The document contains a project schedule with 17 tasks and their details like duration, cost, start date, finish date etc. It shows that the overall project is 25% complete and is scheduled to finish on 18 March 2021. Task A is the first task which started on 21 December 2020 and finished on 1 January 2021. Most of the other tasks are scheduled to start on 4 February 2021. The resources assigned to various tasks are ABI, JAI, LIZ, ABEL and JOY.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views

08akshaya Lab2

The document contains a project schedule with 17 tasks and their details like duration, cost, start date, finish date etc. It shows that the overall project is 25% complete and is scheduled to finish on 18 March 2021. Task A is the first task which started on 21 December 2020 and finished on 1 January 2021. Most of the other tasks are scheduled to start on 4 February 2021. The resources assigned to various tasks are ABI, JAI, LIZ, ABEL and JOY.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

Name Duration Actual Cost SPI Early Start Percent Complete

1 Project 64 days Rs.115000.00 0.0 2 1 / 1 2 / 2 0 8 : 0 0 A M 25%


2 A 10 days Rs.60000.00 1.0 21/12/20 8:00 AM 100%
3 B 5 days Rs.10000.00 1.0 4/1/21 8:00 AM 100%
4 C 6 days Rs.12000.00 1.0 4/1/21 8:00 AM 100%
5 D 7 days Rs.21000.00 1.0 4/1/21 8:00 AM 100%
6 E 8 days Rs.12000.00 0.5 4/1/21 8:00 AM 50%
7 F 1 day Rs.0.00 0.0 14/1/21 8:00 AM 0%
8 G 7 days Rs.0.00 0.0 15/1/21 8:00 AM 0%
9 H 6 days Rs.0.00 0.0 26/1/21 8:00 AM 0%
10 I 4 days Rs.0.00 0.0 15/1/21 8:00 AM 0%
11 J 4 days Rs.0.00 0.0 15/1/21 8:00 AM 0%
12 K 1 day Rs.0.00 0.0 3/2/21 8:00 AM 0%
13 L 30 days Rs.0.00 0.0 4/2/21 8:00 AM 0%
14 M 28 days Rs.0.00 0.0 4/2/21 8:00 AM 0%
15 C 15 days Rs.0.00 0.0 4/2/21 8:00 AM 0%
16 O 25 days Rs.0.00 0.0 4/2/21 8:00 AM 0%
17 P 1 day Rs.0.00 0.0 18/3/21 8:00 AM 0%

Lab Exam - page1


Baseline Cost Cost Start Finish Critical Early Finish Free Slack
Rs.431000.00 Rs.431000.00 2 1 / 1 2 / 2 0 8 : 0 0 A M 18/3/21 5:00 PM 18/3/21 5:00 PM 0 days
Rs.60000.00 Rs.60000.00 21/12/20 8:00 AM 1/1/21 5:00 PM 1/1/21 5:00 PM 0 days
Rs.10000.00 Rs.10000.00 4/1/21 8:00 AM 8/1/21 5:00 PM 8/1/21 5:00 PM 3 days
Rs.12000.00 Rs.12000.00 4/1/21 8:00 AM 11/1/21 5:00 PM 11/1/21 5:00 PM 2 days
Rs.21000.00 Rs.21000.00 4/1/21 8:00 AM 12/1/21 5:00 PM 12/1/21 5:00 PM 1 day
Rs.24000.00 Rs.24000.00 4/1/21 8:00 AM 13/1/21 5:00 PM 13/1/21 5:00 PM 0 days
Rs.6000.00 Rs.6000.00 14/1/21 8:00 AM 14/1/21 5:00 PM 14/1/21 5:00 PM 0 days
Rs.14000.00 Rs.14000.00 15/1/21 8:00 AM 25/1/21 5:00 PM 25/1/21 5:00 PM 6 days
Rs.12000.00 Rs.12000.00 26/1/21 8:00 AM 2/2/21 5:00 PM 2/2/21 5:00 PM 0 days
Rs.12000.00 Rs.12000.00 15/1/21 8:00 AM 20/1/21 5:00 PM 20/1/21 5:00 PM 9 days
Rs.12000.00 Rs.12000.00 15/1/21 8:00 AM 20/1/21 5:00 PM 20/1/21 5:00 PM 9 days
Rs.6000.00 Rs.6000.00 3/2/21 8:00 AM 3/2/21 5:00 PM 3/2/21 5:00 PM 0 days
Rs.60000.00 Rs.60000.00 4/2/21 8:00 AM 17/3/21 5:00 PM 17/3/21 5:00 PM 0 days
Rs.56000.00 Rs.56000.00 4/2/21 8:00 AM 15/3/21 5:00 PM 15/3/21 5:00 PM 2 days
Rs.45000.00 Rs.45000.00 4/2/21 8:00 AM 24/2/21 5:00 PM 24/2/21 5:00 PM 15 days
Rs.75000.00 Rs.75000.00 4/2/21 8:00 AM 10/3/21 5:00 PM 10/3/21 5:00 PM 5 days
Rs.6000.00 Rs.6000.00 18/3/21 8:00 AM 18/3/21 5:00 PM 18/3/21 5:00 PM 0 days

Lab Exam - page2


20 Dec 20 27 Dec 20 3 Jan 21 10 Jan 21 17 Jan 21 24 Jan 21
Total Slack Predecessors Resource Names
T WT F S S M T WT F S S M T WT F S S M T WT F S S M T WT F S S M T WT F S S M T WT
0 days
6 days ABI;JAI ABI;JAI

9 days 2 LIZ LIZ

8 days 2 JAI JAI

7 days 2 ABEL ABEL

6 days 2 JOY JOY

6 days 6;5;4;3 ABEL;JOY ABEL;JOY

6 days 7 LIZ LIZ

0 days 7 LIZ
9 days 7 ABEL ABEL

9 days 7 JOY JOY

0 days 11;10;9;8 ABEL;JOY


0 days 1 2 JAI
2 days 1 2 LIZ
15 days 1 2 ABEL
5 days 1 2 JOY
0 days 16;15;14;13 ABI;JAI

Lab Exam - page3


24 Jan 21 31 Jan 21 7 Feb 21 14 Feb 21 21 Feb 21 28 Feb 21 7 Mar 21 14 Mar 21 21 Mar 21 28 Mar 21 4 Apr 2
S M T WT F S S M T WT F S S M T WT F S S M T WT F S S M T WT F S S M T WT F S S M T WT F S S M T WT F S S M T WT F S S M T WT F S S M T

LIZ

LIZ

ABEL;JOY

JAI

LIZ

ABEL

JOY

ABI;JAI

Lab Exam - page4


4 Apr 21 11 Apr 21 18 Apr 21
F S S M T WT F S S M T WT F S S

Lab Exam - page5