0% found this document useful (0 votes)
690 views

Bill of Quantities: No. Project: Zinwa Tank Stand Job No. DRG No. Sheet No. 1 of 1 Rev. Designed Checked Date

This bill of quantities is for a ZINWA tank stand project. It lists 10 items with descriptions, quantities, units, rates, and amounts. The major items include supply and fabrication of stanchions, stringers, bracing, base plates, and accessories like a ladder and guard rail. The total amount for all items is $5950.95.

Uploaded by

Sitche Ziso
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
690 views

Bill of Quantities: No. Project: Zinwa Tank Stand Job No. DRG No. Sheet No. 1 of 1 Rev. Designed Checked Date

This bill of quantities is for a ZINWA tank stand project. It lists 10 items with descriptions, quantities, units, rates, and amounts. The major items include supply and fabrication of stanchions, stringers, bracing, base plates, and accessories like a ladder and guard rail. The total amount for all items is $5950.95.

Uploaded by

Sitche Ziso
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

BILL OF

QUANTITIES

No. 1
PROJECT: ZINWA TANK STAND Job No. 190/S Drg No. 190/S/1 Sheet No. 1 of 1 Rev. 0
Designed SM Checked TM Date 12/26/2020

Quantit
Item Description Unit Rate Amount
y
1 Supply, cut and fabricate 150x75x18PFC Stanchions kg 644.4 1.90 1224.36
2 Supply, cut and fabricate 125x65x15PFC Stringers kg 932.4 1.90 1771.56
3 Supply, cut and fabricate 150x75x18PFC Stringers kg 375.9 1.90 714.21
4 Supply, cut and fabricate 160x60x5L Bracing kg 425.96 1.90 809.324
5 Allow for M20 HD bolts 400mm long No. 12 12.00 144
6 Supply, cut and fabricate 10mm thick base plates m² 0.25 350.00 87.5
7 Supply, cut and fabricate 6mm thick base plates m² 2 325.00 650
8 Supply steel and fabricate access ladder sum 150
9 Supply steel and fabricate guard rail sum 250
10 Supply and apply red oxide primer sum 150
Total 5950.95