Table 2.1: Gantt Chart of The Project: Sr. No Task

The document is a Gantt chart showing the timeline for 15 tasks over 15 weeks for a project. It includes tasks such as discussing the project, designing it, choosing materials, buying materials, starting work on the project, testing equations, and final testing across the 15-week period with tasks scheduled in various weeks.

Uploaded by

salmanhbcc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views

Table 2.1: Gantt Chart of The Project: Sr. No Task

The document is a Gantt chart showing the timeline for 15 tasks over 15 weeks for a project. It includes tasks such as discussing the project, designing it, choosing materials, buying materials, starting work on the project, testing equations, and final testing across the 15-week period with tasks scheduled in various weeks.

Uploaded by

salmanhbcc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Table 2.

1: Gantt chart of the Project

Week 12

Week 13
Week 10

Week 11

Week 14

Week 15
Week 1

Week 2

Week 5

Week 6

Week 8

Week 9
Week 3

Week 4

Week 7
Sr.
Task
No

01 discussion about our project


02 design the project
03 choice the material
04 buy the material
05 start to do the project
06 take some numbers( equation )about this project
07 test the project
08 Final test