Masonry Platform
Masonry Platform
Prepare a detailed estimate of a masonry platform as per the plan and elevation
u1) Earthwork in excavation@375 RS /m^3.
u2)Ist class brickwork in foundation (1:6) @300 Rs /m^3
u4)DPC @ 20 Rs /m^2
Center to center
length of long 5 +0.3/2
wall = +0.3/2 = 5.3 N= 2
Center to center
length of
shortwall = 4 + 0.3/2 +0.3/2 = 4.3 N= 2
Height is
from
ground
Earthwork in level till
excavation bottom
length of
1 long wall
= 5.3 +
0.8/2
Longwall 2 6.1 0.8 1 9.76 M^3 +0.8/2
1
length of
Short
wall =
4.3 -
0.8/2
Short wall 2 3.5 0.8 1 5.60 M^3 -0.8/2
Total 15.36 M^3
PCC in
foundation 1 M^3
length of
long wall
= 5.3 +
2 0.9/2
Longwall 2 6.1 0.8 0.3 2.93 M^3 +0.9/2
length of
Short
wall =
4.3 -
0.9/2
Short wall 2 3.5 0.8 0.3 1.68 M^3 -0.9/2
Total 4.61 M^3
Ist class
brickwork in
foundation
Long wall
length of
long wall
= 5.3 +
0.6/2
Step 1 2 5.9 0.6 0.4 2.83 M^3 +0.6/2
length of
long wall
3 = 5.3 +
0.5/2
step 2 2 5.8 0.5 0.3 1.74 M^3 +0.5/2
Short wall
3
length of
Short
wall =
4.3 -
0.6/2
Step 1 2 3.7 0.6 0.3 1.33 M^3 -0.6/2
length of
Short
wall =
4.3 -
0.5/2
step 2 2 3.8 0.5 0.3 1.14 M^3 -0.5/2
Total 7.04 M^3
Ist Class
brickwork in
superstructure M^3
length of
long wall
4 = 5.3 +
0.3/2
Longwall 2 5.6 0.3 4 13.44 M^3 +0.3/2
length of
Short
wall =
4.3 -
0.3/2
Short wall 2 4 0.3 4 9.60 M^3 -0.3/2
Total 23.04 M^3
5 Earth fill at
center 1 5 4 4 80 M^3
Plastering
Outside 1
7
white wash
Outside 1
7
Longwall 2 5.6 4.4 49.28 M^2 outer length of room u
8
Concrete floor at
center 1 5 4 0.05 1 M^3
9
2 mm top plaster
floor 1 5.6 4.6 25.76 M^2
1
Earthwork in
excavation 15.36 M^3 375 Rs /M^3 5760
2 PCC in
foundation 4.60 M^3 380 Rs /M^3 1748
3
Ist class
brickwork in
foundation 7.5 M^3 300 Rs /M^3 2247
5
Ist Class
brickwork in
superstructure 23.04 M^3 390 Rs /M^3 8985.6
6 earth fill at
center 80 M^3 280 Rs /M^3 22400
7 PlasteringOutsid
e 81.6 M^2 15 Rs /M^2 1224
8
concrete floor 1 M^3 380 Rs /M^3 380
9 white wash outsi 81.6 M^2 11 Rs /M^2 897.6
10
2 mm top plaster
floor 25.76 M^2 15 Rs /M^2 386.4
Total 44028.6 RS
Add
Continge
ncy 3% 1320.84 RS
Add
work
charge
establish
ment 2% 880.4 RS
Overall
cost 46229.8 RS
Qno2
Prepare a detailed estimate of a masonry platform as per the plan and elevation
u1) Earthwork in excavation@375 RS /m^3.
u2)Ist class brickwork in foundation (1:6) @300 Rs /m^3
u4)DPC @ 20 Rs /m^2
Center to center
length of long 6 +0.4/2
wall = +0.4/2 = 6.4
Center to center
length of
shortwall = 4 + 0.4/2 +0.4/2 = 5.4
DETAIL OF MEASUREMENT FORM
Sno Description No Length Breadth Height Quantity Unit Remarks
Height is
from
ground
Earthwork in level till
excavation bottom
1
length of
long wall
Longwall 2 M^3 =
length of
Short
Short wall 2 M^3 wall =
Total 0.00 M^3
PCC in
foundation 1 M^3
length of
long wall
= 5.3 +
2 0.9/2
Longwall 2 M^3 +0.9/2
length of
Short
wall =
4.3 -
0.9/2
Short wall 2 M^3 -0.9/2
Total 0.00 M^3
Ist class
brickwork in
foundation
Long wall
length of
long wall
Step 1 2 M^3 =
Step 2 2 M^3
3 length of
long wall
Step 3 2 M^3 =
Short wall
3
length of
Short
Step 1 2 M^3 wall =
Step 2 2 M^3
length of
Short
Step 3 2 M^3 wall =
Total 0.00 M^3
Ist Class
brickwork in
superstructure M^3
length of
long wall
4 = 5.3 +
0.3/2
Longwall 2 M^3 +0.3/2
length of
Short
wall =
4.3 -
0.3/2
Short wall 2 M^3 -0.3/2
Total 0.00 M^3
5 Earth fill at
center 1 M^3
Plastering
Outside 1
Total 0 M^2
white wash
Outside 1
7
Longwall 2 M^2 outer length of room u
7
8
Concrete floor at
center 1 M^3
9
2 mm top plaster
floor 1 M^2
1
Earthwork in
excavation M^3 375 Rs /M^3 375
2 PCC in
foundation M^3 380 Rs /M^3 380
3
Ist class
brickwork in
foundation M^3 300 Rs /M^3 300
4
Ist Class
brickwork in
superstructure M^3 390 Rs /M^3 390
5 earth fill at
center M^3 280 Rs /M^3 280
6 PlasteringOutsid
e M^2 15 Rs /M^2 15
7
concrete floor M^3 380 Rs /M^3 380
8 white wash outside M^2 11 Rs /M^2 11
9
2 mm top plaster
floor M^2 15 Rs /M^2
Total RS
Add
Continge
ncy 3% 1527.3 RS
Add
work
charge
establish
ment 2% 1018.2 RS
Overall
cost 2545.5 RS
Qno3
Prepare a detailed estimate of a masonry platform as per the plan and elevation
u1) Earthwork in excavation@375 RS /m^3.
u2)Ist class brickwork in foundation (1:6) @300 Rs /m^3
u4)DPC @ 20 Rs /m^2
Center to center
length of long 6 +0.4/2
wall = +0.4/2 = 6.4
Center to center
length of
shortwall = 6 + 0.4/2 +0.4/2 = 6.4
PCC in
foundation 1 M^3
length of
2 long wall
Longwall 2 M^3 =
length of
Short
Short wall 2 M^3 wall =
Total 0.00 M^3
Ist class
brickwork in
foundation
Long wall
length of
long wall
Step 1 2 M^3 =
Step 2 2 M^3
3 length of
long wall
Step 3 2 M^3 =
Short wall
length of
Short
Step 1 2 M^3 wall =
Step 2 2 M^3
length of
Short
Step 3 2 M^3 wall =
Total 0.00 M^3
Ist Class
brickwork in
superstructure M^3
4 length of
long wall
Longwall 2 M^3 =
length of
Short
Short wall 2 M^3 wall =
Total 0.00 M^3
5 Earth fill at
center 1 M^3
Plastering
Outside 1
Total 0 M^2
white wash
Outside 1
7
Longwall 2 M^2 outer length of room u
8
Concrete floor at
center 1 M^3
9
2 mm top plaster
floor 1 M^2
1
Earthwork in
excavation M^3 375 Rs /M^3 375
2 PCC in
foundation M^3 380 Rs /M^3 380
3
Ist class
brickwork in
foundation M^3 300 Rs /M^3 300
4
Ist Class
brickwork in
superstructure M^3 390 Rs /M^3 390
5 earth fill at
center M^3 280 Rs /M^3 280
6 PlasteringOutsid
e M^2 15 Rs /M^2 15
7
concrete floor M^3 380 Rs /M^3 380
8 white wash outside M^2 11 Rs /M^2 11
9
2 mm top plaster
floor M^2 15 Rs /M^2
Total RS
Add
Continge
ncy 3% 1527.3 RS
Add
work
charge
establish
ment 2% 1018.2 RS
Overall
cost 2545.5 RS
an and elevation given use following specifications
0 Rs /m^2
5 Rs /m^2
outer length of room upto ground level
0 Rs /m^2
5 Rs /m^2
outer length of room upto ground level
0 Rs /m^2
5 Rs /m^2
outer length of room upto ground level
u4)DPC @ 20 Rs /m^2
Center to
center length 5 +0.3/2
of long wall = +0.3/2 = 5.3 N 2
Center to
center length
of shortwall = 4 + 0.3/2 +0.3/2 = 4.3 N 2
total center to center length = 5.3X2 + 4.3 x2 = 19.2
outside length for plastering = 5.6x2+4.6x 2 = 20.4 m
1
Earthwork in
excavation 1 19.2 0.8 1 15.36 M^3
2 PCC in
foundation 1 19.2 0.8 0.3 4.608 M^3
Ist class
3 brickwork in
foundation
3
Step 1 1 19.2 0.6 0.4 4.61 M^3
step 2 1 19.2 0.5 0.3 2.88 M^3
Total 7.49 M^3
4 Ist Class
brickwork in
superstructu
re 1 19.4 0.3 4 23.28 M^3
5 Earth fill at
center 1 5 4 4 80 M^3
6 Plastering
Outside 1 20.4 4 81.6 M^2
white wash
Outside 1 20.4 4 81.6 M^3
8 Concrete
floor at
center 1 5 4 0.05 1 M^3
9
2 mm top
plaster floor 1 5.6 4.6 25.76 M^2
1
Earthwork in
excavation 15.36 M^3 375 Rs /M^3 5760
2 PCC in
foundation 4.60 M^3 380 Rs /M^3 1748
3
Ist class
brickwork in
foundation 7.5 M^3 300 Rs /M^3 2247
4 Ist Class
brickwork in
superstructu
re 23.04 M^3 390 Rs /M^3 8985.6
5 earth fill at
center 80 M^3 280 Rs /M^3 22400
7 PlasteringOu
tside 81.6 M^2 15 Rs /M^2 1224
8 concrete
floor 1 M^3 380 Rs /M^3 380
9 white wash ou 81.6 M^2 11 Rs /M^2 897.6
10
2 mm top
plaster floor 25.76 M^2 15 Rs /M^2 386.4
Total 44028.6 RS
Add
Continge
ncy 3% 1320.6 RS
Add
work
charge
establish
ment 2% 880.4 RS
Overall
cost 46229.6 RS
Qno2
Prepare a detailed estimate of a masonry platform as per the plan and elevation gi
u1) Earthwork in excavation@375 RS /m^3.
u2)Ist class brickwork in foundation (1:6) @300 Rs /m^3
Center to
center length 6 +0.4/2
of long wall = +0.4/2 = 6.4 N 2
Center to
center length 5 + 0.4/2
of shortwall = +0.4/2 = 5.4 N 2
total center to center length = 6.4X2 + 5.4 x2 = 23.6
outside length for plastering = 6.8x2+5.8x 2 = 25.2
1
Earthwork in
excavation 1 M^3
2 PCC in
foundation 1 M^3
Ist class
brickwork in
3 foundation
Step 1 1 M^3
Step 2 1
Step 3 1 M^3
Total 0.00 M^3
4 Ist Class
brickwork in
superstructu
re 1 M^3
5 Earth fill at
center 1 M^3
6 Plastering
Outside 1 M^2
white wash
Outside 1 M^3
8 Concrete
floor at
center 1 M^3
9
2 mm top
plaster floor 1 M^2
1
Earthwork in
excavation M^3 375 Rs /M^3 375
2 PCC in
foundation M^3 380 Rs /M^3 380
3
Ist class
brickwork in
foundation M^3 300 Rs /M^3 300
4 Ist Class
brickwork in
superstructu
re M^3 390 Rs /M^3 390
5 earth fill at
center M^3 280 Rs /M^3 280
7 PlasteringOu
tside M^2 15 Rs /M^2 15
8 concrete
floor M^3 380 Rs /M^3 380
9 white wash outside M^2 11 Rs /M^2 11
10
2 mm top
plaster floor M^2 15 Rs /M^2 15
Total 2146 RS
Add
Continge
ncy 3% 1320.6 RS
Add
work
charge
establish
ment 2% 880.4 RS
Overall
cost 4347 RS
Qno3
Prepare a detailed estimate of a masonry platform as per the plan and elevation gi
u1) Earthwork in excavation@375 RS /m^3.
u2)Ist class brickwork in foundation (1:6) @300 Rs /m^3
u4)DPC @ 20 Rs /m^2
Center to
center length 6 +0.4/2
of long wall = +0.4/2 = 6.4 N 2
Center to
center length
of shortwall = 6 + 0.4/2 +0.4/2 = 6.4 N 2
total center to center length = 6.4X2 + 6.4 x2 = 25.6
outside length for plastering = 6.8x2+6.8x 2 = 27.2
1
Earthwork in
excavation 1 M^3
2 PCC in
foundation 1 M^3
Ist class
brickwork in
3 foundation
Step 1 1 M^3
Step 2 1
Step 3 1 M^3
Total 0.00 M^3
4 Ist Class
brickwork in
superstructu
re 1 M^3
5 Earth fill at
center 1 M^3
6 Plastering
Outside 1 M^2
white wash
Outside 1 M^3
8 Concrete
floor at
center 1 M^3
9
2 mm top
plaster floor 1 M^2
1
Earthwork in
excavation M^3 375 Rs /M^3 375
2 PCC in
foundation M^3 380 Rs /M^3 380
3
Ist class
brickwork in
foundation M^3 300 Rs /M^3 300
4 Ist Class
brickwork in
superstructu
re M^3 390 Rs /M^3 390
5 earth fill at
center M^3 280 Rs /M^3 280
7 PlasteringOu
tside M^2 15 Rs /M^2 15
8 concrete
floor M^3 380 Rs /M^3 380
9 white wash outside M^2 11 Rs /M^2 11
10
2 mm top
plaster floor M^2 15 Rs /M^2 15
Total 2146 RS
Add
Continge
ncy 3% 1320.6 RS
Add
work
charge
establish
ment 2% 880.4 RS
Overall
cost 4347 RS
per the plan and elevation given use following specifications
@300 Rs /m^3
(1:4)@390 Rs /m^2
side @15 Rs /m^2
Remarks
Height is from
ground level till
bottom
per the plan and elevation given use following specifications
@300 Rs /m^3
(1:4)@390 Rs /m^2
side @15 Rs /m^2
Remarks
Height is from
ground level till
bottom
per the plan and elevation given use following specifications
@300 Rs /m^3
(1:4)@390 Rs /m^2
side @15 Rs /m^2
Remarks
Height is from
ground level till
bottom