0% found this document useful (0 votes)
291 views

PRMGT - Assignment Guide (Individual)

The document outlines an individual assignment involving identifying project issues from a case study and mapping appropriate tools and techniques from the PMBOK standards to address the issues. Specifically, it requires identifying 3 unique issues from the case study and proposing tools and techniques from 2 knowledge areas to resolve each. Samples of the proposed tools and techniques must also be provided in the required format and justified in how they relate to resolving the issues from the case study.

Uploaded by

Volticz
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
291 views

PRMGT - Assignment Guide (Individual)

The document outlines an individual assignment involving identifying project issues from a case study and mapping appropriate tools and techniques from the PMBOK standards to address the issues. Specifically, it requires identifying 3 unique issues from the case study and proposing tools and techniques from 2 knowledge areas to resolve each. Samples of the proposed tools and techniques must also be provided in the required format and justified in how they relate to resolving the issues from the case study.

Uploaded by

Volticz
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

INDIVIDUAL COMPONENT

1. PMBOK Standards (70%)


o Each individual to identify 3 Project Issues from Case Study (#2 to #18, unique to each
member of the team) and identify Tools & Techniques that are able to resolve the
respective project issues. (30%)
o Map the Tools & Techniques to respective process groups and knowledge areas of
PMBOK Standard. (10%)
o Analyze and justify your selections of Tools and Techniques (30%) – Relate to Case Study
(Duration, scale, objectives, etc.)
2. Tools & Techniques Samples (30%)
o Provide sample of the tools & techniques selected for each issue addressed which
should relate to the assignment case study. (Format, template, filled in with actual
information)
1. PMBOK Standards
a) Three selected issues must be from at least two different Process Groups

b) Each selected issue must have proposed tools and techniques from two Knowledge Areas

Issue Tools & Process Process Knowledge


Techniques Groups Areas
1. The steering committee Project Develop Initiating Integration
(which consist of the board of Charter Project Management
directors, CEO and Senior Charter
Managers of the organisation
do not recall of being Meeting Plan Scope Planning
presented the project Management Scope
feasibility study by the Project Management
Sponsor or the Project
Manager to them.
2. xxxxx
3. yyyy

Justification #1

The Project Sponsor and/or Project Manager shall call for a meeting with the Steering Committee and
have a briefing on the project. The Project Charter is a document comprise of all the relevant
information about the project which was approved by the project sponsor and agreed with the project
manager. It is an approval to the project manager to go ahead with the project. Hence, the Project
Charter shall be used to brief the steering committee

Justification #2

xxxx

Justification #3

Yyyyy
2. Tools & Techniques Samples

Issue #1

- Project Charter sample template


- Agenda of Meeting

Issue #2

- xxxxxxx sample template


- zzzzzzz

Issue #3

- yyyyyy sample template