Exercise 3: S-Curve: Culla, Ian Gabriel
Exercise 3: S-Curve: Culla, Ian Gabriel
DE LEON, NICOLE R.
EXERCISE 3: S- CURVE
ACTIVTY
1 Walls and Ceiling
2 Foundation
3 Roof Timbers
4 Roof Sheathing
5 Electrical Wiring
6 Roof Shingles
7 Exteriior Sliding
8 Windows
9 Paint
10 Inside Wall Board
0 3 3 8 8
2 1 3
3 5 2
0 3 3 8 8
5
4
14
8
8
2
14
TIVTY ImmediatePredecessor(s)
Expected Time (Days)
nd Ceiling 2 5
dation - 3
Timbers 1 2
heathing 3 3
al Wiring 1 4
hingles 4 8
or Sliding 8 5
dows 1 2
aint 6,7,10 2
Wall Board 8,5 3
8 10 10 13
3 4
2 3
8 10 10 13
8 12 13 21
5 6
4 8
14 18 13 21
8 10 12 15 21
8 10 9
2 3 2
14 16 18 21 21
10 15
7
5
16 21
96
88
100
80
90
72
80
64
70
56
60
48
50
40
40
32
30
24
20
16
10
8
0
1 2 3 4 5 6 7 8 9
0 4 8 12 16 20 24
21 23
9
2
21 23
S-CURVE
7 8 9 10 11 12 13 14 15 16 17 18 19
28 32 36 40 44 48 52 56 60 64
17 18 19 20 21 22 23 24 25
68 72 76 81 84 87 89 91
ACTIVTY Predecessor(s) Duration(weeks)
A: Manuscript proofreading by editor None 3
B: Sample pages preparation None 2
C: Book cover design None 4
D: Artwork preparation None 3
E: Author's approval of edited manuscript A, B 2
F: Book formatting E 4
G: Author's review of formated pages F 2
H: Author's review of artwork D 1
I: Production of printed plates G 2
J: Book production and binding H 4
0 3
A
3
0 3
0 2
B
2
1 3
0 3
D
3
7 10
0 4
C
4
9 13
3 5 5 9
E F
2 4
3 5 5 9
G
2
9
3 4
H
1
10 11
11
G
2
11
11 13
I
2
11 13
13 17
J
4
13 17
81
78
75
7290
69
66
80
63
60
5770
54
51
4860
45
42
50
39
36
3340
30
27
2430
21
18
20
15
12
9
10
6
3
00
1 2
S-curve
90
80
70
60
50
40
30
20
10
0 3 6 9 14 19 26 29 32 37 40
1 2 3 4 5 6 7 8 9 10 11 12
e
44 49 54 60 66 72 78
10 11 12 13 14 15 16 17 18