1. The document provides time periods (T) for different types of buildings based on building height (h) and base dimension (d). T is provided for bare moment resisting frame (MRF) buildings, MRF buildings with structural walls, and MRF buildings with brick infill panels. 2. Response spectrum values (Sa/g) are provided for use in response spectrum and equivalent static analysis methods for soft and medium soil conditions. 3. Sample calculations are shown for seismic load analysis including seismic loads in two horizontal directions, static and spectral seismic loads, and other load parameters like dead and live loads.

Uploaded by

Dilip
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
89 views

Base Shear Check

1. The document provides time periods (T) for different types of buildings based on building height (h) and base dimension (d). T is provided for bare moment resisting frame (MRF) buildings, MRF buildings with structural walls, and MRF buildings with brick infill panels. 2. Response spectrum values (Sa/g) are provided for use in response spectrum and equivalent static analysis methods for soft and medium soil conditions. 3. Sample calculations are shown for seismic load analysis including seismic loads in two horizontal directions, static and spectral seismic loads, and other load parameters like dead and live loads.

Uploaded by

Dilip
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

1. Time period for bare MRF buildings without any masonry infills: T= 0.075h 0.

75
When h = 12.34 m ( h in meters excludes basement storeys)
T= 0.49 sec (for RC MRF building)
T= 0.53 sec (for RC-Steel Composite MRF bui
T= 0.56 sec (for Steel MRF building)
Sa/g = 2.0251275 Medium Soil
2. Time period for MRF buildings with RC structural walls: T= 0.075h 0.75 /√Aw >= 0.09h/√d
When h = 12.34 m Awi = Effective c/s area of wall I in first storeybof building, in s
Awi = 2.804 sqm Lwi = Length of structural wall I in first storey in the considere
Lwi = 14.02 m d = base dimension of the building at plinth lvl along consid
d= 17.07 m Nw = number of walls in the considred direction
Nw = 2 Lw/h shall not exceed 0.9.
T= 0.29 sec

3. All other buildings: Time period for MRF with brick infill panel: T= 0.09h/√d
When h = 17.1 m
d= 11.60 m
T= 0.45 sec

For use in response spectrum method - Sa/g = 2.5 Soft Soil


Sa/g = 2.5 Medium Soil

Sa/g = 2.5 Soft Soil


For use in equivalent static method-
Sa/g = 2.5 Medium Soil

When h = 15.25 d= 32.45 T= 0.29 Sa/g = 2.5


When h = 15.25 d= 32.45 T= 0.34 Sa/g = 2.50

1.5DL EQX EQY Spectra-X Spectra-Y DL %LL

40367.27 700.511 700.511 26911.513 2052.1933

40367.27 3085.42 3085.42 0 0 26911.513 2052.1933

33368.58 1075.76 1075.76 793.74 823.57 22245.72 902.54

84133.11 2848.03 2848.03 5789.39 5793.68 40816.85 2995.16


(for RC MRF building)
(for RC-Steel Composite MRF building)
(for Steel MRF building)

all I in first storeybof building, in sqm


all I in first storey in the considered direction
building at plinth lvl along considered direction
considred direction

Soft Soil
Medium Soil

Z I R Sa/g Vx=(Z/2)*(I/R)*(Sa/g)*(DL+%LL) Static,Sx Static,Sy

0.36 1.5 5 2.5 3910.10 5.58 5.58

0.36 1.5 5 2.5 3910.10 1.27 1.27

0.36 1 5 2.5 2083.34 1.937 1.937

0.36 1.5 5 2.5 5914.62 2.077 2.077


Spectra,Sx Spectra,Sy

2.625 2.530

1.022 1.021
1. Time period for bare MRF buildings without any masonry infills: T= 0.075h 0.75
When h = 27.2 m ( h in meters excludes basement storeys)
T= 0.89 sec (for RC MRF building)
T= 1.01 sec (for Steel MRF building)
Sa/g = 1.119469 Medium Soil

2. All other buildings: Time period for MRF with brick infill panel: T= 0.09h/√d
When h = 16.09 m
d= 24.42 m
T= 0.29 sec

Sa/g = 2.5 Soft Soil


Sa/g = 2.5 Medium Soil

1.5DL EQX EQY Spectra-X Spectra-Y DL %LL

46742.3 3818.52 3818.52 31161.533 1545.3

15625.15 1323.03 1322.58 0 0 10416.767 458.43

15625.15 1323.03 1322.58 0 0 10416.767 458.43


(for RC MRF building)
(for Steel MRF building)

Z I R Sa/g Vx=(Z/2)*(I/R)*(Sa/g)*(DL+%LL) Static,Sx Static,Sy

0.36 1.5 5 2.5 4415.42 1.16 1.16

0.36 1.5 5 2.135 1253.80 0.95 0.95

0.36 1.5 5 2.203 1293.74 0.98 0.98


Spectra,Sx Spectra,Sy