 3660 A
Rated Voltage 0.433 KV
Sym. SC Cuurrent during 3
( Minimum Fault Lavel as per ETAP)
ph fault 63.34 KA
25% Fault level choosen to
reduce stress of the 15.835 KA ( Fault Current Set 25 % for BC)
system
15835 A
Max. Load Current 3660 A

PS = 10 % above of Actual Load Current


CT ratio
= 0.81
POC ( Pick of Current) = CTR * PS
= 4026 A
Proposed PSM = Fault current
POC
3.9
Proposed Time Setting:
Variables - OCE Settings-PCC-12
Considering, NI curve as Per IEC 60255 -4 - Standard Inverse Protection Curve
Over Current
ROT ( Relay Operating time) = 0.14 CTR Current Setting-1 Current Setting-3
Rated Setting-2
Name
Volt.
(PSM)^0.02 -1 Pri Sec. Curve PSM TMS(k) Curve PSM TMS(k) Curve PSM TMS(k)
PCC-12
= 5.0 415 5000 1 SI 0.2 0.5 SI 5.60 0.03
s Incomer
Minimum Operating time of Breaker 20 ms BC 415 5000 1 SI 0.15 0.4 SI 5.60 0.03
Grading Margine for next upstream breaker 100 ms
Hence, Total Delay Operating time delay (DOTR) 0.12 S 1000

TMS = DOTR
ROT
= 0.02
2 Setting Calculation for Instantanious OC (50)>>
100

High Current to be set 1.5 to 5 times full load current.

Fault Current Consider for setting = 9000 A


PCC-12
Phase fault 50 Pick up secondary = 1.8 A 10 Income
r

Time In Sec.
BC
Pick up setting in the Relay = 1.8 x ln

Setting time = 0.04 s 1

3 Setting Calculation for Instantanious OC (50) >

0.1

Low Current to be set 0.5 to 5 times full load current.

Fault Current Consider for setting = 2000 A


0.01
Phase fault 50 Pick up secondary = 0.4 A 0.1 1 10 100 1000 10000 100000
Fault MVA
Pick up setting in the Relay = 0.4 x ln

COORDINATION GRAPH - OCE-PCC-12


Setting time = 0.4 s

4 Setting Calculation for Instantanious Earth Fault (50N) >

Fault Current Consider for setting = 750 A

Phase fault 50 Pick up secondary = 0.15 A

Pick up setting in the Relay = 0.15 x ln


Setting time = 0.4 s

5 Setting Calculation for Earth Fault (51N)

Earth Fault setting of 75% of CT primary Current


= 3750
Considered

Earth Fault Pick up Secondary = 0.75 A

Pick up setting in the Relay (PS) = 0.75 x ln

POC ( Pick of Current) = 75% CTR * PS


= 2812.5 A

Proposed PSM = Fault current (25% Fault Current choosen to reduce


POC stress of the system for BC)
5.6
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 4.0 S
Minimum Operating time of Breaker 20 ms
Grading Margine for next upstream breaker 100 ms
Hence, Total Delay Operating time delay (DOTR) 0.12 S

TMS = DOTR
ROT
= 0.03
D PCC-12 5000A ACB ( Incomer)
( Fault Current as per ETAP Report)
Relay Details: ABB MAKE REF 615 ( Catalouge is attached as Annex)
O/C (51)
1 System Data:
System Voltage 0.415 KV
Selected CT ratio 5000 /1A
Max. Load Current 3660 A
Rated Voltage 0.433 KV
Sym. SC Cuurrent during 3
( Minimum Fault Lavel as per ETAP)
ph fault 63.34 KA
25% Fault level choosen to
reduce stress of the 15.835 KA ( Fault Current Set 25% for Incomer)
system
15835 A
Max. Load Current 3660 A

PS = 10 % above of Actual Load Current


CT ratio
= 0.81
POC ( Pick of Current) = CTR * PS
= 4026 A
Proposed PSM = Fault current
POC
3.9
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 5.0 s
Minimum Operating time of Breaker 20 ms
Grading Margine for next upstream breaker 100 ms
Hence, Total Delay Operating time delay (DOTR) 0.12 S
TMS = DOTR
ROT
= 0.02
2 Setting Calculation for Instantanious OC (50) > >

High Current to be set 1.5 to 5 times full load current.

Fault Current Consider for setting = 10000 A

Phase fault 50 Pick up secondary = 2A

Pick up setting in the Relay = 2 x ln

Setting time = 0.05 s

3 Setting Calculation for Instantanious OC (50) >

Low Current to be set 0.5 to 5 times full load current.

Fault Current Consider for setting = 3000 A

Phase fault 50 Pick up secondary = 0.6 A

Pick up setting in the Relay = 0.6 x ln

Setting time = 0.5 s

4 Setting Calculation for Instantanious Earth Fault (50N) >

Fault Current Consider for setting = 1000 A

Phase fault 50 Pick up secondary = 0.2 A

Pick up setting in the Relay = 0.2 x ln

Setting time = 0.5 s

5 Setting Calculation for Earth Fault (51N)

Earth Fault setting of 75% of CT primary Current


= 3750
Considered

Earth Fault Pick up Secondary = 0.75 A

Pick up setting in the Relay (PS) = 0.75 x ln

POC ( Pick of Current) = 75% CTR * PS


= 2812.5 A

Proposed PSM = Fault current (25% Fault Current choosen to reduce


POC stress of the system for Incomer)
5.6
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 4.0 s
Minimum Operating time of Breaker 20 ms
Grading Margine for next upstream breaker 100 ms
Hence, Total Delay Operating time delay (DOTR) 0.12 S
TMS = DOTR
ROT
= 0.03
E PCC-13 5000A ACB ( Buscoupler)

( Fault Current as per ETAP Report) Variables-OC Settings - PCC-13


Relay Details: ABB MAKE REF 615 ( Catalouge is attached as Annex) Protection Curve Over Current
O/C (51) CTR Current Setting-1 Current Setting-2 Current Setting-3
Feeder Name Rated Volt.
1 System Data: Pri Sec. Curve PSM TMS(k) Curve PSM TMS(k) Curve PSM TMS(k)

PCC-13
Incomer 415 5000 1 SI 2 0.05 SI 0.6 0.5 SI 4.4 0.03
Incomer
System Voltage 0.415 KV
Selected CT ratio 5000 /1A BC BC 415 5000 1 SI 1.8 0.04 SI 0.4 0.4 SI 4.4 0.03
Max. Load Current 3236 A
Rated Voltage 0.433 KV
Sym. SC Cuurrent during 3
( Minimum Fault Lavel as per ETAP)
ph fault 63.34 KA 1000
25% Fault level choosen to
reduce stress of the 15.835 KA ( Fault Current Set 25 % for BC)
system
15835 A
Max. Load Current 3236 A 100

PS = 10 % above of Actual Load Current


CT ratio
= 0.71
10
POC ( Pick of Current) = CTR * PS PCC-13

Time In Sec.
= 3559.6 A Incomer
Proposed PSM = Fault current BC
POC
4.4 1
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1 0.1
= 4.6 s
Minimum Operating time of Breaker 20 ms
Grading Margine for next upstream breaker 100 ms
Hence, Total Delay Operating time delay (DOTR) 0.12 S 0.01
0.1 1 10 100 1000 10000 100000
TMS = DOTR
ROT
Fault MVA
= 0.03
2 Setting Calculation for Instantanious OC (50)>>

High Current to be set 1.5 to 5 times full load current.


COORDINATION GRAPH - OC -PCC-13
Fault Current Consider for setting = 9000 A

Phase fault 50 Pick up secondary = 1.8 A


Pick up setting in the Relay = 1.8 x ln

Setting time = 0.04 s


Variables - OCE Settings-PCC-13
3 Setting Calculation for Instantanious OC (50) > Protection Curve
Feeder Name Rated Volt. CTR Current Setting-1 Current Current Setting-3
Low Current to be set 0.5 to 5 times full load current. Pri Sec. Curve PSM TMS(k) Curve PSM TMS(k) Curve PSM TMS(k)
PCC-13
Incomer 415 5000 1 SI 0.2 0.5 SI 5.60 0.03
Incomer
Fault Current Consider for setting = 2000 A BC BC 415 5000 1 SI 0.15 0.4 SI 5.60 0.03

Phase fault 50 Pick up secondary = 0.4 A

Pick up setting in the Relay = 0.4 x ln


1000
Setting time = 0.4 s

4 Setting Calculation for Instantanious Earth Fault (50N) >

Fault Current Consider for setting = 750 A 100

Phase fault 50 Pick up secondary = 0.15 A

Pick up setting in the Relay = 0.15 x ln PCC-13


10 Incomer
Setting time = 0.4 s

Time In Sec.
BC

5 Setting Calculation for Earth Fault (51N)

Earth Fault setting of 75% of CT primary Current 1


= 3750
Considered

Earth Fault Pick up Secondary = 0.75 A

Pick up setting in the Relay (PS) = 0.75 x ln 0.1

POC ( Pick of Current) = 75% CTR * PS


= 2812.5 A

Proposed PSM = Fault current (25% Fault Current choosen to reduce 0.01
POC stress of the system for BC) 0.1 1 10 100 Fault MVA 1000 10000 100000
5.6
Proposed Time Setting:

COORDINATION GRAPH - OCE-PCC-13


Considering, NI curve as Per IEC 60255 -4 - Standard Inverse
ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 4.0 S
Minimum Operating time of Breaker 20 ms
Grading Margine for next upstream breaker 100 ms
Hence, Total Delay Operating time delay (DOTR) 0.12 S

TMS = DOTR
ROT
= 0.03
F PCC-13 5000A ACB ( Incomer)
( Fault Current as per ETAP Report)
Relay Details: ABB MAKE REF 615 ( Catalouge is attached as Annex)
O/C (51)
1 System Data:
System Voltage 0.415 KV
Selected CT ratio 5000 /1A
Max. Load Current 3236 A
Rated Voltage 0.433 KV
Sym. SC Cuurrent during 3
( Minimum Fault Lavel as per ETAP)
ph fault 63.34 KA
25% Fault level choosen to
reduce stress of the 15.835 KA ( Fault Current Set 25% for Incomer)
system
15835 A
Max. Load Current 3236 A

PS = 10 % above of Actual Load Current


CT ratio
= 0.71
POC ( Pick of Current) = CTR * PS
= 3559.6 A
Proposed PSM = Fault current
POC
4.4
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 4.6 s
Minimum Operating time of Breaker 20 ms
Grading Margine for next upstream breaker 100 ms
Hence, Total Delay Operating time delay (DOTR) 0.12 S
TMS = DOTR
ROT
= 0.03
2 Setting Calculation for Instantanious OC (50) > >

High Current to be set 1.5 to 5 times full load current.

Fault Current Consider for setting = 10000 A

Phase fault 50 Pick up secondary = 2A

Pick up setting in the Relay = 2 x ln

Setting time = 0.05 s

3 Setting Calculation for Instantanious OC (50) >

Low Current to be set 0.5 to 5 times full load current.

Fault Current Consider for setting = 3000 A

Phase fault 50 Pick up secondary = 0.6 A

Pick up setting in the Relay = 0.6 x ln

Setting time = 0.5 s


4 Setting Calculation for Instantanious Earth Fault (50N) >

Fault Current Consider for setting = 1000 A

Phase fault 50 Pick up secondary = 0.2 A

Pick up setting in the Relay = 0.2 x ln

Setting time = 0.5 s

5 Setting Calculation for Earth Fault (51N)

Earth Fault setting of 75% of CT primary Current


= 3750
Considered

Earth Fault Pick up Secondary = 0.75 A

Pick up setting in the Relay (PS) = 0.75 x ln

POC ( Pick of Current) = 75% CTR * PS


= 2812.5 A

Proposed PSM = Fault current (25% Fault Current choosen to reduce


POC stress of the system for Incomer)
5.6
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 4.0 s
Minimum Operating time of Breaker 20 ms
Grading Margine for next upstream breaker 100 ms
Hence, Total Delay Operating time delay (DOTR) 0.12 S
TMS = DOTR
ROT
= 0.03