Safe
Safe
This is when multiple teams are working together in a similar fashion as described above, but this time
to deliver an overall system. This amalgamation of teams is called an Agile Release Train (ART), which can
comprise of about 50 - 125 people. For each ART, a Program Increment is the time of delivery for its
product. This Program Increment (PI), is composed of 5 iterations each of 2 weeks.
Within this level, we have a Product Owner who, using the features in the backlog, determines the tasks
each team must complete. This is done at the start of the PI. For each ART there is a Release Train
Engineer (RTE), who like the Scrum Master monitors the trains progress. These RTEs meet the Scrum
Master bi-weekly to ensure that the objectives are being met. The PI ends with a demo of the integrated
system to check for any problems and reflection to ensure the next PI is smoother.
Within the 5 iterations of the PI, the last iteration is not one for development, rather it is called the
Innovation and Planning iteration. The innovations in this iteration are when the teams plan events like
hackathons etc. The planning phase serves as a point in the PI where the team can reflect on
improvements in the train and plan the next PI.
Value Stream
This is when multiple ARTS must be coordinated together to create a much larger solution that a single
ART cannot create. In this case, we have the same planning, testing and reflecting phases but the people
managing the process change;
Solution Manager: The person dividing the work amongst the ARTs.
Value Stream Manager: Ensures the entire process is smooth and coordinated.
Solution Architect: Ensures that the trains follow the path that is laid out and the overall structure
remains intact .
*********************************************************************************
All SAFe teams are part of one or other Agile Release Train (ART).
Each team is equally responsible for defining, building and testing stories from their Team Backlog in a
fixed-length Iterations
Teams plan and execute two-week time-boxed iterations in accordance with agreed-to Iteration Goals.
Teams will use ScrumXP/Team Kanban routine to deliver high-quality systems to produce a System Demo
on every two weeks.
All different teams in the ART (Agile Release Trains) will create an integrated and tested system.
Stakeholders will evaluate and respond with fast feedback
Each ScrumXP team will have 5-9 team members, which includes all the roles necessary to build a quality
incremental value in each Iteration.
Team(Dev+QA)
Scrum Master
SAFe divides the development timeline into a set of iterations within a PI (Program Increment).
The team will use stories to deliver the value. The Product Owner will have content authority over their
creation and acceptance of the stories.
Team Backlog includes user and enabler stories, which are identified during PI planning. When the
Product Management presents the Roadmap, Vision, and Program Backlog.
Identifying, elaborating, prioritizing, scheduling, implementing, testing, and accepting the stories are the
primary requirements of management work in team level.
Retrospective
Repeat for the next iteration
Teams also support the System Demo at the end of each Iteration. which is the critical integration point
for the ART.
The Innovation and Planning (IP) Iterations leverage the teams with an opportunity for innovation and
exploration.
*****************************************************************
In Program level, Value of SAFe is delivered by long-lived Agile Release Trains (ART). Iteration is for team
and train is for the program.
Agile Release Trains (ART) is the primary vehicle for value delivery at the program level. It delivers a value
stream to the organization.
ART is of 5 - 12 Agile Teams (~50 – 125+ people) which includes all the roles and infrastructure needed to
deliver fully tested, working, system-level software.
Each PI is a multiple-Iteration time box. During which a significant, valuable increment of the system is
developed and delivered.
In each PI a "demo" and "Inspect and adapt" sessions will happen, and Planning begins for the next PSI.