Estimation ESTIMATE OF Wall
Estimation ESTIMATE OF Wall
Prepare a detailed estimate of a single wall as per the plan and elevation given u
u1) Earthwork in excavation@375 RS /m^3.
u2)Ist class brickwork in foundation (1:6) @300 Rs /m^3
u4)DPC @ 20 Rs /m^2
u6) Plastering inside @12 Rs /m^2 and outside and top @15 Rs /m
u7)Inside two coats of white wash @9 Rs /m^2 with one coat of col
1
Earthwork in excavation 1 6 0.8 2.4
2 PCC in foundation 1 6 0.8 0.4
Ist class brickwork in
foundation
Step 1 1 6 0.7 0.6
3
step 2 1 6 0.6 0.5
step 3 1 6 0.5 0.5
Step 4 1 6 0.4 0.6
Total
4 DPC 6 0.3
5 Ist Class brickwork in
superstructure 1 6 0.3 3.4
Outside 1 6 3.8
7
Top 1 6 0.3
Total
White wash Inside 1 6 3.4
8 White wash Outside 1 6 3.8
White wash Top 1 6 0.3
Total
9 Colour wash Inside 1 6 3.4
Abstract of estimated cost
Sno Description Quantity Unit Rate Per unit
1 Earthwork in excavation 11.52 M^3 375 Rs /M^3
2 PCC in foundation 1.92 M^3 380 Rs /M^3
3 Ist class brickwork in
foundation 7.26 M^3 300 Rs /M^3
4 DPC 1.8 M^2 20 Rs /M^2
5 Ist Class brickwork in
superstructure 6.12 M^3 390 Rs /M^3
6 Plastering Inside 20.4 M^2 12 Rs /M^2
Outside 22.8 M^2 15 Rs /M^2
7
Top 1.8 M^2 15 Rs /M^2
8 White wash 45 M^2 9 Rs /M^2
9 Colour wash Inside 20.4 M^2 11 Rs /M^2
Total
Add
Contingency 3%
Add work
charge
establishment 2%
Overall
cost
QNO 2
Prepare a detailed estimate of a single wall as per the plan and elevation given u
u1) Earthwork in excavation@375 RS /m^3.
u2)Ist class brickwork in foundation (1:6) @300 Rs /m^3
u4)DPC @ 20 Rs /m^2
u6) Plastering inside @12 Rs /m^2 and outside and top @15 Rs /m
u7)Inside two coats of white wash @9 Rs /m^2 with one coat of col
6 Plastering Inside 1
Outside 1
7
Top 1
Total
White wash Inside 1
8 White wash Outside 1
White wash Top 1
Total
9 Colour wash Inside 1
Total
Add
Contingency 3%
Add work
charge
establishment 2%
Overall
cost
Qno3
QNO 2
Prepare a detailed estimate of a single wall as per the plan and elevation given u
u1) Earthwork in excavation@375 RS /m^3.
u2)Ist class brickwork in foundation (1:6) @300 Rs /m^3
u4)DPC @ 20 Rs /m^2
u6) Plastering inside @12 Rs /m^2 and outside and top @15 Rs /m
u7)Inside two coats of white wash @9 Rs /m^2 with one coat of col
1
Earthwork in excavation 1
2 PCC in foundation 1
Ist class brickwork in
foundation
Step 1 1
3
step 2 1
step 3 1
Step 4 1
Total
4 DPC
5 Ist Class brickwork in
superstructure 1
6 Plastering Inside 1
Outside 1
7
Top 1
Total
White wash Inside 1
8 White wash Outside 1
White wash Top 1
Total
9 Colour wash Inside 1
Total
Add
Contingency 3%
Add work
charge
establishment 2%
Overall
cost
an and elevation given use following specifications
00 Rs /m^3
4)@390 Rs /m^2
de and top @15 Rs /m^2
2 with one coat of colour wash @11 Rs /m^2
@ 9Rs /^2
M
Quantity Unit Remarks
Height is
from ground
level till
11.52 M^3 bottom
1.92 M^3
ELEVATION /PLA
2.52
1.8
1.5
1.44
7.26 M^3
1.8 M^2
6.12 M^3
20.4 M^2
22.8
1.8
24.6 M^2
20.4
22.8
1.8
45 M^2
20.4 M^2
Amount Unit
4320
729.6
3D VIEW
2178
36
2386.8
244.8
342
27
405
224.4
10893.6 RS
326.808 RS
217.872 RS
11438.28 RS
00 Rs /m^3
4)@390 Rs /m^2
de and top @15 Rs /m^2
2 with one coat of colour wash @11 Rs /m^2
@ 9Rs /^2
M
Quantity Unit Remarks
Height is
from ground
level till
M^3 bottom
M^3
M^3
M^2
M^3
M^2
M^2
0 M^2
M^2
Amount Unit
RS
RS
RS
RS
00 Rs /m^3
4)@390 Rs /m^2
de and top @15 Rs /m^2
2 with one coat of colour wash @11 Rs /m^2
@ 9Rs /^2
M
Quantity Unit Remarks
Height is
from ground
level till
M^3 bottom
M^3
M^3
M^2
M^3
M^2
M^2
0 M^2
M^2
Amount Unit
RS
RS
RS
RS
ELEVATION /PLAN
3D VIEW