0% found this document useful (0 votes)
46 views1 page

Bill of Quantities and Cost: 420.00 WO Including Markup of 10% Total WO

This document provides a bill of quantities and cost for work requested at the Rulers Representative old and new courts facility. It includes one item, inner reinforcement for a gate barrier, with a quantity of one, a unit rate of 420 AED, and a total value of 420 AED. The total work order including a 10% markup is 420 AED. The work is expected to be completed within 7 days.

Uploaded by

fairoos ali
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
46 views1 page

Bill of Quantities and Cost: 420.00 WO Including Markup of 10% Total WO

This document provides a bill of quantities and cost for work requested at the Rulers Representative old and new courts facility. It includes one item, inner reinforcement for a gate barrier, with a quantity of one, a unit rate of 420 AED, and a total value of 420 AED. The total work order including a 10% markup is 420 AED. The work is expected to be completed within 7 days.

Uploaded by

fairoos ali
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Bill of Quantities and Cost

Date:
Helpdesk Request Number: GMC23:33014 Date of Request:23/6/2020 Requested by : Muhammed Haneef
Facility Name: Rulers Representative old and new courts Facility Code: H8004 Expected execution dates:7days

Type of
Total Value of the contract
Item Ref. No. Description Location Qty. Unit Unit Rate Comments
Contractor (WO/Tender)

Inner Rerinforcement for Gate Barrier GARD series, 100mm diameter round
M01787 Back Side Entrance 1.00 no's 420.00 420.00
arm

Total WO 420.00
WO Including markup of 10%

BOQ-33014/BOQ Page 1 of 1