0% found this document useful (0 votes)
29 views2 pages

Structure Type Description: LVUP - 90+278

The document contains design details for several infrastructure projects including bridges and elevated railways. It includes the design of bearings, deck slabs, girders, foundations, abutments, piers, and overall structural drawings for structures numbered LVUP_106+062, LVUP_90+278, Interchange _19+709, ROB_48+486, and an elevated railway named Railway Elevated (HRIDC). Calculations relate to pre-stressing, ultimate load capacity, and foundation sizing. Corresponding drawings are provided for the substructure and superstructure of each structure.

Uploaded by

Raghwinder Gupta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views2 pages

Structure Type Description: LVUP - 90+278

The document contains design details for several infrastructure projects including bridges and elevated railways. It includes the design of bearings, deck slabs, girders, foundations, abutments, piers, and overall structural drawings for structures numbered LVUP_106+062, LVUP_90+278, Interchange _19+709, ROB_48+486, and an elevated railway named Railway Elevated (HRIDC). Calculations relate to pre-stressing, ultimate load capacity, and foundation sizing. Corresponding drawings are provided for the substructure and superstructure of each structure.

Uploaded by

Raghwinder Gupta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Structure Type Description

Design of POT PTFE Bearing for LVUP_106+062


Design of Deck slab for LVUP_106+062
Design calculation of PSC outer girder design of LVUP_106+062(Inferior
Pre stressing & Ultimate checks)
Design calculation of PSC outer girder design of LVUP_106+062(Superior
LVUP_106+062 Pre stressing & Ultimate checks)
Design Calculation of Abutment foundation for LVUP_106+062
Design Calculation of Portal cap for LVUP_106+062
Drawings of LVUP_106+062(Substructure & Superstructure)

Design of POT PTFE Bearing for LVUP_90+272

Design of Deck slab for LVUP_90+272

Design calculation of RCC girder design for LVUP_90+272

Design Calculation of Abutment foundation for LVUP_90+278


LVUP_90+278
Design Calculation of Abutment foundation for LVUP_90+278

Design Calculation of Portal cap for LVUP_90+278

Drawings of LVUP_90+278(Substructure & Superstructure)

Design of POT PTFE Bearing for Interchange _19+709

Design of Deck slab for Interchange _19+709

Design calculation of PSC outer girder design of Interchange


_19+709(Inferior Pre stressing & Ultimate checks)
Design calculation of PSC outer girder design of Interchange
_19+709(Superior Pre stressing & Ultimate checks)
Design Calculation of Abutment foundation for Interchange _19+709
Interchange _19+709

Design Calculation of Portal cap for Interchange _19+709

Design Calculation of Pier foundation for Interchange _19+709

Design Calculation of Portal cap for Interchange _19+709

Drawings of Interchange_19+709(Substructure & Superstructure)

Design of PSC girder 38m superior for ROB_48+486


Design of PSC girder 38m Inferior for ROB_48+486

Design of Deck slab for ROB_48+486

Design of Bearing for ROB_48+486

Drawings of Superstructure
ROB_48+486
Design of Abutment (A1+A2)

Design of Pier (P1+P2)

Design of Pier (CP1,CP2,CP3)

Drawings of Substructure and foundation

Design of Abutment of Railway Elevated

Design of Pier (P93, P96, P138, P140, P173, P175, P190, P193) of Railway
Elevated
Design of Pier (P94, P95, P139, P174, P191, P192) of Railway Elevated
Railway Elevated (HRIDC)
Design of Pier (P1-P45,P46-P92,P97-P137,P141-172,P176-P189,P194-
P212) of Railway Elevated
Drawings of Railway Elevated

You might also like