The letter requests support for a construction project exempted from Dubai's COVID-19 sterilization program and movement restrictions. It details a project to design, supply, construct, install, test, and commission a 132/11kV substation. Green Energy Consultancy is supervising construction works by Danway Electrical & Mechanical Engg. L.L.C. as the contractor. Support is requested to fully execute this important strategic project for Dubai.
The letter requests support for a construction project exempted from Dubai's COVID-19 sterilization program and movement restrictions. It details a project to design, supply, construct, install, test, and commission a 132/11kV substation. Green Energy Consultancy is supervising construction works by Danway Electrical & Mechanical Engg. L.L.C. as the contractor. Support is requested to fully execute this important strategic project for Dubai.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1
To Whom it May Concern
Project: DS 233/1A- Design, Supply,
Construction, Installation, Testing & 233/1A Commissioning of 132/11KV Substation.
Subject: COVID 19 Sterilization Program
Movement Permit
Under the instructions of Director General of
Dubai Municipality, Drainage Projects Department has Danway Electrical & Mechanical Engg. L.L.C the Contractor for the above-mentioned Project DS 233/1A
Green Energy Consultancy is the supervising
consultant engaged by Dubai Municipality to supervise the construction works of this Project.
The sterilization program for COVID-19 is now 24
hours a day across all areas and communities in the Emirate of Dubai along with movement restrictions to protect the health and safety of the community. However, Construction Sector was list that is exempted from such restrictions.
This Construction Project is considered one of
the most important and strategic Projects for the Emirate of Dubai and You are hereby kindly requested to provide the above mentioned representatives and staff with the necessary support to execute the Project fully.
Any queries can be addressed Dubai Municipality
call center Tel No.: 800900
Thank you for your co-operation.
Eng. Fahed Ahmed Saeed
Director Drainage Projects Department
(This letter is electronically signed and does not
Handbook on Construction Techniques: A Practical Field Review of Environmental Impacts in Power Transmission/Distribution, Run-of-River Hydropower and Solar Photovoltaic Power Generation Projects
Climate-Related Financial Disclosures 2021: Progress Report on Implementing the Recommendations of the Task Force on Climate-Related Financial Disclosures
LED Street Lighting Best Practices: Lessons Learned from the Pilot LED Municipal Streetlight and PLN Substation Retrofit Project (Pilot LED Project) in Indonesia