0% found this document useful (0 votes)
29 views18 pages

Exercise 3: S-Curve: Culla, Ian Gabriel

The document outlines an activity schedule for building construction with 10 numbered tasks and their expected durations in days. It includes an S-curve graph showing planned progress versus actual progress over time. A second document provides details on a book production schedule, listing tasks, predecessors, and durations in weeks, and includes another S-curve graph.

Uploaded by

Nicole De Leon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views18 pages

Exercise 3: S-Curve: Culla, Ian Gabriel

The document outlines an activity schedule for building construction with 10 numbered tasks and their expected durations in days. It includes an S-curve graph showing planned progress versus actual progress over time. A second document provides details on a book production schedule, listing tasks, predecessors, and durations in weeks, and includes another S-curve graph.

Uploaded by

Nicole De Leon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 18

CULLA, IAN GABRIEL

DE LEON, NICOLE R.

TAN PIAN, JELIANNE KYLA S.

EXERCISE 3: S- CURVE
ACTIVTY
1 Walls and Ceiling
2 Foundation
3 Roof Timbers
4 Roof Sheathing
5 Electrical Wiring
6 Roof Shingles
7 Exteriior Sliding
8 Windows
9 Paint
10 Inside Wall Board

0 3 3 8 8

2 1 3
3 5 2

0 3 3 8 8

5
4

14
8

8
2

14
TIVTY ImmediatePredecessor(s)
Expected Time (Days)
nd Ceiling 2 5
dation - 3
Timbers 1 2
heathing 3 3
al Wiring 1 4
hingles 4 8
or Sliding 8 5
dows 1 2
aint 6,7,10 2
Wall Board 8,5 3

8 10 10 13

3 4
2 3

8 10 10 13

8 12 13 21

5 6
4 8

14 18 13 21
8 10 12 15 21

8 10 9
2 3 2

14 16 18 21 21

10 15

7
5

16 21
96

88
100
80
90
72
80
64
70
56
60
48
50
40
40
32
30
24
20
16
10
8
0
1 2 3 4 5 6 7 8 9
0 4 8 12 16 20 24
21 23

9
2

21 23
S-CURVE

7 8 9 10 11 12 13 14 15 16 17 18 19
28 32 36 40 44 48 52 56 60 64
17 18 19 20 21 22 23 24 25
68 72 76 81 84 87 89 91
ACTIVTY Predecessor(s) Duration(weeks)
A: Manuscript proofreading by editor None 3
B: Sample pages preparation None 2
C: Book cover design None 4
D: Artwork preparation None 3
E: Author's approval of edited manuscript A, B 2
F: Book formatting E 4
G: Author's review of formated pages F 2
H: Author's review of artwork D 1
I: Production of printed plates G 2
J: Book production and binding H 4

0 3

A
3
0 3

0 2

B
2
1 3

0 3

D
3
7 10

0 4

C
4
9 13
3 5 5 9

E F
2 4
3 5 5 9

G
2
9

3 4

H
1
10 11
11

G
2
11

11 13

I
2
11 13

13 17

J
4
13 17

81
78
75
7290
69
66
80
63
60
5770
54
51
4860
45
42
50
39
36
3340
30
27
2430
21
18
20
15
12
9
10
6
3
00
1 2
S-curve
90

80

70

60

50

40

30

20

10

0 3 6 9 14 19 26 29 32 37 40
1 2 3 4 5 6 7 8 9 10 11 12
e

44 49 54 60 66 72 78
10 11 12 13 14 15 16 17 18