0% found this document useful (0 votes)
64 views8 pages

Strap Footing Design

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
64 views8 pages

Strap Footing Design

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 8
352. | Design of Foundations Example 11.4 Design of strap footing Page 13 Ret Calculations Output No 6000 300_x 900 foo im Tres s H Data : ‘Size Load (KN) Gamxmm)[ ge | 9x | Total ‘Column A 300x300 | 800 | 275 | 1075 ‘Column B 300 x 300 | 1000 | 525 | 1525 Soil bearing capacity Characteristic strength of concrete, fx Characteristic strength of steel, fy, = Nonimal concrete cover, ¢ FOOTING SIZE Assume selfweight of footing about 10% of service load, Wr= O8KN |Wy = — 153 KN Beam selfweight, Wy =25 (0.3 x0.9( 5.7) = 38. KN =M@B =0 (Ra~ Wa) (6.15~ 1.0)- Na(6.0) ~ We (3.0) = 0 (Ra - 108) (5.15) - 1075 (6.0)- 383.0) = 0 (Ra- 108)= 127SKN, Ry = 1382 kN R,/2.0H = 200 Footing A: H = 1382/(2.0x 200)= — 3.46m 2.00 x 350m sy ’ AR At iia Design of strap footing Reinforced Calculations Ratha = (Nat Nat Wa4 Wy sy 075 + 1525+ 108+ 153 + 3g = Ry =| 2898-1382 = | “isieluny 2898 ky size of footing B, S =(1516/ 209) _ 275 m Footing selfweight, Wy = 25(2.0%3.5% 0.70) = 123 kN Wy = 25(2.8%28%x 0.70) = 132 KN Distance from resultant force R to the centr oid of (1075 x 6.0) +(123x 5.15) +@8x 3.0) = sam X = 248m Distance from centroid of footings to the centroid of cohumn B 20x 3.50% 5.15)= [2.0% 3.5)+ @8x 29) 7 Concmte Desen | 353 p—_ Reza = Output Footing 275 4295 m | x = 248 iz + Soll pressure Total service had = 1075+ 1525+ 123 + 132 + 38 = 2893 kN Area of footing = __ (2.00 x_3.5) + (2.75 x 2.75) = 14.6 m? Soil pressure = 2893 / 14.56 | = 199 kN/m* << 200 KN/m* Ok | ANALYSIS Design load: (1.35x 800) +(1.50x275) = 1493 KN | (1.35 x 1000) + (1.50 x $25) 2138 KN 135x123 165 a | 135x132 = 1 in We= 1.35x 38 = oN | Total 402 | Unimate soil pressure : | = 4026 / (7.00 + 7.56) = 276 kNim | al MY | 354. | Design of Foundations Example 11.4 Design of strap footing Page 3/8, Ret Calculations Output 1493 kN. | 2138 kN $2. /5.7 9.1 KN/m | f= EEE TTT 276.5 - (165 /7.00) 276.5 - (179 /7.56) =253 x3.5= 885 kKN/im = 253 x 2.8 695 kN/m DESIGN OF FOOTING A Shear Force (KN) Moment (kNm) Main reinforcement Soil pressure, 253x 2.0 = 506 kN/m Bending moment at column face, My. = wh7/2 = 506 x 1.607 /2 647 KNm wkNim 1X Effective depth d= h-Com-0.59 tur = 700 -40- 05x16 = 652 mm my 0 z = 921.1 6.2.2 K = M/bas, As =M/O87F.2 = 0.954 647 x 10°/ (0.87 x 5 aos 100 x 0.95 x 652) Minimum and maximum rei Asmin = 0-26Fam/fy) bd = 0.26 x 2.90/ 500) x ba = 0.0015 bd = 0.0015 x2000 x 652 = 1964 mm? or 982 mm’/m = 0.044, = 0.04 x 2000 x 700 = 56000 mm? Shear @._ Vertical shear at 1.0d from cotumn face. 948 <(latd )= 366 +a 652 = 36x 16+ 652 = 1228 mm oot 80 Aa 0mm Shear force, "2000 Vig = 253x (0.948 x 2.0) }-——| = 479.4 kN Design shear resistance, Varac =[ 012k (1002 fa)? | od = ie k = 1+(200/d)'% = 2.0 +(200 /652) = 1.55 < 2.0 Pi = Aglbd s 0.02 = < 0.02 = 0/ (2000 x652)= 0 = 0.02 yy 0.12 x. 1.55 x (100 x 0.0000 x 30) x 2000 x 652 Rae = O- = ON = 0.0 KN 3812) bd Vin = 0:035k "Feryyg 140 mn "0.035 x 1.55" 30°" x 2000 x 652 = 484194N = 484.2 KN 484.2KN > Vw So, Vrde Design of strap footing Reinforced Concrete Design | 355 a ee pew va ——— Output —— Use: 14 16 (2815 mm) Secondary bar: H16 - 200 (1005 m=’ Ok! nsy 08 | —__" 356. | Design of Foundations Example 11.4: Design of strap footing Pree sy lations mee Calew Output CRACKING 733 = 700mm —_ > 200 mm Steel stress under quasi permanent loading , = 0.59 (fFyp/1-15A s.r0y/A prov) = 0.59 (500/ 1.15) (2402 / 2815) 219 N/mm? For design crack width = Max. allowable bar spacing 200° mm Max. bar spacing = [ 2000- 2(40) -16]/ 13 = 146mm < Table 7.3N am 200 mm "Mao /Nu) 883/ 1495 059 Ok! DESIGN OF FOOTING B Main reinforcement K = M/bd*fx A 522 x 10°/ (2750 x 636 * x 30) 0.016 << Kyy = 0.167 Ay =M/O08Tf x2 522 x 10°/ (0.87 x 500 x 0.95 x 636) 1985 mm? 9211 Minimum and maximum reinforcement area, A smnin = 0.26Famlfy,) bd = [y= r= 409.5 kN oxi Cracking 133 us 700mm > 200 mm | Steel stress under quasi permanent loading , Sa 0.54 (Fyi/1-IS\(A grealA gn) wha) = 0.54 (500/ 1.15) (1985 / 2815) Sen ae 166 N/mm? abe 73N | For design crack width = 0.3 mm Max. allowable bar spacin; 250. mm | Max. bar spacing = [ 2750- 2(40) -16]/13 | = 204 mm < 250mm ox! DESIGN OF TIE BEAM Main reinforcement bxh 300 x 900 mm Ore = 32mm d =h-c-Ore = 900 -40- 32 = 828 mm K = M/bdfx 7 1044 x 10°/ (300 x 828 x 30) | 0.169 > Kya = 0.167 - 5 inte is require: | Compression reinforcement is Fe oa 2 =d [05 +/025 - K/-134)] = 082 4 § 0 Ay = M/087 fz ° 1044 x 10°/ (0.87 x 500 x 0.82% 828) vse $1BE = 3544 mm? (402 | 92, — 7 "1 | Minimum and maximum reinforcement 1 7\ shop x bd | Asin = 0.26 amlfyx) 64 = (0.26% ae 2374 me | 0.0015 bd = 0.0015 x300 SOM ogg mnt Ainge = 0.044, = 0.04x 300% eee pO ee | 358. | Design of Foundations Example 11.4 Design of strap footing Page 7/8 Ret Calculations Output 62 Shear Design shear force, Vig = 261.9 KN 6.23 Conerete strut capacity Ves, mm 0.366 wf y( - fa/250)/ (cot 0 + tan 0) = 36x _300x _828x _30(1- 30/250.) (cot @ + tan 0) - 820KN => 8 = Wdeg cord = 25 = 1180 KN = 0 45deg cot? = 1.0} Via < | Vt, me COLO =2.5 Vis <_ Veg, max COt 8 = 1.0 => Therefore angle 0 < 2 8 = 0.5sin ™ [Vig / 0.186 wdfa(1- fg/250)] 0.5sit 261.9 x 10° } 18x 300x 828% 30(1- 30/250 ). = 0.5sin“ (0.22) =6.4° Use: @ = 220° tan 0 = 0.40 cot @ = 2.48) Vig / 0.78/ yd cot 0 261.9 x 10° / (0.78x SO0x 828 x 2.48) 0.328 H6 Aww = 57mm = $7/ 0.328 173 mm Use = 9.2.2(6) | Max. spacing, Sma = 0.75d = 0.75 x 828 = 621 mm He - 150 73 Cracking Assume steel stress under quasi permanent loading , 0.55 Fy./1AS\A gual. 0.55 (500/ prov) 1.15) (3544 / 4022) [Table 7.3N 0.3 mm Max. allowable bar spacing= 200 mm Bar spacing, $= [ 300 - 240) - 206) - (32) 4/2 = 88mm < 200 mm Ok! prample 11.4 Design of strap footing Reinforced Concrete Design | 359 Page 8/8 an Calculations Output i 6000 fa 1375 300 3 300) i fe rot FA [os o = bn | 00 bal Loe pe Sa }}-__2000.__} i = = sre a o |, a Bar mark ai 14 H16- 146 02: 18 H16- 200 900 03: 14 16-204 04: 3.32 ase 2.432 ee 2H16 peg 07: Link H6~ 150 ri Nominal cover= 40 mm snsy 09

You might also like