Form - I: Proposed Construction Project of Santnagari
Form - I: Proposed Construction Project of Santnagari
for
by
1
(I) Basic Information
4. New/Expansion/Modernization. New
9. Location:
Village. Mahor
Tehsil. Vadali
District. Sabarkantha
State. Gujarat
10. Nearest railway station/airport along with Railway station: Taranga hill at approximately 15
Distance in kms. km from proposed site in WSW direction.
Vadali at approximately 18 km from proposed site
in E direction.
Airport: Ahmedabad at 100 km from the proposed
site in SSW direction.
11. Nearest Town, city, District Headquarters Idar around 20 km in SSE direction.
Along with distance in kms.
2
13. Registered address. Gujarat Pavitra Yatradham Vikas Road
Block-6/2, Dr. Jivaraj Mehta Bhavan, Gandhinagar-
382010.
15. Details of Alternative Sites examined if Not Applicable, as this location is selected based on
any. Location of these sites should be its merits on seismic and approachability. It is a
shown on a toposheet. wasteland hence the environmental impacts shall be
minimal.
21. Whether there is any Government For the Planning, Monitoring, Execution and
Order/Policy relevant/relating to the site? Maintenance of the project, a committee was
formed through Government Resolution No.
102014/1197/Y dated 18/11/2016 published by
Industries & Mines Department, Government of
Gujarat. GR and GO are for this project are
attached as additional attachments.
23. Whether there is any litigation pending There is no litigation pending against the project
3
against the project and/or land in which the and/or land in which the proposed project to be set
project is proposed to be set up? up.
(a) Name of the Court
(b) Case No.
(c) Order/Directions of the Court, if any
and its relevance with the proposed
project.
(II) Activity
Temporary sites used for construction Labour Camps with all sanitation facilities
1.7 works or housing of construction No will be provided at sites for labours during
workers? construction phase.
Construction of different pillars and other
Above ground buildings, structures or architectural structures, buildings. The
1.8 earthworks including linear structures, Yes excavation formed due to the
cut and fill or excavations. constructional activities is filled up with
same side.
Underground works including mining
1.9 No Not Applicable
or tunneling?
1.10 Reclamation works? No Reclamation is not required.
1.11 Dredging? No Not Applicable.
4
Details thereof (with approximate
Sr.
Information/Checklist confirmation Yes/No quantities /rates, wherever possible) with
No.
source of information data
1.12 Offshore structures? No Not Applicable.
5
Details thereof (with approximate
Sr.
Information/Checklist confirmation Yes/No quantities /rates, wherever possible) with
No.
source of information data
1.26 Long-term dismantling or No Not Applicable.
decommissioning or restoration
works?
1.27 Ongoing activity during No No Decommissioning is involved.
decommissioning which could have an
impact on the environment?
1.28 Influx of people to an area in either Yes During Construction around 200 workers
temporarily or permanently? per day will be employed on contract basis.
Santnagari is essentially a spiritual tourism
project. During peak days it is expected to
attract ~30,000 visitors while there will be
~1,000 residents/staff/overnight visitors in
the facility.
1.29 Introduction of alien species? No Not Applicable.
1.30 Loss of native species or genetic No Not Applicable.
diversity?
1.31 Any other actions? No None.
2. Use of Natural resources for construction or operation of the Project (such as land, water,
materials or energy, especially any resources which are non-renewable or in short supply):
6
Details thereof (with approximate quantities
Sr. Information/checklist
Yes/No /rates, wherever possible) with source of
No. confirmation
information data
2.5 Forests and timber (source – Yes Timber collected from nearest sources as per the
MT). requirement for the completion of project. Quantity
required will be calculated based on the availability
and quality of the material.
2.6 Energy including electricity Yes Construction Phase: 400 KVA (Multiple of 50 to
and fuels (source, competing 70 KW in different location) and D. G. Set 500
users) Unit: fuel (MT), energy KVA (Multiple of 50 KVA and 75 KVA).
(MW). Fuel: 50 KVA DG set - 8.6 lit/Hr &
75 KVA DG set – 14.3 lit/Hr
7
4. Production of solid wastes during construction or operation or decommissioning (MT/month)
8
Details thereof (with Approximate
Sr.
Information/Checklist confirmation Yes/No quantities/rates, wherever possible) with
No.
source of information data
debris).
7. Risks of contamination of land or water from releases of pollutants into the ground or into
sewers, surface waters, groundwater, coastal waters or the sea:
9
8. Risk of accidents during construction or operation of the Project, which could affect human
health or the environment
9. Factors which should be considered (such as consequential development) which could lead to
environmental effects or the potential for cumulative impacts with other existing or planned
activities in the locality.
10
Details thereof (with approximate
Sr. Information/Checklist
Yes/No quantities/rates, wherever possible) with source
No. confirmation
of information data
9.4 Have cumulative effects due to No Not Applicable
proximity to other existing or
planned projects with similar effects.
11
(IV) Proposed Terms of Reference for EIA studies:
Proposed construction project comes under category-8(a) Building and Construction projects as per
EIA Notification date 14th September, 2006.
I hereby give an under taking that the data and information given in the application and enclosure are
true to the best of my knowledge and belief and I am aware that if any part of the data and information
submitted is found to be false or misleading at any stage, the project will be rejected and clearance
given, if any to the project will be revoked at our risk and cost.
Date: 11.04.2017
Place: Gandhinagar
12
ADDITIONAL ATTACHMENT
LIST OF ANNEXURE
ANNEXURE
TITLE
NO.
I Photographs of the Proposed Project Site
II Land Document
III Layout Plan & Entrance
IV Water Requirement and Its Source
V Infrastructure and Facilities
VI Soil Testing Report
VII GR and GO for the project
13
ANNEXURE – I
PHOTOGRAPHS OF THE PROPOSED PROJECT SITE
14
ANNEXURE – II
LAND DOCUMENT
15
ANNEXURE – II (CONT…)
LAND DOCUMENT
16
ANNEXURE – III
LAYOUT PLAN & ENTRANCE
17
ANNEXURE – III (CONT…)
LAYOUT PLAN & ENTRANCE
18
ANNEXURE – IV
WATER REQUIREMENT AND ITS SOURCE
Proposed project site is near to Dharoi dam so water requirement for the construction and operation
phase will be sourced from this dam.
During construction phase only domestic wastewater will be generated which will be treated in
proposed Sewage treatment plant (STP).
During operation phase, domestic wastewater will be generated which will be treated in STP and
reused in gardening and flushing purpose. Domestic wastewater i.e. 1,200 KLD in peak traffic season
will be generated and that will be treated and reused for gardening and flushing purpose.
Note: Total 1,200 KLD STP treated water will be reused for flushing and gardening purpose.
19
ANNEXURE –V
INFRASTRUCTURE AND FACILITIES
A. Sant Areas:
Nos. of Total land area
Description Unit Land area (sq. mt)
Saint (sq. mt)
Sant Pavilion-A type 11 200 2200
Sant Pavilion-B type 20 150 3000
Sant Pavilion-C type 20 100 2000
Total 450 7200
B. Residential Building/Infrastructure:
Nos. of Total land area
Description Unit Land area (sq. mt)
Building (sq. mt)
Guest House (50 Rooms) (G+2) 1 1800 1800
Admin complex (G+1) 1 3000 3000
Total 4800 4800
C. Special Infrastructures
Nos. of Total land area
Description Unit Land area (sq. mt)
Building (sq. mt)
Cave construction 20 200 4,000
Stone carving (3mt*2mt) 60 10 600
Inscription (5mt*2mt) (Story
10 20 200
telling)
Divine element (7mt*7mt) (Land) 100 50 5000
Total 280 9,800
D. Common facilities
Nos. of Total land area
Description Unit Land area (sq. mt)
Building (Sq. mt)
Food court, Toilets, Rest room,
Public lounge, First aid, Fire 1 1,500 1,500
station, Etc.
Road, Parking, Substations, UGR,
1
OHR, Gardens, Water tanks, Etc.
Total 1,500 1,500
20
ANNEXURE –VI
SOIL TESTING REPORT
21
ANNEXURE –VII
GR AND GO FOR THE PROJECT
22
ANNEXURE –VII (CONT…)
GR AND GO FOR THE PROJECT
23
ANNEXURE –VII (CONT…)
GR AND GO FOR THE PROJECT
24
ANNEXURE –VII (CONT…)
GR AND GO FOR THE PROJECT
25
ANNEXURE –VII (CONT…)
GR AND GO FOR THE PROJECT
26