Inspection Test Plan: Fabrication and Instalation of Piping
Inspection Test Plan: Fabrication and Instalation of Piping
DANEM ENGINEERING WORKS WLL. FABRICATION AND INSTALATION OF PIPING QCP NO: Rev:0
CLIENT:
Verifying
Inspection by
Item Quality Control Activity Characterstic to be verified Controling Documents Acceptance Standards Documents/Reports Responsible Person Remarks
DANEM QVC
1.0 Engineering Approved Drawings Site Contractual Documents Relevent Contractual Documents Drawing Calculations Design Engg: H H
survey Standards Relevent Standards Requirements Project Manager
Preliminary activities
drawing approval technical Approved Drawings Approved Drawings Approved letter of
2.0
documents to start of Specifications - Specifications signature on Project Manager H H
documents
manufacture
4.0
Shop Fabrication prior to Dimensions, Heat Number Approved Drawings Approved Drawings Inspection Report QA/QC , H R
cutting of pipe ,Grade, Size&Specs Fab:SUPVR
5.0 Welding Monitoring Welding control procedure Electrode baking/Holding/Issue MFRS Recommendations Records QA/QC , Store S S
Records Keeper
5.1 Welding ApprovedWPS /PQR,Welders WPS /PQR,Welders certificate ASME SEC-IX ASMEB31.3 Weld /NDT summary QA/QC H R
certificate &drawings report
1 of 3
INSPECTION TEST PLAN Contract No:
DANEM ENGINEERING WORKS WLL. FABRICATION AND INSTALATION OF PIPING QCP NO: Rev:0
CLIENT:
Verifying
Inspection by
Item Quality Control Activity Characterstic to be verified Controling Documents Acceptance Standards Documents/Reports Responsible Person Remarks
DANEM QVC
As per approved
Surface preparation and Painting procedure and Project Blasting & painting QA/QC
8.0 Blasting&Painting drawings and Project Report. PAINTING. SUPVR
H R
painting Spec.
Spec.
8.0 Shipping
Final Review
8.1 Shipping to Site ( Document &Reports ) Delivery Note Relevant Document Delivery Note FAB.SUPVR. H S
Approval Identification Mark
Accordance with
Fit-Up Approved WPS,Check weld Fit Approved Drawings approved and project Inspection Report QA/QC , H R
9.1
up asper WPS spec Fab:SUPVR
As per approved
Stage wise Inspection
9.3 Stage wise Inspection As per approved drawings drawings and Project Inspection Report QA/QC H R
during Installation.
Spec.
As per approved
Alignment Check of all
9.4 Alignment As per approved drawings drawings and Project Inspection Report QA/QC H R
Flanges
Spec.
As per approved
Orientation check of all
9.5 Orientation As per approved drawings drawings and Project Inspection Report QA/QC H R
Flanges.
Spec.
2 of 3
INSPECTION TEST PLAN Contract No:
DANEM ENGINEERING WORKS WLL. FABRICATION AND INSTALATION OF PIPING QCP NO: Rev:0
CLIENT:
Verifying
Inspection by
Item Quality Control Activity Characterstic to be verified Controling Documents Acceptance Standards Documents/Reports Responsible Person Remarks
DANEM QVC
As per approved
Alignment Check of all
9.6 Alignment As per approved drawings drawings and Project Inspection Report QA/QC H R
valves
Spec.
As per approved
Orientation check of all
9.7 Orientation As per approved drawings drawings and Project Inspection Report QA/QC H R
valves
Spec.
As per approved
9.8 Overall dimension Overall dimension check As per approved drawings drawings and Project Inspection Report QA/QC H R
Spec.
Visual Inspection 100% Visual inspection on Approved Drawings Weld map ASMEB31.3 &drawings Inspection Report QA/QC H R
9.9
completed weld
Mechanical Completion Activities have to be Weld Map and Records App. Drawing Project QC Documents QA/QC H H
11
completed Specification FAB. SUPVR.
Quality Dossier Contractual Requirements Documents and Reports Quality Inspection Test QC Dossier QA/QC Engineer H H
12
Plan Clients Requirements
3 of 3