Quality Control System Using Simple Implementation
Quality Control System Using Simple Implementation
Quality Control System using Simple Implementation of Seven Tools for Batik Textile
Manufacturing
This content has been downloaded from IOPscience. Please scroll down to see the full text.
(http://iopscience.iop.org/1757-899X/215/1/012028)
View the table of contents for this issue, or go to the journal homepage for more
Download details:
IP Address: 191.101.95.15
This content was downloaded on 28/07/2017 at 07:11
Modification of chitosan by swelling and crosslinking using epichlorohydrin as heavy metal Cr (VI)
adsorbent in batik industry wastes
B Hastuti, A Masykur and S Hadi
A case study of electrostatic accidents in the process of oil-gas storage and transportation
Yuqin Hu, Diansheng Wang, Jinyu Liu et al.
Automatic recognition of defect areas on a semiconductor wafer using multiple SEM images
Ryo Nakagaki, Toshifumi Honda and Koji Nakamae
MOIME 2017 IOP Publishing
IOP Conf. Series: Materials Science and Engineering 215 (2017) 012028 doi:10.1088/1757-899X/215/1/012028
1234567890
Abstract. In order to produce better products and mitigate defect in products, every company
must implement a quality control system. Company will find means to implement a quality
control system that is capable and reliable. One of the methods is using the simple
implementation of the seven tools in quality control defects. The case studied in this research
was the level of disability xyz grey fabric on a shuttle loom 2 on the Batik manufacturing
company. The seven tools that include: flowchart, check sheet, histogram, scatter diagram
combined with control charts, Pareto diagrams and fishbone diagrams (causal diagram). Check
sheet results obtained types of defects in the grey fabric was woven xyz is warp, double warp,
the warp break, double warp, empty warp, warp tenuous, ugly edges, thick warp, and rust.
Based on the analysis of control chart indicates that the process is out of control. This can be
seen in the graph control where there is still a lot of outlier data. Based on a scatter diagram
shows a positive correlation between the percentage of disability and the number of production.
Based on Pareto diagram, repair needs priority is for the dominant type of defect is warp (44%)
and based on double warp value histogram is also the highest with a value of 23635.11 m. In
addition, based on the analysis of the factors causing defect by fishbone diagram double warp
or other types of defects originating from the materials, methods, machines, measurements,
man and environment. Thus the company can take to minimize the prevention and repair of
defects and improve product quality.
Keywords: quality control, seven tools, batik manufacturing, defective products
1. Introduction
The growing global market introducing a competition between companies in providing high quality
products in accordance with the wishes of the consumer. Due to the increasing consumer demand for
certain products led to the company strives to meet the needs of consumers, thus demanding the
company strives to improve the quality of its products. Judging from the views of consumers,
subjectively people say the quality is something that is suited to the taste (fitness for use) [1]. With the
good quality products, the company will benefit in terms of marketing and satisfaction of consumers.
Although the company has been striving hard to make a high quality product produced products must
have disabilities. Defective product is one of the common problems shared by all companies. Usually
a defective product contained in a product produced physical changes that are not in accordance with
prescribed standards due to causes in the production process as well as other causes. Disability
products may be due to the factors of machines, humans or the environment. Product defects can also
cause loss of the company such as cost and production time. Moreover, if many defective products
produced, it will increase the cost for repairs and other expenses. Not only that, defective products also
reduce the selling price. In order to cope with product defects each company must have a quality
Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution
of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.
Published under licence by IOP Publishing Ltd 1
MOIME 2017 IOP Publishing
IOP Conf. Series: Materials Science and Engineering 215 (2017) 012028 doi:10.1088/1757-899X/215/1/012028
1234567890
control department that is in charge of checking whether there is a defect of the product before it is
marketed.
This company is engaged in textiles also experienced defective products. Products produced by this
company is grey cloth (calico cloth), and Batik fabric (fabric for batik material). The company also has
a quality policy for orientation in its business activities. To respond with the often discovery of
defective fabric products therefore it is necessary to control the quality of the existing products so that
later can reduce defective products. One basic way in quality control of products is to make
corrections to the elements concerned with the production and evaluation of the results. So with the
correct quality control company will know how to deal with the problem there and get a result that is
useful for subsequent excretion process. One of the tool that can be used is quality control system
using simple implementation of seven tools. This seven tools includes flowchart, check sheet,
histogram, scatter diagram combined with control charts, Pareto diagrams and fishbone diagrams
(causal diagram).
From the above purposes, for reducing and preventing of defects, researchers will conduct research on
quality control in cloth/textile product in Batik Company. Hence the title that will be raised is
“Quality Control System using Simple Implementation of Seven Tools for Batik Textile
Manufacturing”.
2. Literature review
2
MOIME 2017 IOP Publishing
IOP Conf. Series: Materials Science and Engineering 215 (2017) 012028 doi:10.1088/1757-899X/215/1/012028
1234567890
Scatter Diagram
Scatter diagram is a useful tool to clarify whether there is a relationship between two variables,
and whether the relationship is positive or negative [7].
Control chart
Control chart is a tool in the form of process control charts to determine the upper control limit
(upper limit control) and lower control limit (lower limit control) process performance [4].
In the quality control of products, often used Quality Control Chart. With chart or a control chart
can be known immediately whether the quality of the goods being processed under or out of
control. Control chart or map control is a graphic comparison of data performance process (test
results/observations of the nature of the product), for calculating limit control which is described
as a limit line on the map. The main objective of Control Chart is to determine whether there
uniformities that can be avoided in the process. The types of control charts, there are 5 types:
- X - Chart,a chartis that used for an average price, and chart thisis the most frequently used.
- R - Chart, used alongside the X - Chart, intended to show the magnitude of the variation of
each subgroup.
- P - Chart, used to indicate the value of the defect (percent defective).
- Pn - Chart, is used to control the number of defects with sample values fixed size.
- C - Chart, used to indicate the number of times the value of the actual defect (not in percent)
per piece or per unit.
Pareto diagram
Charts Pareto are used to classify problems according to cause and symptoms [8]. Problems
were depicted by priority or importance, using a bar graph format, where 100% indicates a total
loss. The underlying principle of this diagram is the '80 -20 rule 'which states that "80% of the
trouble comes from 20% of the problems'.
3
MOIME 2017 IOP Publishing
IOP Conf. Series: Materials Science and Engineering 215 (2017) 012028 doi:10.1088/1757-899X/215/1/012028
1234567890
3. Methods
This study was conducted in Batik Textile Manufacturing Company. The resulting product is a yarn
clothes, grey cotton, cambric (bleaching, mercerized, Sanforized).
The first stage of the research is done in the field observations, in the shop floor. In this observation
phase researchers will conduct direct observation to see all production activities in the company.
After making observations the next step is to identify the problem, researchers will know the
problems-problems that occur in the company. In this research focus is the problem identification
shuttle loom two departments that have problems in production on disability production so it needs to
be quality control of products.
After looking for theories that could be used as a support and research support to match the existing
theory and workable, next is the data collection. The required data are flawed product data for the
month of a certain month in Shuttle loom 2. Data have been collected covering total production, the
type of defect and the number of defects cheek sheet then combined in a useful order for the data
neatly and concisely. After it makes a comparison chart between the amount of production and the
number of defects in order to determine the level of the comparison.
The next step is data processing, At this stage there are a few sequences in the data processing that is
the first to calculate and determine the value of upper and lower control limits of the product are used
to determine whether the process that has been known to be in a controlled or uncontrolled. The
second is to create a scatter diagram to see the positive and negative relationship between two
variables: the amount of production and the number of defects. The third is to identify the highest type
of disability through the histogram. The fourth is to create Pareto diagram is used to classify problems
according to cause and symptoms. The fifth is to identify the most influential defects and identify the
cause. Sixth, once known cause then create fishbone diagrams or cause-effect diagram which is useful
as a tool to identify problems and provide solutions to improvement or change in the object studied.
In the discussions, the researcher will discuss and analyse the overall results of the data processing
method of the seven tools. From this analysis, researchers will find out what the cause of the defect
can cause problems in production.
Lastly is the conclusions and suggestions, which conclusion is the result of that will be missed from
the formulation of the problem has been determined. While the advice is input and solutions to related
parties are expected to be useful for future evaluation.
4
MOIME 2017 IOP Publishing
IOP Conf. Series: Materials Science and Engineering 215 (2017) 012028 doi:10.1088/1757-899X/215/1/012028
1234567890
From the data on known types of defects are often found in xyz grey cloth that has been set by the
company, the type of defect, respectively are:
Unwoven weft weaving is a type of defect in which there is no pitch thread woven perfectly
due to several reasons.
Double wrap is a type of defect in which yarn that goes double numbering resulting in woven
wicker is not perfect.
Wrap breaking out is a type of defect in which there are broken threads in woven wicker
resulting imperfect.
Double woven is a type of defect in which there is a thread that is woven thick double that
grounds exist on the surface of the fabric.
Empty woven is a type of defect in which there is a part of the fabric that is discharged from
the turn of the pallet is not perfect during the weaving process.
Warp sprawl is a type of defect which occurs apart on the fabric.
An ugly edge where the defect type on the edge of the fabric is not woven well.
Warp thick is a type of defect in which there is a thread that is woven with thick, so there is a
thick line on the surface of the fabric.
Karat is a type of defect in which there are rust stains on the fabric, this is due to rust obtained
from the engine when the fabric weaving process.
Here is a graph illustrating the amount of production and the number of defective products in
the grey cloth xyz starting on day 2 to day 31, is as follows
5
MOIME 2017 IOP Publishing
IOP Conf. Series: Materials Science and Engineering 215 (2017) 012028 doi:10.1088/1757-899X/215/1/012028
1234567890
4.1. C-Chart
The C Chart control data will be shown on the next table.
Table 2. C-Chart control data
Total
production Total Cacat UCL CL LCL
number
160221 53572,02 2044,51 1913,29 1782,06
Average 5722,17 1913,29
Once known the value of the upper limit (UCL), a middle value (CL) and the lower control limit
(LCL), later described the results of calculation of a control chart that has been created as the
following chart
Fig 4. C-Chart
6
MOIME 2017 IOP Publishing
IOP Conf. Series: Materials Science and Engineering 215 (2017) 012028 doi:10.1088/1757-899X/215/1/012028
1234567890
4.2. Histogram
So the correlation coefficient between the total production and total production defects is 0.4923
means that the two variables have a fairly close relationship because if the value of r> 0 means that
there is a positive relationship. Close to 1 means a strong relationship. If made into a scatter diagram
of the shape as shown below:
Percentage Cumulative
Defect Type Frequency
from Total Percentage
Double Warp/Pakan Double 23635,11 44% 44%
Warp Break/Lusi Putus 9631,43 18% 62%
Double WarpLusi Double 7447,25 14% 76%
Warp tunous/Pakan
7233,16 14% 89%
Renggang
Unwoven Warp/Pakan Tak
2071,08 4% 93%
Teranyam
Thick Warp/Pakan Tebal 1316,68 2% 96%
Empty Warp/Pakan Kosong 1017,46 2% 98%
7
MOIME 2017 IOP Publishing
IOP Conf. Series: Materials Science and Engineering 215 (2017) 012028 doi:10.1088/1757-899X/215/1/012028
1234567890
After an inventory of the problems and unknown factors cause of the defect under 5M 1E, then do
manufacture fishbone diagram, that also had been combined with 5 W (what, why, when, who and
where), 1 how and 5 whys.
The Pareto analysis and fishbone diagram would enhance company to explore the root cause of the
problem identified as shown in the fig 8. This result is similar for building remediation contractor for
elimination problem [15].
5.1. Conclusions
The types of defects that occur in grey cloth warp xyz is not woven, warp double, dropping
out of warp, weft double, empty warp, warp tenuous, ugly edges, thick fodder, and rust. And
8
MOIME 2017 IOP Publishing
IOP Conf. Series: Materials Science and Engineering 215 (2017) 012028 doi:10.1088/1757-899X/215/1/012028
1234567890
of the various types of disabilities that are categorized by the company, the most common
defect is a defect warp double the percentage value of 44%.
Based on the analysis of the fishbone diagram above, it can be seen that there are several
factors causing the defect types that double warp material, human, machine, and environment
management. Hence there is need for improvement and evaluation of the company.
Efforts need to be made by the company in order to reduce defects in the fabric of gray xyz
types are
- In terms of the company's material should be tightened and more thoroughly in attention and
choose the quality of the raw material fabric
- n terms of human or workers in the company will have to give directions or training to them
in order to improve performance and improve the regulation and strict supervision over
again so that the workers could work properly
- In terms of engine actions that must be done is to improve the care and cleaning of the
machine regularly
- In terms of its working methods should be the elements of the company's more obedient
again and adhere to the SOP that has been applied
- In terms of the measurement of the company should be more attention to measurement of the
testing equipment so as to meet the standards in the company so as to produce a desired
output quality
- In terms of the environment should the company further improve the implementation of 5S
workplace culture that covers everything about the company's environmental conditions.
5.2. Recommendations
The result shown that the seven tools could be effectively used in this company, and therefore,
seven tools could be implemented in other garment industry and duplicated the same method.
Companies should improve the quality of raw materials according to the standard specified
Companies should improve control over the performance of its employees in order to avoid
deterioration in performance and negligence at work
Perform routine engine maintenance, and pay attention to cleanliness of the engine so that the
engine is not damaged or distractions while walking
Follow standard operating procedures that have been defined
Perform calibration routine within 6 months-12 months
Evaluate the working environment such as lighting and 5s for workplace [10].
6. Reference list:
9
MOIME 2017 IOP Publishing
IOP Conf. Series: Materials Science and Engineering 215 (2017) 012028 doi:10.1088/1757-899X/215/1/012028
1234567890
[11] Magar, V.M. and Shinde, V.B., 2014. Application of 7 Quality Control (7 QC) Tools for
Continuous Improvement of Manufacturing Processes. International Journal of Engineering
Research and General Science Volume 2, Issue 4, June-July, 2014
[12] Sokovic, M., Jovanovic, J., Krivokapic, Z., and Vujovic, A., 2009. Basic Quality Tools in
Continuous Improvement Process. Strojniški vestnik - Journal of Mechanical Engineering
55(2009)5.
[13] Pavletic, D., Sokovic, M., and Paliska, G., 2008. PRACTICAL APPLICATION OF QUALITY
TOOLS. 2nd International Quality Conference, Kragujevac.
[14] Ograjensek, Irena, 2002. Applying Statistical Tools to Improve Quality in the Service Sector.
Developments in Social Science Methodology. Metodološki zvezki, 1 8, Lj ublj ana: FDV,
2002.
[15] Panthi, K., and Ahmed, S.M., 2008. Application of Quality Tools to Improve Quality: A Case
Study of a Building Remediation Contractor. In ASC Proceedings of the 44th Annual
Conference, Auburn University, April 2-5.
10