0% found this document useful (0 votes)
139 views

Attendance Sheet

This document contains the attendance details of a worker for the Fire Research Division of the Central Building Research Institute in Roorkee, India for the month of October 2018. It lists the attendance of the worker from the 1st to the 31st of October, showing a total of 21 days worked. It also provides identifying details of the worker such as name, Aadhar number, bank details, and PPF number if applicable. The document is signed by both the Project Leader and Group Leader/Divisional Head.

Uploaded by

Aravind Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
139 views

Attendance Sheet

This document contains the attendance details of a worker for the Fire Research Division of the Central Building Research Institute in Roorkee, India for the month of October 2018. It lists the attendance of the worker from the 1st to the 31st of October, showing a total of 21 days worked. It also provides identifying details of the worker such as name, Aadhar number, bank details, and PPF number if applicable. The document is signed by both the Project Leader and Group Leader/Divisional Head.

Uploaded by

Aravind Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

dsUnzh; Hkou vuqla/kku laLFkku] :M+dh

CENTRAL BUILDING RESEARCH INSTITUTE


(A constituent Establishment of CSIR)
Roorkee-247667 (Uttarakhand)

Date wise Attendance details of the worker for the month of OCT. 2018
Date: 01 Nov. 2018

Name of the Division Fire Research Division


Project No. HCP - 17
Duration of Sanction (w.e.f._01/08/2018 to 01 Oct. 2018 to 31 Oct. 2018
31/10/2018 )
Category (e.g. Skilled & Unskilled etc.) skilled

Date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Day
Mon
Tue
Wed
Thur
Fri
Sat
Sun
Total No. of Days - 21

Details of the worker:

Name of the worker


Aadhar No.
Bank Details
Name of the Bank & Branch
Account Number
IFSC Code
PPF No., if any -

Signature of the Project Leader

Signature of the Group Leader/Divisional Head

You might also like