Weekly Work Progress Report For PAL-Zone

This document provides an overview of ongoing construction projects for PAL-Zone Company. It lists 22 projects with details on project name, code, building type, area, total cost, start date, and finish date. The construction status and remarks for each project are also noted. The projects range from 12-100% completion and include buildings like ETP structures, sheds, roads, and more.

Uploaded by

Mobin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
61 views8 pages

Weekly Work Progress Report For PAL-Zone

This document provides an overview of ongoing construction projects for PAL-Zone Company. It lists 22 projects with details on project name, code, building type, area, total cost, start date, and finish date. The construction status and remarks for each project are also noted. The projects range from 12-100% completion and include buildings like ETP structures, sheds, roads, and more.

Uploaded by

Mobin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 8

On-going Project Activities For PAL-Zone

Company

Total
Building Project Cost
Project Name Project Code area Start date Finish date
Type (Lakh)
(sft)

P ETP-01 PAL RCC Structure 18,000 12.46 25/08/020 15/11/020

P ETP-02 PAL RCC Structure 15,000 178.00 10/09/020 30/06/021

Spice-01 Veranda RCC shed


extension building

P PAL 5,720 68.64 30/11/020

Single-storied
Spice Shed -01 RCC building
P PAL 42,000 200.50 15/10/020
Floor casting
P Spice Shed -01 Paint work
PAL 47,500 61.75 25/11/020
Floor Paint work
P Paint Work
Retort Bldg Roof NAL 11,200 19.89 20/10/020 05/11/020
top Paint work
P RCC Road RCC Road
casting work
PAL 7000 33.22 12/10/020 30/12/020

P M.Oil M/C base NAL RCC Foundation 200 5.24 24/09/020 25/10/020
Single-storied
RCC building
P Coconut shed NAL 7560 57.45 01/10/020 30/12/020
extension

P entrance Office work


facilities bar line PAL 4,180 13.34 03/10/020 20/11/020
at Noodles Bldg.
P 4 storied Wire RCC
house multistoried
PAL bldg. 36,000 1,280.00 15/11/020 30/12/021

RCC shed bldg.


Connection shed
between Spice PAL 1,200 17.25 10/11/020 30/12/020
Shed -01 & 02.
P Suger store Single-storied
extension RCC shed
PAL building 13,950 97.65 25/11/020 25/02/021

P Boiler Shed Single-storied


extension RCC shed
PAL building 1,440 15.84 17/10/020 30/01/021

PAL-02
Dist. Loading Single-storied
unloading point RCC building
with canopy PAL-2 3520 56.35 11/08/202 30/10/020
work.
Parking area with RCC drain and
drain work double
PAL-2 interlock block 10050 56.35 25/10/020 30/11/020

RCC bldg with


Air blower Room PAL-02
shed
450 5.40 01/10/020 15/12/020
P Macadam Road Development
with ETP work
surounding area PAL-02 6000 8.60 01/10/020 30/11/020
development
work

P Fuel dispenser PAL-2 285 10.93


P Dist. Loading Single-storied
unloading for RCC shed bldg.
Market return PAL-2 9000 81.00 02/11/020 30/01/021
shed

PDC Shahjadpur(PRAN-Depot)
P Chattle feed mill Single-storied
Shed RCC building
PDL 4,900 26/08/020 30/11/020

P Lacha production Single-storied


floor PDC RCC shed 4,000 20/08/020 20/10/020
P Bogra

Up coming Project(PRAN-Depot)
Develomnent
P Main Gate PAL work
OHWT shifting Develomnent
PAL work
Spice shed
internal all works PAL
Expeller & Ghani
M/C base NAL
Main gate
finished PAL-2
RCC road
PAL-2
M. oil bldg-2 PAL-2
AHU shed on the
Noodles roof top PAL
Printing M/C Ishwardi
AL-Zone

work
Construction Status Remarks
progress

1st face all work done……..2nd face work running.


As 1.Filter press base: Roof slab casting done, floor
casting done, b/w done plaster work done,……..2.
Pump base: Roof slab & floor casting done,……..3.
Chamical store: All RCC casting done, ceiling plaster
done, b/w done & plaster work done grill fitting
done & window profile pending.…4. Operator 95%
Room: All RCC casting done, B/w & plaster done,
grill, door fitting done & window profile pending.

TPI Work: 1st steap sheet pile work done 2nd


steap sheet pile done, breacing work done and
hopper bottom slab & inclined wall 1st lift casting
done 2nd lift casting done. Verticla wall 1st lift
casting done, deshuttering
ongoing..............Collection tank work: sheet pile 16%
work done but work is pending, it will start after tpi
part 60% casting done and sand filling.

Civil part:…...10 grid all RCC work done out of 13


grid, rest part work stopped due to compressor
room, It will be later. Brick work done plaster done..
…floor paint work ongoing.....Truss work:……Truss 98%
erection done, gate & grill work ongoing.

All floor casting done


100%
Floor paint work ongoing
80%
Work not start due to materials.
0%

RCC dismantling work 5% done, now work stopped


due to excavator chizzel problem.
5%

All work done 100%


All work done
Footing casting done 13# out of 17#, 4# pending
due to RCC pipe line relocated. g/b casting ongoing
and extra earth cutting work ongoing. Long column 22%
1st lift casting done & 2nd lift 70% done. Truss
work: Truss work ongoing Need RCC pipe line
remove & refitting.
we couldn’t get started because the decission
pending. Work is stopped due
to decision pending.
we will preparetion for work start 0%

Need materials
Existing all pit increase up to floor & floor filling 5%
ongoing Need to remove
obstacle materials &
pipe line
As discousion with GM sir it will start later.

RCC road dismantling work done, footing casting 15%


done, G/B casting done, 1st lift column casting
done, 2nd lift ongoing. Need to Floor
hardener cement
All civil work done and truss work also done now
gate fitting work pending due to sheet.
99% Handover without
parking area block &
drain
Drain work: Floor casting done, wall casting done
on side and rest side wall shutter work ongoing.
….Block work: Macadam done, Compaction done, 30%
block laying 50% done Contractor Manpower
short
Earth excavation work done, footing casting done
slab casting done. Curring work ongoing. 60%

All road work done guide wall pending


Need drawing for
90% guide wall

Location not selected 0%


Footing casting done, short column casting done, 12%
back filling done, floor filling ongoing & g/b rebar
placement ongoing.

Depot)
Footing, s/column, g/b floor sand filling & macadam
filling done, anchore bolt fitting done & casting also
done. And floor ready for casting.. Truss work pending 35%
due to contractor select.
Materials pending
All civil work done, floor chipping work done for tiles
work, tiles work ongoing, drain work ongoing. 65%

-Depot)
Need drawing, BOQ &
Financial approval.
T/Tank=03#
(10000ltr+10000ltr+50
00ltr=25000ltr)
Need working drawing
Approval donr but working drawing not finnal final,
Need BOQ & financial
Drawing ok approval.

Materials PR done.
Need layout &
finnancial approval.
Need drawing

BOQ ongoing
Need Drawing