0% found this document useful (0 votes)
1K views3 pages

Method Statement For Leakage Testing of Gravity Sewer Line

The document provides a method statement for conducting leakage testing of gravity sewer pipelines on the islands of Lh. Naifaru and Th. Vehmandhoo in the Maldives. It outlines the required equipment, procedures for testing unbranched pipelines between manholes, pipelines between cleanouts and manholes, and pipelines with house connections. The test involves plugging the pipeline ends, filling with water to 1.5m above the pipe invert, and allowing up to 4.5mm drop in water level per meter of pipe after 2 hours.

Uploaded by

Gerlie Dimayuga
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views3 pages

Method Statement For Leakage Testing of Gravity Sewer Line

The document provides a method statement for conducting leakage testing of gravity sewer pipelines on the islands of Lh. Naifaru and Th. Vehmandhoo in the Maldives. It outlines the required equipment, procedures for testing unbranched pipelines between manholes, pipelines between cleanouts and manholes, and pipelines with house connections. The test involves plugging the pipeline ends, filling with water to 1.5m above the pipe invert, and allowing up to 4.5mm drop in water level per meter of pipe after 2 hours.

Uploaded by

Gerlie Dimayuga
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

MINISTRY OF ENVIRONMENT AND ENGERY

MALDIVES

CONSULTANT: RIYAN PVT LTD., MALE

CONSTRUCTION OF WATER SUPPLY AND SEWERAGE FACILITES


AT ISLAND OF LH. NAIFARU & TH.VEHMANDHOO

METHOD STATEMENT FOR LEAKAGE TEST OF GRAVITY SEWER


PIPE LINE.
PREPARED BY:

LE-TRIVENI JV, LH. NAIFARU, MALDIVES

18-7-2018 Approval GK pj

DATE ISSUED FOR PREP.BY CHKD BY APPVD BY


Method Statement for Leakage Testing of Gravity Sewer Line

Introduction: Leakage Test to be conducted for Gravity Sewer line as per Technical Specification
–Sewerage System Works of Contract No : (AGM) 438-WS/PRIV/2017/51 under the clause no
3.12.8.5

Equipment and Tools Required:

1. Water tank with Pump


2. Raiser Pipe
3. Measuring Scale
4. End Plugs (Balloon)
5. Stop Watch
6. Transparent tubes

Procedure to conduct test:

On completion of laying of pipes and construction of consecutive two manholes, LE-Triveni JV will
test the pipes and manhole for leaks. The ends of the pipes will be plugged. A riser pipe will be
installed in the pipeline to be tested. The raiser pipe will be used to monitor the leaks. The pipe
shall be filled until the water level in the tube is 1 .5m above the invert of the pipe and monitored
for 30 minutes after waiting for two hours to stabilize. The drop in level must not be more than
4.5mm per meter length tested. Water for testing shall be provided by contractor and water used
for testing will not be saline.

For the Pipeline from Manhole to Manhole without any hose connection in between: There will be
one end of (down Stream) would be plugged tightly with the Balloon and another end (Up Stream) will
be plugged by a Balloon with a transparent raiser pipe.. Then water shall be poured from upstream till
the required Hight. Loss of water to be measured as per specification.

Manhole Raiser (Transparent tube)

Balloon Plug Manhole


For the Pipeline between Clear out and manhole: The raiser pipe will be installed at Clean-out and
other end of the pipeline to be tested will be plugged with a Balloon. The pipeline is filled water through
the raiser. Loss of water to be measured as per specification.

Manhole Raiser Pipe

Balloon Plug Clean-Out

For the Pipeline from Manhole to manhole with one or more house connection in between:

The raiser pipe will be installed at 110mm dia house connection line and the both ends of the pipeline to
be tested will be plugged with Balloons. The pipeline is filled water through the raiser. Loss of water to
be measured as per specification.

Manhole Raiser Pipe

Balloon Pllug Y-Branch for HC Manhole

Conclusion : All the leak test will be inspected and witnessed by Riyan. The record will be maintained.