Construction Project Working Site of Environmental Pollution and Countermeasures
Construction Project Working Site of Environmental Pollution and Countermeasures
Introduction
Since the reform and opening up, the role of the construction industry in China play an important
economic development, with the rapid development of national economy, the construction industry
has become a pillar industry of China's economic development. Although the construction industry
has brought great opportunities for the development of the national community, but has produced a
large number of pollutants in the course of construction, it has seriously affected the quality of life
of the people, but also destroyed the balance of ecological environment. How to effectively solve
the construction of environmental problems have gradually become the focus of attention.
formaldehyde concentration of BTEX was still seriously overweight. Pollutants produced building
materials for the body's nervous system, blood system, respiratory system, reproductive system, etc.
will produce great harm.
dust pollution
Dust is a major source of surface dust, but also to measure an important indicator of air quality of
the urban environment. Construction dust pollution mainly refers to the construction site leveling
operations, cement transport, concrete mixer, carpentry room sawdust, lime, stone and backfill yarn
and other building materials in transportation, stacking and use, due to human or some
meteorological factors. Dust great impact on human lungs, once inhaled into the lungs, it will
irreversibly permanent retention, until death.
waste pollution
Building solid waste emissions from large, wide scope and far-reaching, difficult to degrade and
persist in the soil will alter soil characteristics, not only the beauty of damage to the environment,
the impact of appearance of the city, harm to human health, contamination of soil and ground water,
reduce land economy value and so on. Waste pollution is mainly composed of soil, sediment,
scattered mortar and concrete, masonry and concrete fragments tick chisel generated waste piling
cut under reinforced concrete pile head, metal, bamboo wood, decoration produced a variety of
building materials packaging and garbage and so on.
Light Pollution
Light pollution is a common building Following contaminated waste gas, waste water, waste and
noise, and a new source of environmental pollution, light pollution at construction site mainly refers
to the arc welding emitted light at night during the construction, etc. These Light pollution can
sometimes affect people's normal sleep, some even once shine directly on the human eye, there is
the danger caused by blind.
Emissions of hazardous waste
Construction site hazardous waste category is very large, such as chemical waste materials (often
toxic) and its packaging, waste aluminum foil, industrial cotton, oil gloves, oil cotton cloth, paint
brush, scrap thermometers (mercury ); laboratory waste bottles (mainly potassium dichromate,
sodium hydroxide, potassium hydroxide, acid, etc.); waste on-site cleaning tools, machinery
maintenance liquid waste (some containing heavy metal ions); office waste copy pape r, copier
waste cartridges, ribbons of waste, waste batteries, waste disk, calculators waste, waste fluorescent
tubes and so on.
construction site is completed before performing masonry walls, noise protection for sensitive target
adjacent side noise reduction pre- installed security curtain around. Strengthen man-made noise
control, eliminate human beat, loud noises. Secondly, according to the characteristics of the
construction phase, a reasonable layout of the construction site, will produce high noise machinery
and equipment disposed on the side away from the sound environmental protection goals. Then, try
to choose low-noise muffler or with construction machinery equipment, adopt environmentally
friendly working methods. Construction site construction vehicle access point should be kept
away from sensitive sites, vehicle access to the site should be low, Jinming. Promoting the use of
ready-mixed concrete. Strengthen the construction machinery inspection, repair and maintenance, to
avoid mechanical failures run and generate abnormal noise pollution. Finally, strengthening the
construction site noise monitoring, to achieve the purpose of the construction is not disturbing.
In terms of dust, but also to do science and technology-based, first, construction, living and work
area equipped with hand watering hardening road sweeping to control dust. Second, prohibit mixing
of concrete at the construction site, always use the ready- mixed concrete; dust material transport
should be limited to the height, and the surface is sprayed with water and cover to prevent dust
pollution. Third, the floor waste removal, is strictly prohibited to throw out garbage from floor
surface. Fourth, the construction site used for decoration as much as possible the use of
semi- finished raw materials (such as plaster), reduce dust. Fifth, centralized dust sifting, mixing and
set enclosure, reducing pollution of the surrounding environment.
In wastewater treatment: wastewater settling ponds should be set in advance to import pro hibited
directly discharged into the city sewer and river; sewage should be discharged into municipal
sewage pipe network, together with the construction of waste water treated by the sewage treatment
plant; for all types of vehicles, Fuel equipment used motor oil and lubricants should strengthen the
management, all waste grease have to focus; paint, oil and other chemical materials polluting the
classified storage, with sand, shovel, child care and other oil pan to prevent leakage caused by
chemical contamination .
In terms of solid waste prevention: first, construction and garbage should be concentrated into a
garbage tank, respectively, adequate coverage and timely removal; and second, the waste generated
by carpentry work should be timely recovery of removal; and thirdly, electric welding scrap and
waste Packaging materials should be collected, unified treatment; fourth, the scene of metal scrap
should be collected into the pool. Effectively reduce light pollution: a reasonable preparation of
construction work planned; try to choose lower-power lighting; lighting plus set shade, light
direction concentrated in the construction area, the irradiation direction away from the residents;
and take measures to block the welding work, welding arc avoid leakage.
Conclusion
In short, with the improvement of the quality of citizens civilization, environmental awareness is
enhanced, citizens in the face of building construction pollution problems, the performance of more
and more tough. Construction companies due to construction accidents disputes and increasing pay
compensation to the enterprise also caused some damage. "Sustainable development and
environmental protection" is the theme of our times, construction companies only fully aware of
this point, to take the necessary measures to actively eliminate and reduce pollution during
construction, will inevitably win-win results.
References
[1] GuoZhi Xin Talking about the construction of Environmental Pollution and Control Measures
[j] Science and Technology Innovation Herald .2012 (01): 208-210
[2] YuPing Li Construction environmental analysis and Green Construction Management Method [j]
Science and Technology Innovation Herald .2010 (35): 315-317. Measures
[3]ChaoYuan Luo Measures to eliminate the construction of environmental pollution and safety
issues [j]Towns Construction .2009 (04): 211-213
[4] Yue Lin Niu, FengPing Luo etc. On the construction site of the Environmental Pollution and
Control Measures [j] Resources Environment & Engineering .2006,20 (03): 114-116