PPM Gazipur
PPM Gazipur
Accountant Monthly
Asphalt Work Team Team
Asst.Surveyor Monthly
Bitumen Sprayer Daily
Bitumen Tanker Daily
Bitumen Work Team Team
Brick Chips Work Team Team
Civil Engineer Monthly
Concrete Mix Design Team Team
Concrete Work Team Team
Container Project
Cook Monthly
Day Labour Daily 350
Dozer Daily
Driver Monthly
Ducting Material Work Team Team
Dump Truck Project
Electrical Arrangement Work Team Team
Electrician Monthly
Excavator Project
Footpath and Divider Team Team
Grader Daily
Hand Compactor Project
Jeep Car Project
Lab Equipment Project
Lab Technician Monthly
Labour Foreman Daily
Laptop Project
Motor Bike Project
Moving Generator Project
Paver Daily
Payloader Project
Printer Scanner Photocopier Project
Project Coordinator Monthly
Project Manager Monthly
Pump/Mud Pump Project
Reinforcement Work Team Team
Road Dismantling Team Team
Road Mix design Work Team Team
Rubber Tyre Roller Daily
Sand Work Team Team
Scrafier Daily
Security Guard Monthly
Shutter Formwork Project
Site Engineer Monthly
Soil Bed Preparation Team Team
Steel Drum Roller/Vibratory Roller Daily
Stone Chips Work Team Team
Store Keeper Monthly
Sub-Contractor NA
Survey Equipment Project
Surveyor Monthly
Thermoplast Machine Daily
Vibrator Machine Project
Water Supply Line/Water Browser Daily
Nahid Monthly
Sl No. Task id Task name
1 1 Preliminary Survey
2 1 Preliminary Survey
3 1 Preliminary Survey
4 1 Preliminary Survey
5 2 Mobilization & Site Prep
6 2 Mobilization & Site Prep
7 2 Mobilization & Site Prep
8 2 Mobilization & Site Prep
9 2 Mobilization & Site Prep
10 2 Mobilization & Site Prep
11 2 Mobilization & Site Prep
12 2 Mobilization & Site Prep
13 3 Land Acquisition
14 3 Land Acquisition
15 3 Land Acquisition
16 3 Land Acquisition
17 4 Land Acquisition
18 4 Clearing, Grubbing & Dismantling
19 4 Clearing, Grubbing & Dismantling
20 4 Clearing, Grubbing & Dismantling
21 4 Clearing, Grubbing & Dismantling
22 4 Clearing, Grubbing & Dismantling
23 4 Clearing, Grubbing & Dismantling
24 5 Survey Inspection
25 5 Survey Inspection
26 5 Survey Inspection
27 6 Final Design, Drawing etc.
28 6 Final Design, Drawing etc.
29 7 Bed Preparation for R.C.C Drain & Ducting
30 7 Bed Preparation for R.C.C Drain & Ducting
31 7 Bed Preparation for R.C.C Drain & Ducting
32 8 Sand Filling and Compaction for R.C.C Drain
33 8 Sand Filling and Compaction for R.C.C Drain
34 8 Sand Filling and Compaction for R.C.C Drain
35 9 C.C Casting for R.C.C Drain
36 9 C.C Casting for R.C.C Drain
37 9 C.C Casting for R.C.C Drain
38 10 Rebar Fabrication for Drain
39 11 Shuttering for Drain
40 12 Concreting
41 12 Concreting
42 13 Curing
43 13 Curing
44 14 Ducting Works
45 15 Excavation & Backfilling for road
46 15 Excavation & Backfilling for road
47 16 Subgrade Preparation
48 16 Subgrade Preparation
49 16 Subgrade Preparation
50 17 Improved Subgrade
51 17 Improved Subgrade
52 17 Improved Subgrade
53 17 Improved Subgrade
54 17 Improved Subgrade
55 18 Existing Road Dismantling
56 18 Existing Road Dismantling
57 18 Existing Road Dismantling
58 19 Sub Base Preparation
59 19 Sub Base Preparation
60 19 Sub Base Preparation
61 19 Sub Base Preparation
62 19 Sub Base Preparation
63 19 Sub Base Preparation
64 19 Sub Base Preparation
65 19 Sub Base Preparation
66 20 Base-2 Preparation
67 20 Base-2 Preparation
68 20 Base-2 Preparation
69 20 Base-2 Preparation
70 20 Base-2 Preparation
71 20 Base-2 Preparation
72 20 Base-2 Preparation
73 21 Rebar Fabrication for R.C.C Road
74 21 Rebar Fabrication for R.C.C Road
75 21 Rebar Fabrication for R.C.C Road
76 21 Rebar Fabrication for R.C.C Road
77 22 Casting of R.C.C Road
78 22 Casting of R.C.C Road
79 22 Casting of R.C.C Road
80 22 Casting of R.C.C Road
81 23 Base-1 Preparation
82 23 Base-1 Preparation
83 23 Base-1 Preparation
84 23 Base-1 Preparation
85 23 Base-1 Preparation
86 23 Base-1 Preparation
87 23 Base-1 Preparation
88 24 Prime Coat laying
89 24 Prime Coat laying
90 24 Prime Coat laying
91 25 Bitumen Binder Course prep
92 25 Bitumen Binder Course prep
93 25 Bitumen Binder Course prep
94 25 Bitumen Binder Course prep
95 26 Bitumen Tack Coat
96 27 Bitumen Wearing Course Prep.
97 27 Bitumen Wearing Course Prep.
98 27 Bitumen Wearing Course Prep.
99 27 Bitumen Wearing Course Prep.
100 28 Road Marking & Other Finishing Works
101 28 Road Marking & Other Finishing Works
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
Resource name Utilization % Duration (Days)
Asst.Surveyor 100 3
Jeep Car 100 3
Survey Equipment 100 3
Surveyor 100 3
Container 100 20
Cook 100 20
Electrical Arrangement Work Team 100 20
Jeep Car 100 20
Laptop 100 20
Motor Bike 100 20
Printer Scanner Photocopier 100 20
Site Engineer 100 20
Civil Engineer 100 15
Project Manager 100 15
Surveyor 100 15
Asst.Surveyor 100 15
Survey Equipment 100 15
Civil Engineer 100 30
Dozer 100 30
Excavator 100 30
Site Engineer 100 30
Surveyor 100 30
Dump Truck 100 30
Asst.Surveyor 100 5
Survey Equipment 100 5
Surveyor 100 5
Civil Engineer 100 15
Project Manager 100 15
Excavator 100 20
Hand Compactor 100 20
Soil Bed Preparation Team 100 20
Hand Compactor 100 20
Sand Work Team 100 20
Water Supply Line/Water Boucher 100 20
Concrete Work Team 100 10
Concrete Mix Design Team 100 10
Lab Technician 100 10
Reinforcement Work Team 100 15
Shutter Formwork 100 15
Concrete Mix Design Team 100 30
Lab Technician 100 30
Day Labour 100 7
Day Labour 100 30
Ducting Material Work Team 100 40
Excavator 100 30
Sand Work Team 100 30
Dump Truck 100 30
Excavator 100 30
Hand Compactor 100 30
Dump Truck 100 8
Hand Compactor 100 8
Lab Equipment 100 8
Lab Technician 100 8
Sand Work Team 100 8
Road Dismantling Team 100 10
Excavator 100 10
Dump Truck 100 10
Brick Chips Work Team 100 11
Civil Engineer 100 11
Concrete Mix Design Team 100 11
Dump Truck 100 11
Lab Technician 100 11
Sand Work Team 100 11
Site Engineer 100 11
Steel Drum Roller/Vibratory Roller 100 11
Dump Truck 100 30
Grader 100 30
Sand Work Team 100 30
Scrafier 100 30
Steel Drum Roller/Vibratory Roller 100 30
Stone Chips Work Team 100 30
Water Supply Line/Water Boucher 100 30
Civil Engineer 100 12
Reinforcement Work Team 100 12
Site Engineer 100 12
Surveyor 100 12
Civil Engineer 100 30
Concrete Work Team 100 30
Lab Technician 100 30
Shutter Formwork 100 30
Dump Truck 100 20
Grader 100 20
Sand Work Team 100 20
Scrafier 100 20
Steel Drum Roller/Vibratory Roller 100 20
Stone Chips Work Team 100 20
Water Supply Line/Water Boucher 100 20
Bitumen Work Team 100 16
Bitumen Sprayer 100 16
Sand Work Team 100 16
Asphalt Work Team 100 30
Road Mix design Work Team 100 30
Rubber Tyre Roller 100 30
Steel Drum Roller/Vibratory Roller 100 30
Bitumen Work Team 100 30
Asphalt Work Team 100 20
Road Mix design Work Team 100 20
Rubber Tyre Roller 100 20
Steel Drum Roller/Vibratory Roller 100 20
Thermoplast Machine 100 15
Footpath and Divider Team 100 15
Resources
Asst.Surveyor
Asst.Surveyor, Jeep Car
Asst.Surveyor, Jeep Car, Survey Equipment
Asst.Surveyor, Jeep Car, Survey Equipment, Surveyor
Container
Container, Cook
Container, Cook, Electrical Arrangement Work Team
Container, Cook, Electrical Arrangement Work Team, Jeep Car
Container, Cook, Electrical Arrangement Work Team, Jeep Car, Laptop
Container, Cook, Electrical Arrangement Work Team, Jeep Car, Laptop , Motor Bike
Container, Cook, Electrical Arrangement Work Team, Jeep Car, Laptop , Motor Bike, Printer Scanner Photocopier
Container, Cook, Electrical Arrangement Work Team, Jeep Car, Laptop , Motor Bike, Printer Scanner Photocopier, Site En
Civil Engineer
Civil Engineer, Project Manager
Civil Engineer, Project Manager, Surveyor
Civil Engineer, Project Manager, Surveyor, Asst.Surveyor
Civil Engineer, Project Manager, Surveyor, Asst.Surveyor, Survey Equipment
Civil Engineer
Civil Engineer, Dozer
Civil Engineer, Dozer, Excavator
Civil Engineer, Dozer, Excavator, Site Engineer
Civil Engineer, Dozer, Excavator, Site Engineer, Surveyor
Civil Engineer, Dozer, Excavator, Site Engineer, Surveyor, Dump Truck
Asst.Surveyor
Asst.Surveyor, Survey Equipment
Asst.Surveyor, Survey Equipment, Surveyor
Civil Engineer
Civil Engineer, Project Manager
Excavator
Excavator, Hand Compactor
Excavator, Hand Compactor, Soil Bed Preparation Team
Hand Compactor
Hand Compactor, Sand Work Team
Hand Compactor, Sand Work Team, Water Supply Line/Water Boucher
Concrete Work Team
Concrete Work Team, Concrete Mix Design Team
Concrete Work Team, Concrete Mix Design Team, Lab Technician
Reinforcement Work Team
Shutter Formwork
Concrete Mix Design Team
Concrete Mix Design Team, Lab Technician
Day Labour
Day Labour
Ducting Material Work Team
Excavator
Excavator, Sand Work Team
Dump Truck
Dump Truck, Excavator
Dump Truck, Excavator, Hand Compactor
Dump Truck
Dump Truck, Hand Compactor
Dump Truck, Hand Compactor, Lab Equipment
Dump Truck, Hand Compactor, Lab Equipment, Lab Technician
Dump Truck, Hand Compactor, Lab Equipment, Lab Technician, Sand Work Team
Road Dismantling Team
Road Dismantling Team, Excavator
Road Dismantling Team, Dump Truck
Brick Chips Work Team
Brick Chips Work Team, Civil Engineer
Brick Chips Work Team, Civil Engineer, Concrete Mix Design Team
Brick Chips Work Team, Civil Engineer, Concrete Mix Design Team, Dump Truck
Brick Chips Work Team, Civil Engineer, Concrete Mix Design Team, Dump Truck, Lab Technician
Brick Chips Work Team, Civil Engineer, Concrete Mix Design Team, Dump Truck, Lab Technician, Sand Work Team
Brick Chips Work Team, Civil Engineer, Concrete Mix Design Team, Dump Truck, Lab Technician, Sand Work Team, Site
Brick Chips Work Team, Civil Engineer, Concrete Mix Design Team, Dump Truck, Lab Technician, Sand Work Team, Site
Dump Truck
Dump Truck, Grader
Dump Truck, Grader, Sand Work Team
Dump Truck, Grader, Sand Work Team, Scrafier
Dump Truck, Grader, Sand Work Team, Scrafier, Steel Drum Roller/Vibratory Roller
Dump Truck, Grader, Sand Work Team, Scrafier, Steel Drum Roller/Vibratory Roller, Stone Chips Work Team
Dump Truck, Grader, Sand Work Team, Scrafier, Steel Drum Roller/Vibratory Roller, Stone Chips Work Team, Water Supp
Civil Engineer
Civil Engineer, Reinforcement Work Team
Civil Engineer, Reinforcement Work Team, Site Engineer
Civil Engineer, Reinforcement Work Team, Site Engineer, Surveyor
Civil Engineer
Civil Engineer, Concrete Work Team
Civil Engineer, Concrete Work Team, Lab Technician
Civil Engineer, Concrete Work Team, Lab Technician, Shutter Formwork
Dump Truck
Dump Truck, Grader
Dump Truck, Grader, Sand Work Team
Dump Truck, Grader, Sand Work Team, Scrafier
Dump Truck, Grader, Sand Work Team, Scrafier, Steel Drum Roller/Vibratory Roller
Dump Truck, Grader, Sand Work Team, Scrafier, Steel Drum Roller/Vibratory Roller, Stone Chips Work Team
Dump Truck, Grader, Sand Work Team, Scrafier, Steel Drum Roller/Vibratory Roller, Stone Chips Work Team, Water Supp
Bitumen Work Team
Bitumen Work Team, Bitumen Sprayer
Bitumen Work Team, Bitumen Sprayer, Sand Work Team
Asphalt Work Team
Asphalt Work Team, Road Mix design Work Team
Asphalt Work Team, Rubber Tyre Roller
Asphalt Work Team, Rubber Tyre Roller, Steel Drum Roller/Vibratory Roller
Bitumen Work Team
Asphalt Work Team
Asphalt Work Team, Road Mix design Work Team
Asphalt Work Team, Rubber Tyre Roller
Asphalt Work Team, Rubber Tyre Roller, Steel Drum Roller/Vibratory Roller
Thermoplast Machine
Thermoplast Machine, Footpath and Divider Team
bratory Roller
###
###
###
###
Project Start Date 10/1/2020 10/26/2021
###
Week Required 0 55.71
1
2
3
1 Preliminary Survey 10/1/2020 10/4/2020 1
2 Mobilization & Site Prep
3 Land Acquisition 10/4/2020 10/19/2020 1 1
4 Clearing, Grubbing & Dismantling 10/19/2020 11/18/2020 1
5 Survey Inspection 11/18/2020 11/23/2020
6 Final Design, Drawing etc. 11/23/2020 12/8/2020
7 Bed Preparation for R.C.C Drain & Ducting 12/8/2020 12/28/2020
8 Sand Filling and Compaction for R.C.C Drain 12/28/2020 1/17/2021
9 C.C Casting for R.C.C Drain 1/17/2021 1/27/2021
10 Rebar Fabrication for Drain 1/27/2021 2/11/2021
11 Shuttering for Drain 2/11/2021 2/26/2021
12 Concreting 2/26/2021 3/28/2021
13 Curing 3/28/2021 4/27/2021
14 Ducting Works 4/27/2021 6/6/2021
15 Excavation & Backfilling for road 3/28/2021 4/27/2021
16 Subgrade Preparation 4/27/2021 5/27/2021
17 Improved Subgrade 4/27/2021 5/5/2021
18 Existing Road Dismantling 4/27/2021 5/7/2021
19 Sub Base Preparation 5/7/2021 5/18/2021
20 Base-2 Preparation 5/18/2021 6/17/2021
21 Rebar Fabrication for R.C.C Road 6/17/2021 6/29/2021
22 Casting of R.C.C Road 6/29/2021 7/29/2021
23 Base-1 Preparation 6/17/2021 7/7/2021
24 Prime Coat laying 7/7/2021 7/23/2021
25 Bitumen Binder Course prep 7/23/2021 8/22/2021
26 Bitumen Tack Coat 8/22/2021 9/21/2021
27 Bitumen Wearing Course Prep. 9/21/2021 10/11/2021
28 28 Road Marking & Other Finishing Works 10/11/2021 10/26/2021
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
4 ###
5 ###
1 1 1
6 ###
1
7 ###
8 ###
1 1
9 ###
### ###
### ###
1 1 1
### ###
### ###
### ###
1 1 1
### ###
1
### ###
### ###
### ###
1 1 1
### ###
### ###
1 1 1
### ###
### ###
### ###
### ###
1 1 1 1
### ###
### ###
### ###
### ###
1 1 1 1
1 1 1 1
### ###
1
### ###
1 1
### ###
1
### ###
### ###
1 1 1 1 1
### ###
1 1 1 1 1 1
### ###
### ###
1 1 1 1 1 ### ###
1 1 ### ###
1 1 1
### ###
### ###
### ###
1 1 1 ### ###
1 1 1 1 1
### ###
### ###
### ###
1 1 1 1
### ###
### ###
### ###
### ###
1 1 1 1
### ###
1
### ###
### ###
1 1
### ###
### ###
1 1
### ###
### ###
### ###
### ###
### ###
### ###
### ###
### ###
### ###
### ###
### ###
### ###
### ###
### ###
### ###
### ###
### ###
### ###
### ###
### ###
### ###
### ###
### ###
### ###
### ###
### ###
### ###
### ###
### ###
### ###
### ###
### ###
### ###
### ###
### ###
### ###
### ###
Quantity
Sum of Quantity
Sub Item
0.18mm thick polythene sheet
18/20/22 BWG MS Sheet/plate
1st Class Brick
1st Class Brick Chips (20mm down graded)
1st Class Picked Brick Chips (20mm down graded)
1st Class/ Picked Brick chips (40mm down graded)
300mmx300mmx25mm high load bearing parking Tiles
75mm PVC Pipe -2.9mm to 3.4mm wall thick
AC Paver
All remaining cost like Labour,Tee, elbow, bend, socket, plug, solvent cement, clamp etc. ( +22.00 % on Subtotal-A )
Asphalt Plant
Bitumen [Grade 60/70]
Bitumen [Grade 80/100]
Bitumen [Grade 80/100]
Diesel
Electrode
Empty Gunny Bag
Fire wood
Foreman
Geo Textile (Grade-I-DF-20-1.5mm thick)
GI Wire (22 BWG)
H. C. of Thermoplastic Appilicator Machine
H.C. of 3 Wheel Static Road roller (8-10 ton)
H.C. of Backhoe End Loader (6 tons)
H.C. of Casing
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum)
H.C. of Distributor
H.C. of Driving Equipment
H.C. of Dump Truck/ Tripping Trucks
H.C. of Excavator (Medium Size)
H.C. of Flat Body Truck (3 tons)
H.C. of Grinding Machine
H.C. of Mixing Machine for Aggregate
H.C. of Motor Graders (14 tons)
H.C. of Pneumatic Multiple Tired Roller (7 tires, 8-10 tons)
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & other related cost
H.C. of Tripod and Mechanical Winch Machine complete with power unit and accessories
H.C. of Vibratory (Ride On) Roller 2 Steel Drum Compactor (3-5 tons)
H.C. of Vibratory Road Roller (8-10 ton)
H.C. of Water Pump
H.C. of Water Tanker (Towed by Tractor)
H.C. of Water Tanker (Truck Mounted)
H.C. of Welding Machine
Head Mason
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/Operator
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/Operator
Hire and running charges of Batching and Mixing Plant @ 20 cum/hour
Hire and running charges of Concrete Pump (30 & 45 cum capacity)
Hire and running charges of Concrete Vibrator
Kerosene
Lubricant
M.S. Ribbed/ Deformed Bar (Grade 400)
Manufacturing and supplying CC blocks (3.09.5.2)
Manufacturing and supplying CC blocks (3.09.5.3)
Mason
MS Angle 25mmx25mmx3mm
MS Angle, Flat bar, Z bar
Operator
Ordinary Labour
Plumber/ Electric Mistry/ Painter
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N)
Re-bar Fabricator
Reflectorising Glass Beads
Royalty of Earth
Royalty of Earth (Within Municipal Area)
Sand (FM - 0.5)
Sand (FM - 0.8)
Sand (FM - 1.2)
Sand (FM - 1.5)
Sand (FM - 1.8)
Sand (FM - 2.5)
Sardar
Skilled Labour
Stackyard Rent
Stone Chips (12mm down graded) [LAA≤25]
Stone Chips (12mm down graded) [LAA≤30]
Stone Chips (12mm down graded) [LAA≤35]
Stone Chips (16mm down graded) [LAA≤35]
Stone Chips (20mm down graded) [LAA≤35]
Stone Chips (25mm down graded) [LAA≤35]
Stone Chips (25mm down graded)[LAA≤30]
Stone Chips (38mm down graded) [LAA≤35]
Stone Chips (6mm down graded) [LAA≤35]
Stone Dust (2.38mm down)
Stone Shingles (20mm down graded)
Synthetic Enamel Paint
Synthetic enamel paint primer/ sealer
Thermoplastic Compound
Turf
uuPVC Pipe 50mm dia of 2.5mm to 3.0mm wall thick
Water reducing chemical admixture : Type-A
Welder
(blank)
Grand Total
(All)
Sardar day
Ordinary Labour day
Skilled Labour day
Ordinary Labour day
H.C. of Excavator (Medium Size) day
H.C. of 3 Wheel Static Road roller (8-10 ton) day
Diesel liter
Lubricant liter
Mason day
Ordinary Labour day
H.C. of Water Tanker (Towed by Tractor) day
H.C. of Water Pump day
H.C. of 3 Wheel Static Road roller (8-10 ton) day
Diesel liter
Lubricant liter
Mason day
Ordinary Labour day
Sand (FM - 0.8) m3
Ordinary Labour day
H.C. of Vibratory Road Roller (8-10 ton) day
Diesel liter
Lubricant liter
1st Class/ Picked Brick chips (40mm down graded) m3
1st Class Brick Chips (20mm down graded) m3
Sand (FM - 0.8) m3
Ordinary Labour day
Skilled Labour day
Mason day
Diesel liter
Lubricant liter
H.C. of Vibratory Road Roller (8-10 ton) day
H.C. of Water Tanker (Towed by Tractor) day
H.C. of Water Pump day
1st Class Brick each
Sand (FM - 0.5) m3
Mason day
Ordinary Labour day
1st Class/ Picked Brick chips (40mm down graded) m3
1st Class Picked Brick Chips (20mm down graded) m3
Sand (FM - 0.5) m3
Ordinary Labour day
Skilled Labour day
Head Mason day
H.C. of Mixing Machine for Aggregate day
H.C. of Dump Truck/ Tripping Trucks day
H.C. of Motor Graders (14 tons) day
H.C. of Vibratory Road Roller (8-10 ton) day
H.C. of Water Tanker (Truck Mounted) day
Stackyard Rent m3
Diesel liter
Lubricant liter
Stone Chips (38mm down graded) [LAA≤35] cum
Stone Chips (20mm down graded) [LAA≤35] cum
Stone Chips (12mm down graded) [LAA≤35] cum
Sand (FM - 0.8) m3
Ordinary Labour day
Skilled Labour day
Head Mason day
H.C. of Mixing Machine for Aggregate day
H.C. of Dump Truck/ Tripping Trucks day
H.C. of Motor Graders (14 tons) day
H.C. of Vibratory Road Roller (8-10 ton) day
H.C. of Water Tanker (Truck Mounted) day
Stackyard Rent m3
Diesel liter
Lubricant liter
Bitumen [Grade 80/100] kg
Fire wood kg
Kerosene liter
Mason day
Skilled Labour day
Ordinary Labour day
H.C. of Distributor day
Diesel liter
Lubricant liter
Stone Chips (16mm down graded) [LAA≤35] cum
Stone Chips (12mm down graded) [LAA≤35] cum
Stone Chips (6mm down graded) [LAA≤35] cum
Stone Dust (2.38mm down) cum
Bitumen [Grade 60/70] kg
Mason day
Skilled Labour day
Ordinary Labour day
H.C. of Pneumatic Multiple Tired Roller (7 tires, 8-10 tons) day
H.C. of Vibratory (Ride On) Roller 2 Steel Drum Compactor (3-5 tons) day
Diesel liter
Lubricant liter
Foreman day
Asphalt Plant day
AC Paver day
H.C. of Dump Truck/ Tripping Trucks day
Stone Chips (25mm down graded) [LAA≤35] cum
Bitumen [Grade 80/100] kg
Fire wood kg
Mason day
Skilled Labour day
Ordinary Labour day
H.C. of Distributor day
Diesel liter
Lubricant liter
Stone Chips (16mm down graded) [LAA≤35] cum
Stone Chips (12mm down graded) [LAA≤35] cum
Stone Chips (6mm down graded) [LAA≤35] cum
Stone Dust (2.38mm down) cum
Bitumen [Grade 60/70] kg
Mason day
Skilled Labour day
Ordinary Labour day
H.C. of Pneumatic Multiple Tired Roller (7 tires, 8-10 tons) day
H.C. of Vibratory (Ride On) Roller 2 Steel Drum Compactor (3-5 tons) day
Diesel liter
Lubricant liter
Foreman day
Asphalt Plant day
AC Paver day
H.C. of Dump Truck/ Tripping Trucks day
1st Class Brick each
Sand (FM - 0.5) m3
Mason day
Ordinary Labour day
0.18mm thick polythene sheet m2
Ordinary Labour day
1st Class Brick Chips (20mm down graded) m3
Sand (FM - 1.2) m3
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) bag
Head Mason day
Mason day
Skilled Labour day
Ordinary Labour day
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) day
Hire and running charges of Concrete Vibrator day
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) bag
1st Class Brick each
Sand (FM - 1.2) m3
Head Mason day
Mason day
Skilled Labour day
Ordinary Labour day
Stone Chips (25mm down graded)[LAA≤30] cum
Stone Chips (12mm down graded) [LAA≤30] m3
Sand (FM - 2.5) m3
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) bag
Head Mason day
Mason day
Skilled Labour day
Ordinary Labour day
Hire and running charges of Batching and Mixing Plant @ 20 cum/hour day
Hire and running charges of Concrete Vibrator day
H.C. of Backhoe End Loader (6 tons) day
Hire and running charges of Concrete Pump (30 & 45 cum capacity) day
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & other related cost day
Diesel liter
M.S. Ribbed/ Deformed Bar (Grade 400) kg
GI Wire (22 BWG) kg
Re-bar Fabricator day
Skilled Labour day
Ordinary Labour day
Manufacturing and supplying CC blocks (3.09.5.3) each
Sand (FM - 0.5) m3
Mason day
Ordinary Labour day
Royalty of Earth (Within Municipal Area) m3
Ordinary Labour day
Sardar day
H.C. of Flat Body Truck (3 tons) day
Diesel liter
Lubricant liter
H.C. of Vibratory Road Roller (8-10 ton) day
0
Turf m2
Ordinary Labour day
Geo Textile (Grade-I-DF-20-1.5mm thick) m2
Skilled Labour day
Ordinary Labour day
Stone Shingles (20mm down graded) m3
Sand (FM - 1.5) m3
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) bag
Mason day
Skilled Labour day
Ordinary Labour day
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) day
Mason day
Skilled Labour day
Ordinary Labour day
Synthetic Enamel Paint liter
Synthetic enamel paint primer/ sealer liter
Plumber/ Electric Mistry/ Painter day
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/Operator day
Thermoplastic Compound kg
Reflectorising Glass Beads kg
H. C. of Thermoplastic Appilicator Machine day
Foreman day
Skilled Labour day
Ordinary Labour day
0
18/20/22 BWG MS Sheet/plate kg
MS Angle 25mmx25mmx3mm kg
Electrode pkt
Foreman day
Welder day
Skilled Labour day
Ordinary Labour day
H.C. of Welding Machine day
H.C. of Grinding Machine day
0
Sand (FM - 2.5) m3
Bitumen [Grade 80/100] kg
Fire wood kg
Skilled Labour day
Ordinary Labour day
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) bag
Stone Chips (20mm down graded) [LAA≤35] cum
Stone Chips (12mm down graded) [LAA≤25] cum
Sand (FM - 2.5) m3
Sand (FM - 1.8) m3
Water reducing chemical admixture : Type-A liter
Head Mason day
Mason day
Skilled Labour day
Ordinary Labour day
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) day
Hire and running charges of Concrete Vibrator day
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) bag
Stone Chips (20mm down graded) [LAA≤35] cum
Stone Chips (12mm down graded) [LAA≤35] cum
Sand (FM - 2.5) m3
Sand (FM - 1.8) m3
Water reducing chemical admixture : Type-A liter
Head Mason day
Mason day
Skilled Labour day
Ordinary Labour day
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) day
Hire and running charges of Concrete Vibrator day
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) bag
Stone Chips (20mm down graded) [LAA≤35] cum
Stone Chips (12mm down graded) [LAA≤35] cum
Sand (FM - 2.5) m3
Sand (FM - 1.8) m3
Water reducing chemical admixture : Type-A liter
Head Mason day
Mason day
Skilled Labour day
Ordinary Labour day
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) day
Hire and running charges of Concrete Vibrator day
Manufacturing and supplying CC blocks (3.09.5.2) each
Sand (FM - 0.5) m3
Mason day
Ordinary Labour day
Royalty of Earth m3
Sardar day
Ordinary Labour day
Skilled Labour day
Ordinary Labour day
Operator day
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/Operator day
H.C. of Excavator (Medium Size) day
Diesel liter
Lubricant liter
Sand (FM - 0.5) m3
Ordinary Labour day
H.C. of Vibratory Road Roller (8-10 ton) day
Diesel liter
Lubricant liter
0.18mm thick polythene sheet m2
Ordinary Labour day
1st Class Brick Chips (20mm down graded) m3
Sand (FM - 1.2) m3
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) bag
Head Mason day
Mason day
Skilled Labour day
Ordinary Labour day
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) day
Hire and running charges of Concrete Vibrator day
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) bag
Stone Chips (20mm down graded) [LAA≤35] cum
Stone Chips (12mm down graded) [LAA≤25] cum
Sand (FM - 2.5) m3
Sand (FM - 1.8) m3
Water reducing chemical admixture : Type-A liter
Head Mason day
Mason day
Skilled Labour day
Ordinary Labour day
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) day
Hire and running charges of Concrete Vibrator day
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) bag
Stone Chips (20mm down graded) [LAA≤35] cum
Stone Chips (12mm down graded) [LAA≤35] cum
Sand (FM - 2.5) m3
Sand (FM - 1.8) m3
Water reducing chemical admixture : Type-A liter
Head Mason day
Mason day
Skilled Labour day
Ordinary Labour day
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) day
Hire and running charges of Concrete Vibrator day
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) bag
Stone Chips (20mm down graded) [LAA≤35] cum
Stone Chips (12mm down graded) [LAA≤35] cum
Sand (FM - 2.5) m3
Sand (FM - 1.8) m3
Water reducing chemical admixture : Type-A liter
Head Mason day
Mason day
Skilled Labour day
Ordinary Labour day
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) day
Hire and running charges of Concrete Vibrator day
M.S. Ribbed/ Deformed Bar (Grade 400) kg
GI Wire (22 BWG) kg
Re-bar Fabricator day
Skilled Labour day
Ordinary Labour day
uuPVC Pipe 50mm dia of 2.5mm to 3.0mm wall thick m
remaining cost like Labour,Tee, elbow, bend, socket, plug, solvent cement, clamp etc. ( +22.00 % on Subtotal-A
ls )
1st Class Brick Chips (20mm down graded) m3
75mm PVC Pipe -2.9mm to 3.4mm wall thick m
Sand (FM - 0.8) m3
Empty Gunny Bag each
Skilled Labour day
Stone Shingles (20mm down graded) m3
Sand (FM - 2.5) m3
H.C. of Casing day
H.C. of Tripod and Mechanical Winch Machine complete with power unit and accessories day
H.C. of Driving Equipment day
Operator day
Foreman day
Skilled Labour day
Ordinary Labour day
Diesel liter
Lubricant liter
Stone Chips (38mm down graded) [LAA≤35] cum
Stone Chips (16mm down graded) [LAA≤35] cum
Sand (FM - 1.8) m3
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) bag
Mason day
Skilled Labour day
Ordinary Labour day
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) day
Hire and running charges of Concrete Vibrator day
300mmx300mmx25mm high load bearing parking Tiles sqm
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) bag
Sand (FM - 1.2) m3
Head Mason day
Mason day
Skilled Labour day
Ordinary Labour day
MS Angle, Flat bar, Z bar kg
Stone Shingles (20mm down graded) m3
Sand (FM - 1.5) m3
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) bag
Mason day
Skilled Labour day
Ordinary Labour day
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) day
Hire and running charges of Concrete Vibrator day
Sand (FM - 1.2) m3
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) bag
Head Mason day
Mason day
Skilled Labour day
Ordinary Labour day
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Quantity Rate Total Sub Item Quantity
m2 5 5
day 370 16.65
m2 60 64.2
day 450 13.5
day 370 37
m3 3500 42
m3 795 4.77
bag 430 24.51
day 550 0.55
day 450 4.5
day 370 8.88
day 1200 0.96
day 550 11
day 450 135
day 370 481
liter 260 31.2
liter 206 18.54
day 680 73.44
day 470 50.76
kg 121.4 607
kg 121.4 30.35
day 2000 57.2
day 800 22.88
day 450 25.7
day 370 42.29
kg 70 697.2
kg 58 848.89
pkt 810 186.3
day 800 64
day 680 272
day 450 67.5
day 370 222
day 500 150
day 100 30
m3 1500 1.5
kg 49 26.52
kg 7.75 5.08
day 450 11.07
day 370 18.2
bag 430 2601.5
cum 4930 2563.6
cum 4640 1577.6
m3 1500 387
m3 970 166.84
liter 130 157.3
day 650 52
day 550 231
day 450 337.5
day 370 740
day 1200 72
day 400 24
bag 430 2601.5
cum 4930 2563.6
cum 4320 1468.8
m3 1500 387
m3 970 166.84
liter 130 157.3
day 650 52
day 550 231
day 450 337.5
day 370 740
day 1200 72
day 400 24
bag 430 2601.5
cum 4930 2563.6
cum 4320 1468.8
m3 1500 387
m3 970 166.84
liter 130 157.3
day 650 52
day 550 231
day 450 337.5
day 370 740
day 1200 72
day 400 24
each 57.53 152.45
m3 420 0.42
day 550 5.5
day 370 37
m3 25 28
day 800 3.2
day 370 129.5
day 450 1.35
day 370 6.73
day 570 1.71
day 470 2.87
day 8880 26.64
liter 68 25.14
liter 220 2.4
m3 420 483
day 370 37
day 3000 24
liter 68 2.72
liter 220 0.77
m2 12.31 12.31
day 370 0.37
m3 2940 2528.4
m3 584 251.12
bag 430 2603.22
day 650 52
day 550 231
day 450 337.5
day 370 666
day 1200 72
day 400 24
bag 430 2601.5
cum 4930 2563.6
cum 4640 1577.6
m3 1500 387
m3 970 166.84
liter 130 157.3
day 650 52
day 550 231
day 450 337.5
day 370 740
day 1200 72
day 400 24
bag 430 2601.5
cum 4930 2563.6
cum 4320 1468.8
m3 1500 387
m3 970 166.84
liter 130 157.3
day 650 52
day 550 231
day 450 337.5
day 370 740
day 1200 72
day 400 24
bag 430 2601.5
cum 4930 2563.6
cum 4320 1468.8
m3 1500 387
m3 970 166.84
liter 130 157.3
day 650 52
day 550 231
day 450 337.5
day 370 740
day 1200 72
day 400 24
kg 58 59.16
kg 90 0.9
day 570 1.71
day 450 1.13
day 370 2.78
m 93 93
ls 20.46 20.46
m3 2940 249.9
m 165 99
m3 480 12.96
each 30 30
day 450 45
m3 3500 700
m3 1500 150
day 260 7.8
day 3000 90
day 350 10.5
day 570 17.1
day 800 19.2
day 450 43.2
day 370 31.08
liter 68 129.74
liter 220 5.26
cum 4850 36.86
cum 4720 15.58
m3 970 5.24
bag 430 32.9
day 550 0.55
day 450 2.75
day 370 8.44
day 1200 1.08
day 400 0.36
sqm 452 452
bag 430 116.1
m3 584 11.68
day 650 143
day 550 121
day 450 148.5
day 370 122.1
kg 59 60.18
m3 3500 197.05
m3 795 22.34
bag 430 113.78
day 550 2.75
day 450 13.5
day 370 41.63
day 1200 5.4
day 400 1.8
m3 584 43.92
bag 430 152.13
day 650 13
day 550 137.5
day 450 360
day 370 555