Material specification
S. NO TEST
SA/ASTM A216, 217 SA/ASTM A352 SA/ASTM A 351
1 Tension Test As per the Specification
2 Hardness Test As per the Specification 225 BHN. max. Not applicable
Angle of Dia of
Bend Pin
WCB 90º 2t
3 Bend Test Specimen 1”x ¾" WCC 90º 2t Not applicable S3 of SA703
WC6 120º 3t
WC9 90º 3t
C12A 90º 2t
4 Charpy- U Impact for all QCNRV.CRHNRV As per IBR. at Room temperature.
Not applicable Not applicable
BODIES FOR IBR. Acceptance: Avg /Single=36J/32J min.
5 Charpy- V Impact for CE Marking-Pressure
At 20 Deg.C temperature. As per
Equipment Directive (PED) items as Not applicable
Acceptance: Avg /Single=40J/27J min. Specification
Specified in the Purchase Order.
6 Charpy- V Impact for API -6D items if Test Temperature=As per specification
As per
design temperature below minus 29ºC ( - Acceptance: Avg/Single=34J/25J Not applicable
Specification
29 ºC)
7 Charpy- V Impact for LPBP BODIES At 20 Deg.C temperature.
Not applicable Not applicable
Acceptance: Avg /Single=27J/21J min.
BHEL,Tiruchirapalli-620014. Quality Assurance TECHNICAL DELIVERY CONDITION
c. Radiography not required after satisfactory development of casting & production based on
established method for following parts: SRV Bonnet,Disc holder,Upper and Lower adjusting rings,
Packed cap,Cover plate,Yoke and SRV guide flanges
BHEL,Tiruchirapalli-620014. Quality Assurance TECHNICAL DELIVERY CONDITION
9.0 REPAIR:
Castings with unacceptable cracks, hot tears, shrinkage, etc. to be rectified by grinding & if required by
welding. Welding to be done by qualified welder and qualified procedure as per ASME Section IX .For
IBR items welder shall be qualified as per IBR.
Guidelines for repair of Steel castings shall be as per SIP:VS:17 (latest).for activities like defects require/
not require weld repair, welding, Post weld heat treatment, NDE and surface treatment. All repaired
areas after PWHT shall NDE tested and Hardness tested. Hardness shall meet material Specification.
For CE-Marking (PED) casting, permanent joining (welding and weld repair) of components must be
carried out by suitably qualified personnel according to suitable operating procedures. Also Non-
destructive tests of permanent joints must be carried out by suitable qualified personnel. The procedures
and personnel must be approved by a competent third party which, at the manufacturer's discretion, may
be:
- a notified body,
- a third-party organization recognized by a Member State of European Community
1. Foundry code, 2.Specification, grade & Melt number, 3.Other details as per drawing.
For use in valves and other components like flanges, fittings etc. for high temperature & high pressure
applications meeting IBR, ASME Section I, ASME B 16.34, PED and API.
Radiography Area
Radiography Area
BHEL,Tiruchirapalli-620014. Quality Assurance TECHNICAL DELIVERY CONDITION
R
e
f
Radiography Area
Radiography Area